Tender For Supply Of Mould Room Equipment
Tender Overview
Project Description
Tender For Supply Of Mould Room Equipment-1. All – In – One Base Plate Carbon Fibre Along With Arm Support And Moveable Knee Rest, For Head, & Neck, Thorax, Abdomen And Pelvis Treatment ( Usa Fda Approved ) 2. Same Base Plate To Be Upgraded For Sbrt Treatment Using Bite Bridge And Respiratory Belt With Dedicated Comfort Cushion 3. Same Base Plate To Be Upgraded For Srs / Srt Treatment Using Bite Lock And Accuu Cushion 4. Breast Board Carbon Fibre 5. Head Rest Carbon Fibre A To F ( Set Of 6 Pieces ) 6. Multifix Prone Head Holder Carbon Fibre 7. Multifix Tilting Baseplate Carbon Fibre For Head 8. Multifix Lateral Base Plate Carbon Fibre For Head 9. Wing Board - Carbon Fibre, Can Be Use With Supine Breast Board And Alone Also 10. Feet Positioned 11. Digital Water Bath 12. Indexing Rod Carbon Fibre 13. Abdomen Compression - Respiratory Belt 14. Accu Cushion 15X20cm For Head 15. Accu Cushion 52X47cm For Head & Neck 16. Vacuum Bag 200X100cm 17. Vacuum Bag 100X70cm 18. Vacuum Bag 70X70cm 19. Vacuum Bag 50X70cm 20. Vacuum Bag 40X50cm 21. Vacuum Pump 22. Vacuum Storage Stand Ss Along With Movable Wheel 23. ‘S’ Hooks For Handing Vacuum Bag 24. 2.0Mm Lead Ball Sure Mark For Ct 110 / Per Box 25. Bolus 30X30x0.5Cm 26. Bolus 30X30x1.0Cm 27. Electron Foam Cutter 28. Styrofoam Block 30X30x3 / 4” ( Pack Of 30 Block ) 29. Alloy Melter 30. Alloy 31. Electron Molds 32. Block Making Tools And Accessories 33. Mould Room Table ( Standard Size ) 34. Sagital Laser Green ( Line Laser ) For Mould Room
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 30-Nov-2023 | Date Extension | Date | 15-Dec-2023 |
| 2 | 15-Dec-2023 | Date Extension-28.12.2023 | Date | 28-Dec-2023 |
| 3 | 28-Dec-2023 | Extension | Date | 11-Jan-2024 |
| 4 | 11-Jan-2024 | date Extension | Date | 27-Jan-2024 |
| 5 | 27-Jan-2024 | Date Extension with Amendments | Date | 06-Feb-2024 |
| 6 | 07-Feb-2024 | extension- 21.02.2024 | Date | 21-Feb-2024 |
| 7 | 21-Feb-2024 | Amendments | Date | 29-Feb-2024 |
| 8 | 28-Feb-2024 | date ext | Date | 09-Mar-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | Mould RoomEquipment |
| 2 | CMC for ist year |
| 3 | CMC for2nd year |
| 4 | CMC for 3rd Year |
| 5 | CMC for 4th year |
| 6 | CMC for 5th Year |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender