| 1 | Supply, install , testing and commissioning of Digital Flow meter with telemetry system for 25mm size complete all as specified and as directed by Engineer-in-Charge with following Specifications :- Metering Technology : Ultrasonic or ElectromagneticCommunication type : LAN (for internet connectivity) or LoRa WAN and/or Cellular (GPRS / 3G / 4G)Tamper proof : (a) Power source : The meter shall be battery operated or UPS powered supply with provision of power OFF detection. The telemetry system units shall be battery operated or through external power supply. The metering data should be stored in the meter even if the telemetry system is off due to power failure. (b) Sealing : The meter and telemetry system shall have proper mechanical and electronic sealing (through software) arrangement. Any attempt to open the meter or system enclosure should physically damage the tag. Compliance : The meter shall preferably be manufactured as per ISO 4064: 2014 Standards and shall have IP 68 ingress protection. Accuracy : The meter shall be of accuracy better than ± 2% for the operating flow range (from 10 % to 100 % of maximum flow rate).Test certificate : The meter manufacturer shall submit the latest test/calibration certificate of the meter, from Fluid Control Research Institute (FCRI) / National Physical Laboratory (NPL) or any third party laboratory accredited by National Accreditation Board for Testing and Calibration Laboratories (NABL), for every meter.Parameters to monitor : The meter (since installation of the requisite water meter) shall transmit the following parameters to a secure cloud : - (a) Timestamp (b) Cumulative forward flow volume (c) Cumulative reverse flow volume (d) Cumulative Net volume (e) Cumulative pump working hours (f) Meter serial number (g) Device last calibration date (h) Borewell id (Provided by CGWA)Cloud : The Communication / telemetry data should be directly captured in a secure cloud. The cloud service provider should be empaneled with The Ministry of Electronics and Information Technology (MeitY). Transmission frequency : The data shall be transmitted minimum 2 times in a day.Battery life : In case of battery operated meters the battery shall run at least for a period of 3 years with 2 transmissions per day. The battery shall be replaceable without any data loss.Data acquisition : The meter shall be supplied with complete AMR / AMI system with Data Management software. The Data Management Software must be capable of running on a standard PC. The Data Management Software should be cloud based and should have web portal access so that user can view customer data through browser. In addition to above, Data Management Software will be installed on Server placed in Central Data Base/Control Room, and the software may have option for individual customer to view their meter consumption data through Web portal. Consumer, engineer and manager screens shall be available separately.Data Collection Unit shall be capable of taking data from meter, pump etc. and should be posted in Data Management Software. Real-time data to CGWA : The un-tampered data from the secure cloud shall be sent to Central Ground Water Authority (CGWA) real-time data management platform once it is ready. Proper cyber security measures shall be taken in the secure cloud.Note : - The quoted Rate to be included for the following jobs no additional Payment will be considered in any case.(a) Taking up/down the existing pipe/fixing and any additional job & material required for fixing and testing of Digital flow meter.(b) Additional Pipe requried if any size. (c) Wiring By suitable size Copper cable from Digital flow meter to the telemetry system. |
| 2 | Ditto - all as per above items No 1 but Size-50mm |
| 3 | Ditto - all as per above items No 1 but Size-76mm |
| 4 | M & L for Comprehensive maintenance of water cooler 40/80, 60/120 ltr capacity including performing following tasks at different locations at :-(a) Inspection, dismantling front and rear shutte disconnecting electric and water connection (b) Cleaning thoroughly the body of water cooler including cleaning of cold water tank with bleaching powder solution.(c) Servicing of cooling fan by greasing to bearing, oiling to bushes after opening the motor.(d) Checking/rectifying the connection and working of thermostat relays, condenser, evaporator, capacities, switches, electrical connection, float valve, compressor earth connection including replacement of defective wire sleeves etc (e) Replacement of PVC drain pipe from water cooler tray to neared drain.(f) Reconnecting power and water lines and testing to make it functional complete all as specified and as directed. |
| 5 | S & F in repairs of compressor assembly as per existing make (sealed unit) for water cooler incl testing after gas charging complete all as specified and as directed.Note : Gas charging shall be measured and paid for separately. |
| 6 | M & L for Gas charging the water cooler with gas R-134/R-22 capacity 40/80,60/120 litres capacity including making necessary connection, testing etc to make it functional complete all as specified and as directed |
| 7 | S & F in repairs of compressor assembly as per existing make (Sealed unit) for refrigerator of any size, capacity and make including soldering of copper pipe filling of gas, commissioning and testing all as specified and as directed.Note : Gas charging shall be measured and paid for separately. |
| 8 | S & F in repairs of blower motor for inner unit of 1.5 /2 Ton AC split type all as per manufacturer specification complete as per existing make all as specified and as directed |
| 9 | S & F in repairs PCB Card for 1.5/2 ton AC complete all as specified and as directed |
| 10 | S & F in repairs of compressor unit (sealed) completed for 1.5 Ton AC complete all as specified and as directed |
| 11 | M & L for Comprehensive maintenance of air conditioner split type 15 ton capacity, any make including performing following tasks at different locations at Station :-(a) Inspection,taking down, removing grills and outer housing(b) Descaling, brushing and cleaning thoroughly and replacing filter pad of AC (c) Servicing the cooling fan by greasing/oiling the bearing bushes after opening the motor, cleaning the armature, checking and tightening all nuts and bolts etc (d) Checking rectifying the connection, working of thermostat assembly, relay, condenser, heater assembly, compressor and earth connection etc including replacing defective wire and sleeves etc (e) Re-fixing AC in position, after assembling including packing as required at site and testing complete to make it functionalNote : Supplying and replacement of parts shall be measured and paid separately |
| 12 | M & L for repairing to voltage stabilizer 5 KVA/20 Amps 2/3 step, wall mounting digital type including replacement of relay, electronic circuit, connection socket/ terminal, indicating lamp, copper cable of suitable size 3 core with lug connector, voltmeter if required and other defective parts for high and low voltage cut off and automatic adjustment complete all as specified and as directed. |
| 13 | All as per item No 12 here-in-above but 4 KVA |
| 14 | All as per item No 12 here-in-above but 3 KVA |
| 15 | Total contract sum shall be calculated after deduction of schedule of credit amount of Rs. 5230.00 |