Educational and Research Institute Government Departments TDR #40316337

Sub: Civil Work For Gym Park & Laminar Flow Exhibits At Dsc, Digha.-

Issued by Government Departments · KOLKata, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
Ref Document
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Offline

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
KOLKata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Sub: Civil Work For Gym Park & Laminar Flow Exhibits At Dsc, Digha.-1.0 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 150 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. 20 2.0 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) With earth obtained from excavation of foundation. 20 3.0 Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) 5 4.0 Brick soling with picked Jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. Single brick flat soling (thickness 75 mm.) 50 5.0 Brick work with 1st class bricks (Class designation 75) in cement mortar (1:6) In Foundation & upto plinth. 13 6.0 125mm thick brick work with 1st class bricks in cement mortar (1:4) in any floor. 10 7.0 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary at any height. With 1:4 cement mortar, 15mm thick plaster. 80 8.0 Neat cement punning about 1.5mm thick in wall, dado, window, sill, floor etc. NOTE: Cement 0.152 cu.m per100 sq.m. 50 9.0 Providing and laying in position Ordinary Cement concrete of specified grade with graded stone chips (20 mm nominal size) of Pakur variety excluding the cost of centering, shuttering and reinforcement, if any, in ground floor as per relevant IS codes. 9.1 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) 12 9.2 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) 9 10.0 Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels, curved or straight including fitting, fixing and striking out after completion of works. 25mm to 30mm thick wooden shuttering as per decision and direction of Engineer-incharge. 10

AI Tender Summary

OUR REF NO 40316337
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 05-11-2023
Authority
Authority Name Birla Industrial And Technological Museum
Work Description Sub: Civil Work For Gym Park & Laminar Flow Exhibits At Dsc, Digha.-1.0 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 150 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. 20 2.0 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) With earth obtained from excavation of foundation. 20 3.0 Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) 5 4.0 Brick soling with picked Jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. Single brick flat soling (thickness 75 mm.) 50 5.0 Brick work with 1st class bricks (Class designation 75) in cement mortar (1:6) In Foundation & upto plinth. 13 6.0 125mm thick brick work with 1st class bricks in cement mortar (1:4) in any floor. 10 7.0 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary at any height. With 1:4 cement mortar, 15mm thick plaster. 80 8.0 Neat cement punning about 1.5mm thick in wall, dado, window, sill, floor etc. NOTE: Cement 0.152 cu.m per100 sq.m. 50 9.0 Providing and laying in position Ordinary Cement concrete of specified grade with graded stone chips (20 mm nominal size) of Pakur variety excluding the cost of centering, shuttering and reinforcement, if any, in ground floor as per relevant IS codes. 9.1 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) 12 9.2 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) 9 10.0 Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels, curved or straight including fitting, fixing and striking out after completion of works. 25mm to 30mm thick wooden shuttering as per decision and direction of Engineer-incharge. 10
Basic Detail
Tender No
Bidding Type Tender
Location
City KOLKata
State West Bengal
Key Dates
Publish Date 21 Oct 2023
Submission Date 05 Nov 2023
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
d276a961-ae8b-44d1-8781-4381443bf702.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 21, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 05, 2023
17:00 IST

Bid Submission Deadline

Offline submission at the designated office.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

d276a961-ae8b-44d1-8781-4381443bf702.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders