Public Administrative Department Local Bodies Closing in 0 days TDR #40377090

Tender For Supply And Installation Of Medical Gas Pipeline

Issued by Local Bodies · chandrapur, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
29 Nov 2023
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
chandrapur → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Supply And Installation Of Medical Gas Pipeline-2 Oxygen System, Supply, Installation, Testing And Commissioning Of 2 X 12 Size Manifold ( Secondary Supply ) Complete With Middle Frame With Chain For Individual Cylinder ( D Type ) Along With Non Return Valves For Every Cylinder.With24 Nos.Copper Pig Tail Pipes ( Imported ) ( As Per Technical Specification ) 3 Oxygen System Supply, Installation, Testing And Commissioning Of 1 X 6 Size Manifold ( Emergency Supply ) Complete With Middle Frame With Chain For Individual Cylinder ( D Type ) Along With Non Return Valves For Every Cylinder Along With High Flow Double Stage Regulator And Quick Release And Adopt Mechanism Using O2 With 6 Nos.Copper Pig Tail Pipes. ( Imported ) ( As Per Technical Specification ) 4 Oxygen System Supply, Installation, Testing And Commissioning Of Fully Automatic Control Panel For Secondary Supply Of Oxygen Having A Minimum Flow Output Of Over 1500 Lpm At 4.2 Bar Pressure ( Imported Certified Complying To Htm 02-01 Or Din Or Nfpa 99C Standards ) . As Per Technical Specification. 5 Oxygen System Supply, Installation, Testing And Commissioning Of Emergency Control Panel With 2 Nos Of High Flow Regulators ( 1500 Lpm ) And Isolation Valve For Oxygen Having A Constant Flow Output Of Over 1500 Lpm At 4.2 Bar Pressure For Emergency Bank . ( Imported Certified Complying To Htm 02-01 Or Din Or Nfpa 99C Standards ) . As Per Technical Specification. 6 Oxygen System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Oxygen Outlets ( Imported - First And Second Fix Assembly ) Complying To Htm- 02-01 / Nfpa 99C / Din Standard With Matching Probe In Ss 304. 7 Nitrous Oxide System Supply, Installation, Testing And Commissioning Of 2 X 2 Size Manifold ( Primary & Secondary Supply ) Complete With Middle Frame With Chain For Individual Cylinder ( D Type ) Along With Non Return Valves ( Nrv ) For Every Cylinder With 4 Nos.Copper Pig Tail Pipes. ( Imported ) ( As Per Technical Specification ) 8 Nitrous Oxide System Supply, Installation, Testing And Commissioning Of 1 X 2 Size Manifold ( Secondary Supply ) Complete With Middle Frame With Chain For Individual Cylinder ( D Type ) Along With Non Return Valves ( Nrv ) For Every Cylinder Along With High Flow Double Stage Regulator And Quick Release And Adopt Mechanism Using N20 With 2 Nos. Copper Pig Tail Pipes. ( Imported ) ( As Per Technical Specification ) 9 Nitrous Oxide System Supply, Installation, Testing And Commissioning Of Fully Automatic Control Panel For N2o Having A Min. Flow Output Of Over 500 Lpm At 4.2 Bar Pressure ( Imported Certified Complying To Htm 02-01 Or Din Or Nfpa 99C Standard ) ( As Per Technical Specification ) 10 Nitrous Oxide System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Nitrous Oxide Outlets ( First And Second Fix Assembly ) Complying To Htm- 2022 / Nfpa 99C / Din Standard With Matching Probe. 11 Carbon Dioxide System Supply, Installation, Testing And Commissioning Of 1 X 2 Size Manifold ( Primary & Secondary Supply ) Complete With Middle Frame With Chain For Individual Cylinder ( Vf Size ) Along With Non Return Valves For Every Cylinder.With Regulator ( As Per Technical Specification ) ( Imported ) 12 Carbon Dioxide System Supply, Installation, Testing And Commissioning Using A High Flow Double Stage Regulator ( 2Nos ) Having A Min. Flow Output Of Over 500 Lpm At 4.2 Bar Pressure. 13 Carbon Dioxide System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Co2 Outlets ( First And Second Fix Assembly ) Complying To Htm- 02-01 / Nfpa 99C / Din Standard With Matching Probe. As Per Technical Specification. 14 Compressed Air System Supply, Installation, Testing And Commissioning Of Triplex Air Compressor ( Imported ) With 3 Stage Air Filtration System And Reducing Station Duplex Air Dryer ( Imported ) With Tank Of 2 X 2000 Ltr ( Indigenous ) As Per Technical Specification ( Note-Complete Package With Air Compressors : 03 Nos ) 15 Compressed Air System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Double Locked Outlets ( First And Second Fix Assembly ) Complying To Htm- 02-01 / Nfpa 99C / Din Standard With Probe For Ma 4 & Sa 7Gas Outlet Points / Terminal Units ( Imported ) ( As Per Technical Specification ) A ) Medical Air-4 Bar ( Imported ) 16 Compressed Air System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Double Locked Outlets ( First And Second Fix Assembly ) Complying To Htm- 02-01 / Nfpa 99C / Din Standard With Probe For Ma 4 & Sa 7Gas Outlet Points / Terminal Units ( Imported ) ( As Per Technical Specification ) B ) Surgical Air-7 Bar ( Imported ) 17 Vaccum System Supply, Installation, Testing And Commissioning Of Triplex Vacuum Compressor With Bacteria Filter ( Imported ) Silencer And Tank.Of 2 X 2000 Ltr ( Indigenous ) As Per Technical Specification ( Note-Complete Package With Vacuum Pump : 3 Nos ) 18 Vaccum System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Fvacuum Out Lets, ( First And Second Fix Assembly ) Complying To Htm- 2022 / Nfpa 99 / Din Standard With Matching Probe Gas Outlet Points / Terminal Units ( Imported ) ( As Per Technical Specification ) 19 Electrical Control Panel Supply, Installation, Testing And Commissioning Of Combined Electrical Control Panel For Compressed Air System And Vacuum System & Complete With Plant Room Wiring. The Panel Should Have Energy And Running Hours Meter. As Per Technical Specification Note- Mgps Panel Should Have Dual Incomer Provision With Asco Make Automatic Transfer Switch ( Ats ) Also Outgoing Feeder For Agss Panel And Single Phase Suitable Power Provision For Mgps Control Panel , Alarm Panel , Dryer Etc Asper Oem Requirement , Vendor Should Submit Panel Ga Dwg Along With Bom Before Production Of Panel 20 Anesthetic Gas Scavenging System ( Agss ) Supply, Installation, Testing And Commissioning Of Duplex Agss System ( Imported ) Should Include Required Components In Order To Connect The Anaesthesia Workstation Of Dragger Make ( Model- Fabius Xl ) To The Central Agss System. ( As Per Technical Specification ) . 21 Anesthetic Gas Scavenging System ( Agss ) Supply, Installation, Testing And Commissioning Of Agss Terminal Unit ( First And Second Fix Assembly ) Complying To Htm- 02-01 / Nfpa 99 / Din Standard With Probe For Agss 22 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 12 Mm Od X 1 Mm Thick 23 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 15 Mm Od X 1Mm Thick 24 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 22 Mm Od X 1 Mm Thick 25 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 28 Mm Od X 1 Mm Thick 26 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 35Mm Od X 1.2 Mm Thick 27 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 42 Mm Od X 1.2 Mm Thick 28 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 54 Mm Od X 1.2 Mm Thick 29 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 76 Mm Od X 1.5 Mm Thick 30 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 108 Mm Od X 1.5 Mm Thick 31 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 15 Mm 32 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 22 Mm 33 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 28 Mm 34 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 35 Mm 35 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 42 Mm 36 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 54 Mm 37 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 76 Mm 38 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 108 Mm 39 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 2 Valve Configuration With 15 O2, 28 Vac 40 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 3 Valve Configuration 15 O2, 15 Ma4, 28 Vac 41 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 3 Valve Configuration 15 O2, 22 Ma4, 28 Vac 42 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 4 Valve Configuration 15 O2, 15 N2o, 15 Ma4, 28 Vac 43 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 5 Valve Configuration 15 O2, 15 N2o, 15 Ma4, 15 Sa7, 28 Vac 44 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 6 Valve Configuration 15 O2, 15 N2o, 15 Ma4, 15 Sa7, 22 Vac, 15 Co2 45 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 2 Valve Configuration With 15 O2, 15 Vac ( For Pre, 3Rdfloor 2Nos Isolation Room , Post Procedure ) -Optional [ Qro ] 46 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 2 Valve Configuration With 15 O2, 15 Vac ( For Pre, 3Rdfloor 2Nos Isolation Room , Post Procedure ) Optional [ Qro ] 47 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 3 Valve Configuration With 15 O2, 15 Ma4, 15 Vac ( For Post ) Optional [ Qro ] 48 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 3 Valve Configuration 15 O2, 15 Ma4, 22 Vac ( For Recliners Bed ) Optional [ Qro ] 49 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 3 Valve Configuration 35 O2, 28 Ma4, 42 Vac ( For Icu ) Optional [ Qro ] 50 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 4 Valve Configuration 22 O2, 15 N2o, 15 Ma4, 28 Vac ( For First Floor Dental Area ) Optional [ Qro ] 51 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 4 Valve Configuration 15 O2, 15 N2o, 15 Ma4, 22 Vac ( For Rt ) Optional [ Qro ] 52 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 4 Valve Configuration 15 O2, 15 N2o, 15 Ma4, 15 Vac ( For Minor Ot, Procedure Room ) Optional [ Qro ] 53 Medical Gas Area Alarm Panel ( Imported ) ( As Per Technical Specification ) . Alarm System : Providing And Fixing Alarm System For Medical Gas System Complete Consisting Of Pressure Sensors, Panel And The Control Cabling, All Wiring Shall Be Within 1Mm Sq Multi Core Data Cable, Pvc Pipe For Data Cable. Panel Shall Be Self-Contained Low Voltage ( Less Than 24 V ) ( Imported ) ( As Per Technical Specification ) . 2 Gas 54 Medical Gas Area Alarm Panel ( Imported ) ( As Per Technical Specification ) . Alarm System : Providing And Fixing Alarm System For Medical Gas System Complete Consisting Of Pressure Sensors, Panel And The Control Cabling, All Wiring Shall Be Within 1Mm Sq Multi Core Data Cable, Pvc Pipe For Data Cable. Panel Shall Be Self-Contained Low Voltage ( Less Than 24 V ) ( Imported ) ( As Per Technical Specification ) . 3 Gas 55 Medical Gas Area Alarm Panel ( Imported ) ( As Per Technical Specification ) . Alarm System : Providing And Fixing Alarm System For Medical Gas System Complete Consisting Of Pressure Sensors, Panel And The Control Cabling, All Wiring Shall Be Within 1Mm Sq Multi Core Data Cable, Pvc Pipe For Data Cable. Panel Shall Be Self-Contained Low Voltage ( Less Than 24 V ) ( Imported ) ( As Per Technical Specification ) . 4 Gas 56 Medical Gas Area Alarm Panel ( Imported ) ( As Per Technical Specification ) . Alarm System : Providing And Fixing Alarm System For Medical Gas System Complete Consisting Of Pressure Sensors, Panel And The Control Cabling, All Wiring Shall Be Within 1Mm Sq Multi Core Data Cable, Pvc Pipe For Data Cable. Panel Shall Be Self-Contained Low Voltage ( Less Than 24 V ) ( Imported ) ( As Per Technical Specification ) . 5 Gas [ Qro ] 57 Medical Gas Area Alarm Panel ( Imported ) ( As Per Technical Specification ) . Alarm System : Providing And Fixing Alarm System For Medical Gas System Complete Consisting Of Pressure Sensors, Panel And The Control Cabling, All Wiring Shall Be Within 1Mm Sq Multi Core Data Cable, Pvc Pipe For Data Cable. Panel Shall Be Self-Contained Low Voltage ( Less Than 24 V ) ( Imported ) ( As Per Technical Specification ) . 6 Gas 58 Alarm System- Master Alarm Control Panel Supply, Installation And Commissioning Of Master Alarms Should Be Capable To Monitor Followings Gases In Manifold And Plant Room 1. Liquid Oxygen Line Pressure 2.Oxygen Manifold ( Secondary Supply ) Bank Pressure 3. Emergency O2 Bank Pressure 4. N2o ( Primary Supply ) Bank Pressure 5. N2o Emergency Bank Pressure 6. Air 4 Bar Line Pressure 7. Air 7 Bar Line Pressure 8. Vacuum Line Pressure 9. Co2 Manifold Bank Pressure 10. Agss Line Pressure 11. All The Control Alarm Line Pressure. The System Should Eu Ce Under Class Ii A Category Having 4 Digit No From Notified Body / American Ul Listed / American El Listed. The Master Alarm Should Display Numeric Values Of All Positive And Negative Gas Pressures Along Led Indicator.It Should Capable To Display The Pressure Of Each Gas Along With Fault And Pressure High / Low Alarm With Indication. It Should Capable To Intergrade With The Hospital Bms System Compatible With Bacnet / Modbus. 59 Bed Head Panel Supply, Installation, Testing And Commissioning Of Bed Head Panel.Of 1.2 Mt. Switch & Socket-3, Nursecall1no Only Cutout, Data & Telephone .Cut Out For Outlet ( 2 / 3 Outlet ) Nurse Cal.As Per Specification. ( Indigenous ) - Confirming Htm 02-01, Nfpa 99C Or Equivalent. 60 Supply, Installation, Testing And Commissioning Of Bed Head Panel. Bed Head Panel Of 1.8 Mt. Switch & Socket-6, Nursecall1no Only Cutout, Data & Telephone .Cut Out For Outlet ( 4 / 5 Outlet ) Nurse Cal.As Per Specification. ( Indigenous ) Confirming Htm 02-01, Nfpa 99C Or Equivalent. 61 Accessories:- Oxygen Flow Meter & Humidifier Bottle ( Indigenous ) : Back Pressure Compensated Flow Meter Shall Be Of Accurate Gas Flow Measurement And Control Within A Range Of 0-15 Liters Per Minute For Use In A Variety Of Respiratory Therapy Gas Delivery System. The Flow Tube And Shroud Components Shall Be Made Of Good Quality Plastic. They Shall Be Supplied With Plastic Transparent Reusable Humidifier 62 Accessories:- Ward Vacuum Units ( Indigenous ) : The Vacuum Unit Shall Include Vacuum Regulator Along With 0-760 Mm Hg Vacuum Gauge Of 2 ½ Size Dial, 600 Ml Capacity Reusable Plastic Collection Bottle With Overflow Safety Trap With Plastic Slide Wall Mounted Type..As Per Specification. 63 Accessories:- The Vacuum Unit Shall Include Vacuum Regulator Along With 0-760 Mm Of Hg Vacuum Gauge Of 1000 Ml Capacity Reusable Plastic Collection Bottle With Overflow Safety Trap With Plastic Slide Wall Mounted Type As Per Specification. 64 Accessories:- Theatre Vacuum Uniti : It Shall Be Trolley Mounted. The Unit Shall Include One Regular Having Gauge And Mounted On The Trolley Stand, Having Two Reusable Each 2000 Ml Plastic Collection Bottles Mounted On The Base Of Trolley Unit And Connected With Regulator & Low Pressure Tube Inter-Connections. ( As Per Technical Specification ) . 65 Accessories:- Supply Installation Testing And Commissioning Of Medical Gas Hose Assemblies Hoses Shall Be Color Coded Throughout Their Length As Specified In Britishstandards. 50M For O2, 60M Air 100M Vaccum15m For Co2, 15M For Agss, 30M N2o. ( Imported ) 66 Accessories:- Double Stage Pressure Regulator 67 Accessories:- Emergency Control Panel ( With 2 High Flow Regulator And 2 ) Isolation Valves

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 23-Nov-2023 Clarification on BoQ and Tender Submission Other 29-Nov-2023
2 27-Oct-2023 Pre bid meeting link Other 29-Nov-2023
3 08-Nov-2023 Amendment in Contract and Clarification on Pre-Bid Queries Other 29-Nov-2023

BOQ

Name of Work: C1-MGPS
Sl. No. Item Description
1C1-MGPS
2OXYGEN SYSTEM, Supply, Installation, Testing and commissioning of 2 x 12 size manifold (Secondary supply) complete with middle frame with chain for individual cylinder (D Type) along with Non Return Valves for every cylinder.with24 nos.copper pig tail pipes ( Imported ) (as per Technical specification)
3OXYGEN SYSTEM Supply, Installation, Testing and commissioning of 1 x 6 size manifold (Emergency supply) complete with middle frame with chain for individual cylinder (D Type ) along with Non Return Valves for every cylinder along with high flow double stage Regulator and quick release and adopt mechanism using O2 with 6 nos.copper pig tail pipes. ( Imported ) (as per Technical specification)
4OXYGEN SYSTEM Supply, Installation, Testing and Commissioning of fully Automatic Control Panel for secondary supply of Oxygen having a minimum flow output of over 1500 LPM at 4.2 bar pressure (imported certified complying to HTM 02-01 or DIN or NFPA 99C standards). As per Technical specification.
5OXYGEN SYSTEM Supply, Installation, Testing and commissioning of Emergency control panel with 2 Nos of High flow regulators (1500 LPM) and isolation valve for Oxygen having a constant flow output of over 1500 LPM at 4.2 bar pressure for emergency bank . (imported certified complying to HTM 02-01 or DIN or NFPA 99C standards). As per Technical specification.
6OXYGEN SYSTEM Supply, Installation, Testing and commissioning of Surface mounted front loading Oxygen outlets (Imported - first and second fix assembly) complying to HTM- 02-01 / NFPA 99C/ DIN standard with matching probe in SS 304.
7NITROUS OXIDE SYSTEM Supply, Installation, Testing and commissioning of 2 x 2 size manifold (Primary & Secondary supply) complete with middle frame with chain for individual cylinder (D type) along with Non Return Valves (NRV) for every cylinder with 4 nos.copper pig tail pipes. ( Imported ) (as per Technical specification)
8NITROUS OXIDE SYSTEM Supply, Installation, Testing and commissioning of 1 x 2 size manifold (Secondary supply) complete with middle frame with chain for individual cylinder (D Type ) along with Non Return Valves (NRV) for every cylinder along with high flow double stage Regulator and quick release and adopt mechanism using N20 with 2 nos. copper pig tail pipes. ( Imported ) (as per Technical specification)
9NITROUS OXIDE SYSTEM Supply, Installation, Testing and commissioning of Fully automatic control panel for N2O Having a min. flow output of over 500 LPM at 4.2 bar pressure (imported certified complying to HTM 02-01 or DIN or NFPA 99C standard) (As per Technical Specification)
10NITROUS OXIDE SYSTEM Supply, Installation, Testing and commissioning of Surface mounted front loading Nitrous Oxide outlets (first and second fix assembly) complying to HTM- 2022 / NFPA 99C/ DIN standard with matching probe.
11CARBON DIOXIDE SYSTEM Supply, Installation, Testing and commissioning of 1 x 2 size manifold (Primary & Secondary supply) complete with middle frame with chain for individual cylinder (VF size) along with Non Return Valves for every cylinder.with regulator (As per Technical Specification) ( Imported )
12CARBON DIOXIDE SYSTEM Supply, Installation, Testing and commissioning using a High Flow double stage regulator ( 2Nos) Having a min. flow output of over 500 LPM at 4.2 bar pressure.
13CARBON DIOXIDE SYSTEM Supply, Installation, Testing and commissioning of Surface mounted front loading CO2 outlets (first and second fix assembly) complying to HTM- 02-01 / NFPA 99C/ DIN standard with matching probe. As per Technical Specification.
14COMPRESSED AIR SYSTEM Supply, Installation, Testing and commissioning of Triplex Air compressor (Imported) with 3 Stage Air Filtration system and reducing station Duplex Air Dryer (Imported) with Tank of 2 x 2000 LTR (Indigenous) As per Technical specification ( Note-complete package with Air Compressors : 03 Nos)
15COMPRESSED AIR SYSTEM Supply, Installation, Testing and commissioning of Surface mounted front loading double locked outlets (first and second fix assembly) Complying to HTM- 02-01/ NFPA 99C/DIN standard with probe for MA 4 & SA 7Gas Outlet Points/ Terminal Units (Imported )(As per Technical Specification) a) Medical Air-4 bar (Imported)
16COMPRESSED AIR SYSTEM Supply, Installation, Testing and commissioning of Surface mounted front loading double locked outlets (first and second fix assembly) Complying to HTM- 02-01/ NFPA 99C/DIN standard with probe for MA 4 & SA 7Gas Outlet Points/ Terminal Units (Imported )(As per Technical Specification) b) Surgical Air-7 bar (Imported)
17VACCUM SYSTEM Supply, Installation, Testing and commissioning of Triplex vacuum compressor with Bacteria filter (Imported) Silencer and Tank.of 2 x 2000 LTR (Indigenous) As per technical specification( Note-complete package with Vacuum Pump : 3 Nos )
18VACCUM SYSTEM Supply, Installation, Testing and commissioning of Surface mounted front loading FVacuum out lets, (first and second fix assembly)Complying to HTM- 2022/ NFPA 99/ DIN standard with matching probe Gas Outlet Points/ Terminal Units (Imported )(As per Technical Specification)
19Electrical Control Panel Supply, Installation, Testing and commissioning of combined Electrical Control Panel for compressed air system and Vacuum System & complete with plant Room wiring. The panel should have energy and running hours meter. As per technical specification NOTE- MGPS panel should have dual incomer provision with ASCO make automatic transfer switch (ATS) also outgoing feeder for AGSS panel and single phase suitable power provision for MGPS control panel , alarm panel ,dryer etc asper OEM requirement , vendor should submit panel GA dwg along with BOM before production of panel
20ANESTHETIC GAS SCAVENGING SYSTEM (AGSS) Supply, Installation, Testing and commissioning of Duplex AGSS System (Imported ) should include required components in order to connect the Anaesthesia workstation of Dragger Make (Model- Fabius XL) to the central AGSS system.(As per Technical Specification).
21ANESTHETIC GAS SCAVENGING SYSTEM (AGSS) Supply, Installation, Testing and commissioning of AGSS terminal unit (first and second fix assembly)Complying to HTM- 02-01/ NFPA 99/DIN standard with probe for AGSS
22MEDICAL GAS PIPE LINE , PIPELINE DISTRIBUTION SYSTEM: Supply, Installation, Testing and commissioning of Copper Pipe \"Lloyd Certified\" for medical gas services. Pipes shall be priced for all necessary supports, standard fittings.MEDICAL GAS PIPE LINE : BS EN: 13348:2001Supply,Instllation and commissioning of Copper Piping as per specification 12 mm OD x 1 mm thick
23MEDICAL GAS PIPE LINE , PIPELINE DISTRIBUTION SYSTEM: Supply, Installation, Testing and commissioning of Copper Pipe \"Lloyd Certified\" for medical gas services. Pipes shall be priced for all necessary supports, standard fittings.MEDICAL GAS PIPE LINE : BS EN: 13348:2001Supply,Instllation and commissioning of Copper Piping as per specification 15 mm OD x 1mm thick
24MEDICAL GAS PIPE LINE , PIPELINE DISTRIBUTION SYSTEM: Supply, Installation, Testing and commissioning of Copper Pipe \"Lloyd Certified\" for medical gas services. Pipes shall be priced for all necessary supports, standard fittings.MEDICAL GAS PIPE LINE : BS EN: 13348:2001Supply,Instllation and commissioning of Copper Piping as per specification 22 mm OD x 1 mm thick
25MEDICAL GAS PIPE LINE , PIPELINE DISTRIBUTION SYSTEM: Supply, Installation, Testing and commissioning of Copper Pipe \"Lloyd Certified\" for medical gas services. Pipes shall be priced for all necessary supports, standard fittings.MEDICAL GAS PIPE LINE : BS EN: 13348:2001Supply,Instllation and commissioning of Copper Piping as per specification 28 mm OD x 1 mm thick
26MEDICAL GAS PIPE LINE , PIPELINE DISTRIBUTION SYSTEM: Supply, Installation, Testing and commissioning of Copper Pipe \"Lloyd Certified\" for medical gas services. Pipes shall be priced for all necessary supports, standard fittings.MEDICAL GAS PIPE LINE : BS EN: 13348:2001Supply,Instllation and commissioning of Copper Piping as per specification 35mm OD X 1.2 mm thick
27MEDICAL GAS PIPE LINE , PIPELINE DISTRIBUTION SYSTEM: Supply, Installation, Testing and commissioning of Copper Pipe \"Lloyd Certified\" for medical gas services. Pipes shall be priced for all necessary supports, standard fittings.MEDICAL GAS PIPE LINE : BS EN: 13348:2001Supply,Instllation and commissioning of Copper Piping as per specification 42 mm OD x 1.2 mm thick
28MEDICAL GAS PIPE LINE , PIPELINE DISTRIBUTION SYSTEM: Supply, Installation, Testing and commissioning of Copper Pipe \"Lloyd Certified\" for medical gas services. Pipes shall be priced for all necessary supports, standard fittings.MEDICAL GAS PIPE LINE : BS EN: 13348:2001Supply,Instllation and commissioning of Copper Piping as per specification 54 mm OD x 1.2 mm thick
29MEDICAL GAS PIPE LINE , PIPELINE DISTRIBUTION SYSTEM: Supply, Installation, Testing and commissioning of Copper Pipe \"Lloyd Certified\" for medical gas services. Pipes shall be priced for all necessary supports, standard fittings.MEDICAL GAS PIPE LINE : BS EN: 13348:2001Supply,Instllation and commissioning of Copper Piping as per specification 76 mm OD x 1.5 mm thick
30MEDICAL GAS PIPE LINE , PIPELINE DISTRIBUTION SYSTEM: Supply, Installation, Testing and commissioning of Copper Pipe \"Lloyd Certified\" for medical gas services. Pipes shall be priced for all necessary supports, standard fittings.MEDICAL GAS PIPE LINE : BS EN: 13348:2001Supply,Instllation and commissioning of Copper Piping as per specification 108 mm OD x 1.5 mm thick
31Isolation Valve /Floor valve (Imported ) as per specification Supply, Installation, Testing and commissioning of Isolation Valve assembly as per HTM/ EN for medical gas services, provision for locking type assembly. All valve should be gas specific. (Imported ) as per specification 15 mm
32Isolation Valve /Floor valve (Imported ) as per specification Supply, Installation, Testing and commissioning of Isolation Valve assembly as per HTM/ EN for medical gas services, provision for locking type assembly. All valve should be gas specific. (Imported ) as per specification 22 mm
33Isolation Valve /Floor valve (Imported ) as per specification Supply, Installation, Testing and commissioning of Isolation Valve assembly as per HTM/ EN for medical gas services, provision for locking type assembly. All valve should be gas specific. (Imported ) as per specification 28 mm
34Isolation Valve /Floor valve (Imported ) as per specification Supply, Installation, Testing and commissioning of Isolation Valve assembly as per HTM/ EN for medical gas services, provision for locking type assembly. All valve should be gas specific. (Imported ) as per specification 35 mm
35Isolation Valve /Floor valve (Imported ) as per specification Supply, Installation, Testing and commissioning of Isolation Valve assembly as per HTM/ EN for medical gas services, provision for locking type assembly. All valve should be gas specific. (Imported ) as per specification 42 mm
36Isolation Valve /Floor valve (Imported ) as per specification Supply, Installation, Testing and commissioning of Isolation Valve assembly as per HTM/ EN for medical gas services, provision for locking type assembly. All valve should be gas specific. (Imported ) as per specification 54 mm
37Isolation Valve /Floor valve (Imported ) as per specification Supply, Installation, Testing and commissioning of Isolation Valve assembly as per HTM/ EN for medical gas services, provision for locking type assembly. All valve should be gas specific. (Imported ) as per specification 76 mm
38Isolation Valve /Floor valve (Imported ) as per specification Supply, Installation, Testing and commissioning of Isolation Valve assembly as per HTM/ EN for medical gas services, provision for locking type assembly. All valve should be gas specific. (Imported ) as per specification 108 mm
39AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 2 valve configuration with 15 O2, 28 VAC
40AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 3 valve configuration 15 O2, 15 MA4, 28 VAC
41AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 3 valve configuration 15 O2, 22 MA4, 28 VAC
42AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 4 valve configuration 15 O2, 15 N2O, 15 MA4, 28 VAC
43AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 5 valve configuration 15 O2, 15 N2O, 15 MA4, 15 SA7, 28 VAC
44AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 6 valve configuration 15 O2, 15 N2O, 15 MA4, 15 SA7, 22 VAC, 15 CO2
45AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 2 valve configuration with 15 O2, 15 VAC (for pre, 3rdfloor 2nos isolation room , post procedure )-optional [QRO]
46AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 2 valve configuration with 15 O2, 15 VAC (for pre, 3rdfloor 2nos isolation room ,post procedure ) optional [QRO]
47AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 3 valve configuration with 15 O2, 15 MA4,15 VAC (for post) optional [QRO]
48AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 3 valve configuration 15 O2, 15 MA4, 22 VAC (for recliners bed) optional [QRO]
49AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 3 valve configuration 35 O2, 28 MA4, 42 VAC(for ICU ) optional [QRO]
50AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 4 valve configuration 22 O2, 15 N2O, 15 MA4, 28 VAC (for first floor dental area ) optional [QRO]
51AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 4 valve configuration 15 O2, 15 N2O, 15 MA4, 22 VAC (for RT ) optional [QRO]
52AREA VALVE SERVICE UNIT (AVSU) (Imported )(As per Technical Specification) Supply and installation of AVSU box with all its accessories with valve and pressure / vacuum gauges, NIST connectors with lockable arrangement and breakable glass cover. (Imported ) (As per Technical Specification) 4 valve configuration 15 O2, 15 N2O, 15 MA4, 15 VAC(for minor OT, procedure room) optional [QRO]
53MEDICAL GAS AREA ALARM PANEL (Imported )(As per Technical Specification). ALARM SYSTEM : Providing and fixing alarm system for Medical gas system complete consisting of pressure sensors, panel and the control cabling, all wiring shall be within 1mm sq multi core data cable, PVC pipe for data cable. Panel shall be self-contained low voltage (less than 24 V) (Imported )(As per Technical Specification). 2 Gas
54MEDICAL GAS AREA ALARM PANEL (Imported )(As per Technical Specification). ALARM SYSTEM : Providing and fixing alarm system for Medical gas system complete consisting of pressure sensors, panel and the control cabling, all wiring shall be within 1mm sq multi core data cable, PVC pipe for data cable. Panel shall be self-contained low voltage (less than 24 V) (Imported )(As per Technical Specification). 3 Gas
55MEDICAL GAS AREA ALARM PANEL (Imported )(As per Technical Specification). ALARM SYSTEM : Providing and fixing alarm system for Medical gas system complete consisting of pressure sensors, panel and the control cabling, all wiring shall be within 1mm sq multi core data cable, PVC pipe for data cable. Panel shall be self-contained low voltage (less than 24 V) (Imported )(As per Technical Specification). 4 Gas
56MEDICAL GAS AREA ALARM PANEL (Imported )(As per Technical Specification). ALARM SYSTEM : Providing and fixing alarm system for Medical gas system complete consisting of pressure sensors, panel and the control cabling, all wiring shall be within 1mm sq multi core data cable, PVC pipe for data cable. Panel shall be self-contained low voltage (less than 24 V) (Imported )(As per Technical Specification). 5 Gas [QRO]
57MEDICAL GAS AREA ALARM PANEL (Imported )(As per Technical Specification). ALARM SYSTEM : Providing and fixing alarm system for Medical gas system complete consisting of pressure sensors, panel and the control cabling, all wiring shall be within 1mm sq multi core data cable, PVC pipe for data cable. Panel shall be self-contained low voltage (less than 24 V) (Imported )(As per Technical Specification). 6 Gas
58Alarm System- Master Alarm Control Panel Supply, Installation and commissioning of master alarms should be capable to monitor followings gases in Manifold and plant Room 1. Liquid oxygen line pressure 2.Oxygen Manifold (Secondary Supply) Bank pressure 3. Emergency O2 Bank pressure 4. N2O (Primary Supply) Bank Pressure 5. N2O Emergency Bank pressure 6. Air 4 Bar line Pressure 7. Air 7 bar line pressure 8. Vacuum line pressure 9. Co2 manifold bank pressure 10. AGSS line pressure 11. All the Control Alarm line pressure. The system should EU CE under class II A category having 4 digit no from notified body / American UL Listed /American EL listed. The Master Alarm should display numeric values of all positive and negative gas pressures along LED Indicator.It should capable to display the pressure of each gas along with fault and pressure High/ Low alarm with indication. It should capable to Intergrade with the Hospital BMS system compatible with BacNet / Modbus.
