}

Tender For Design, Manufacture, Supply , Delivery, Commissioning ,Proving Out And Handing Over Of The Equipments /Machines As Per Specified Standards On Turn Key Basis., faridabad-Delhi

Rail India Technical And Econimics Services Ltd-RITES has published Tender For Design, Manufacture, Supply , Delivery, Commissioning ,Proving Out And Handing Over Of The Equipments /Machines As Per Specified Standards On Turn Key Basis.. Submission Date for this Tender is 23-11-2023. Calorimeters Tenders in faridabad Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

40376037
Corrigendum : Tender For Design, Manufacture, Supply , Delivery, Commissioning ,Proving Out And Handing Over Of The Equipments /Machines As Per Specified Standards On Turn Key Basis.
Open Tender
Indian
Delhi
faridabad
23-11-2023

Tender Details

Tender For Design, Manufacture, Supply , Delivery, Commissioning , Proving Out And Handing Over Of The Equipments / Machines As Per Specified Standards On Turn Key Basis.; 1 Supply & Deliveryof Smoke Chamber For Optical Density With Ftir For Toxicity As Specifiedin Iso 5659-2: 2017 And En 17084:2018 Including Concomitant Accessories As Per Annexure D , Consumables & Mandatory Spares For 02 Years Mainteance On Cip ( Carriage Insurance Paid, Destination At Faridabad ) Basis. 2 Supply & Delivery Of Cone Calorimeter-Iso 5660-1:2015+A1 ( 2019 ) ( Reaction To Fire Test- Heat Release, Smoke Production And Mass Loss Rate ) Including Concomitant Accessories As Per Annexure C , Consumables & Mandatory Spares For 02 Years Mainteance On Cip ( Carriage Insurance Paid, Destination At Faridabad ) Basis. 3 Erection / Installation , Commissioning, Training & Proving Out Of Machine / Equipment ( Item No. 1.1 ) ( I.E Smoke Chamber For Optical Density With Ftir For Toxicity 4 Erection / Installation , Commissioning, Training & Proving Out Of Machine / Equipment ( Item No. 1.2 ) ( I.E Cone Calorimeter-Iso 5660-1:2015+A1 ( 2019 ) 5 Camc ( Comprehensive Annual Maintainance ) Cost For 1St Year ( After Completion Of Warranty Period Of 2 Years ) ( Please Enter Camc Cost In Percentage 6 Camc ( Comprehensive Annual Maintainance ) Cost For 2Nd Year ( After Completion Of Warranty Period Of 2 Years ) 7 Camc ( Comprehensive Annual Maintainance ) Cost For 3Rd Year ( After Completion Of Warranty Period Of 2 Years ) 8 Camc ( Comprehensive Annual Maintainance ) Cost For 4Thyear ( After Completion Of Warranty Period Of 2 Years ) 9 Camc Cost ( Comprehensive Annual Maintainance ) For 5Th Year ( After Completion Of Warranty Period Of 2 Years ) 10 Others 11 Operation & Performance Of Machines : ( Pl. Refer Clause 15.3 Of Section Vii ) Bidder / Contractor Shall Depute His Staff For Operation & Performing The Required Testfor A Period Of Min. 03 ( Three ) Months In Rites Nr Lab , Faridabad After The Issue Of Commissioning Certificates Of Machines.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 27-Oct-2023 Corrigendum 1 Fee 16-11-2023
2 06-Nov-2023 Corrigendum2 Technical Bid 16-11-2023
3 16-Nov-2023 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 23-11-2023

Key Value

Document Fees
INR 8260 /-
EMD
INR 642000.0 /-
Tender Value
INR 3.21 Crore /-

BOQ Items

Name of Work:Design, manufacture, supply , delivery, commissioning ,proving out and handing over of the equipments /machines as per specified standards on Turn Key basis
Sl. No. Item Description
1Supply & Deliveryof Smoke Chamber for optical density with FTIR for toxicity as specifiedin ISO 5659-2: 2017 and EN 17084:2018 including concomitant accessories as per Annexure D ,consumables & mandatory spares for 02 years mainteance on CIP(carriage insurance paid,Destination at Faridabad)basis.
2Supply & Delivery of Cone Calorimeter-ISO 5660-1:2015+A1(2019) (Reaction to Fire Test- Heat release, smoke production and mass loss rate) including concomitant accessories as per Annexure C ,consumables & mandatory spares for 02 years mainteance on CIP(carriage insurance paid,Destination at Faridabad)basis.
3Erection/Installation ,Commissioning, Training & Proving out of machine/equipment ( item no. 1.1)(i.e Smoke Chamber for optical density with FTIR for toxicity
4Erection/Installation ,Commissioning, Training & Proving out of machine/equipment ( item no. 1.2)(i.e Cone Calorimeter-ISO 5660-1:2015+A1(2019)
5CAMC (Comprehensive Annual Maintainance ) COST FOR 1ST YEAR (after completion of warranty period of 2 years) (Please enter CAMC cost in percentage
6CAMC (Comprehensive Annual Maintainance )COST FOR 2ND YEAR (after completion of warranty period of 2 years)
7CAMC (Comprehensive Annual Maintainance )COST FOR 3rd YEAR (after completion of warranty period of 2 years)
8CAMC (Comprehensive Annual Maintainance )COST FOR 4thYEAR (after completion of warranty period of 2 years)
9CAMC COST (Comprehensive Annual Maintainance )FOR 5th YEAR (after completion of warranty period of 2 years)
10Others
11Operation & Performance of machines :(pl. refer clause 15.3 of Section VII) Bidder/Contractor shall depute his staff for operation & performing the required testfor a period of min. 03(Three) months in RITES NR LAB ,Faridabad after the issue of commissioning certificates of machines.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail