|
| 1 | Marching of 3000GPM Pump, Motor set with the drum pontoon |
| 2 | Dismantling & transporting of Hose pipe |
| 3 | Dismantling & withdrawal of 3000GPM Pump along with the Motor, starter & baseplate from Pontoon |
| 4 | Dismantling, transporting & fitting of suction of the pump |
| 5 | Dismantling & withdrawal of pontoon 01 set (2 big box and 4 small box) of 3000GPM Pump from main patch sump |
| 6 | Transporting of dismantled pontoon set (2 big box and 4 small box) from main patch sump to loading point manually 8headx2shift=16head |
| 7 | Transporting of dismantled pontoon set (2 big box and 4 small box) from loading point to Jarlhai sump |
| 8 | Assembling & installation the Pontoon on the sump |
| 9 | Transporting of 3000GPM Pump motor set with baseplate from main patch sump to Jarlahi sump |
| 10 | Installation of the Pump, Motor & baseplate on the pontoon with proper alignment including fitting of coupling belt & greasing packing of the pump |
| 11 | Dismantling, transporting & fitting of suction of the pump |
| 12 | Dismantling, transporting & fitting of 10\"dia Nipple, 10\"dia M.S.Bend, 10\"dia shortpiece in the delivery side of the Pump |
| 13 | Dismantling, transporting, laying & jointing of 10\"dia M.S. Pipe in the delivery of 3000GPM Pump 66Nos.×20\"=1320ft |
| 14 | Dismantling, transporting, laying & jointing of 8\"dia M.S. Pipe in the delivery of 3000GPM Pump 26Nos.×20\"=520ft |
| 15 | Vertically laying & jointing of 8\"dia M.S. Pipe in the proposed range 08headx07shift=56head |
| 16 | Dismantling, transporting & fitting of 10\"dia hose for jointing of delivery of 3000GPM Pump |
| 17 | Dismantling, transporting & fitting of sluice valve & N.R. valve |
| 18 | PVC cable laying, hanging & shifting from pole to starter & starter to the motor in the pump |
| 19 | Providing of bolt & nut with washer |
| 20 | Fabrication & fitting of a matching piece of 10\"dia M.S. pipe in the delivery |
| 21 | Fabrication & making of 10\"dia M.S. bend |
| 22 | Fabrication & making of 10\"dia Taper pipe |
| 23 | Fabrication & making of 8\"dia M.S. bend |
| 24 | Fabrication & making of 8\"dia Taper pipe |
| 25 | Providing of rubber joints |
| 26 | Alignment of pump motor set & commissioning the pump |
| 27 | Total impact of GST for the purpose of CTC |