59Bed Head Panel Supply, Installation, Testing and commissioning of Bed head panel.of 1.2 mt. Switch & Socket-3, Nursecall1no Only cutout,Data & Telephone .Cut out for Outlet (2/3 outlet) Nurse cal.as per specification.(indigenous) - Confirming HTM 02-01, NFPA 99C or equivalent.
60Supply, Installation, Testing and commissioning of Bed head panel. Bed head panel of 1.8 mt. Switch & Socket-6, Nursecall1no Only cutout,Data & Telephone .Cut out for Outlet (4/5 outlet) Nurse cal.as per specification.(Indigenous) Confirming HTM 02-01, NFPA 99C or equivalent.
61ACCESSORIES:- OXYGEN FLOW METER & HUMIDIFIER BOTTLE (Indigenous) : Back Pressure Compensated Flow meter shall be of accurate gas flow measurement and control within a range of 0-15 liters per minute for use in a variety of respiratory therapy gas delivery system. The flow tube and shroud components shall be made of good quality plastic. They shall be supplied with plastic transparent reusable humidifier
62ACCESSORIES:- WARD VACUUM UNITS (Indigenous) : The vacuum unit shall include vacuum regulator along with 0-760 mm Hg vacuum gauge of 2 ½ size dial, 600 ml capacity reusable plastic collection bottle with overflow safety trap with plastic slide wall mounted type..as per specification.
63ACCESSORIES:- The vacuum unit shall include vacuum regulator along with 0-760 mm of Hg vacuum gauge of 1000 ml capacity reusable plastic collection bottle with overflow safety trap with plastic slide wall mounted type as per specification.
64ACCESSORIES:- THEATRE VACUUM UNITI : It shall be trolley mounted. The unit shall include one regular having gauge and mounted on the trolley stand, having two reusable each 2000 ml plastic collection bottles mounted on the base of trolley unit and connected with regulator & low pressure tube inter-connections.(As per Technical Specification).
65ACCESSORIES:- Supply installation testing and commissioning of Medical gas hose assemblies Hoses shall be color coded throughout their length as specified in Britishstandards. 50m for O2, 60m Air 100m Vaccum15m for Co2, 15m for AGSS, 30m N2O.( Imported)
66ACCESSORIES:- Double stage Pressure Regulator
67ACCESSORIES:- Emergency control panel ( with 2 high flow regulator and 2) isolation valves

AI Tender Summary

OUR REF NO 40377090
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 29-11-2023
Authority
Authority Name District Collector
Work Description Tender For Supply And Installation Of Medical Gas Pipeline-2 Oxygen System, Supply, Installation, Testing And Commissioning Of 2 X 12 Size Manifold ( Secondary Supply ) Complete With Middle Frame With Chain For Individual Cylinder ( D Type ) Along With Non Return Valves For Every Cylinder.With24 Nos.Copper Pig Tail Pipes ( Imported ) ( As Per Technical Specification ) 3 Oxygen System Supply, Installation, Testing And Commissioning Of 1 X 6 Size Manifold ( Emergency Supply ) Complete With Middle Frame With Chain For Individual Cylinder ( D Type ) Along With Non Return Valves For Every Cylinder Along With High Flow Double Stage Regulator And Quick Release And Adopt Mechanism Using O2 With 6 Nos.Copper Pig Tail Pipes. ( Imported ) ( As Per Technical Specification ) 4 Oxygen System Supply, Installation, Testing And Commissioning Of Fully Automatic Control Panel For Secondary Supply Of Oxygen Having A Minimum Flow Output Of Over 1500 Lpm At 4.2 Bar Pressure ( Imported Certified Complying To Htm 02-01 Or Din Or Nfpa 99C Standards ) . As Per Technical Specification. 5 Oxygen System Supply, Installation, Testing And Commissioning Of Emergency Control Panel With 2 Nos Of High Flow Regulators ( 1500 Lpm ) And Isolation Valve For Oxygen Having A Constant Flow Output Of Over 1500 Lpm At 4.2 Bar Pressure For Emergency Bank . ( Imported Certified Complying To Htm 02-01 Or Din Or Nfpa 99C Standards ) . As Per Technical Specification. 6 Oxygen System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Oxygen Outlets ( Imported - First And Second Fix Assembly ) Complying To Htm- 02-01 / Nfpa 99C / Din Standard With Matching Probe In Ss 304. 7 Nitrous Oxide System Supply, Installation, Testing And Commissioning Of 2 X 2 Size Manifold ( Primary & Secondary Supply ) Complete With Middle Frame With Chain For Individual Cylinder ( D Type ) Along With Non Return Valves ( Nrv ) For Every Cylinder With 4 Nos.Copper Pig Tail Pipes. ( Imported ) ( As Per Technical Specification ) 8 Nitrous Oxide System Supply, Installation, Testing And Commissioning Of 1 X 2 Size Manifold ( Secondary Supply ) Complete With Middle Frame With Chain For Individual Cylinder ( D Type ) Along With Non Return Valves ( Nrv ) For Every Cylinder Along With High Flow Double Stage Regulator And Quick Release And Adopt Mechanism Using N20 With 2 Nos. Copper Pig Tail Pipes. ( Imported ) ( As Per Technical Specification ) 9 Nitrous Oxide System Supply, Installation, Testing And Commissioning Of Fully Automatic Control Panel For N2o Having A Min. Flow Output Of Over 500 Lpm At 4.2 Bar Pressure ( Imported Certified Complying To Htm 02-01 Or Din Or Nfpa 99C Standard ) ( As Per Technical Specification ) 10 Nitrous Oxide System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Nitrous Oxide Outlets ( First And Second Fix Assembly ) Complying To Htm- 2022 / Nfpa 99C / Din Standard With Matching Probe. 11 Carbon Dioxide System Supply, Installation, Testing And Commissioning Of 1 X 2 Size Manifold ( Primary & Secondary Supply ) Complete With Middle Frame With Chain For Individual Cylinder ( Vf Size ) Along With Non Return Valves For Every Cylinder.With Regulator ( As Per Technical Specification ) ( Imported ) 12 Carbon Dioxide System Supply, Installation, Testing And Commissioning Using A High Flow Double Stage Regulator ( 2Nos ) Having A Min. Flow Output Of Over 500 Lpm At 4.2 Bar Pressure. 13 Carbon Dioxide System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Co2 Outlets ( First And Second Fix Assembly ) Complying To Htm- 02-01 / Nfpa 99C / Din Standard With Matching Probe. As Per Technical Specification. 14 Compressed Air System Supply, Installation, Testing And Commissioning Of Triplex Air Compressor ( Imported ) With 3 Stage Air Filtration System And Reducing Station Duplex Air Dryer ( Imported ) With Tank Of 2 X 2000 Ltr ( Indigenous ) As Per Technical Specification ( Note-Complete Package With Air Compressors : 03 Nos ) 15 Compressed Air System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Double Locked Outlets ( First And Second Fix Assembly ) Complying To Htm- 02-01 / Nfpa 99C / Din Standard With Probe For Ma 4 & Sa 7Gas Outlet Points / Terminal Units ( Imported ) ( As Per Technical Specification ) A ) Medical Air-4 Bar ( Imported ) 16 Compressed Air System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Double Locked Outlets ( First And Second Fix Assembly ) Complying To Htm- 02-01 / Nfpa 99C / Din Standard With Probe For Ma 4 & Sa 7Gas Outlet Points / Terminal Units ( Imported ) ( As Per Technical Specification ) B ) Surgical Air-7 Bar ( Imported ) 17 Vaccum System Supply, Installation, Testing And Commissioning Of Triplex Vacuum Compressor With Bacteria Filter ( Imported ) Silencer And Tank.Of 2 X 2000 Ltr ( Indigenous ) As Per Technical Specification ( Note-Complete Package With Vacuum Pump : 3 Nos ) 18 Vaccum System Supply, Installation, Testing And Commissioning Of Surface Mounted Front Loading Fvacuum Out Lets, ( First And Second Fix Assembly ) Complying To Htm- 2022 / Nfpa 99 / Din Standard With Matching Probe Gas Outlet Points / Terminal Units ( Imported ) ( As Per Technical Specification ) 19 Electrical Control Panel Supply, Installation, Testing And Commissioning Of Combined Electrical Control Panel For Compressed Air System And Vacuum System & Complete With Plant Room Wiring. The Panel Should Have Energy And Running Hours Meter. As Per Technical Specification Note- Mgps Panel Should Have Dual Incomer Provision With Asco Make Automatic Transfer Switch ( Ats ) Also Outgoing Feeder For Agss Panel And Single Phase Suitable Power Provision For Mgps Control Panel , Alarm Panel , Dryer Etc Asper Oem Requirement , Vendor Should Submit Panel Ga Dwg Along With Bom Before Production Of Panel 20 Anesthetic Gas Scavenging System ( Agss ) Supply, Installation, Testing And Commissioning Of Duplex Agss System ( Imported ) Should Include Required Components In Order To Connect The Anaesthesia Workstation Of Dragger Make ( Model- Fabius Xl ) To The Central Agss System. ( As Per Technical Specification ) . 21 Anesthetic Gas Scavenging System ( Agss ) Supply, Installation, Testing And Commissioning Of Agss Terminal Unit ( First And Second Fix Assembly ) Complying To Htm- 02-01 / Nfpa 99 / Din Standard With Probe For Agss 22 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 12 Mm Od X 1 Mm Thick 23 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 15 Mm Od X 1Mm Thick 24 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 22 Mm Od X 1 Mm Thick 25 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 28 Mm Od X 1 Mm Thick 26 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 35Mm Od X 1.2 Mm Thick 27 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 42 Mm Od X 1.2 Mm Thick 28 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 54 Mm Od X 1.2 Mm Thick 29 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 76 Mm Od X 1.5 Mm Thick 30 Medical Gas Pipe Line , Pipeline Distribution System: Supply, Installation, Testing And Commissioning Of Copper Pipe Lloyd Certified For Medical Gas Services. Pipes Shall Be Priced For All Necessary Supports, Standard Fittings.Medical Gas Pipe Line : Bs En: 13348:2001Supply, Instllation And Commissioning Of Copper Piping As Per Specification 108 Mm Od X 1.5 Mm Thick 31 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 15 Mm 32 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 22 Mm 33 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 28 Mm 34 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 35 Mm 35 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 42 Mm 36 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 54 Mm 37 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 76 Mm 38 Isolation Valve / Floor Valve ( Imported ) As Per Specification Supply, Installation, Testing And Commissioning Of Isolation Valve Assembly As Per Htm / En For Medical Gas Services, Provision For Locking Type Assembly. All Valve Should Be Gas Specific. ( Imported ) As Per Specification 108 Mm 39 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 2 Valve Configuration With 15 O2, 28 Vac 40 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 3 Valve Configuration 15 O2, 15 Ma4, 28 Vac 41 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 3 Valve Configuration 15 O2, 22 Ma4, 28 Vac 42 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 4 Valve Configuration 15 O2, 15 N2o, 15 Ma4, 28 Vac 43 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 5 Valve Configuration 15 O2, 15 N2o, 15 Ma4, 15 Sa7, 28 Vac 44 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 6 Valve Configuration 15 O2, 15 N2o, 15 Ma4, 15 Sa7, 22 Vac, 15 Co2 45 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 2 Valve Configuration With 15 O2, 15 Vac ( For Pre, 3Rdfloor 2Nos Isolation Room , Post Procedure ) -Optional [ Qro ] 46 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 2 Valve Configuration With 15 O2, 15 Vac ( For Pre, 3Rdfloor 2Nos Isolation Room , Post Procedure ) Optional [ Qro ] 47 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 3 Valve Configuration With 15 O2, 15 Ma4, 15 Vac ( For Post ) Optional [ Qro ] 48 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 3 Valve Configuration 15 O2, 15 Ma4, 22 Vac ( For Recliners Bed ) Optional [ Qro ] 49 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 3 Valve Configuration 35 O2, 28 Ma4, 42 Vac ( For Icu ) Optional [ Qro ] 50 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 4 Valve Configuration 22 O2, 15 N2o, 15 Ma4, 28 Vac ( For First Floor Dental Area ) Optional [ Qro ] 51 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 4 Valve Configuration 15 O2, 15 N2o, 15 Ma4, 22 Vac ( For Rt ) Optional [ Qro ] 52 Area Valve Service Unit ( Avsu ) ( Imported ) ( As Per Technical Specification ) Supply And Installation Of Avsu Box With All Its Accessories With Valve And Pressure / Vacuum Gauges, Nist Connectors With Lockable Arrangement And Breakable Glass Cover. ( Imported ) ( As Per Technical Specification ) 4 Valve Configuration 15 O2, 15 N2o, 15 Ma4, 15 Vac ( For Minor Ot, Procedure Room ) Optional [ Qro ] 53 Medical Gas Area Alarm Panel ( Imported ) ( As Per Technical Specification ) . Alarm System : Providing And Fixing Alarm System For Medical Gas System Complete Consisting Of Pressure Sensors, Panel And The Control Cabling, All Wiring Shall Be Within 1Mm Sq Multi Core Data Cable, Pvc Pipe For Data Cable. Panel Shall Be Self-Contained Low Voltage ( Less Than 24 V ) ( Imported ) ( As Per Technical Specification ) . 2 Gas 54 Medical Gas Area Alarm Panel ( Imported ) ( As Per Technical Specification ) . Alarm System : Providing And Fixing Alarm System For Medical Gas System Complete Consisting Of Pressure Sensors, Panel And The Control Cabling, All Wiring Shall Be Within 1Mm Sq Multi Core Data Cable, Pvc Pipe For Data Cable. Panel Shall Be Self-Contained Low Voltage ( Less Than 24 V ) ( Imported ) ( As Per Technical Specification ) . 3 Gas 55 Medical Gas Area Alarm Panel ( Imported ) ( As Per Technical Specification ) . Alarm System : Providing And Fixing Alarm System For Medical Gas System Complete Consisting Of Pressure Sensors, Panel And The Control Cabling, All Wiring Shall Be Within 1Mm Sq Multi Core Data Cable, Pvc Pipe For Data Cable. Panel Shall Be Self-Contained Low Voltage ( Less Than 24 V ) ( Imported ) ( As Per Technical Specification ) . 4 Gas 56 Medical Gas Area Alarm Panel ( Imported ) ( As Per Technical Specification ) . Alarm System : Providing And Fixing Alarm System For Medical Gas System Complete Consisting Of Pressure Sensors, Panel And The Control Cabling, All Wiring Shall Be Within 1Mm Sq Multi Core Data Cable, Pvc Pipe For Data Cable. Panel Shall Be Self-Contained Low Voltage ( Less Than 24 V ) ( Imported ) ( As Per Technical Specification ) . 5 Gas [ Qro ] 57 Medical Gas Area Alarm Panel ( Imported ) ( As Per Technical Specification ) . Alarm System : Providing And Fixing Alarm System For Medical Gas System Complete Consisting Of Pressure Sensors, Panel And The Control Cabling, All Wiring Shall Be Within 1Mm Sq Multi Core Data Cable, Pvc Pipe For Data Cable. Panel Shall Be Self-Contained Low Voltage ( Less Than 24 V ) ( Imported ) ( As Per Technical Specification ) . 6 Gas 58 Alarm System- Master Alarm Control Panel Supply, Installation And Commissioning Of Master Alarms Should Be Capable To Monitor Followings Gases In Manifold And Plant Room 1. Liquid Oxygen Line Pressure 2.Oxygen Manifold ( Secondary Supply ) Bank Pressure 3. Emergency O2 Bank Pressure 4. N2o ( Primary Supply ) Bank Pressure 5. N2o Emergency Bank Pressure 6. Air 4 Bar Line Pressure 7. Air 7 Bar Line Pressure 8. Vacuum Line Pressure 9. Co2 Manifold Bank Pressure 10. Agss Line Pressure 11. All The Control Alarm Line Pressure. The System Should Eu Ce Under Class Ii A Category Having 4 Digit No From Notified Body / American Ul Listed / American El Listed. The Master Alarm Should Display Numeric Values Of All Positive And Negative Gas Pressures Along Led Indicator.It Should Capable To Display The Pressure Of Each Gas Along With Fault And Pressure High / Low Alarm With Indication. It Should Capable To Intergrade With The Hospital Bms System Compatible With Bacnet / Modbus. 59 Bed Head Panel Supply, Installation, Testing And Commissioning Of Bed Head Panel.Of 1.2 Mt. Switch & Socket-3, Nursecall1no Only Cutout, Data & Telephone .Cut Out For Outlet ( 2 / 3 Outlet ) Nurse Cal.As Per Specification. ( Indigenous ) - Confirming Htm 02-01, Nfpa 99C Or Equivalent. 60 Supply, Installation, Testing And Commissioning Of Bed Head Panel. Bed Head Panel Of 1.8 Mt. Switch & Socket-6, Nursecall1no Only Cutout, Data & Telephone .Cut Out For Outlet ( 4 / 5 Outlet ) Nurse Cal.As Per Specification. ( Indigenous ) Confirming Htm 02-01, Nfpa 99C Or Equivalent. 61 Accessories:- Oxygen Flow Meter & Humidifier Bottle ( Indigenous ) : Back Pressure Compensated Flow Meter Shall Be Of Accurate Gas Flow Measurement And Control Within A Range Of 0-15 Liters Per Minute For Use In A Variety Of Respiratory Therapy Gas Delivery System. The Flow Tube And Shroud Components Shall Be Made Of Good Quality Plastic. They Shall Be Supplied With Plastic Transparent Reusable Humidifier 62 Accessories:- Ward Vacuum Units ( Indigenous ) : The Vacuum Unit Shall Include Vacuum Regulator Along With 0-760 Mm Hg Vacuum Gauge Of 2 ½ Size Dial, 600 Ml Capacity Reusable Plastic Collection Bottle With Overflow Safety Trap With Plastic Slide Wall Mounted Type..As Per Specification. 63 Accessories:- The Vacuum Unit Shall Include Vacuum Regulator Along With 0-760 Mm Of Hg Vacuum Gauge Of 1000 Ml Capacity Reusable Plastic Collection Bottle With Overflow Safety Trap With Plastic Slide Wall Mounted Type As Per Specification. 64 Accessories:- Theatre Vacuum Uniti : It Shall Be Trolley Mounted. The Unit Shall Include One Regular Having Gauge And Mounted On The Trolley Stand, Having Two Reusable Each 2000 Ml Plastic Collection Bottles Mounted On The Base Of Trolley Unit And Connected With Regulator & Low Pressure Tube Inter-Connections. ( As Per Technical Specification ) . 65 Accessories:- Supply Installation Testing And Commissioning Of Medical Gas Hose Assemblies Hoses Shall Be Color Coded Throughout Their Length As Specified In Britishstandards. 50M For O2, 60M Air 100M Vaccum15m For Co2, 15M For Agss, 30M N2o. ( Imported ) 66 Accessories:- Double Stage Pressure Regulator 67 Accessories:- Emergency Control Panel ( With 2 High Flow Regulator And 2 ) Isolation Valves
Basic Detail
Tender No C1_MGPS/01-2023
Bidding Type Tender
Location
City chandrapur
State Maharashtra
Key Dates
Publish Date 23 Nov 2023
Submission Date 29 Nov 2023
Open Date 07 Dec 2023
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
07ee9d75-8ea5-4ac7-a15c-12a9c48cf19e.html
BOQ_1668392.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 23, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 29, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 29, 2023
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 29, 2023
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 29, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 07, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

07ee9d75-8ea5-4ac7-a15c-12a9c48cf19e.html

xls

BOQ_1668392.xls

pdf

Tendernotice_1.pdf

TenderDetail
Loading tenders