Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 08-11-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 15-11-2023 |
| Sl. No. | Item Description |
| 1 | Labour only for attending complaints of Air Conditioner carried out by manufacture\"s authorised mechanic from servicing center without any delay incl rectification of the defects after carefully opening and checking the ACs for smooth functioning complete all as specified and directed.Note :- Items required to be replaced for smooth functioning of ACs shall measure and paid separately under respective item of BOQ. |
| 2 | M & L for annual servcing of split AC of capacity 1.5/2.0 TR by disconnecting electric connection from its stabilizer or its electric supply board and removing the front cover of indoor split unit of AC and cleaning it with pressurised water and nylon brush, refixing the front cover of indoor unit. including removing the front cover of outdoor unit with polythen/plastic cover so that water shall not be entered in the motor while cleaning the outdoor unit and cleaning the condensing coilunit with pressurised water then applying one coat of descaling solution and cleaning with nylon brush.Cleaning of condensing coil of outdoor unit shall be properly carried out without damaging other parts, cheking and making serviceable electrical connection of DB, stabiliser, wiring of AC as per site condition and tightening of loose connection complete all as specified and directed. |
| 3 | Material and labour for flushing out system for leak testing of cooling coils attached with indoor and outdoor unit of split air conditioner using CO2/ nitrogen Gas arrest of leakage with brazing of copper pipe including gas charging with using refrigerant R-22, oil charging complete in compressor window type AC/ Split type AC cap.1.5/2 Ton all as directed & with entire satisfaction of Engineer-in-Charge.and retest again for rectification leakage on load complete all as specified and directed. |
| 4 | Description all as per item No 3.00 here-in-before but using gas charging with Gas R-32 complete all as specified and directed. |
| 5 | Description all as per item No 3.00 here-in-before but using gas charging with Gas R-410a complete all as specified and directed. |
| 6 | Labour only for dust cleaning of dust filter of indoor unit to obtain maximum effeciency of split AC 1.5/2.0TR complete as per schedule complete all as specified and directed.Note : Dust cleaning of filter shall be required on every 45 day. Each cleaning is measured as one Job. |
| 7 | NOTE FOR ITEM No 1.00to 6.00 above:-(a)All T & P/Stationeries and labour team required comprising of sufficient trained technician (Ref Mech/helper) will be provided by the contractor daily for location ie Makarpura / Harni area as directed. During MES mela or any other occasion the contractor will arrange additional menpower to rectify the complaint within justified time.b) Rep of the contractor will present in complaint cell & responsible for receiving & attending the complaints from 08.30 Hrs to 04.30 Hrs. In absence of rep of Contractor penal recovery as decided by GE shall be imposed on contractor.(c) Cost of minor stores such as screws,clamps,insulation tapes,nuts/bolts, nail of required size, lubricating oil/grease etc shall deemed to be included in the above quoted rates. However, major items such as Protecting relay, gas,capacitor, etc shall be measured and paid separately under appropriate items of Schedule \"A\".(d) If contractor fails to rectify the complaint with in 24 hours after receiving, Rs 1000/- per complaint will be penalised. |
| 8 | Material and labour for replacement of unserviceablecut sealed compressor of window type/split type ACs 1.5TR capacity with new uncut sealed hermetically compressor unit supplied by the manufacturer complete unit including wiring as required to unit with flushing out system checking and rectification of leakage, includinggas charging complete and testing after completion of work at MES store yard for satisfactory functioning complete all as specified and directed.NOTE:- (i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms & conditions(ii)The new compressor unit will be purchased fromauthorized dealers only as perexisting make and model |
| 9 | Material and labour for replacement of unserviceablecut sealed compressor of split type ACs2TR capacity with new uncut hermetically sealed compressor unit supplied by the manufacturer complete unit including wiring as required to unit with flushing out system checking and rectification of leakage, including gas charging complete and testing after completion of work at MES store yard for satisfactory functioning:- NOTE:- (i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms & conditions. (ii)The new compressor unit will be purchased fromauthorized dealers only as perexisting make and model |
| 10 | Material and labor for replacement of unserviceablecut sealed compressor of split typeInvertors ACs1.5 TR capacity with new uncut hermetically sealed compressor unit supplied by the manufacturer complete unit including wiring as required to unit with flushing out system checking and rectification of leakage, including gas charging complete and testing after completion of work at MES store yard for satisfactory functioningcomplete all as specified and directed. NOTE:- (i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms & conditions. (ii)The new compressor unit will be purchased fromauthorized dealers only as perexisting make and model |
| 11 | Material and labor for replacement of unserviceablecut sealed compressor of split typeInvertors ACs2 TR capacity with new uncut hermetically sealed compressor unit supplied by the manufacturer complete unit including wiring as required to unit with flushing out system checking and rectification of leakage, including gas charging complete and testing after completion of work at MES store yard for satisfactory functioning complete all as specified and directed. NOTE:- (i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms & conditions. (ii)The new compressor unit will be purchased fromauthorized dealers only as perexisting make and model |
| 12 | Material and labour for gas charging R-410 A with rectification of leakageof dehumidifier if any and make it serviceable complete all as specified and directed |
| 13 | Material and labourfor replacement of defective wiring set (with suitable copper wire) of window/Split Air conditioner of cap 1.5/2 Ton complete all as specified and directed |
| 14 | Cheking of refrigirent pressure ofsplit AC system by using pressur gauge and topping up the refergirent gas to obtain pressure for R22 requires up to 60 to 65 PSI, R32 requires up to 110 to 120 PSI, and R410A requires up to 110 to 120 PSI and obtain desire level of cooling as per users satisfaction complete all as specified and directed. |
| 15 | R-22 |
| 16 | R-32 |
| 17 | R-410a |
| 18 | Supply and installation of Insulation pipe highly flexible pipe closed cellnitrile rubber Suitable forsuction /discharge copper tubes of 1.5 TR/2 TR split AC including PVC self adhesive with monsoon tape overthe insulation tape complete all as specified and directed. |
| 19 | M & L for replacement of copper pipe of size 1/4 \" from outdoor unit to indoor unit including soldering and brazing complete all as specified and directed |
| 20 | M & L for replacement of copper pipe of size 1/2 \" from outdoor unit to indoor unit including soldering and brazing complete all as specified and directed |
| 21 | M & L for replacement of copper pipe of size 5/8 \" from outdoor unit to indoor unit including soldering and brazingcomplete all as specified and directed |
| 22 | Material and labour fortaking down and refixingsplit type of capacity(Indoor and outdoor unit) 1.5/2 TR from one site to another site complete all as specified and directed |
| 23 | Material and labour for repairing of PCB card for non-invertor type AC of cap 1.5/2.0 TR all as specified and directed. |
| 24 | Material and labour for repairing of PCB card for invertor type AC for indoor and outdoor unit both of cap 1.5/2.0 TR all as specified and directed. |
| 25 | Replacement of following U/s items in split type AC: (Non invertor type AC) complete all as specified and directed. |
| 26 | Supply only Swing motor for indoor unit of window/Split Air conditioner of cap 1.5/2 TR |
| 27 | Supply only Condensor fan motor of Speed 900 RPM of window/Split Air conditioner of cap 1.5/2.0 TR |
| 28 | Supply only running capacitor clip type of cap. 50/2+4+6 MFD, 240 volts 50 cycles for window type/Split typeair conditioner 1.5/2.0 TR. |
| 29 | Supply only Over load protector with relay for 1.5/2.0 Ton cap for window/Split type AC. |
| 30 | Supply only Thermostat switch for window/Split AC cap.1.5/2.0 TR. |
| 31 | Supply only copper Cooling coil for indoor unit split type ACCap.1.5 /2.0 TR. |
| 32 | Supply only Copper condenser unit (Heating Condenser) for out door unit for split type ACCap.1.5 /2.0 TR. |
| 33 | Supply only Blade of condensing fan motor for window/split type (outdoor unit) AC cap1.5/2.0 TR. |
| 34 | Supply only Connector unit |
| 35 | Supply only PCB Card for split type AC of capacity 1.5 TR |
| 36 | Supply only PCB Card for split type AC of capacity 2 TR |
| 37 | Supplu only Remote hand set for split type AC 1.5/2 TR Capacity |
| 38 | Supply only Valve 1/2 \" ,1/4 \" and 5/8 \"for split type of capacity 1.5/2.0 TR |
| 39 | Supply only Cooling coil and room temperature sensor |
| 40 | Supply only Display unit for 1.5/2 Ton AC |
| 41 | Supply only blower motor of indoor unit of split type of cap 1.5 /2 TR. |
| 42 | Supply only PT relay for split type Acs of Capacity 1.5/2 TR. |
| 43 | Supply only airfilter for split type ac for 1.5/2 TR. |
| 44 | Supply only outdoor unit jali for split type ac for 1.5/2 TR. |
| 45 | Supply only Outdoor fan motor as per existing for 1.5/2.0 Ton Spilt AC |
| 46 | Supply only Compresser Capacitor as per existing for 1.5/2.0 Split type AC |
| 47 | Supply only Swing Patti as per existing for 1.5/2.0 Split type AC |
| 48 | Supply only Drain pipe as per existing for 1.5/2.0 Split type AC |
| 49 | Supply only PCB Transformer as per existing for 1.5/2.0 Split type AC |
| 50 | Replacement of following U/s items in split type AC: (Invertor type AC) complete all as specified and directed. |
| 51 | Supply only PCB card for indoor and outdoor unit both for 1.5/2.0 Ton Invertor type AC as per existing |
| 52 | Supply only Fan motor of 1.5/2.0 Ton split type invertor Acs as per existing. |
| 53 | Supply only outdoor heating condenser of 1.5/2.0 Ton split type invertor Acs as per existing. |
| 54 | Supply only Sensor of 1.5/2.0 Ton split type invertor Acs as per existing. |
| 55 | Supply only remote control of 1.5/2.0 Ton split type invertor Acs as per existing. |
| 56 | Material and Labourfor replacement of unserviceable hermitically sealed compressor suitable forwater cooler cooling capacity 40 liters/hour with new uncut sealed compressor supplied by manufacture complete all as specified and directed.Note:- i) The rate quoted by the contractor including all charges like transportation , filling oil & gas charging incl flushing out system ,checking and rectification of leakage etc and testing complete up to entire satisfaction of Engr-in-charge with necessary guarantee period as per the company terms and condition ii)The new sealed unit will be purchased from authorized dealer only. |
| 57 | Material and Labour for Replacement of copper filter and capillary tube of water cooler of cooling capacity 40 Ltr/hrcomplete all as specified and directed |
| 58 | Materialand Labour forReplacement of relay with over load protectors for suitable water cooler of 40 Ltr/hr cooling capacityas per site requirementcomplete all as specified and directed |
| 59 | Material and Labour forReplacement of condenser fan of motor HP- 1/32, RPM-1300 suitable forwater cooler havingcooling cap 40 Ltr/hrwith clips and motor fixing stand with fan blade complete all as specified and directed |
| 60 | Material and Labour for Replacement of thermostat switch with knob for water cooler. having cooling capacity 40 Ltrs / hrcomplete all as specified and directed |
| 61 | Material and Labour forReplacement of starting capacitor 40/60 Mfd oil filled240 volt AC Supplycomplete all as specified and directed |
| 62 | Material and Labour for Replacement of running capacitor of 10 Mfd oil filled complete all as specified and directed |
| 63 | Material and Labour for brass float valve 15 mm bore with PVC float, ball ISI Marked complete with check nut /socket/GI nipple complete all as specified and directed |
| 64 | Material and Labour for replacement of top cover of water cooler with rubber beading, hinges screws etc complete for 40 Ltr/Hr cap. water cooler complete all as specified and directed |
| 65 | Material and Labour for rewinding of condensing fan motor of water cooler (1/35 HP) cap. 40 Ltr/Hr with supper enameled copper wire of suitable gauge complete incl. insulating material and replacement of gun metal bush & capacitor 2.5 MFD. complete all as specified and directed |
| 66 | Material and labour for replacement of fan blade for condensing fan motor (as per sample) suitable for water cooler having cooling capacity 40 Ltr/Hr water cooler. complete all as specified and directed |
| 67 | S & F condenser unit complete suitable for 40 Ltr/Hr cap. water cooler incl repairs of leakages in system including gas charging flushing out the system brazing,welding and jointing the suction reed and discharge reedcomplete all as specified and directed |
| 68 | Material and labourfor flushing out system, checking and rectification of leakages if any and make it serviceable incl. gas charging with suitable refrigerant, oil charging complete in compressor of water coolar all as directed & with entire satisfactioncomplete all as specified and directedNote: Once the system is repaired and gas is charged, the contractor shall stand responsible for any leakage and recharging of gas for next one year from the date of repair without any extra cost. |
| 69 | S&F in repair for Desert Cooler fan motor 3 speed,1400 RPM of make as approved by GE of capacity of 1/5 HP complete all as specified and directed |
| 70 | Material and labour for replacementof oil filled type capacitor for fan motor cap 4 MFD, 240 voltssuitable for desert cooler fan complete all as specified and directedmotor . |
| 71 | Material and labour for replacement of front grill (moveable) of the Desert Cooler made out of 20 gauge PGI sheet complete incl.Selector switch with knob,indicator etc. Suitable for 4000 /5000 cfmDesert Cooler complete all as specified and directed |
| 72 | Material and Labour for replacment ofBottom water tank of size 750x750x200 mm fabricated out of 18 gauge PGI sheet.inclnuts bolts and washers etccomplete all as specified and directed |
| 73 | Material and labour for replacement of side supporting columns fabricated out of 20 gauges PGI sheet of size 80x80x800 mm incl. necessary nut, bolts etc . complete all as specified and directed |
| 74 | Material and labour for replacement of side panel made out of 22 gauge PGI Sheet with suitable handles including painting to match with the existing desert cooler complete all as specified and directed |
| 75 | Material and labour for replacement of top covermade out of 22 gauge PGI Sheet including painting to match with the existing desert coolercomplete all as specified and directed |
| 76 | Material and labour for painting to old steel surfaces of Desert cooler up to 5000 cfm with two coatsof synthetic enamel paint over and incl one coat of red oxide on external surface & two coats of anti corrosive black paint inside the Body tank & side grills over and incl a coat of Red Oxide on internal surfaces including scraping/rubbing with wire brush on old surface of Desert cooler. and writing of MES NO etccomplete all as specified and directed.Note: Painting shall be done through spray painting method. |
| 77 | Material and labour for replacement ofsubmersible pump of discharge head 2.5 Mtr 220-240 Volts AC Supply single phase 40 wattcomplete all as specified and directed |
| 78 | S&F in replacement Wood / wool chips pad for Desert Cooler (set of three pads) superior quality complete all as specified and directed |
| 79 | S&F in replacement supporting jali of wood/wool chips pad set made out of hard MS wire and fitted in side louvers complete all as specified and directed |
| 80 | S&F in replacement selector switch with knob three speed for D/C fan motorcomplete all as specified and directed. |
| 81 | Material and labour for replacement of PVC insulated and PVC sheathed cable copper conductor 3 core 23/0.0076 cross sectional area superior qualitycomplete all as specified and directed |
| 82 | S&F in replacement PVC water distributor of 3 out lets withMS nuts & bolts complete (as per sample) complete all as specified and directed |
| 83 | S&F in replacement PVC elbow suitable for desert cooler (as per sample) complete all as specified and directed |
| 84 | S&F in replacement PVC pipe 15 mm dia heavy duty for D/Cooler Pumpcomplete all as specified and directed |
| 85 | S&F in replacement 3 pin plug top cap 5 Amp AC 240 Volts 50 Hz complete all as specified and directed |
| 86 | S&F in replacement motor fixing ring for desert cooler eight screw / clip type(asper sample) complete all as specified and directed |
| 87 | Supply and fix in repair voltage stablizer for automatic operation single phase naturally air cooled indoor type having low and high voltage cut-off protection, inbuilt thermal protection & designed for input variation between 170 V to 250 V with output voltage stabilized at 230 V with accuracy +/- 2.5% and of capacity of 5 KVA wall mountable complete all as specified and directed.Note: rates for fixing of existing ACs and power supply via volatge stabilizer deemed to be considered in quoted rates. |
| 88 | Material and Labourfor flushing of system, testing and repairs of leakages in system charging of Gas(between inner cooling cabin and outer fabrication), Oil complete incl. testing andcommissioning of deep freezer of capacity upto 300 Ltrs of any makecomplete all as specified and directedNote: Spares to be used in repair, gas charging and transportation to workshop and back to site shall be deemed to be included in the quoted rates. |
| 89 | Material and Labourfor replacement of unserviceable hermitically sealed compressor suitable fordeep freezer of capacity 300 Ltrs with new uncut sealed compressor supplied by manufacture complete all as specified and directed.Note:-(i) The rate quoted by the contractor including all charges like transportation, filling oil & gas charging incl flushing out system ,checking and rectification of leakage etc and testing complete up to entire satisfaction of Engr-in-charge with necessary guarantee period as per the company terms and condition.(ii)The new sealed unit will be purchased from authorized dealer only. |
| 90 | Supply, fixing and fabricating and testing of desert cooler in GI body sheet with and including cooler fan motor size/Sweep 450 mm (fan blade only) 230 V single phase 50 Hz, 1400 RPM, heavy duty single sheet, totally enclosed. The overall dimensions of the deset cooler shall not be less than 690mm x 690mm x 1020mm with and including following accessories each complete all as specified and directed.(a) Air grill of suitable size made out of 0.5mm PGI sheet including GSS arrangment with a knob for easy and smooth movement.(b) Front & Side panel made out of 1mm thick PGI Sheetof Sitable size and shape.(c) Water tank height should not less than 11 inch made out of 2 mm thick PGI Sheet.(d) Submersible pump electric driven single phase 230 v , 50 Hz of suitable and head but motor capacity not less than 18 watt. (e) Service cord of 3 Core Copper wire 1.5 Sqmm with plug top 5 Amps lenght not less than 2 m.(f) Electric fan dimmer 1000 watts AC 239 V for controlling the fan speed.(g) Complete electric wiring of desert coolers as required to operate fan and pump along with 5 Amps Swithes. |
| 91 | Material and labourfor replacement of unserviceable hermiticallysealed compressor of Refrigerator 310/280 Ltr. Capacity with fresh new uncut sealed compressor including suitable relay and over load protector with new sealed unit as per the company scheme supplied by the manufacturer complete including flushing out system, checking and rectification of leakage,gas charging, complete and testing after completion of work at MES Store yard for satisfactory function complete all as specified and directed.Note:- (i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms and conditions. (ii)The new unit will be purchased from authorized delar only. |
| 92 | Description all as per item Ser No 58.00 here-in-before but for 165/170/180 Ltr capacity refrigerator complete all as specified and directed. |
| 93 | Material and labour for replacement of relay suitable for 280/310 Liters cap. refrigerator complete all as specified and directed. |
| 94 | Description all as per item Ser No 60.00 here-in-before but cap 165 Liters complete all as specified and directed |
| 95 | S&F in replacement thermostat automatic `R\" frost with knob suitable for 165/286/310 liters cap refrigerator complete all as specified and directed. |
| 96 | Material and labourfor replacement of door gasket of best quality complete suitablefor 280/310 liters cap refrigerator as per manufacturer\"s instruction complete all as specified and directed |
| 97 | Description all as per item Ser No 63.00 here-in-before but for 165/170/180 Ltrs Cap complete all as specified and directed |
| 98 | S&F in replacement Bulb pin /screw type, 230 Volts suitable for 286/310 Ltrs Cap. Refrigerator complete all as specified and directed |
| 99 | Description all as per item Ser No 65.00 here-in-before but for 165/170/180 Ltrs Cap complete all as specified and directed |
| 100 | S&F in replacement refrigerator door handle of 165/ 286/310 Ltrs Cap. of any make.and model complete all as specified and directed |
| 101 | S&F in replacement freezer assy (including gas charging R-134/600) complete with screw,jointing of tubes etc. and testing of cap. 280/310 Ltrs refrigerator complete all as specified and directed |
| 102 | Description all as per item Ser No. 68.00 here-in-before butof capacity 165/170/180 Ltr refrigerator complete all as specified and directed |
| 103 | S&F in replacement condenser unit of refrigerator cap. 280/310 Ltrs of any make includingjointing of tubes andtesting etc. complete all as specified and directed.(Gas charging will be measured and paid under relevant item separately) |
| 104 | Description all as per item Ser No. 70.00 here-in-before butfor 165/170/180 ltrs capacity refrigerator complete all as specified and directed |
| 105 | S&F in replacement timer of refrigerator cap. 280/310/165 Ltrs of any make complete all as specified and directed |
| 106 | S&F in replacement PCB of refrigerator cap. 280/310/165 Ltrs of any make complete all as specified and directed. Hitachi/Voltas |
| 107 | S&F in replacement cooling coil of refrigerator cap 280/310/165 Ltrs as per existing complete all as specified and directed |
| 108 | S&F in replacement capilary of refrigerator cap 280/310/165 Ltrs as per existing complete all as specified and directed |
| 109 | Dimantling old u/s warnout outdoor unit of AC Cap 1.5 TR and supply and Fix new outdoor unit in repalcement as per existing make including compressor suitable for 1.5 TR tonnage and all controls complete all as specified and directed. |
| 110 | Description all as per item Ser No 76.00 here-in-before but for 2 TR capacity complete all as specified and directed |
| 111 | Dismantling old u/s indoor unit of AC Cap 1.5 TR and supply and fix new indoor unit in repalcement as per existing make and 1.5 Ton rating including filters, remote control, control wiring etc complete all as specified and directed. |
| 112 | Description all as per item Ser No 78.00 here-in-before but for 2 TR capacity complete all as specified and directed |
| 113 | Labour for checking and finding the defect of Dehumidifier, Auto Humiditiy sense test, Pressure test, Leak testing of Dehumidifier including cleaning and descaling installed at 57 ASP Storage Bldg and LLQRM Buildings for maintating the required humiditiycomplete all as specified and directed.Note :- All defective items required for smooth functioning of equipment shall be measure and paid separately under respective item of BOQ. |
| 114 | Supply and fix Power Circuit Board for controliing all parameters of Dehumidifier such astemperatute, humidity, etc complete all as specified and directed. |
| 115 | S&F in replacement Condenser for Fan motor of speed 600 RPM suitable for dehumidifier all as specified and directed. |
| 116 | S&F in replacement Condenser for Fan motor Rotational Blade suitable for dehumidifier all as specified and directed. |
| 117 | Labour only for attending complaints of Air curtain carried out by manufacture\"s authorised mechanic from servicing center without any delay with rectifying the defects by carefully opening and check the Acs for smooth functioning complete all as specified and directed.Note :- All defective items required for smooth functioning of equipment shall be measure and paid separately under respective item of BOQ. |
| 118 | S&F in replacement fan Blower motor suitable for air curtain complete all as specified and directed. |
| 119 | S&F in replacement Power circuit board suitable for Air curtain complete all as specified and directed. |
| 120 | Material and laborfor rewinding of blower motor ofSpeed 900 RPM of window/Split Air conditioner of cap. 1.5/ 2tonany make with super enameled copper conductorincluding replacement of worn out bushes ,Shaft and capacitor etchant testing complete all as specified and directed |
| 121 | S&F digital AC Timer Unit Meant for Cyclic Operation of two any type Air Conditioner each AC can be kept On from 01 hr to 24 hr (Max in this Unit) AC on condition is showm by their respective display.Company provides 12 months unconditional warranty. It has LCD fully digital display can see all parameter like AC1 on/AC2 on, balance time and set timer, AC1 Manual/AC2 Manual facility also provided complete all as specified and directed. |
| 122 | Labour only for attending complaints of Air conditioner Plant of 22 TR each carried out by manufacture\"s authorised mechanic from the servicing centre without any delay with rectified the defects by carefuly opening and check the ACs parts which defects find out at site and replace the defected parts from the ACs for smooth functioning complete all as specified and directedNote :- Supply only item shall be measured andpaid separately under respective item of BOQ |
| 123 | S&F in repair of copper piping with fittings for hot gas line from package AC unit to outdoor condenser unit, hard copper pipe of 18 guage having size of 5/8\" with supporting accessories and painting complete all as specified and directed. |
| 124 | S&F in repair of copper piping with fittings for liquid line from package AC unit to outdoor condenser unit, hard copper pipe of 18 guage having size of 7/8\" with supporting accessories and painting complete all as specified and directed. |
| 125 | S&F in repair cath all driers 5/8\"x5/8\" for package type AC complete all as specified and directed. |
| 126 | S&F in repair ball valves 5/8\" in liquid line for package type AC complete all as specified and directed. |
| 127 | Material and labour for flushing out system, checking and rectification of leakages if any and make it serviceable including gas charging with refrigerant R-407C complete in compressor package type AC plant capacity 11TR Ton with entire satisfaction of Engineer-in-Charge complete all as specified and directed. |
| 128 | S&F in repair of motor protection device (MPD) rating 11 to 30 Amp with display suitable for package type AC of capacity 22 TR complete all as specified and directed. |
| 129 | Material and labour for servicing/ overhauling with chemical wash of package type AC capacity 22 TR for each Unit complete all as specified and directed. |
| 130 | Material and labour for rewinding of blower motor of 5 HP 3 Phase 415 V package type AC capacity 22 TR with super enameled copper conductor including replacement of worn out bushes, Shaft etc and testing complete all as specified and as directed. |
| 131 | Material and labour for rewinding of condenser fan motor of package type AC capacity 22 TR with super enameled copper conductor including replacement of worn out bushes, shaft and capacitor etc and testing complete all as specified and as directed. |
| 132 | Supply and fix in repair of contactor CE certified for 5 HP motor starter 415 V, 50 Hz capacity for blower motor of AC plant of capacity 22 TR complete all as specified and directed |
| 133 | Supply and fix in repair of contactor CE certified for 11 TR compressor 415 V, 50 Hz capacity for AC plantcomplete all as specified and directed |
| 134 | Supply and fix Voltas PKC Unit Display of 22 TR Unit of AC Plant for controliing all parameters of AC plant Unit such astemperatute, humidity, timer, pressure, temperature, etc complete all as specified and directed |
| 135 | Supply and fix Outdoor Unit Fan Blade od Condenser of AC Plant complete all as specified and directed |
| 136 | Attending complaint of leaking of water indoor unit of 1.5 TR/ 2 TR AC, dismantling the front cover cleaning of duct / dirt from duct of the indoor unit tighten the water pipe and refixed the same in position complete all as specified and directed |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail