Agra Municipal Corporation has published Tender For Cc Flooring Construction Work From Sanjays House To Rajans House Near Lal Bahadur Shastri School In Tajganj, Room No. 70 Madhunagar.. Submission Date for this Tender is 02-11-2023. Flooring Work Tenders in agra Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in Filling in ordinary Soil (Loam, Clay or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. (SI No. 251) |
2 | Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10) |
3 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labor T&P etc. required for proper completion of work. (S.No. 6.1.1) |
4 | 12mm thick cement plaster in single coat of fair side of single of half brick wall forinterior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii)) |
5 | Raising & re-fixing of manhole including all material labor T&P etc. all complete.(NS) |
6 | Supply & fixing of R.C.C. manhole frame and cover including all complete. (NS) |
7 | Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying including the cost of centering, shuttering, finishing and but excluding reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retarder for setting of concrete/improve workability without impairing strength and durability as per direction of engineer-in-charge. Note- cement concrete considered in this item is @ 330kg/cum. Excess or less cement used as per design mix is payable or recoverable separately up to plinth level. (New) |
8 | R.C.C. work Providing and laying in position specified grade of renforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (S.I. No. 5.1.3) |
9 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). |
10 | Cartage of ballast, Kankar, Coat, Grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 8 Km distance |
11 | Supply & Fixing GraniteBoard 2.5"x4" Size Display Board including Painting, Lettering etc. all complete. (None Schedule) |
12 | Total(A) |
13 | Add amount for Estimate Figure match |
14 | Say Amount |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail