|
| 1 | Clearing shrub jungles uprooting stumps and small bushes and trees below 1M girth on premeasurement etc. complete to shape with alllabours required for work as per direction of the Engineer-in-charge. |
| 2 | Excavation of foundation, loading,unloading and carriage by mechanical means of all kinds of soil,including stoney earth,gravel and moorum etc interspread with bounders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge with initial & all leads, lifts & delifts from the place of excavationetc complete in all respectas directed by the Engineer-in-charge. |
| 3 | C.C.M-15 grade using20mm down grade crusher broken hard granite aggregate of approved qualityfree from weathered skin,quarry rubbish and foreign materials mixing by concrete mixer including lifting the materials, hoisting, lowering and laying the concrete to required level, with all leads and lifts, compacting in layers of 0.15m thick withVibrators ramming, finishing to proper slope and level,finishing the exposed surface smooth including watering, curing for required period etc. including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item including hire and running charges of the machineries complete as directed by the Engineer-in-charge. |
| 4 | R.C.C.M-20 grade using20mm down grade crusher broken hard granite aggregate of approved qualityfree from weathered skin,quarry rubbish and foreign materials mixing by concrete mixer including lifting the materials, hoisting, lowering and laying the concrete to required level, with all leads and lifts, compacting in layers of 0.15m thick withVibrators ramming, finishing to proper slope and level,finishing the exposed surface smooth including watering, curing for required period etc. including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item including hire and running charges of the machineries complete as directed by the Engineer-in-charge. |
| 5 | Supplying, Straightening, cutting, bending , bindingand tying the grills and placing in position for fabrication and fixing of reinforcement includinglapping where necessaryincluding cost,conveyance & supply of binding wire with all leads, lifts from bending yard to placement spot with cost & conveyance and all taxes of steel bars of any reinforcement supplying all labour and T & P required for the work etc. complete in all respect as directed by the Engineer-in-charge. |
| 6 | Providing and removing rigid smooth centering and shuttering for C.C./R.C.C. work including cost and conveyance of the materials required for the work complete in all respect as directed by the Engineer-in-Charge. |
| 7 | Providing rigid shuttering with the box type steel shuttering plates with keys for intermediate construction joints in rafts of weirs, barrages and dam blocks including cost of all materials, labour,T. & P. etc. complete as directed by the Engineer-in-charge including removal of forms. |
| 8 | Rough stone dry packingin aprons and revetments to all heights and thickness using hard stone of15Cm to 30 CM size weighing 140 Lbs/Cft and above of approved quality free from weathered skin including filling interstices with small stones by edging and hammering to proper slope and level with cost, conveyance, royalty and other taxes of all materials labour & T&P materialsrequired for the item completely as directed by the Engineer-in-charge.( 1/6th Vol. will be deducted towards voids) |
| 9 | Filling in foundation & plinth with excavated materials well watered and rammed to proper layer & level with all cost, conveyance, royalty & taxes of all materials with all labor, required for the item complete as directed by the Engineer-in-charge |
| 10 | Providing weep holes in brick masonary /plain/ Reinforced concrete abutment, wing wall / return wall with 100 mm dia A.C pipe extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. |