Uttranchal Jal Vidyut Nigam Ltd-UJVNL has published Engagement Of Project Management Consultant For Lakhwar Mpp(300 Mw) On River Yamuna In Dist Dehradun, Uttarkhand. Submission Date for this Tender is 18-12-2023. Project Management Service Tenders in dakpathar Uttarakhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-Nov-2023 | Date Extension Notice 01 | Date | 05-12-2023 |
2 | 25-Nov-2023 | Corrigendum No 01 | Technical Bid | 05-12-2023 |
3 | 04-Dec-2023 | Date Extension 02 | Date | 09-12-2023 |
4 | 08-Dec-2023 | Date Extension Notice No 03 | Date | 18-12-2023 |
Sl. No. | Item Description |
1 | Deployment of structural design expert well versed with detail design engineering of mega hydropower projects for proper coordination & Technical assistance to CWC to avoid any undue delay in release of design/drawings for execution of works. |
2 | Structural Design Expert(ConcreteDam/ Spillway Expert) |
3 | Structural Design Expert(Underground Power House/Tunnel Expert) |
4 | Draftsman(Civil) |
5 | Draftsman(HM) |
6 | Detail design, engineering, and drawings of any Civil Structure of the project (civil work) on specific direction from Engineer in Charge including required associated services of designers, technical assistants with expertise in latest engineering FEM softwared like STAAD PRO, ANSYS,FLAC 3D,Slope Stability software etc.for proper completion of the assignment. |
7 | Structural Design Expert |
8 | Draftsman (Civil) |
9 | Assisting UJVNL in preparation of tender document of Hydo-Mechanical works including tender drawings in association with CWC & obtaining approval from CWC |
10 | Review of design & drawing of HM works submitted by vendors & getting its approval from CWC. |
11 | Finalization of quality assurance plan for hydro mechanical works & customer hold points for manufactures items,obtaining approval of CWC & review of test results |
12 | Assisting UJVNL in inspection and quality control during manufacturing of HM equipments at Vendors workshop |
13 | Assisting UJVNL in Inspection and quality control during erection of HM works/equipments at site. |
14 | Asssisting UJVNL with Third party quality control of E&M works during inspection at manufacturer works. |
15 | Assisting UJVNL by deployment of EM experts in qualitycontrol of E&M works during erection at site. |
16 | Site Visit charges of Experts (Dam, Under-ground power House, HM, EM)as and when desired by UJVNL (1. excluding site visits as mentioned in above items 2. List of identified subject experts shall be got approved well in advance from UJVNL). |
17 | Providing manpower for consistent monitoring of project progress during construction which includes quality control and quality assurance of civil works, supervision of major civil construction activities and carrying out all associated project management services as mentioned in scope of work. |
18 | Residential Project Manager cum team leader |
19 | Quality Control & Quality Assurance manager |
20 | Mid Level Quality Control Engineer |
21 | Mid Level Project Management Engineer |
22 | Environment Officer |
23 | Junior Quality Control Engineer |
24 | Senior Site Engineer |
25 | Resident Geologist |
26 | Junior site Engineer |
27 | Office Supporting staff |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail