Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #40285109

Tender For Providing 1 Nos Of Vikravandi Block

Issued by Local Bodies · Villupuram, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
07 Nov 2023
0 days left
EMD
23000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Villupuram → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Providing 1 Nos Of Vikravandi Block; 1 Construction Of Open Well And Pump Room And Motor Accessories At Thoravi Colony In Thoravi Panchayat 2 Geophysical Investigation Charges Etc.Complete 3 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Hard Stiff Clay , Stiff Black Cotton Soil, Hard Red Gravel, Stoney Earth And Earth Mixed With Small Size Bouldersearth, Shales, Murram And Hard Gravely Soil 4 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Soft Rock Notrequiring Blasting 5 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Medium Rock Notrequiring Blasting 6 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Medium Rock Requiring Blasting 7 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Medium Rock Requiring Blasting 8 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Hard Granite Measured In Solid Including Blasting And Stacking 9 Vith & Depth ( 10.00 -12.00M ) 10 Vith & Depth ( 12.00 -14.00M ) 11 Centering Chaqrges For R C C Itemsincluding Cost And Conveyance Etc .Complete 12 Supplying And Fabrication Of Steel Including Cost And Conveyance Ofsteel To Site And All Labour Charges For Straightening, Cutting To Length, Bending To Shape And Tying In Position And Forming Grills For All R.C.C Works Etc, . 13 Rcc 1:1.5:3 Mix Using 20 Mm Iss Sine Hbg Metal Including Cost And Conveyace Of All Materials And All Labour Charges, Etc. 14 Dewatering Using 5Hp To 70Hp Diesel Engine Pumpsetincluding Hire Charges, Cost Of Diesel, Engine Oil, Pume Operator, Labour Charges, Conveyance Of Pumpset And Fuel To Site And Back, Loading, Unloading And Any Otherincidental Charges Etc., Complete. 15 Motor Accessories 16 Supply, Delivery And Erection Of Submersible Pumpset Of50 Lpmx 175 Head As Per Sor Twad - Page 88 17 Supply And Delivery Of 3 Phase Panel Board D.O.L With Two Level Guard And Auto Start Confirming To Is Specification For 5 Hp Pumpset.Twad Sor Page 101 18 Supply, Delivery Of 1.1 Kv Grade, Pvc Insulated And Sheathed3 Core Flat Copper Submersible Cable With Isi Marking Conforming Of Is 694 / 1990 Of Reputed Make For Submersible Motor Erected In Borewell. 19 Supply And Delivery Of Ms Kiosk Of Size0.75M X 0.45M X 0.75M Made Up Of Msangle Of Size 50Mm X 50Mmx 4Mm Alroundcovered With 16 Gauge Ms Sheet And Kioskdoor Made Up Of Ms Plates Of Size 25 Mm X3 Mm Including Cutting, Welding, Grinding, Locking Arrangements And Labour Charges 20 Hdpe50mm Dia Pipe 21 Motor Accessories 22 Labour Charges For Erection Of Submersible Pump Set Including Fixing And Jointing The Submersible Cable With Clamps To The Required Depth, Valves And Errection Panel Board Control Room Twin Earthing As Per I.E Rules Including Cost Of Civil Works 23 Pump Room 24 Earth Work Excavation & Depositing On Bankwith An Initial Lead Of 10 Metre & Initial Lift Of 2 Metre In Hard Shift Clay, Stiff Block Cotton, Hard Red Earth Shales, Murrum, Gravel, Stoney Earth, And Earth Mixed With Small Size Boulders And Hard Gravelly Soil ( Ss 20B ) For Foundation Including Shoring, Strutting, Baling Out Water Providing Danger Light Wherever Necessarydepositing Thesurplus Earth On Bank And Otherincedential Charges Etc., Complete And As Directed By Twad Board Officers 25 Levelling Course With P.C.C 1:4:8 ( One Cement, Four Sand And Eigth Course Aggregate ) Using 40 Mm H.B.G Stone Including Mixing Concrete, Laying, Curing And Compacting Of Concrete Etc., Complete And As Directed By The Twad Board Officers. 26 Earth Filling In Basement & Sides Of Foundation With Excavated Earth Including Ramming And Consolidation Etc., Complete 27 Supply And Filling The Foundation And Basement With Clear River Sand In Layers Complying With Standard Specification Including Consolidation And Watering Etc. Complete And As Directed By Twad Board Officers. 28 Brick Work In Cm 1:5 ( One Cement And Five Sand ) Using Country Bricks Of Size 8.75 X 4.25 X 2.00 Including Cost Of All Materials, Labour Charges, Curing Etc., Complete And As Directed By Twad Board Officers. 29 For Foundation And Basement 30 For Super Structure 31 Reinforced Cement Concrete 1 : 1 1 / 2: 3 ( One Cement, Oneand Half Sand And Three Coarse Aggregate ) Using 20Mm Size Hard Broken Stone Jelly ( Machine Crushed ) For The Following Members.The Rate To Excludethe Cost Of Steel For Reinforcement, Centering, Shuttering, Strutting But Includingcost Of Mixing Of Concrete, Placing, Vibrating With Mechanical Vibrator, Finishingand Curing Etc. Complete And As Directed By Twad Board Officers. 32 Reinforced Cement Concrete 1 : 1 1 / 2: 3 ( One Cement, Oneand Half Sand And Three Coarse Aggregate ) Using 20Mm Size Hard Broken Stone Jelly ( Machine Crushed ) Excluding Cost Of Steel Fabrication, Fixing In Position And Centring Charges But Including Mixing, Lifting And Vibrating For Sunshade 75Mm Thick At Wall Face And 50Mm Thick At Free End Projecting 45Cm From Wall Face Moulded Along With Lintel Etc. As Directed By Twad Board Officers. 33 Steel Centering For Soffits Of Rcc Members Including Shuttering, Strutting To The Centring And Providing Supports Etc.Complete For The Following Members Using Ms Sheets Of Size 90Cm X 60Cm And Bg 10 Gaugesstiffened With Welded Ms Angles Of Size 25 X 25 X3mm Laid Over Silver Oak ( Country Wood ) Joists Of Size 10 X 6.5 Cm ( Spaced At About 90Cm C / C ) And Supported By Casurania Props Of 10 Cmto 13 Cm Dia. Spaced At 75 Cm C / C And As Directed By Twad Board Officers.The Centring Materials Should Be Supplied And Should Be Removed After The Specified Stripping Time Of The Concrete As Per Is 456 / 1978. 34 Plastering With C.M. 1:5 ( One Part Of Cement And Five Parts Of Sand ) With 12Mm Thick Over Brickwork Portion Including Labour Charges For Mixing Finishing And Curing Etc., Complete And As Directed By Twad Board Officers. 35 Special Ceiling Plastering For Rcc Slab With C.M.1:3 ( One Part Of Cement And Three Parts Of Sand ) 10Mm Thickover Rcc Surface Including Labour Charges For Mixing Finishingand Curing Etc., Complete As Directed By Twad Board Officers. 36 Flooring In C C 1:4:8 ( One Cement , Four Sand And Eight Hbs ) 10 Cm Thick Using 40Mm Hbs Metal And Top Finished With Cement Mortar 1:3 ( One Cement And Three Sand ) 12 Mm Thick Including Labour Charges For Mixing, Finishing And Curing Etc. Complete And As Directed By Twad Board Officers. 37 Supply And Fixing Of Ms Door ( Single Leaf ) Of Sizes 1.00 X 2.00M In Ms Angle 50 X 50 X 4Mm And Ms Flat 35 X 6Mm With Ms Sheet Of 18 Gauge Including Ventilating Arrangements Using 20Mm Square Ms Rods With Locing Arrangements Including Two Coats Of Approved Enamel Painting Over One Coat Of Primer 38 Supply, Fabricating And Fixing In Position Of Rts Rods Including Cost Of Steel And Binding Wire Etc., Complete. 39 Supply And Fixing Of Rcc Box Type Jolly Of Size 0.6 X 0.45 M 40 Painting Two Coats With Approved Cement Paint Over One Priming Coat Of White Cementover Cement Plastered Wall Surface And Ceiling Including Cleaning Preparing The Surface And Curing Etc., Complete ( Using Cement Paint Of Colour As Approved By The Departm 41 White Washing Two Coats Using Fine Screened Shell Lime For The New Plastered Surface For Inner And Outer Side Of The Room Including The Cost Of Materials Labour Charges Etc., Complete And As Directed By Twad Board Officers. 42 Providingname Board 43 Photo Graphic Charges 44 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }

BOQ

Name of Work: Providing1 Nos of VikravandiBlock
Sl. No. Item Description
1Construction of Open well and Pump room and Motor accessories at Thoravi colony in Thoravi Panchayat
2Geophysical Investigation charges etc.complete
3Earth work open well excavation complying with relevent clausesof T.N.D.S.S well sinking and with lead upto 10 metre in Hard stiff clay ,stiff black cotton soil,hard red Gravel,stoney earth and earth mixed with small size bouldersearth,shales,murram and Hard Gravely Soil
4Earth work open well excavation complying with relevent clausesof T.N.D.S.S well sinking and with lead upto 10 metre in Soft Rock Notrequiring blasting
5Earth work open well excavation complying with relevent clausesof T.N.D.S.S well sinking and with lead upto 10 metre in Medium rock Notrequiring blasting
6Earth work open well excavation complying with relevent clausesof T.N.D.S.S well sinking and with lead upto 10 metre in Medium rock requiring blasting
7Earth work open well excavation complying with relevent clausesof T.N.D.S.S well sinking and with lead upto 10 metre in Medium rock requiring blasting
8Earth work open well excavation complying with relevent clausesof T.N.D.S.S well sinking and with lead upto 10 metre in Hard granite measured in solid including blasting and stacking
9VIth & depth (10.00 -12.00M)
10VIth & depth (12.00 -14.00M)
11Centering chaqrges For R C C Itemsincluding cost and conveyance etc .complete
12Supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works etc,.
13RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges, etc.
14Dewatering using 5hp to 70hp diesel engine pumpsetincluding Hire charges, cost of Diesel, Engine oil, pume operator, labour charges, conveyance of pumpset and fuel to site and back, loading,unloading and any otherincidental charges etc., complete.
15Motor accessories
16Supply, delivery and erection of Submersible Pumpset of50 LPMX 175 Head as per SOR TWAD - Page 88
17Supply and delivery of 3 phase Panel Board D.O.L with two level guard and auto start confirming to IS specification for 5 HP pumpset.TWAD SOR Page 101
18Supply, delivery of 1.1 KV Grade,PVC insulated and sheathed3 core flat copper submersible cable with ISI marking conforming of IS 694/1990 of reputed make for submersible motor erected in borewell.
19Supply and delivery of MS Kiosk of size0.75m x 0.45m x 0.75m made up of MSangle of size 50mm x 50mmx 4mm alroundcovered with 16 gauge MS sheet and kioskdoor made up of MS plates of size 25 mm x3 mm including cutting, welding, grinding,locking arrangements and labour charges
20HDPE50mm dia Pipe
21Motor Accessories
22Labour charges for erection of submersible pump set including fixing and jointing the submersible cable with clamps to the required depth, valves and errection panel board control room twin earthing as per I.E Rules including cost of civil works
23Pump Room
24Earth work excavation & depositing on bankwith an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessarydepositing thesurplus earth on bank and otherincedential charges etc., complete and as directed by TWAD board Officers
25Levelling course with P.C.C 1:4:8 (one cement, four sand and eigth course aggregate) using 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the TWAD Board Officers.
26Earth filling in basement & sides of foundation with excavated earth including ramming and consolidation etc., complete
27Supply and filling the foundation and basement with clear river sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by TWAD Board Officers.
28Brick work in CM 1:5 (one cement and five sand) using country bricks of size 8.75\" X 4.25\" X 2.00\" including cost of all materials, labour charges, curing etc., complete and as directed by TWAD Board Officers.
29For foundation and basement
30For super structure
31Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishingand curing etc. complete and as directed by TWAD Board Officers.
32Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) excluding cost of steel fabrication,fixing in position and centring charges but including mixing,lifting and vibrating for SUNSHADE 75mm thick at wall face and 50mm thick at free end projecting 45cm from wall face moulded along with lintel etc. as directed by TWAD Board Officers.
33Steel centering for soffits of RCC members including shuttering,strutting to the centring and providing supports etc.complete for the following members using MS Sheets of size 90cm x 60cm and BG 10 Gaugesstiffened with welded MS angles of size 25 x 25 x3mm laid over Silver Oak(country wood) joists of size 10 x 6.5 cm (spaced at about 90cm C/C) and supported by Casurania props of 10 cmto 13 cm dia. spaced at 75 cm C/C and as directed by TWAD Board Officers.The centring materials should be supplied and should be removed after the specified stripping time of the concrete as per IS 456/1978.
34Plastering with C.M. 1:5(One part of cement and Five parts of sand) with 12mm thick over brickwork portion including labour charges for mixing finishing and curing etc., complete and as directed by TWAD Board Officers.
35Special ceiling plastering for RCC Slab with C.M.1:3(One part of cement and Three parts of sand) 10mm thickover RCC surface including labour charges for mixing finishingand curing etc., complete as directed by TWAD Board Officers.
36Flooring in C C 1:4:8 (one cement ,four sand and eight HBS) 10 cm thick using 40mm HBS metal and top finished with Cement mortar 1:3 (one cement and three sand) 12 mm thick including labour charges for mixing,finishing and curing etc. complete and as directed by TWAD Board Officers.
37Supply and fixing of MS door (Single leaf) of sizes 1.00 x 2.00m in MS angle 50 x 50 x 4mm and MS flat 35 x 6mm with MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locing arrangements including two coats of approved enamel painting over one coat of primer
38Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
39Supply and fixing of RCC box type jolly of size 0.6 x 0.45 m
40Painting two coats with approved cement paint over one priming coat of white cementover cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departm
41White washing two coats using fine screened shell lime for the new plastered surface for inner and outer side of the room including the cost of materials labour charges etc., complete and as directed by TWAD Board Officers.
42ProvidingName Board
43Photo Graphic Charges
44GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}

AI Tender Summary

OUR REF NO 40285109
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 07-11-2023
Authority
Authority Name Rural Development And Panchayats Department
Work Description Tender For Providing 1 Nos Of Vikravandi Block; 1 Construction Of Open Well And Pump Room And Motor Accessories At Thoravi Colony In Thoravi Panchayat 2 Geophysical Investigation Charges Etc.Complete 3 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Hard Stiff Clay , Stiff Black Cotton Soil, Hard Red Gravel, Stoney Earth And Earth Mixed With Small Size Bouldersearth, Shales, Murram And Hard Gravely Soil 4 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Soft Rock Notrequiring Blasting 5 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Medium Rock Notrequiring Blasting 6 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Medium Rock Requiring Blasting 7 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Medium Rock Requiring Blasting 8 Earth Work Open Well Excavation Complying With Relevent Clausesof T.N.D.S.S Well Sinking And With Lead Upto 10 Metre In Hard Granite Measured In Solid Including Blasting And Stacking 9 Vith & Depth ( 10.00 -12.00M ) 10 Vith & Depth ( 12.00 -14.00M ) 11 Centering Chaqrges For R C C Itemsincluding Cost And Conveyance Etc .Complete 12 Supplying And Fabrication Of Steel Including Cost And Conveyance Ofsteel To Site And All Labour Charges For Straightening, Cutting To Length, Bending To Shape And Tying In Position And Forming Grills For All R.C.C Works Etc, . 13 Rcc 1:1.5:3 Mix Using 20 Mm Iss Sine Hbg Metal Including Cost And Conveyace Of All Materials And All Labour Charges, Etc. 14 Dewatering Using 5Hp To 70Hp Diesel Engine Pumpsetincluding Hire Charges, Cost Of Diesel, Engine Oil, Pume Operator, Labour Charges, Conveyance Of Pumpset And Fuel To Site And Back, Loading, Unloading And Any Otherincidental Charges Etc., Complete. 15 Motor Accessories 16 Supply, Delivery And Erection Of Submersible Pumpset Of50 Lpmx 175 Head As Per Sor Twad - Page 88 17 Supply And Delivery Of 3 Phase Panel Board D.O.L With Two Level Guard And Auto Start Confirming To Is Specification For 5 Hp Pumpset.Twad Sor Page 101 18 Supply, Delivery Of 1.1 Kv Grade, Pvc Insulated And Sheathed3 Core Flat Copper Submersible Cable With Isi Marking Conforming Of Is 694 / 1990 Of Reputed Make For Submersible Motor Erected In Borewell. 19 Supply And Delivery Of Ms Kiosk Of Size0.75M X 0.45M X 0.75M Made Up Of Msangle Of Size 50Mm X 50Mmx 4Mm Alroundcovered With 16 Gauge Ms Sheet And Kioskdoor Made Up Of Ms Plates Of Size 25 Mm X3 Mm Including Cutting, Welding, Grinding, Locking Arrangements And Labour Charges 20 Hdpe50mm Dia Pipe 21 Motor Accessories 22 Labour Charges For Erection Of Submersible Pump Set Including Fixing And Jointing The Submersible Cable With Clamps To The Required Depth, Valves And Errection Panel Board Control Room Twin Earthing As Per I.E Rules Including Cost Of Civil Works 23 Pump Room 24 Earth Work Excavation & Depositing On Bankwith An Initial Lead Of 10 Metre & Initial Lift Of 2 Metre In Hard Shift Clay, Stiff Block Cotton, Hard Red Earth Shales, Murrum, Gravel, Stoney Earth, And Earth Mixed With Small Size Boulders And Hard Gravelly Soil ( Ss 20B ) For Foundation Including Shoring, Strutting, Baling Out Water Providing Danger Light Wherever Necessarydepositing Thesurplus Earth On Bank And Otherincedential Charges Etc., Complete And As Directed By Twad Board Officers 25 Levelling Course With P.C.C 1:4:8 ( One Cement, Four Sand And Eigth Course Aggregate ) Using 40 Mm H.B.G Stone Including Mixing Concrete, Laying, Curing And Compacting Of Concrete Etc., Complete And As Directed By The Twad Board Officers. 26 Earth Filling In Basement & Sides Of Foundation With Excavated Earth Including Ramming And Consolidation Etc., Complete 27 Supply And Filling The Foundation And Basement With Clear River Sand In Layers Complying With Standard Specification Including Consolidation And Watering Etc. Complete And As Directed By Twad Board Officers. 28 Brick Work In Cm 1:5 ( One Cement And Five Sand ) Using Country Bricks Of Size 8.75 X 4.25 X 2.00 Including Cost Of All Materials, Labour Charges, Curing Etc., Complete And As Directed By Twad Board Officers. 29 For Foundation And Basement 30 For Super Structure 31 Reinforced Cement Concrete 1 : 1 1 / 2: 3 ( One Cement, Oneand Half Sand And Three Coarse Aggregate ) Using 20Mm Size Hard Broken Stone Jelly ( Machine Crushed ) For The Following Members.The Rate To Excludethe Cost Of Steel For Reinforcement, Centering, Shuttering, Strutting But Includingcost Of Mixing Of Concrete, Placing, Vibrating With Mechanical Vibrator, Finishingand Curing Etc. Complete And As Directed By Twad Board Officers. 32 Reinforced Cement Concrete 1 : 1 1 / 2: 3 ( One Cement, Oneand Half Sand And Three Coarse Aggregate ) Using 20Mm Size Hard Broken Stone Jelly ( Machine Crushed ) Excluding Cost Of Steel Fabrication, Fixing In Position And Centring Charges But Including Mixing, Lifting And Vibrating For Sunshade 75Mm Thick At Wall Face And 50Mm Thick At Free End Projecting 45Cm From Wall Face Moulded Along With Lintel Etc. As Directed By Twad Board Officers. 33 Steel Centering For Soffits Of Rcc Members Including Shuttering, Strutting To The Centring And Providing Supports Etc.Complete For The Following Members Using Ms Sheets Of Size 90Cm X 60Cm And Bg 10 Gaugesstiffened With Welded Ms Angles Of Size 25 X 25 X3mm Laid Over Silver Oak ( Country Wood ) Joists Of Size 10 X 6.5 Cm ( Spaced At About 90Cm C / C ) And Supported By Casurania Props Of 10 Cmto 13 Cm Dia. Spaced At 75 Cm C / C And As Directed By Twad Board Officers.The Centring Materials Should Be Supplied And Should Be Removed After The Specified Stripping Time Of The Concrete As Per Is 456 / 1978. 34 Plastering With C.M. 1:5 ( One Part Of Cement And Five Parts Of Sand ) With 12Mm Thick Over Brickwork Portion Including Labour Charges For Mixing Finishing And Curing Etc., Complete And As Directed By Twad Board Officers. 35 Special Ceiling Plastering For Rcc Slab With C.M.1:3 ( One Part Of Cement And Three Parts Of Sand ) 10Mm Thickover Rcc Surface Including Labour Charges For Mixing Finishingand Curing Etc., Complete As Directed By Twad Board Officers. 36 Flooring In C C 1:4:8 ( One Cement , Four Sand And Eight Hbs ) 10 Cm Thick Using 40Mm Hbs Metal And Top Finished With Cement Mortar 1:3 ( One Cement And Three Sand ) 12 Mm Thick Including Labour Charges For Mixing, Finishing And Curing Etc. Complete And As Directed By Twad Board Officers. 37 Supply And Fixing Of Ms Door ( Single Leaf ) Of Sizes 1.00 X 2.00M In Ms Angle 50 X 50 X 4Mm And Ms Flat 35 X 6Mm With Ms Sheet Of 18 Gauge Including Ventilating Arrangements Using 20Mm Square Ms Rods With Locing Arrangements Including Two Coats Of Approved Enamel Painting Over One Coat Of Primer 38 Supply, Fabricating And Fixing In Position Of Rts Rods Including Cost Of Steel And Binding Wire Etc., Complete. 39 Supply And Fixing Of Rcc Box Type Jolly Of Size 0.6 X 0.45 M 40 Painting Two Coats With Approved Cement Paint Over One Priming Coat Of White Cementover Cement Plastered Wall Surface And Ceiling Including Cleaning Preparing The Surface And Curing Etc., Complete ( Using Cement Paint Of Colour As Approved By The Departm 41 White Washing Two Coats Using Fine Screened Shell Lime For The New Plastered Surface For Inner And Outer Side Of The Room Including The Cost Of Materials Labour Charges Etc., Complete And As Directed By Twad Board Officers. 42 Providingname Board 43 Photo Graphic Charges 44 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }
Basic Detail
Tender No IDS 2023-24 Packge-1
Bidding Type Tender
Location
City Villupuram
State Tamil Nadu
Key Dates
Publish Date 19 Oct 2023
Submission Date 07 Nov 2023
Open Date 07 Nov 2023
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 23000
Exemption Not Available
Document List
270f2f25-538e-4988-83c7-40e343bf0b18.html
BOQ_453485.xls
TenderDocuments.rar
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 19, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 07, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 07, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

270f2f25-538e-4988-83c7-40e343bf0b18.html

xls

BOQ_453485.xls

rar

TenderDocuments.rar

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders