Drinking Water And Sanitation Department has published Tender For Annual Rate Contract For Repairing Of Different Duties Pumps In Executive Engineer Uttarakhand Jal Sansthan, Division Pithoragarh. Submission Date for this Tender is 27-10-2023. Spare Part Tenders in pithoragarh Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Rates for Annual Rate Contract For Repairing Of Different Duties Pumps In Executive Engineer Uttarakhand Jal Sansthan, Division Pithoragarh. |
2 | Financial Year 2023-24 |
3 | Complete Overhaulling of Meghraj Make/ WPIL Make, VT Pump having discharge 2150 LPM at 30 M head & 1450 RPM operated by 30 HP Motor as per below spare parts at Raw water Ghat Pumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
4 | Shaft Coupling Bush with Thrud |
5 | Spendle Bush |
6 | Rubber Coupling |
7 | Column pipe 1.5 m long and 200 mm dia |
8 | Column pipe flanze |
9 | Welding work for flanze nut bolt 15 mm dia |
10 | Tale Piece |
11 | Spindle Sleeve bush with thrud |
12 | Line Shaft 3.00 mtr into 2.5 cm |
13 | T.T. Plate |
14 | Gland Bush |
15 | Impeller G.M. |
16 | Pump Shaft 1.5mt x 2.5 cm |
17 | Motor Shaft 1.5 mt x 2.5 cm |
18 | Long Bush |
19 | Short Bush with Thured |
20 | Gland Dori 12 mm dia |
21 | Hole Tight |
22 | Champion Packing |
23 | Nut bolt 7.5 cm x 12mm |
24 | Spray For nut bolt |
25 | Grease waxpole |
26 | Repairing of Suction and delivery base |
27 | Diffuser |
28 | Gland Dori |
29 | Riched Coupling |
30 | Riched Bush |
31 | Check Nut |
32 | Impeller Lock |
33 | Shaft Key |
34 | Spindle |
35 | Casing rubber ring |
36 | Shaft oil ring |
37 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
38 | Transportation and labour charges for cartage of material from road head to pump house. |
39 | Complete Overhaulling of Mather & Platt Make, Model 1PB, 5CHR, Centrifugal horizontal Pump having discharge 2050LPM at 200 M head & 1485 RPM operated by 150 HP Motor as per below spare parts at GhatClear water Pumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
40 | Impeller : Bronze |
41 | Shaft EN8: SS |
42 | Neckring Large |
43 | Neckring Small |
44 | Long Bush GM |
45 | Short Bush GM |
46 | Check Nut |
47 | Bearing Brass |
48 | Balancing plate Bronze |
49 | Balancing Disc |
50 | Balancing Plate |
51 | Oil Ring GM |
52 | Spray For nut bolt |
53 | Hole Tight |
54 | Neckring brass Screw |
55 | Mobil Oil |
56 | Coupling Rubber Bush |
57 | Coupling Studs |
58 | Suction & Delivery repairing work |
59 | Diffuser |
60 | Gland Bush |
61 | Nut Bolt 7.5cm x 12mm |
62 | MS Coupling |
63 | Balancing stud |
64 | Gland (Brass) |
65 | Siction & Delivery Bush |
66 | Transformer oil |
67 | Casing rubber ring |
68 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
69 | Transportation and labour charges for cartage of material from road head to pump house. |
70 | Complete Overhaulling of Mather & Platt Make, 4/6 PJ, 12CHR, Centrifugal horizontal Pump having discharge 2050 LPM at 535 M head & 1485 RPM operated by 400 HP Motor as per below spare parts at MatelaPumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
71 | Impeller : Bronze |
72 | Shaft EN8: SS |
73 | Neckring GM |
74 | Long Bush with check nut GM+Nikle |
75 | Short Bush |
76 | Firki SS |
77 | Shaft Key Carbon |
78 | Gland Bush |
79 | Brass GM |
80 | Brass Bush for Housing GM |
81 | Pressure Plate GM |
82 | Balancing DiscGM |
83 | Sleeve |
84 | Neckring Small |
85 | Hole tight |
86 | Spray For nut bolt |
87 | Coupling Rubber Bush |
88 | Coupling Studs |
89 | Diffuser |
90 | Gland Dori |
91 | Riched Coupling |
92 | Riched Bush |
93 | Check Nut |
94 | Casing rubber ring |
95 | Mobil oil |
96 | Neckring Brass scrap |
97 | Balancing Screw |
98 | MS Coupling |
99 | Impeller Lock |
100 | Shaft Key |
101 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
102 | Transportation and labour charges for cartage of material from road head to pump house. |
103 | Complete Overhaulling of Mather & Platt Make, 4/6 PJ, 12CHR, Centrifugal horizontal Pump having discharge 2050 LPM at 535 M head & 1485 RPM operated by 400 HP Motor as per below spare parts at GurnaPumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
104 | Impeller : Bronze |
105 | Shaft EN8: SS |
106 | Neckring GM Large |
107 | Long Bush with check nut GM+Nikle |
108 | Short Bush |
109 | Firki SS |
110 | Shaft Key Carbon |
111 | Gland Bush |
112 | Brass GM |
113 | Brass Bush for Housing GM |
114 | Pressure Plate GM |
115 | Balancing DiscGM |
116 | Sleeve |
117 | Neckring Small |
118 | Hole tight |
119 | Spray For nut bolt |
120 | Coupling Rubber Bush |
121 | Coupling Studs |
122 | Oil Ring |
123 | Oil Cover |
124 | Casing Rubber Ring |
125 | Casing Repair |
126 | Diffuser Repair |
127 | Diffuser Supply |
128 | Mobil Oil |
129 | Champion Packing |
130 | Gland Dori |
131 | Balancing Screw |
132 | Neckring Screw |
133 | M.S Coupling |
134 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
135 | Transportation and labour charges for cartage of material from road head to pump house. |
136 | Complete Overhaulling of KSB MakeCentrifugal horizontal8CHR Pump having discharge 1700LPM at 200 M head & 1450 RPM operated by 125 HP Motor as per below spare parts at Hanuman MandirPumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
137 | Impeller : Bronze |
138 | Shaft EN8: SS |
139 | Neckring GM Large |
140 | Long Bush with check nut GM+Nikle |
141 | Short Bush |
142 | Firki SS |
143 | Shaft Key Carbon |
144 | Gland Bush |
145 | Bearing Bracket GM |
146 | Balancing DiscGM |
147 | Pressure Plate GM |
148 | SP Sleeve D/E: SS-410 |
149 | SP Sleeve ND/E:SS-410 |
150 | Gland Dori 12 mm |
151 | Champion Packing |
152 | Grease |
153 | Neckring Small |
154 | Spray For nut bolt |
155 | Coupling Rubber Bush |
156 | Coupling Studs |
157 | Casing Repair |
158 | Hole Tight |
159 | Diffuser |
160 | MS Coupling |
161 | Bearing 210 K |
162 | Bearing Sleev |
163 | Mobil Oil |
164 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
165 | Transportation and labour charges for cartage of material from road head to pump house. |
166 | Complete overhauling of Meghraj make VT Pump having discharge 2650 LPM at 69 M head & 1470 RPM operated by 60 HP Motor as per below spare parts at Thuligad Raw water pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
167 | Shaft Coupling Bush with Thrud |
168 | Spendle Bush |
169 | Rubber Coupling |
170 | Riched Coupling |
171 | Riched Couling Bush |
172 | Tale Piece |
173 | Spindle Sleeve bush with thrud |
174 | Line Shaft 1.5 mtr into 2.5 cm |
175 | T.T. Plate |
176 | Gland Bush |
177 | Impeller G.M./SS |
178 | Pump Shaft 1.5mt x 2.5 cm |
179 | Motor Shaft 1.5 mt x 2.5 cm |
180 | Long Bush |
181 | Short Bush |
182 | Gland Dori 12 mm dia |
183 | Hole Tight |
184 | Champion Packing |
185 | Nut bolt 7.5 cm x 12mm |
186 | Spray For nut bolt |
187 | Grease |
188 | Repairing of Suction |
189 | Spendor |
190 | Shaft Socket Bush |
191 | Neckring |
192 | Main pump shaft with throud |
193 | Nut Bolt pump body |
194 | Casing |
195 | Shaft lock |
196 | Deduction of GM |
197 | Deduction of Iron |
198 | S/O Tale Piece |
199 | Diffuser |
200 | Diffuser Repair |
201 | Casing repair |
202 | Impellor Lock Bush |
203 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
204 | Transportation and labour charges for cartage of material from road head to pump house Merut to Thuligad Raw water pump house |
205 | Complete overhauling of KSB Make Centrifugal Horizontal, 4CHR,Pump having discharge 2400 LPM at 210 M head & 2955 RPM operated by 180 HP Motor as per below spare parts at Kasanipumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
206 | Impeller : Bronze |
207 | Shaft EN8 |
208 | Neckring :CI |
209 | Long Bush with check nut GM+Nikkle |
210 | Short Bush CI |
211 | Shaft Key Carbon |
212 | Gland Plate : CI |
213 | Bearing Bracket CI |
214 | Gland Bush CI |
215 | Casing CI |
216 | Diffuser CI |
217 | Balance Disc : CI |
218 | Balancing Plate CI |
219 | Nut Bolt 50mm x 10 mm |
220 | Grease Plate CI |
221 | MS Coupling |
222 | Coupling nut bolt |
223 | Rubber Bush metallic |
224 | 25mm dia tie rod with bolt EN9 |
225 | Gland Dori 12 mm |
226 | Repairing of Suction and delivery |
227 | Bearing 208 K |
228 | Bearing Sleeve 208 K |
229 | Hole tight |
230 | Spray for nut bolt |
231 | Grease |
232 | Firki |
233 | Champion Packing |
234 | Oil |
235 | Tri Rod |
236 | Casing Rubber Ring |
237 | Cooling Pipe |
238 | Coupling Nut bolt |
239 | ACB Repair complete 600 Amp. |
240 | ACB 1200 Amp repair |
241 | TronsformerOil |
242 | Movil Oil |
243 | Cartage of material Kasani Gaon to Kasani Pump House |
244 | Reflex valve repair |
245 | Sluice valve repair |
246 | Repair of Delivery valve |
247 | Repir of Suction valve |
248 | Deduction of old material |
249 | Deduction of G.M. |
250 | Deduction of Iron |
251 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
252 | Transportation and labour charges for cartage of material from Meerut to pump house. |
253 | Complete overhauling of Kirloskar Make/KSB Make Centrifugal 9CHR, Horizontal Pump having discharge 330 LPM at 220 M head & 2900 RPM operated by 30 HP Motor as per below spare parts at Rai pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
254 | Impeller: Bronze |
255 | Shaft EN8 |
256 | Neckring:CI |
257 | Long Bush with check nut GM+Nikkle |
258 | Short Bush CI |
259 | Firki SS |
260 | Air cock : Brass |
261 | Shaft Key carbon |
262 | Gland Plate: CI |
263 | Bearing Bracket CI |
264 | Gland Sleeve small CI |
265 | Casing CI |
266 | Diffuser CI |
267 | Nut bolt 50mm x 10mm |
268 | Grease PlateCI |
269 | Nut Bolt 50mm x 10mm |
270 | Rubber Coupling 9” Dia |
271 | Coupling nut bolt |
272 | 25mm dia tie rod with bolt EN9 |
273 | Gland Dori 12mm |
274 | Hole tight |
275 | Spray for nut bolt |
276 | Grease |
277 | Bearing 7307 |
278 | Bearing 307 |
279 | Neckring |
280 | Cartage of Pump complete |
281 | Champion Packing |
282 | Repairing of suction |
283 | Repairing of Delivery |
284 | Gland Bush |
285 | M.S. Coupling |
286 | Tri Rod |
287 | O-Ring |
288 | Deduction of Old Bronze Material |
289 | Dedection of old iron scrap |
290 | Supply of Tale Piece |
291 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
292 | Transportation and labour charges for cartage of material from Meerut to Pithoragarh Rai Pumping Station |
293 | Complete overhauling of KSB Make Centrifugal, 14CHR, Horizontal Pump having discharge 100 LPM at 190 M head & 2900 RPM operated by12.5 HP Motor as per below spare parts at Chherapumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
294 | Impeller : GM |
295 | Neckring : GM |
296 | SP Sleeve D/E :SS-410 |
297 | SP Sleeve ND/E : SS-410 |
298 | Long Bush : GM |
299 | Small Bush : GM |
300 | Gland Plate CI |
301 | Pump Shaft with check nut & Key : EN 24 |
302 | M.S. Coupling with nut bolt 8 hole |
303 | Bearing bracket with stud CI |
304 | O-Ring |
305 | Rubber Coupling L 110 |
306 | Casing diffuser |
307 | Bearing 6306 |
308 | Hole tight |
309 | Spray for nut bolt |
310 | Grease |
311 | Repairing of suction and delivery |
312 | Grease Plate |
313 | Firki |
314 | Suction valve |
315 | Gland Bush |
316 | Shaft key carbon |
317 | Delivery |
318 | Diffuser |
319 | Champian Packing |
320 | Gland Dori |
321 | Tri Rod |
322 | Nut Bolt |
323 | Gland Dori |
324 | Deduction of old G.M. SCRAP |
325 | Deuction of old iron |
326 | Check Nut |
327 | Tale Piece |
328 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
329 | Transportation and labour charges for cartage of material from Meerut to pump house. |
330 | Complete overhauling of KSB Make Centrifugal, 13CHR, Horizontal Pump having discharge 300 LPM at 190 M head & 2900 RPM operated by25 HP Motor as per below spare parts at Hyupani Stage-Ist (Ghatudi)pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
331 | Impeller : Bronze |
332 | Shaft EN 8 |
333 | Neckring : CI |
334 | Long Bush with check nut GM+Nikkle |
335 | Short Bush CI |
336 | Shaft Key Carbon |
337 | Bearing Bracket CI |
338 | Gland Bush CI |
339 | Casing CI |
340 | Diffuser |
341 | Grease Plate |
342 | MS Coupling 8 Hole |
343 | Gland Dori 12 mm |
344 | Bearing 6305 |
345 | Rubber coupling 8 hole |
346 | Grease |
347 | Hole tight |
348 | Spray for Nut bolt |
349 | Repairing of Suction and delivery |
350 | Suction Delivery Repair |
351 | Nut Bolt |
352 | Bearing 6305 |
353 | Tri Rod |
354 | Firkki |
355 | Champion Packing |
356 | Gland Dori |
357 | Sleeve |
358 | Neckring |
359 | Cartage of Pump Complete |
360 | Repairing of Delivery |
361 | Gland Plate |
362 | Check Nut |
363 | O-Ring |
364 | Tale piece |
365 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
366 | Transportation and labour charges for cartage of material from Meerut to Pithoragarh.. |
367 | Complete overhauling of KSB Make Centrifugal, 13CHR, Horizontal Pump having discharge 300 LPM at 320 M head & 2900 RPM operated by25 HP Motor as per below spare parts at Hyupani Stage-IInd (Hyupani)pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
368 | Impeller : Bronze |
369 | Shaft EN 8 |
370 | Neckring : CI |
371 | Long Bush with check nut GM+Nikkle |
372 | Short Bush CI |
373 | Shaft Key Carbon |
374 | Bearing Bracket CI |
375 | Gland Bush CI |
376 | Casing CI |
377 | Diffuser CI |
378 | Grease Plate |
379 | MS Coupling 8 Hole |
380 | Gland Dori 12 mm |
381 | Rubber coupling 8 hole |
382 | Grease |
383 | Hole tight |
384 | Spray for Nut bolt |
385 | Repairing of Suction and delivery |
386 | Nut Bolt |
387 | Bearing 6305 |
388 | Tri Rod |
389 | Firkki |
390 | Champion Packing |
391 | Gland Dori |
392 | Sleeve |
393 | Neckring |
394 | Cartage of Pump complete |
395 | S/O Tale Piece |
396 | Shaft Check Nut |
397 | Check Nut |
398 | Gland Bush |
399 | Repair of Delivery |
400 | O-Ring |
401 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
402 | Transportation and labour charges for cartage of material from Meerut to Pithoragarh |
403 | Complete overhauling of Kirloakar Make Horizontal Pump having discharge 200 LPM at 310M head, 2940 RPM & 30 HP Motor as per below spare parts at Bankote Stage Ist pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
404 | Impeller: Bronze |
405 | Neckring: CI |
406 | Diffuser |
407 | Shaft SS |
408 | Bush Small |
409 | SP Sleeve D/E SS |
410 | SP Sleve ND/ESS |
411 | Casing |
412 | Bearing Bracket |
413 | Key Lock |
414 | M.S Coupling 8 Hole |
415 | Bearing 7307 NBC Make |
416 | Grease |
417 | Rubber Coupling 150 |
418 | Rubber Coupling 110 8 Hole |
419 | M.S Coupling L 150 |
420 | Long Bush |
421 | Check Nut EN 8 |
422 | Motor Connection Plate |
423 | Bearing 307 |
424 | Nut Bolt |
425 | Gland Dori |
426 | Hole tight |
427 | Champion Packing |
428 | Spray for Nut Bolt |
429 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
430 | Transportation and labour charges for cartage of material from road head to pump house. |
431 | Assembling of above pump with supplied parts & making alignment of above pump with motor on base plate & testing of pump on full load including all material,labour T&P etc complete. |
432 | Bronze Scrap (Only for deduction) |
433 | Iron Scrap (Only for Deduction ) |
434 | Supply of 32 mm dia balance flow pipe |
435 | Suction Delivery valve Repair |
436 | Tie Rod |
437 | Complete overhauling of Kirloakar Make Horizontal Pump having discharge 200 LPM at 310M head, 2940 RPM & 30 HP Motor as per below spare parts at Bankote Stage Ist pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
438 | Impeller: Bronze |
439 | Neckring: CI |
440 | Diffuser |
441 | Shaft SS |
442 | Bush Small |
443 | SP Sleeve D/E SS |
444 | SP Sleve ND/ESS |
445 | Casing |
446 | Bearing Bracket |
447 | Key Lock |
448 | M.S Coupling 8 Hole |
449 | Bearing 7307 NBC Make |
450 | Grease |
451 | Rubber Coupling 150 |
452 | Rubber Coupling 110 8 Hole 9” dia |
453 | M.S Coupling L 150 |
454 | Long Bush |
455 | Check Nut EN 8 |
456 | Motor Connection Plate |
457 | Bearing 307 |
458 | Nut Bolt |
459 | Gland Dori |
460 | Hole tight |
461 | Champion Packing |
462 | Spray for Nut Bolt |
463 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
464 | Transportation and labour charges for cartage of material from road head to pump house. |
465 | Assembling of above pump with supplied parts & making alignment of above pump with motor on base plate & testing of pump on full load including all material,labour T&P etc complete. |
466 | Bronze Scrap (Only for deduction) |
467 | Iron Scrap (Only for Deduction ) |
468 | Supply of 32 mm dia balance flow pipe |
469 | Suction Delivery valve Repair |
470 | Tie Rod |
471 | Complete overhauling of Mather & PlattMake, 100/150 IPB-T80, 8 Stage centrifugalPump having discharge 2100 LPM at 350 M head, 300 HP Motor as per below spare parts atGangolihatpumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
472 | Impeller: Bronze |
473 | Shaft SS |
474 | Neckring GM Large |
475 | Neckring Small |
476 | Long Bush with checkNut GM+Nikle |
477 | Short Bush |
478 | Long Bush |
479 | Firki SS |
480 | Shaft Key Carbon |
481 | Gland BushGM |
482 | Brass Bearing GM |
483 | Brass Bush for Housing GM |
484 | Pressure Plate : GM |
485 | Balancing Disc GM |
486 | Sleeve |
487 | Casing CI |
488 | Repairing of Suction and delivery |
489 | Hole Tight |
490 | Spray for Nut Bolt |
491 | M.S Coupling |
492 | Rubber Coupling |
493 | Coupling Stud |
494 | Brass Oil Ring |
495 | Champion Packing |
496 | Gland Dori |
497 | Mobil Oil |
498 | Grease |
499 | Casing Rubber Ring |
500 | Diffuser |
501 | Air Cock |
502 | Balancing Brass Screw |
503 | Neckring Brass Screw |
504 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
505 | Transportation and labour charges for cartage of material from road head to pump house. |
506 | Complete overhauling of Mather & PlattMake, 100/150 IPB-T80, 8 Stage centrifugalPump having discharge 2100 LPM at 350 M head, 300 HP Motor as per below spare parts atGangolihatpumping Station IInd Stage under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
507 | Impeller: Bronze |
508 | Shaft SS |
509 | Neckring GM Large |
510 | Neckring Small |
511 | Long Bush with checkNut GM+Nikle |
512 | Short Bush |
513 | Long Bush |
514 | Firki SS |
515 | Shaft Key Carbon |
516 | Gland BushGM |
517 | Brass Bearing GM |
518 | Brass Bush for Housing GM |
519 | Pressure Plate : GM |
520 | Balancing Disc GM |
521 | Sleeve |
522 | Casing CI |
523 | Repairing of Suction and delivery |
524 | Hole Tight |
525 | Spray for Nut Bolt |
526 | M.S Coupling |
527 | Rubber Coupling |
528 | Coupling Stud |
529 | Brass Oil Ring |
530 | Champion Packing |
531 | Gland Dori |
532 | Mobil Oil |
533 | Grease |
534 | Casing Rubber Ring |
535 | Diffuser |
536 | Air Cock |
537 | Balancing Brass Screw |
538 | Neckring Screw |
539 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
540 | Transportation and labour charges for cartage of material from road head to pump house. |
541 | Complete overhauling of Mather & PlattMake, 100/150 IPB-T80, 8 Stage centrifugalPump having discharge 2100 LPM at 350 M head, 300 HP Motor as per below spare parts atGangolihatpumping Station IIIrd Stage under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
542 | Impeller: Bronze |
543 | Shaft SS |
544 | Neckring GM Large |
545 | Neckring Small |
546 | Long Bush with checkNut GM+Nikle |
547 | Short Bush |
548 | Long Bush |
549 | Firki SS |
550 | Shaft Key Carbon |
551 | Gland BushGM |
552 | Brass Bearing GM |
553 | Brass Bush for Housing GM |
554 | Pressure Plate : GM |
555 | Balancing Disc GM |
556 | Sleeve |
557 | Casing CI |
558 | Repairing of Suction and delivery |
559 | Hole Tight |
560 | Spray for Nut Bolt |
561 | M.S Coupling |
562 | Rubber Coupling |
563 | Coupling Stud |
564 | Brass Oil Ring |
565 | Champion Packing |
566 | Gland Dori |
567 | Mobil Oil |
568 | Grease |
569 | Casing Rubber Ring |
570 | Diffuser Air Cock |
571 | Balancing Brass Screw |
572 | Neckring Brass Screw |
573 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
574 | Transportation and labour charges for cartage of material from road head to pump house. |
575 | Complete overhauling of KSBMake, 8 Stage MOVI-32/8 centrifugalPump having discharge 100 LPM at 200 M head operated by 15 HP Motor as per below spare parts atGangolihatpumping Station IIIrd Stage under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
576 | Impeller: Bronze |
577 | Shaft SS |
578 | Neckring GM Large |
579 | Long Bush with checkNut GM+Nikle |
580 | Short Bush |
581 | Firki SS |
582 | Shaft Key Carbon |
583 | Gland BushGM |
584 | Bush Bracket GM |
585 | Brass Bush for Housing GM |
586 | Pressure Plate : GM |
587 | Balancing Disc GM |
588 | Sleeve |
589 | Casing CI |
590 | Repairing of Suction and delivery |
591 | Bearing Bracket |
592 | MS Coupling 8 Hole 9” dia |
593 | Rubber Coupling |
594 | Coupling Stud |
595 | Brass Oil Ring |
596 | Champion Packing |
597 | Grease |
598 | Hole Tight |
599 | Spray for Nut Bolt |
600 | Gland Dori |
601 | Mobil Oil |
602 | Bearing |
603 | Suction Delivery Repair |
604 | Casing |
605 | Diffuser |
606 | Firkki |
607 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
608 | Transportation and labour charges for cartage of material from road head to pump house. |
609 | Complete overhauling of BeaconMake, CentrifugalPump having discharge 410 LPM at 450 M head operated by 100 HP Motor as per below spare parts atMarsoli pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
610 | Impeller: Bronze |
611 | Shaft EN: SS |
612 | Neckring GM Large |
613 | Long Bush with checkNut GM+Nikle |
614 | Short Bush |
615 | Firki SS |
616 | Shaft Key Carbon |
617 | Gland BushGM |
618 | Bush Bracket GM |
619 | Brass Bush for Housing GM |
620 | Pressure Plate : GM |
621 | Balancing Disc GM |
622 | Rubber Coupling |
623 | Air Cock Brass |
624 | Air Pipe |
625 | Sleeve |
626 | Coupling Nut Bolt SS |
627 | Gland Dori |
628 | Nut Bolt |
629 | Casing |
630 | Hole Tight |
631 | Spray for Nut Bolt |
632 | Diffuser |
633 | Bearing NU 206 |
634 | Grease |
635 | Coolin Pipe |
636 | Suction Delivery Repair |
637 | Balancing Plate |
638 | Balancing |
639 | Firkki |
640 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
641 | Transportation and labour charges for cartage of material from road head to pump house. |
642 | Complete overhauling of MAX Flow Make 41 MM-14 Pump Model, 14stage Centrifugal Horizontal Pump having discharge 150 LPM at 300 M head & 25 HP Motor as per below spare parts at Paun Stage Istpumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
643 | Impeller: Bronze |
644 | Shaft SS |
645 | Neckring: CI |
646 | Long Bushwith check nut GM+Nikkle |
647 | Short Bush CI |
648 | Shaft Key carbon |
649 | Bearing bracket CI |
650 | Gland Bush CI |
651 | MS Coupling 8 hole 9” dia |
652 | Diffuser CI |
653 | Bearing 3307 |
654 | Bearing 6306 |
655 | Grease plate CI |
656 | MS Coupling 8hole 9” dia |
657 | Gland Dori |
658 | Repairing of Suction and delivery |
659 | Bearing |
660 | Grease |
661 | Champion Packing |
662 | Hole tight |
663 | Spray tight |
664 | Rubber Coupling |
665 | Firkki Rubber |
666 | Casing |
667 | Tri Rod |
668 | Cartage of Pump complete |
669 | S/O of Pump Sction |
670 | S/O Pump |
671 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
672 | Transportation and labour charges for cartage of material from road head to pump house. |
673 | Complete overhauling of MAX Flow Make 41 MM-14 Pump Model, 14stage Centrifugal Horizontal Pump having discharge 150 LPM at 300 M head & 25 HP Motor as per below spare parts at Paun Stage-IInd pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
674 | Impeller: Bronze |
675 | Shaft SS |
676 | Neckring: CI |
677 | Long Bushwith check nut GM+Nikkle |
678 | Short Bush CI |
679 | Shaft Key carbon |
680 | Bearing bracket CI |
681 | Gland Bush CI |
682 | MS Coupling 8 hole 9” dia |
683 | Diffuser CI |
684 | Bearing 3307 |
685 | Bearing 6306 |
686 | Grease plate CI |
687 | MS Coupling 8hole 9” dia |
688 | Gland Dori |
689 | Repairing of Suction and delivery |
690 | Bearing |
691 | Grease |
692 | Champion Packing |
693 | Hole tight |
694 | Spray tight |
695 | Rubber Coupling |
696 | S/O of Pump Suction |
697 | S/O of Pump |
698 | Tri Rod |
699 | Cartage of Pump complete |
700 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
701 | Transportation and labour charges for cartage of material from road head to pump house. |
702 | Neckring SmallComplete ovehaulling of Kirloskarmake Centrifugal horizontal pump having discharge 200 LPM at 100 M head operated by 15 HP Motor as perbelow spare parts at Hureti Pumping station under divison Pithoragarh. Dismantling of above pump with all labour, T&P etc complete. |
703 | Impleller Bronze |
704 | Shaft :SS |
705 | Neckring GM |
706 | Long Bush with check nut GM+Nikle |
707 | Short Buh |
708 | Firki SS |
709 | Shaft Key Carbon |
710 | Gland Bush GM |
711 | Bush Bracket GM |
712 | BrassBush for Housing CI |
713 | Pressure Plate GM |
714 | Balancing Disc GM |
715 | Sleeve |
716 | Casing CI |
717 | Repairing of Suction and delivery |
718 | Beaing bracket CI |
719 | MS Coupling |
720 | Rubber Coupling |
721 | Coupling Stud |
722 | Brass Oil Ring |
723 | Champion Packing |
724 | Grease |
725 | Hole Tight |
726 | Spray Fot Nut bolt |
727 | Gland Dori |
728 | Mobile Oil |
729 | Gland Bush Rubber |
730 | 15HP Submercible Pump Complete |
731 | Gate valve 25 mm |
732 | Reflex valve 60mm |
733 | Nut Bolt |
734 | Casing |
735 | Labour charge for overhailling of above pump with supllied spare parts and making alignment of above pump with motor on the base plate and testing of pump on full load |
736 | Trasportation and labour charge for cartage of material from road head to pump house distance 150 Mt |
737 | Others Item Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingopening of all nut bolts of Flanges proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixingproper packing required nut and boltsand testing of TEEcomplete all at Ghat Clear water Pumping station. |
738 | Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingall opening of all nut bolts of Flanges of proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixing proper packing required nut and boltsand testing of TEEcomplete all at Matela Pumping station. |
739 | Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingallFlanges of proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts andtesting of TEEcomplete all at Gurna Pumping station . |
740 | Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingallFlanges of proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts andtesting of TEEcomplete all at Hanuman Mandir Pumping station. |
741 | Complete Repairingof Sluice Valve includingall opening of all nut bolts ofFlanges of proper size as required at site ,Cutting all types of od MSERW pipes from Rising mainpipesin proper positionin welding with flanzes,threading ofspendle rod ,making bush , fixing proper packing required nut and bolts andtestingcomplete all. Ghat Clear water Pumping station,Matela Pumping station,Gurna Pumping station & Hanuman Mandir Pumping station. |
742 | Complete Repairingof Suction Valve including opening of all nut bolts of allFlanges of proper size as required at site ,Cutting all types of od pipes from Supply mainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts and and testing of TEEcomplete all. Ghat Clear water Pumping station,Matela Pumping station,Gurna Pumping station & Hanuman Mandir Pumping station. |
743 | Complete Repairingof Non ReturningValve includingopening of all nut bolts of allFlanges of proper size as required at site ,Cutting all types of od pipes from Supply mainpipesin proper positionin welding with flanzes, fixing proper packing required nut and bolts & repairing of rod and and testing of TEEcomplete all. Ghat Clear water Pumping station,Matela Pumping station,Gurna Pumping station & Hanuman Mandir Pumping station. |
744 | Complete Repairingof Air Valve includingall opening of all nut bolts of Flanges of proper size as required at site ,Cutting all types of od pipes from Supply mainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts and and testing of TEEcomplete allRising Main pipe line fromGhat Clear water Pumping station ToHanuman Mandir Pumping station. |
745 | S/F of NRV heavy duty 150 mm |
746 | S/F of Suction valve 150mm |
747 | S/Fof Delivery valve150 mm |
748 | Financial Year 2024-25 |
749 | Complete Overhaulling of Meghraj Make/ WPIL Make, VT Pump having discharge 2150 LPM at 30 M head & 1450 RPM operated by 30 HP Motor as per below spare parts at Raw water Ghat Pumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
750 | Shaft Coupling Bush with Thrud |
751 | Spendle Bush |
752 | Rubber Coupling |
753 | Column pipe 1.5 m long and 200 mm dia |
754 | Column pipe flanze |
755 | Welding work for flanze nut bolt 15 mm dia |
756 | Tale Piece |
757 | Spindle Sleeve bush with thrud |
758 | Line Shaft 3.00 mtr into 2.5 cm |
759 | T.T. Plate |
760 | Gland Bush |
761 | Impeller G.M. |
762 | Pump Shaft 1.5mt x 2.5 cm |
763 | Motor Shaft 1.5 mt x 2.5 cm |
764 | Long Bush |
765 | Short Bush with Thured |
766 | Gland Dori 12 mm dia |
767 | Hole Tight |
768 | Champion Packing |
769 | Nut bolt 7.5 cm x 12mm |
770 | Spray For nut bolt |
771 | Grease waxpole |
772 | Repairing of Suction and delivery base |
773 | Diffuser |
774 | Gland Dori |
775 | Riched Coupling |
776 | Riched Bush |
777 | Check Nut |
778 | Impeller Lock |
779 | Shaft Key |
780 | Spindle |
781 | Casing rubber ring |
782 | Shaft oil ring |
783 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
784 | Transportation and labour charges for cartage of material from road head to pump house. |
785 | Complete Overhaulling of Mather & Platt Make, Model 1PB, 5CHR, Centrifugal horizontal Pump having discharge 2050LPM at 200 M head & 1485 RPM operated by 150 HP Motor as per below spare parts at GhatClear water Pumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
786 | Impeller : Bronze |
787 | Shaft EN8: SS |
788 | Neckring Large |
789 | Neckring Small |
790 | Long Bush GM |
791 | Short Bush GM |
792 | Check Nut |
793 | Bearing Brass |
794 | Balancing plate Bronze |
795 | Balancing Disc |
796 | Balancing Plate |
797 | Oil Ring GM |
798 | Spray For nut bolt |
799 | Hole Tight |
800 | Neckring brass Screw |
801 | Mobil Oil |
802 | Coupling Rubber Bush |
803 | Coupling Studs |
804 | Suction & Delivery repairing work |
805 | Diffuser |
806 | Gland Bush |
807 | Nut Bolt 7.5cm x 12mm |
808 | MS Coupling |
809 | Balancing stud |
810 | Gland (Brass) |
811 | Siction & Delivery Bush |
812 | Transformer oil |
813 | Casing rubber ring |
814 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
815 | Transportation and labour charges for cartage of material from road head to pump house. |
816 | Complete Overhaulling of Mather & Platt Make, 4/6 PJ, 12CHR, Centrifugal horizontal Pump having discharge 2050 LPM at 535 M head & 1485 RPM operated by 400 HP Motor as per below spare parts at MatelaPumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
817 | Impeller : Bronze |
818 | Shaft EN8: SS |
819 | Neckring GM |
820 | Long Bush with check nut GM+Nikle |
821 | Short Bush |
822 | Firki SS |
823 | Shaft Key Carbon |
824 | Gland Bush |
825 | Brass GM |
826 | Brass Bush for Housing GM |
827 | Pressure Plate GM |
828 | Balancing DiscGM |
829 | Sleeve |
830 | Neckring Small |
831 | Hole tight |
832 | Spray For nut bolt |
833 | Coupling Rubber Bush |
834 | Coupling Studs |
835 | Diffuser |
836 | Gland Dori |
837 | Riched Coupling |
838 | Riched Bush |
839 | Check Nut |
840 | Casing rubber ring |
841 | Mobil oil |
842 | Neckring Brass scrap |
843 | Balancing Screw |
844 | MS Coupling |
845 | Impeller Lock |
846 | Shaft Key |
847 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
848 | Transportation and labour charges for cartage of material from road head to pump house. |
849 | Complete Overhaulling of Mather & Platt Make, 4/6 PJ, 12CHR, Centrifugal horizontal Pump having discharge 2050 LPM at 535 M head & 1485 RPM operated by 400 HP Motor as per below spare parts at GurnaPumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
850 | Impeller : Bronze |
851 | Shaft EN8: SS |
852 | Neckring GM Large |
853 | Long Bush with check nut GM+Nikle |
854 | Short Bush |
855 | Firki SS |
856 | Shaft Key Carbon |
857 | Gland Bush |
858 | Brass GM |
859 | Brass Bush for Housing GM |
860 | Pressure Plate GM |
861 | Balancing DiscGM |
862 | Sleeve |
863 | Neckring Small |
864 | Hole tight |
865 | Spray For nut bolt |
866 | Coupling Rubber Bush |
867 | Coupling Studs |
868 | Oil Ring |
869 | Oil Cover |
870 | Casing Rubber Ring |
871 | Casing Repair |
872 | Diffuser Repair |
873 | Diffuser Supply |
874 | Mobil Oil |
875 | Champion Packing |
876 | Gland Dori |
877 | Balancing Screw |
878 | Neckring Screw |
879 | M.S Coupling |
880 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
881 | Transportation and labour charges for cartage of material from road head to pump house. |
882 | Complete Overhaulling of KSB MakeCentrifugal horizontal8CHR Pump having discharge 1700LPM at 200 M head & 1450 RPM operated by 125 HP Motor as per below spare parts at Hanuman MandirPumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
883 | Impeller : Bronze |
884 | Shaft EN8: SS |
885 | Neckring GM Large |
886 | Long Bush with check nut GM+Nikle |
887 | Short Bush |
888 | Firki SS |
889 | Shaft Key Carbon |
890 | Gland Bush |
891 | Bearing Bracket GM |
892 | Balancing DiscGM |
893 | Pressure Plate GM |
894 | SP Sleeve D/E: SS-410 |
895 | SP Sleeve ND/E:SS-410 |
896 | Gland Dori 12 mm |
897 | Champion Packing |
898 | Grease |
899 | Neckring Small |
900 | Spray For nut bolt |
901 | Coupling Rubber Bush |
902 | Coupling Studs |
903 | Casing Repair |
904 | Hole Tight |
905 | Diffuser |
906 | MS Coupling |
907 | Bearing 210 K |
908 | Bearing Sleev |
909 | Mobil Oil |
910 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
911 | Transportation and labour charges for cartage of material from road head to pump house. |
912 | Complete overhauling of Meghraj make VT Pump having discharge 2650 LPM at 69 M head & 1470 RPM operated by 60 HP Motor as per below spare parts at Thuligad Raw water pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
913 | Shaft Coupling Bush with Thrud |
914 | Spendle Bush |
915 | Rubber Coupling |
916 | Riched Coupling |
917 | Riched Couling Bush |
918 | Tale Piece |
919 | Spindle Sleeve bush with thrud |
920 | Line Shaft 1.5 mtr into 2.5 cm |
921 | T.T. Plate |
922 | Gland Bush |
923 | Impeller G.M./SS |
924 | Pump Shaft 1.5mt x 2.5 cm |
925 | Motor Shaft 1.5 mt x 2.5 cm |
926 | Long Bush |
927 | Short Bush |
928 | Gland Dori 12 mm dia |
929 | Hole Tight |
930 | Champion Packing |
931 | Nut bolt 7.5 cm x 12mm |
932 | Spray For nut bolt |
933 | Grease |
934 | Repairing of Suction |
935 | Spendor |
936 | Shaft Socket Bush |
937 | Neckring |
938 | Main pump shaft with throud |
939 | Nut Bolt pump body |
940 | Casing |
941 | Shaft lock |
942 | Deduction of GM |
943 | Deduction of Iron |
944 | S/O Tale Piece |
945 | Diffuser |
946 | Diffuser Repair |
947 | Casing repair |
948 | Impellor Lock Bush |
949 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
950 | Transportation and labour charges for cartage of material from road head to pump house Merut to Thuligad Raw water pump house |
951 | Complete overhauling of KSB Make Centrifugal Horizontal, 4CHR,Pump having discharge 2400 LPM at 210 M head & 2955 RPM operated by 180 HP Motor as per below spare parts at Kasanipumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
952 | Impeller : Bronze |
953 | Shaft EN8 |
954 | Neckring :CI |
955 | Long Bush with check nut GM+Nikkle |
956 | Short Bush CI |
957 | Shaft Key Carbon |
958 | Gland Plate : CI |
959 | Bearing Bracket CI |
960 | Gland Bush CI |
961 | Casing CI |
962 | Diffuser CI |
963 | Balance Disc : CI |
964 | Balancing Plate CI |
965 | Nut Bolt 50mm x 10 mm |
966 | Grease Plate CI |
967 | MS Coupling |
968 | Coupling nut bolt |
969 | Rubber Bush metallic |
970 | 25mm dia tie rod with bolt EN9 |
971 | Gland Dori 12 mm |
972 | Repairing of Suction and delivery |
973 | Bearing 208 K |
974 | Bearing Sleeve 208 K |
975 | Hole tight |
976 | Spray for nut bolt |
977 | Grease |
978 | Firki |
979 | Champion Packing |
980 | Oil |
981 | Tri Rod |
982 | Casing Rubber Ring |
983 | Cooling Pipe |
984 | Coupling Nut bolt |
985 | ACB Repair complete 600 Amp. |
986 | ACB 1200 Amp repair |
987 | TronsformerOil |
988 | Movil Oil |
989 | Cartage of material Kasani Gaon to Kasani Pump House |
990 | Reflex valve repair |
991 | Sluice valve repair |
992 | Repair of Delivery valve |
993 | Repir of Suction valve |
994 | Deduction of old material |
995 | Deduction of G.M. |
996 | Deduction of Iron |
997 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
998 | Transportation and labour charges for cartage of material from Meerut to pump house. |
999 | Complete overhauling of Kirloskar Make/KSB Make Centrifugal 9CHR, Horizontal Pump having discharge 330 LPM at 220 M head & 2900 RPM operated by 30 HP Motor as per below spare parts at Rai pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1000 | Impeller: Bronze |
1001 | Shaft EN8 |
1002 | Neckring:CI |
1003 | Long Bush with check nut GM+Nikkle |
1004 | Short Bush CI |
1005 | Firki SS |
1006 | Air cock : Brass |
1007 | Shaft Key carbon |
1008 | Gland Plate: CI |
1009 | Bearing Bracket CI |
1010 | Gland Sleeve small CI |
1011 | Casing CI |
1012 | Diffuser CI |
1013 | Nut bolt 50mm x 10mm |
1014 | Grease PlateCI |
1015 | Nut Bolt 50mm x 10mm |
1016 | Rubber Coupling 9” Dia |
1017 | Coupling nut bolt |
1018 | 25mm dia tie rod with bolt EN9 |
1019 | Gland Dori 12mm |
1020 | Hole tight |
1021 | Spray for nut bolt |
1022 | Grease |
1023 | Bearing 7307 |
1024 | Bearing 307 |
1025 | Neckring |
1026 | Cartage of Pump complete |
1027 | Champion Packing |
1028 | Repairing of suction |
1029 | Repairing of Delivery |
1030 | Gland Bush |
1031 | M.S. Coupling |
1032 | Tri Rod |
1033 | O-Ring |
1034 | Deduction of Old Bronze Material |
1035 | Dedection of old iron scrap |
1036 | Supply of Tale Piece |
1037 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1038 | Transportation and labour charges for cartage of material from Meerut to Pithoragarh Rai Pumping Station |
1039 | Complete overhauling of KSB Make Centrifugal, 14CHR, Horizontal Pump having discharge 100 LPM at 190 M head & 2900 RPM operated by12.5 HP Motor as per below spare parts at Chherapumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1040 | Impeller : GM |
1041 | Neckring : GM |
1042 | SP Sleeve D/E :SS-410 |
1043 | SP Sleeve ND/E : SS-410 |
1044 | Long Bush : GM |
1045 | Small Bush : GM |
1046 | Gland Plate CI |
1047 | Pump Shaft with check nut & Key : EN 24 |
1048 | M.S. Coupling with nut bolt 8 hole |
1049 | Bearing bracket with stud CI |
1050 | O-Ring |
1051 | Rubber Coupling L 110 |
1052 | Casing diffuser |
1053 | Bearing 6306 |
1054 | Hole tight |
1055 | Spray for nut bolt |
1056 | Grease |
1057 | Repairing of suction and delivery |
1058 | Grease Plate |
1059 | Firki |
1060 | Suction valve |
1061 | Gland Bush |
1062 | Shaft key carbon |
1063 | Delivery |
1064 | Diffuser |
1065 | Champian Packing |
1066 | Gland Dori |
1067 | Tri Rod |
1068 | Nut Bolt |
1069 | Gland Dori |
1070 | Deduction of old G.M. SCRAP |
1071 | Deuction of old iron |
1072 | Check Nut |
1073 | Tale Piece |
1074 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1075 | Transportation and labour charges for cartage of material from Meerut to pump house. |
1076 | Complete overhauling of KSB Make Centrifugal, 13CHR, Horizontal Pump having discharge 300 LPM at 190 M head & 2900 RPM operated by25 HP Motor as per below spare parts at Hyupani Stage-Ist (Ghatudi)pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1077 | Impeller : Bronze |
1078 | Shaft EN 8 |
1079 | Neckring : CI |
1080 | Long Bush with check nut GM+Nikkle |
1081 | Short Bush CI |
1082 | Shaft Key Carbon |
1083 | Bearing Bracket CI |
1084 | Gland Bush CI |
1085 | Casing CI |
1086 | Diffuser |
1087 | Grease Plate |
1088 | MS Coupling 8 Hole |
1089 | Gland Dori 12 mm |
1090 | Bearing 6305 |
1091 | Rubber coupling 8 hole |
1092 | Grease |
1093 | Hole tight |
1094 | Spray for Nut bolt |
1095 | Repairing of Suction and delivery |
1096 | Suction Delivery Repair |
1097 | Nut Bolt |
1098 | Bearing 6305 |
1099 | Tri Rod |
1100 | Firkki |
1101 | Champion Packing |
1102 | Gland Dori |
1103 | Sleeve |
1104 | Neckring |
1105 | Cartage of Pump Complete |
1106 | Repairing of Delivery |
1107 | Gland Plate |
1108 | Check Nut |
1109 | O-Ring |
1110 | Tale piece |
1111 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1112 | Transportation and labour charges for cartage of material from Meerut to Pithoragarh.. |
1113 | Complete overhauling of KSB Make Centrifugal, 13CHR, Horizontal Pump having discharge 300 LPM at 320 M head & 2900 RPM operated by25 HP Motor as per below spare parts at Hyupani Stage-IInd (Hyupani)pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1114 | Impeller : Bronze |
1115 | Shaft EN 8 |
1116 | Neckring : CI |
1117 | Long Bush with check nut GM+Nikkle |
1118 | Short Bush CI |
1119 | Shaft Key Carbon |
1120 | Bearing Bracket CI |
1121 | Gland Bush CI |
1122 | Casing CI |
1123 | Diffuser CI |
1124 | Grease Plate |
1125 | MS Coupling 8 Hole |
1126 | Gland Dori 12 mm |
1127 | Rubber coupling 8 hole |
1128 | Grease |
1129 | Hole tight |
1130 | Spray for Nut bolt |
1131 | Repairing of Suction and delivery |
1132 | Nut Bolt |
1133 | Bearing 6305 |
1134 | Tri Rod |
1135 | Firkki |
1136 | Champion Packing |
1137 | Gland Dori |
1138 | Sleeve |
1139 | Neckring |
1140 | Cartage of Pump complete |
1141 | S/O Tale Piece |
1142 | Shaft Check Nut |
1143 | Check Nut |
1144 | Gland Bush |
1145 | Repair of Delivery |
1146 | O-Ring |
1147 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1148 | Transportation and labour charges for cartage of material from Meerut to Pithoragarh |
1149 | Complete overhauling of Kirloakar Make Horizontal Pump having discharge 200 LPM at 310M head, 2940 RPM & 30 HP Motor as per below spare parts at Bankote Stage Ist pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1150 | Impeller: Bronze |
1151 | Neckring: CI |
1152 | Diffuser |
1153 | Shaft SS |
1154 | Bush Small |
1155 | SP Sleeve D/E SS |
1156 | SP Sleve ND/ESS |
1157 | Casing |
1158 | Bearing Bracket |
1159 | Key Lock |
1160 | M.S Coupling 8 Hole |
1161 | Bearing 7307 NBC Make |
1162 | Grease |
1163 | Rubber Coupling 150 |
1164 | Rubber Coupling 110 8 Hole |
1165 | M.S Coupling L 150 |
1166 | Long Bush |
1167 | Check Nut EN 8 |
1168 | Motor Connection Plate |
1169 | Bearing 307 |
1170 | Nut Bolt |
1171 | Gland Dori |
1172 | Hole tight |
1173 | Champion Packing |
1174 | Spray for Nut Bolt |
1175 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1176 | Transportation and labour charges for cartage of material from road head to pump house. |
1177 | Assembling of above pump with supplied parts & making alignment of above pump with motor on base plate & testing of pump on full load including all material,labour T&P etc complete. |
1178 | Bronze Scrap (Only for deduction) |
1179 | Iron Scrap (Only for Deduction ) |
1180 | Supply of 32 mm dia balance flow pipe |
1181 | Suction Delivery valve Repair |
1182 | Tie Rod |
1183 | Complete overhauling of Kirloakar Make Horizontal Pump having discharge 200 LPM at 310M head, 2940 RPM & 30 HP Motor as per below spare parts at Bankote Stage Ist pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1184 | Impeller: Bronze |
1185 | Neckring: CI |
1186 | Diffuser |
1187 | Shaft SS |
1188 | Bush Small |
1189 | SP Sleeve D/E SS |
1190 | SP Sleve ND/ESS |
1191 | Casing |
1192 | Bearing Bracket |
1193 | Key Lock |
1194 | M.S Coupling 8 Hole |
1195 | Bearing 7307 NBC Make |
1196 | Grease |
1197 | Rubber Coupling 150 |
1198 | Rubber Coupling 110 8 Hole 9” dia |
1199 | M.S Coupling L 150 |
1200 | Long Bush |
1201 | Check Nut EN 8 |
1202 | Motor Connection Plate |
1203 | Bearing 307 |
1204 | Nut Bolt |
1205 | Gland Dori |
1206 | Hole tight |
1207 | Champion Packing |
1208 | Spray for Nut Bolt |
1209 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1210 | Transportation and labour charges for cartage of material from road head to pump house. |
1211 | Assembling of above pump with supplied parts & making alignment of above pump with motor on base plate & testing of pump on full load including all material,labour T&P etc complete. |
1212 | Bronze Scrap (Only for deduction) |
1213 | Iron Scrap (Only for Deduction ) |
1214 | Supply of 32 mm dia balance flow pipe |
1215 | Suction Delivery valve Repair |
1216 | Tie Rod |
1217 | Complete overhauling of Mather & PlattMake, 100/150 IPB-T80, 8 Stage centrifugalPump having discharge 2100 LPM at 350 M head, 300 HP Motor as per below spare parts atGangolihatpumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1218 | Impeller: Bronze |
1219 | Shaft SS |
1220 | Neckring GM Large |
1221 | Neckring Small |
1222 | Long Bush with checkNut GM+Nikle |
1223 | Short Bush |
1224 | Long Bush |
1225 | Firki SS |
1226 | Shaft Key Carbon |
1227 | Gland BushGM |
1228 | Brass Bearing GM |
1229 | Brass Bush for Housing GM |
1230 | Pressure Plate : GM |
1231 | Balancing Disc GM |
1232 | Sleeve |
1233 | Casing CI |
1234 | Repairing of Suction and delivery |
1235 | Hole Tight |
1236 | Spray for Nut Bolt |
1237 | M.S Coupling |
1238 | Rubber Coupling |
1239 | Coupling Stud |
1240 | Brass Oil Ring |
1241 | Champion Packing |
1242 | Gland Dori |
1243 | Mobil Oil |
1244 | Grease |
1245 | Casing Rubber Ring |
1246 | Diffuser |
1247 | Air Cock |
1248 | Balancing Brass Screw |
1249 | Neckring Brass Screw |
1250 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1251 | Transportation and labour charges for cartage of material from road head to pump house. |
1252 | Complete overhauling of Mather & PlattMake, 100/150 IPB-T80, 8 Stage centrifugalPump having discharge 2100 LPM at 350 M head, 300 HP Motor as per below spare parts atGangolihatpumping Station IInd Stage under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1253 | Impeller: Bronze |
1254 | Shaft SS |
1255 | Neckring GM Large |
1256 | Neckring Small |
1257 | Long Bush with checkNut GM+Nikle |
1258 | Short Bush |
1259 | Long Bush |
1260 | Firki SS |
1261 | Shaft Key Carbon |
1262 | Gland BushGM |
1263 | Brass Bearing GM |
1264 | Brass Bush for Housing GM |
1265 | Pressure Plate : GM |
1266 | Balancing Disc GM |
1267 | Sleeve |
1268 | Casing CI |
1269 | Repairing of Suction and delivery |
1270 | Hole Tight |
1271 | Spray for Nut Bolt |
1272 | M.S Coupling |
1273 | Rubber Coupling |
1274 | Coupling Stud |
1275 | Brass Oil Ring |
1276 | Champion Packing |
1277 | Gland Dori |
1278 | Mobil Oil |
1279 | Grease |
1280 | Casing Rubber Ring |
1281 | Diffuser |
1282 | Air Cock |
1283 | Balancing Brass Screw |
1284 | Neckring Screw |
1285 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1286 | Transportation and labour charges for cartage of material from road head to pump house. |
1287 | Complete overhauling of Mather & PlattMake, 100/150 IPB-T80, 8 Stage centrifugalPump having discharge 2100 LPM at 350 M head, 300 HP Motor as per below spare parts atGangolihatpumping Station IIIrd Stage under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1288 | Impeller: Bronze |
1289 | Shaft SS |
1290 | Neckring GM Large |
1291 | Neckring Small |
1292 | Long Bush with checkNut GM+Nikle |
1293 | Short Bush |
1294 | Long Bush |
1295 | Firki SS |
1296 | Shaft Key Carbon |
1297 | Gland BushGM |
1298 | Brass Bearing GM |
1299 | Brass Bush for Housing GM |
1300 | Pressure Plate : GM |
1301 | Balancing Disc GM |
1302 | Sleeve |
1303 | Casing CI |
1304 | Repairing of Suction and delivery |
1305 | Hole Tight |
1306 | Spray for Nut Bolt |
1307 | M.S Coupling |
1308 | Rubber Coupling |
1309 | Coupling Stud |
1310 | Brass Oil Ring |
1311 | Champion Packing |
1312 | Gland Dori |
1313 | Mobil Oil |
1314 | Grease |
1315 | Casing Rubber Ring |
1316 | Diffuser Air Cock |
1317 | Balancing Brass Screw |
1318 | Neckring Brass Screw |
1319 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1320 | Transportation and labour charges for cartage of material from road head to pump house. |
1321 | Complete overhauling of KSBMake, 8 Stage MOVI-32/8 centrifugalPump having discharge 100 LPM at 200 M head operated by 15 HP Motor as per below spare parts atGangolihatpumping Station IIIrd Stage under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1322 | Impeller: Bronze |
1323 | Shaft SS |
1324 | Neckring GM Large |
1325 | Long Bush with checkNut GM+Nikle |
1326 | Short Bush |
1327 | Firki SS |
1328 | Shaft Key Carbon |
1329 | Gland BushGM |
1330 | Bush Bracket GM |
1331 | Brass Bush for Housing GM |
1332 | Pressure Plate : GM |
1333 | Balancing Disc GM |
1334 | Sleeve |
1335 | Casing CI |
1336 | Repairing of Suction and delivery |
1337 | Bearing Bracket |
1338 | MS Coupling 8 Hole 9” dia |
1339 | Rubber Coupling |
1340 | Coupling Stud |
1341 | Brass Oil Ring |
1342 | Champion Packing |
1343 | Grease |
1344 | Hole Tight |
1345 | Spray for Nut Bolt |
1346 | Gland Dori |
1347 | Mobil Oil |
1348 | Bearing |
1349 | Suction Delivery Repair |
1350 | Casing |
1351 | Diffuser |
1352 | Firkki |
1353 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1354 | Transportation and labour charges for cartage of material from road head to pump house. |
1355 | Complete overhauling of BeaconMake, CentrifugalPump having discharge 410 LPM at 450 M head operated by 100 HP Motor as per below spare parts atMarsoli pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1356 | Impeller: Bronze |
1357 | Shaft EN: SS |
1358 | Neckring GM Large |
1359 | Long Bush with checkNut GM+Nikle |
1360 | Short Bush |
1361 | Firki SS |
1362 | Shaft Key Carbon |
1363 | Gland BushGM |
1364 | Bush Bracket GM |
1365 | Brass Bush for Housing GM |
1366 | Pressure Plate : GM |
1367 | Balancing Disc GM |
1368 | Rubber Coupling |
1369 | Air Cock Brass |
1370 | Air Pipe |
1371 | Sleeve |
1372 | Coupling Nut Bolt SS |
1373 | Gland Dori |
1374 | Nut Bolt |
1375 | Casing |
1376 | Hole Tight |
1377 | Spray for Nut Bolt |
1378 | Diffuser |
1379 | Bearing NU 206 |
1380 | Grease |
1381 | Coolin Pipe |
1382 | Suction Delivery Repair |
1383 | Balancing Plate |
1384 | Balancing |
1385 | Firkki |
1386 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1387 | Transportation and labour charges for cartage of material from road head to pump house. |
1388 | Complete overhauling of MAX Flow Make 41 MM-14 Pump Model, 14stage Centrifugal Horizontal Pump having discharge 150 LPM at 300 M head & 25 HP Motor as per below spare parts at Paun Stage Istpumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1389 | Impeller: Bronze |
1390 | Shaft SS |
1391 | Neckring: CI |
1392 | Long Bushwith check nut GM+Nikkle |
1393 | Short Bush CI |
1394 | Shaft Key carbon |
1395 | Bearing bracket CI |
1396 | Gland Bush CI |
1397 | MS Coupling 8 hole 9” dia |
1398 | Diffuser CI |
1399 | Bearing 3307 |
1400 | Bearing 6306 |
1401 | Grease plate CI |
1402 | MS Coupling 8hole 9” dia |
1403 | Gland Dori |
1404 | Repairing of Suction and delivery |
1405 | Bearing |
1406 | Grease |
1407 | Champion Packing |
1408 | Hole tight |
1409 | Spray tight |
1410 | Rubber Coupling |
1411 | Firkki Rubber |
1412 | Casing |
1413 | Tri Rod |
1414 | Cartage of Pump complete |
1415 | S/O of Pump Sction |
1416 | S/O Pump |
1417 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1418 | Transportation and labour charges for cartage of material from road head to pump house. |
1419 | Complete overhauling of MAX Flow Make 41 MM-14 Pump Model, 14stage Centrifugal Horizontal Pump having discharge 150 LPM at 300 M head & 25 HP Motor as per below spare parts at Paun Stage-IInd pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1420 | Impeller: Bronze |
1421 | Shaft SS |
1422 | Neckring: CI |
1423 | Long Bushwith check nut GM+Nikkle |
1424 | Short Bush CI |
1425 | Shaft Key carbon |
1426 | Bearing bracket CI |
1427 | Gland Bush CI |
1428 | MS Coupling 8 hole 9” dia |
1429 | Diffuser CI |
1430 | Bearing 3307 |
1431 | Bearing 6306 |
1432 | Grease plate CI |
1433 | MS Coupling 8hole 9” dia |
1434 | Gland Dori |
1435 | Repairing of Suction and delivery |
1436 | Bearing |
1437 | Grease |
1438 | Champion Packing |
1439 | Hole tight |
1440 | Spray tight |
1441 | Rubber Coupling |
1442 | S/O of Pump Suction |
1443 | S/O of Pump |
1444 | Tri Rod |
1445 | Cartage of Pump complete |
1446 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1447 | Transportation and labour charges for cartage of material from road head to pump house. |
1448 | Neckring SmallComplete ovehaulling of Kirloskarmake Centrifugal horizontal pump having discharge 200 LPM at 100 M head operated by 15 HP Motor as perbelow spare parts at Hureti Pumping station under divison Pithoragarh. Dismantling of above pump with all labour, T&P etc complete. |
1449 | Impleller Bronze |
1450 | Shaft :SS |
1451 | Neckring GM |
1452 | Long Bush with check nut GM+Nikle |
1453 | Short Buh |
1454 | Firki SS |
1455 | Shaft Key Carbon |
1456 | Gland Bush GM |
1457 | Bush Bracket GM |
1458 | BrassBush for Housing CI |
1459 | Pressure Plate GM |
1460 | Balancing Disc GM |
1461 | Sleeve |
1462 | Casing CI |
1463 | Repairing of Suction and delivery |
1464 | Beaing bracket CI |
1465 | MS Coupling |
1466 | Rubber Coupling |
1467 | Coupling Stud |
1468 | Brass Oil Ring |
1469 | Champion Packing |
1470 | Grease |
1471 | Hole Tight |
1472 | Spray Fot Nut bolt |
1473 | Gland Dori |
1474 | Mobile Oil |
1475 | Gland Bush Rubber |
1476 | 15HP Submercible Pump Complete |
1477 | Gate valve 25 mm |
1478 | Reflex valve 60mm |
1479 | Nut Bolt |
1480 | Casing |
1481 | Labour charge for overhailling of above pump with supllied spare parts and making alignment of above pump with motor on the base plate and testing of pump on full load |
1482 | Trasportation and labour charge for cartage of material from road head to pump house distance 150 Mt |
1483 | Others Item Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingopening of all nut bolts of Flanges proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixingproper packing required nut and boltsand testing of TEEcomplete all at Ghat Clear water Pumping station. |
1484 | Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingall opening of all nut bolts of Flanges of proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixing proper packing required nut and boltsand testing of TEEcomplete all at Matela Pumping station. |
1485 | Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingallFlanges of proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts andtesting of TEEcomplete all at Gurna Pumping station . |
1486 | Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingallFlanges of proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts andtesting of TEEcomplete all at Hanuman Mandir Pumping station. |
1487 | Complete Repairingof Sluice Valve includingall opening of all nut bolts ofFlanges of proper size as required at site ,Cutting all types of od MSERW pipes from Rising mainpipesin proper positionin welding with flanzes,threading ofspendle rod ,making bush , fixing proper packing required nut and bolts andtestingcomplete all. Ghat Clear water Pumping station,Matela Pumping station,Gurna Pumping station & Hanuman Mandir Pumping station. |
1488 | Complete Repairingof Suction Valve including opening of all nut bolts of allFlanges of proper size as required at site ,Cutting all types of od pipes from Supply mainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts and and testing of TEEcomplete all. Ghat Clear water Pumping station,Matela Pumping station,Gurna Pumping station & Hanuman Mandir Pumping station. |
1489 | Complete Repairingof Non ReturningValve includingopening of all nut bolts of allFlanges of proper size as required at site ,Cutting all types of od pipes from Supply mainpipesin proper positionin welding with flanzes, fixing proper packing required nut and bolts & repairing of rod and and testing of TEEcomplete all. Ghat Clear water Pumping station,Matela Pumping station,Gurna Pumping station & Hanuman Mandir Pumping station. |
1490 | Complete Repairingof Air Valve includingall opening of all nut bolts of Flanges of proper size as required at site ,Cutting all types of od pipes from Supply mainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts and and testing of TEEcomplete allRising Main pipe line fromGhat Clear water Pumping station ToHanuman Mandir Pumping station. |
1491 | S/F of NRV heavy duty 150 mm |
1492 | S/F of Suction valve 150mm |
1493 | S/Fof Delivery valve150 mm |
1494 | Financial Year 2025-26 |
1495 | Complete Overhaulling of Meghraj Make/ WPIL Make, VT Pump having discharge 2150 LPM at 30 M head & 1450 RPM operated by 30 HP Motor as per below spare parts at Raw water Ghat Pumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1496 | Shaft Coupling Bush with Thrud |
1497 | Spendle Bush |
1498 | Rubber Coupling |
1499 | Column pipe 1.5 m long and 200 mm dia |
1500 | Column pipe flanze |
1501 | Welding work for flanze nut bolt 15 mm dia |
1502 | Tale Piece |
1503 | Spindle Sleeve bush with thrud |
1504 | Line Shaft 3.00 mtr into 2.5 cm |
1505 | T.T. Plate |
1506 | Gland Bush |
1507 | Impeller G.M. |
1508 | Pump Shaft 1.5mt x 2.5 cm |
1509 | Motor Shaft 1.5 mt x 2.5 cm |
1510 | Long Bush |
1511 | Short Bush with Thured |
1512 | Gland Dori 12 mm dia |
1513 | Hole Tight |
1514 | Champion Packing |
1515 | Nut bolt 7.5 cm x 12mm |
1516 | Spray For nut bolt |
1517 | Grease waxpole |
1518 | Repairing of Suction and delivery base |
1519 | Diffuser |
1520 | Gland Dori |
1521 | Riched Coupling |
1522 | Riched Bush |
1523 | Check Nut |
1524 | Impeller Lock |
1525 | Shaft Key |
1526 | Spindle |
1527 | Casing rubber ring |
1528 | Shaft oil ring |
1529 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1530 | Transportation and labour charges for cartage of material from road head to pump house. |
1531 | Complete Overhaulling of Mather & Platt Make, Model 1PB, 5CHR, Centrifugal horizontal Pump having discharge 2050LPM at 200 M head & 1485 RPM operated by 150 HP Motor as per below spare parts at GhatClear water Pumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1532 | Impeller : Bronze |
1533 | Shaft EN8: SS |
1534 | Neckring Large |
1535 | Neckring Small |
1536 | Long Bush GM |
1537 | Short Bush GM |
1538 | Check Nut |
1539 | Bearing Brass |
1540 | Balancing plate Bronze |
1541 | Balancing Disc |
1542 | Balancing Plate |
1543 | Oil Ring GM |
1544 | Spray For nut bolt |
1545 | Hole Tight |
1546 | Neckring brass Screw |
1547 | Mobil Oil |
1548 | Coupling Rubber Bush |
1549 | Coupling Studs |
1550 | Suction & Delivery repairing work |
1551 | Diffuser |
1552 | Gland Bush |
1553 | Nut Bolt 7.5cm x 12mm |
1554 | MS Coupling |
1555 | Balancing stud |
1556 | Gland (Brass) |
1557 | Siction & Delivery Bush |
1558 | Transformer oil |
1559 | Casing rubber ring |
1560 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1561 | Transportation and labour charges for cartage of material from road head to pump house. |
1562 | Complete Overhaulling of Mather & Platt Make, 4/6 PJ, 12CHR, Centrifugal horizontal Pump having discharge 2050 LPM at 535 M head & 1485 RPM operated by 400 HP Motor as per below spare parts at MatelaPumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1563 | Impeller : Bronze |
1564 | Shaft EN8: SS |
1565 | Neckring GM |
1566 | Long Bush with check nut GM+Nikle |
1567 | Short Bush |
1568 | Firki SS |
1569 | Shaft Key Carbon |
1570 | Gland Bush |
1571 | Brass GM |
1572 | Brass Bush for Housing GM |
1573 | Pressure Plate GM |
1574 | Balancing DiscGM |
1575 | Sleeve |
1576 | Neckring Small |
1577 | Hole tight |
1578 | Spray For nut bolt |
1579 | Coupling Rubber Bush |
1580 | Coupling Studs |
1581 | Diffuser |
1582 | Gland Dori |
1583 | Riched Coupling |
1584 | Riched Bush |
1585 | Check Nut |
1586 | Casing rubber ring |
1587 | Mobil oil |
1588 | Neckring Brass scrap |
1589 | Balancing Screw |
1590 | MS Coupling |
1591 | Impeller Lock |
1592 | Shaft Key |
1593 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1594 | Transportation and labour charges for cartage of material from road head to pump house. |
1595 | Complete Overhaulling of Mather & Platt Make, 4/6 PJ, 12CHR, Centrifugal horizontal Pump having discharge 2050 LPM at 535 M head & 1485 RPM operated by 400 HP Motor as per below spare parts at GurnaPumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1596 | Impeller : Bronze |
1597 | Shaft EN8: SS |
1598 | Neckring GM Large |
1599 | Long Bush with check nut GM+Nikle |
1600 | Short Bush |
1601 | Firki SS |
1602 | Shaft Key Carbon |
1603 | Gland Bush |
1604 | Brass GM |
1605 | Brass Bush for Housing GM |
1606 | Pressure Plate GM |
1607 | Balancing DiscGM |
1608 | Sleeve |
1609 | Neckring Small |
1610 | Hole tight |
1611 | Spray For nut bolt |
1612 | Coupling Rubber Bush |
1613 | Coupling Studs |
1614 | Oil Ring |
1615 | Oil Cover |
1616 | Casing Rubber Ring |
1617 | Casing Repair |
1618 | Diffuser Repair |
1619 | Diffuser Supply |
1620 | Mobil Oil |
1621 | Champion Packing |
1622 | Gland Dori |
1623 | Balancing Screw |
1624 | Neckring Screw |
1625 | M.S Coupling |
1626 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1627 | Transportation and labour charges for cartage of material from road head to pump house. |
1628 | Complete Overhaulling of KSB MakeCentrifugal horizontal8CHR Pump having discharge 1700LPM at 200 M head & 1450 RPM operated by 125 HP Motor as per below spare parts at Hanuman MandirPumping Station under Division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1629 | Impeller : Bronze |
1630 | Shaft EN8: SS |
1631 | Neckring GM Large |
1632 | Long Bush with check nut GM+Nikle |
1633 | Short Bush |
1634 | Firki SS |
1635 | Shaft Key Carbon |
1636 | Gland Bush |
1637 | Bearing Bracket GM |
1638 | Balancing DiscGM |
1639 | Pressure Plate GM |
1640 | SP Sleeve D/E: SS-410 |
1641 | SP Sleeve ND/E:SS-410 |
1642 | Gland Dori 12 mm |
1643 | Champion Packing |
1644 | Grease |
1645 | Neckring Small |
1646 | Spray For nut bolt |
1647 | Coupling Rubber Bush |
1648 | Coupling Studs |
1649 | Casing Repair |
1650 | Hole Tight |
1651 | Diffuser |
1652 | MS Coupling |
1653 | Bearing 210 K |
1654 | Bearing Sleev |
1655 | Mobil Oil |
1656 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1657 | Transportation and labour charges for cartage of material from road head to pump house. |
1658 | Complete overhauling of Meghraj make VT Pump having discharge 2650 LPM at 69 M head & 1470 RPM operated by 60 HP Motor as per below spare parts at Thuligad Raw water pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1659 | Shaft Coupling Bush with Thrud |
1660 | Spendle Bush |
1661 | Rubber Coupling |
1662 | Riched Coupling |
1663 | Riched Couling Bush |
1664 | Tale Piece |
1665 | Spindle Sleeve bush with thrud |
1666 | Line Shaft 1.5 mtr into 2.5 cm |
1667 | T.T. Plate |
1668 | Gland Bush |
1669 | Impeller G.M./SS |
1670 | Pump Shaft 1.5mt x 2.5 cm |
1671 | Motor Shaft 1.5 mt x 2.5 cm |
1672 | Long Bush |
1673 | Short Bush |
1674 | Gland Dori 12 mm dia |
1675 | Hole Tight |
1676 | Champion Packing |
1677 | Nut bolt 7.5 cm x 12mm |
1678 | Spray For nut bolt |
1679 | Grease |
1680 | Repairing of Suction |
1681 | Spendor |
1682 | Shaft Socket Bush |
1683 | Neckring |
1684 | Main pump shaft with throud |
1685 | Nut Bolt pump body |
1686 | Casing |
1687 | Shaft lock |
1688 | Deduction of GM |
1689 | Deduction of Iron |
1690 | S/O Tale Piece |
1691 | Diffuser |
1692 | Diffuser Repair |
1693 | Casing repair |
1694 | Impellor Lock Bush |
1695 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1696 | Transportation and labour charges for cartage of material from road head to pump house Merut to Thuligad Raw water pump house |
1697 | Complete overhauling of KSB Make Centrifugal Horizontal, 4CHR,Pump having discharge 2400 LPM at 210 M head & 2955 RPM operated by 180 HP Motor as per below spare parts at Kasanipumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1698 | Impeller : Bronze |
1699 | Shaft EN8 |
1700 | Neckring :CI |
1701 | Long Bush with check nut GM+Nikkle |
1702 | Short Bush CI |
1703 | Shaft Key Carbon |
1704 | Gland Plate : CI |
1705 | Bearing Bracket CI |
1706 | Gland Bush CI |
1707 | Casing CI |
1708 | Diffuser CI |
1709 | Balance Disc : CI |
1710 | Balancing Plate CI |
1711 | Nut Bolt 50mm x 10 mm |
1712 | Grease Plate CI |
1713 | MS Coupling |
1714 | Coupling nut bolt |
1715 | Rubber Bush metallic |
1716 | 25mm dia tie rod with bolt EN9 |
1717 | Gland Dori 12 mm |
1718 | Repairing of Suction and delivery |
1719 | Bearing 208 K |
1720 | Bearing Sleeve 208 K |
1721 | Hole tight |
1722 | Spray for nut bolt |
1723 | Grease |
1724 | Firki |
1725 | Champion Packing |
1726 | Oil |
1727 | Tri Rod |
1728 | Casing Rubber Ring |
1729 | Cooling Pipe |
1730 | Coupling Nut bolt |
1731 | ACB Repair complete 600 Amp. |
1732 | ACB 1200 Amp repair |
1733 | TronsformerOil |
1734 | Movil Oil |
1735 | Cartage of material Kasani Gaon to Kasani Pump House |
1736 | Reflex valve repair |
1737 | Sluice valve repair |
1738 | Repair of Delivery valve |
1739 | Repir of Suction valve |
1740 | Deduction of old material |
1741 | Deduction of G.M. |
1742 | Deduction of Iron |
1743 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1744 | Transportation and labour charges for cartage of material from Meerut to pump house. |
1745 | Complete overhauling of Kirloskar Make/KSB Make Centrifugal 9CHR, Horizontal Pump having discharge 330 LPM at 220 M head & 2900 RPM operated by 30 HP Motor as per below spare parts at Rai pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1746 | Impeller: Bronze |
1747 | Shaft EN8 |
1748 | Neckring:CI |
1749 | Long Bush with check nut GM+Nikkle |
1750 | Short Bush CI |
1751 | Firki SS |
1752 | Air cock : Brass |
1753 | Shaft Key carbon |
1754 | Gland Plate: CI |
1755 | Bearing Bracket CI |
1756 | Gland Sleeve small CI |
1757 | Casing CI |
1758 | Diffuser CI |
1759 | Nut bolt 50mm x 10mm |
1760 | Grease PlateCI |
1761 | Nut Bolt 50mm x 10mm |
1762 | Rubber Coupling 9” Dia |
1763 | Coupling nut bolt |
1764 | 25mm dia tie rod with bolt EN9 |
1765 | Gland Dori 12mm |
1766 | Hole tight |
1767 | Spray for nut bolt |
1768 | Grease |
1769 | Bearing 7307 |
1770 | Bearing 307 |
1771 | Neckring |
1772 | Cartage of Pump complete |
1773 | Champion Packing |
1774 | Repairing of suction |
1775 | Repairing of Delivery |
1776 | Gland Bush |
1777 | M.S. Coupling |
1778 | Tri Rod |
1779 | O-Ring |
1780 | Deduction of Old Bronze Material |
1781 | Dedection of old iron scrap |
1782 | Supply of Tale Piece |
1783 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1784 | Transportation and labour charges for cartage of material from Meerut to Pithoragarh Rai Pumping Station |
1785 | Complete overhauling of KSB Make Centrifugal, 14CHR, Horizontal Pump having discharge 100 LPM at 190 M head & 2900 RPM operated by12.5 HP Motor as per below spare parts at Chherapumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1786 | Impeller : GM |
1787 | Neckring : GM |
1788 | SP Sleeve D/E :SS-410 |
1789 | SP Sleeve ND/E : SS-410 |
1790 | Long Bush : GM |
1791 | Small Bush : GM |
1792 | Gland Plate CI |
1793 | Pump Shaft with check nut & Key : EN 24 |
1794 | M.S. Coupling with nut bolt 8 hole |
1795 | Bearing bracket with stud CI |
1796 | O-Ring |
1797 | Rubber Coupling L 110 |
1798 | Casing diffuser |
1799 | Bearing 6306 |
1800 | Hole tight |
1801 | Spray for nut bolt |
1802 | Grease |
1803 | Repairing of suction and delivery |
1804 | Grease Plate |
1805 | Firki |
1806 | Suction valve |
1807 | Gland Bush |
1808 | Shaft key carbon |
1809 | Delivery |
1810 | Diffuser |
1811 | Champian Packing |
1812 | Gland Dori |
1813 | Tri Rod |
1814 | Nut Bolt |
1815 | Gland Dori |
1816 | Deduction of old G.M. SCRAP |
1817 | Deuction of old iron |
1818 | Check Nut |
1819 | Tale Piece |
1820 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1821 | Transportation and labour charges for cartage of material from Meerut to pump house. |
1822 | Complete overhauling of KSB Make Centrifugal, 13CHR, Horizontal Pump having discharge 300 LPM at 190 M head & 2900 RPM operated by25 HP Motor as per below spare parts at Hyupani Stage-Ist (Ghatudi)pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1823 | Impeller : Bronze |
1824 | Shaft EN 8 |
1825 | Neckring : CI |
1826 | Long Bush with check nut GM+Nikkle |
1827 | Short Bush CI |
1828 | Shaft Key Carbon |
1829 | Bearing Bracket CI |
1830 | Gland Bush CI |
1831 | Casing CI |
1832 | Diffuser |
1833 | Grease Plate |
1834 | MS Coupling 8 Hole |
1835 | Gland Dori 12 mm |
1836 | Bearing 6305 |
1837 | Rubber coupling 8 hole |
1838 | Grease |
1839 | Hole tight |
1840 | Spray for Nut bolt |
1841 | Repairing of Suction and delivery |
1842 | Suction Delivery Repair |
1843 | Nut Bolt |
1844 | Bearing 6305 |
1845 | Tri Rod |
1846 | Firkki |
1847 | Champion Packing |
1848 | Gland Dori |
1849 | Sleeve |
1850 | Neckring |
1851 | Cartage of Pump Complete |
1852 | Repairing of Delivery |
1853 | Gland Plate |
1854 | Check Nut |
1855 | O-Ring |
1856 | Tale piece |
1857 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1858 | Transportation and labour charges for cartage of material from Meerut to Pithoragarh.. |
1859 | Complete overhauling of KSB Make Centrifugal, 13CHR, Horizontal Pump having discharge 300 LPM at 320 M head & 2900 RPM operated by25 HP Motor as per below spare parts at Hyupani Stage-IInd (Hyupani)pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1860 | Impeller : Bronze |
1861 | Shaft EN 8 |
1862 | Neckring : CI |
1863 | Long Bush with check nut GM+Nikkle |
1864 | Short Bush CI |
1865 | Shaft Key Carbon |
1866 | Bearing Bracket CI |
1867 | Gland Bush CI |
1868 | Casing CI |
1869 | Diffuser CI |
1870 | Grease Plate |
1871 | MS Coupling 8 Hole |
1872 | Gland Dori 12 mm |
1873 | Rubber coupling 8 hole |
1874 | Grease |
1875 | Hole tight |
1876 | Spray for Nut bolt |
1877 | Repairing of Suction and delivery |
1878 | Nut Bolt |
1879 | Bearing 6305 |
1880 | Tri Rod |
1881 | Firkki |
1882 | Champion Packing |
1883 | Gland Dori |
1884 | Sleeve |
1885 | Neckring |
1886 | Cartage of Pump complete |
1887 | S/O Tale Piece |
1888 | Shaft Check Nut |
1889 | Check Nut |
1890 | Gland Bush |
1891 | Repair of Delivery |
1892 | O-Ring |
1893 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1894 | Transportation and labour charges for cartage of material from Meerut to Pithoragarh |
1895 | Complete overhauling of Kirloakar Make Horizontal Pump having discharge 200 LPM at 310M head, 2940 RPM & 30 HP Motor as per below spare parts at Bankote Stage Ist pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1896 | Impeller: Bronze |
1897 | Neckring: CI |
1898 | Diffuser |
1899 | Shaft SS |
1900 | Bush Small |
1901 | SP Sleeve D/E SS |
1902 | SP Sleve ND/ESS |
1903 | Casing |
1904 | Bearing Bracket |
1905 | Key Lock |
1906 | M.S Coupling 8 Hole |
1907 | Bearing 7307 NBC Make |
1908 | Grease |
1909 | Rubber Coupling 150 |
1910 | Rubber Coupling 110 8 Hole |
1911 | M.S Coupling L 150 |
1912 | Long Bush |
1913 | Check Nut EN 8 |
1914 | Motor Connection Plate |
1915 | Bearing 307 |
1916 | Nut Bolt |
1917 | Gland Dori |
1918 | Hole tight |
1919 | Champion Packing |
1920 | Spray for Nut Bolt |
1921 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1922 | Transportation and labour charges for cartage of material from road head to pump house. |
1923 | Assembling of above pump with supplied parts & making alignment of above pump with motor on base plate & testing of pump on full load including all material,labour T&P etc complete. |
1924 | Bronze Scrap (Only for deduction) |
1925 | Iron Scrap (Only for Deduction ) |
1926 | Supply of 32 mm dia balance flow pipe |
1927 | Suction Delivery valve Repair |
1928 | Tie Rod |
1929 | Complete overhauling of Kirloakar Make Horizontal Pump having discharge 200 LPM at 310M head, 2940 RPM & 30 HP Motor as per below spare parts at Bankote Stage Ist pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1930 | Impeller: Bronze |
1931 | Neckring: CI |
1932 | Diffuser |
1933 | Shaft SS |
1934 | Bush Small |
1935 | SP Sleeve D/E SS |
1936 | SP Sleve ND/ESS |
1937 | Casing |
1938 | Bearing Bracket |
1939 | Key Lock |
1940 | M.S Coupling 8 Hole |
1941 | Bearing 7307 NBC Make |
1942 | Grease |
1943 | Rubber Coupling 150 |
1944 | Rubber Coupling 110 8 Hole 9” dia |
1945 | M.S Coupling L 150 |
1946 | Long Bush |
1947 | Check Nut EN 8 |
1948 | Motor Connection Plate |
1949 | Bearing 307 |
1950 | Nut Bolt |
1951 | Gland Dori |
1952 | Hole tight |
1953 | Champion Packing |
1954 | Spray for Nut Bolt |
1955 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1956 | Transportation and labour charges for cartage of material from road head to pump house. |
1957 | Assembling of above pump with supplied parts & making alignment of above pump with motor on base plate & testing of pump on full load including all material,labour T&P etc complete. |
1958 | Bronze Scrap (Only for deduction) |
1959 | Iron Scrap (Only for Deduction ) |
1960 | Supply of 32 mm dia balance flow pipe |
1961 | Suction Delivery valve Repair |
1962 | Tie Rod |
1963 | Complete overhauling of Mather & PlattMake, 100/150 IPB-T80, 8 Stage centrifugalPump having discharge 2100 LPM at 350 M head, 300 HP Motor as per below spare parts atGangolihatpumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1964 | Impeller: Bronze |
1965 | Shaft SS |
1966 | Neckring GM Large |
1967 | Neckring Small |
1968 | Long Bush with checkNut GM+Nikle |
1969 | Short Bush |
1970 | Long Bush |
1971 | Firki SS |
1972 | Shaft Key Carbon |
1973 | Gland BushGM |
1974 | Brass Bearing GM |
1975 | Brass Bush for Housing GM |
1976 | Pressure Plate : GM |
1977 | Balancing Disc GM |
1978 | Sleeve |
1979 | Casing CI |
1980 | Repairing of Suction and delivery |
1981 | Hole Tight |
1982 | Spray for Nut Bolt |
1983 | M.S Coupling |
1984 | Rubber Coupling |
1985 | Coupling Stud |
1986 | Brass Oil Ring |
1987 | Champion Packing |
1988 | Gland Dori |
1989 | Mobil Oil |
1990 | Grease |
1991 | Casing Rubber Ring |
1992 | Diffuser |
1993 | Air Cock |
1994 | Balancing Brass Screw |
1995 | Neckring Brass Screw |
1996 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
1997 | Transportation and labour charges for cartage of material from road head to pump house. |
1998 | Complete overhauling of Mather & PlattMake, 100/150 IPB-T80, 8 Stage centrifugalPump having discharge 2100 LPM at 350 M head, 300 HP Motor as per below spare parts atGangolihatpumping Station IInd Stage under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
1999 | Impeller: Bronze |
2000 | Shaft SS |
2001 | Neckring GM Large |
2002 | Neckring Small |
2003 | Long Bush with checkNut GM+Nikle |
2004 | Short Bush |
2005 | Long Bush |
2006 | Firki SS |
2007 | Shaft Key Carbon |
2008 | Gland BushGM |
2009 | Brass Bearing GM |
2010 | Brass Bush for Housing GM |
2011 | Pressure Plate : GM |
2012 | Balancing Disc GM |
2013 | Sleeve |
2014 | Casing CI |
2015 | Repairing of Suction and delivery |
2016 | Hole Tight |
2017 | Spray for Nut Bolt |
2018 | M.S Coupling |
2019 | Rubber Coupling |
2020 | Coupling Stud |
2021 | Brass Oil Ring |
2022 | Champion Packing |
2023 | Gland Dori |
2024 | Mobil Oil |
2025 | Grease |
2026 | Casing Rubber Ring |
2027 | Diffuser |
2028 | Air Cock |
2029 | Balancing Brass Screw |
2030 | Neckring Screw |
2031 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
2032 | Transportation and labour charges for cartage of material from road head to pump house. |
2033 | Complete overhauling of Mather & PlattMake, 100/150 IPB-T80, 8 Stage centrifugalPump having discharge 2100 LPM at 350 M head, 300 HP Motor as per below spare parts atGangolihatpumping Station IIIrd Stage under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
2034 | Impeller: Bronze |
2035 | Shaft SS |
2036 | Neckring GM Large |
2037 | Neckring Small |
2038 | Long Bush with checkNut GM+Nikle |
2039 | Short Bush |
2040 | Long Bush |
2041 | Firki SS |
2042 | Shaft Key Carbon |
2043 | Gland BushGM |
2044 | Brass Bearing GM |
2045 | Brass Bush for Housing GM |
2046 | Pressure Plate : GM |
2047 | Balancing Disc GM |
2048 | Sleeve |
2049 | Casing CI |
2050 | Repairing of Suction and delivery |
2051 | Hole Tight |
2052 | Spray for Nut Bolt |
2053 | M.S Coupling |
2054 | Rubber Coupling |
2055 | Coupling Stud |
2056 | Brass Oil Ring |
2057 | Champion Packing |
2058 | Gland Dori |
2059 | Mobil Oil |
2060 | Grease |
2061 | Casing Rubber Ring |
2062 | Diffuser Air Cock |
2063 | Balancing Brass Screw |
2064 | Neckring Brass Screw |
2065 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
2066 | Transportation and labour charges for cartage of material from road head to pump house. |
2067 | Complete overhauling of KSBMake, 8 Stage MOVI-32/8 centrifugalPump having discharge 100 LPM at 200 M head operated by 15 HP Motor as per below spare parts atGangolihatpumping Station IIIrd Stage under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
2068 | Impeller: Bronze |
2069 | Shaft SS |
2070 | Neckring GM Large |
2071 | Long Bush with checkNut GM+Nikle |
2072 | Short Bush |
2073 | Firki SS |
2074 | Shaft Key Carbon |
2075 | Gland BushGM |
2076 | Bush Bracket GM |
2077 | Brass Bush for Housing GM |
2078 | Pressure Plate : GM |
2079 | Balancing Disc GM |
2080 | Sleeve |
2081 | Casing CI |
2082 | Repairing of Suction and delivery |
2083 | Bearing Bracket |
2084 | MS Coupling 8 Hole 9” dia |
2085 | Rubber Coupling |
2086 | Coupling Stud |
2087 | Brass Oil Ring |
2088 | Champion Packing |
2089 | Grease |
2090 | Hole Tight |
2091 | Spray for Nut Bolt |
2092 | Gland Dori |
2093 | Mobil Oil |
2094 | Bearing |
2095 | Suction Delivery Repair |
2096 | Casing |
2097 | Diffuser |
2098 | Firkki |
2099 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
2100 | Transportation and labour charges for cartage of material from road head to pump house. |
2101 | Complete overhauling of BeaconMake, CentrifugalPump having discharge 410 LPM at 450 M head operated by 100 HP Motor as per below spare parts atMarsoli pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
2102 | Impeller: Bronze |
2103 | Shaft EN: SS |
2104 | Neckring GM Large |
2105 | Long Bush with checkNut GM+Nikle |
2106 | Short Bush |
2107 | Firki SS |
2108 | Shaft Key Carbon |
2109 | Gland BushGM |
2110 | Bush Bracket GM |
2111 | Brass Bush for Housing GM |
2112 | Pressure Plate : GM |
2113 | Balancing Disc GM |
2114 | Rubber Coupling |
2115 | Air Cock Brass |
2116 | Air Pipe |
2117 | Sleeve |
2118 | Coupling Nut Bolt SS |
2119 | Gland Dori |
2120 | Nut Bolt |
2121 | Casing |
2122 | Hole Tight |
2123 | Spray for Nut Bolt |
2124 | Diffuser |
2125 | Bearing NU 206 |
2126 | Grease |
2127 | Coolin Pipe |
2128 | Suction Delivery Repair |
2129 | Balancing Plate |
2130 | Balancing |
2131 | Firkki |
2132 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
2133 | Transportation and labour charges for cartage of material from road head to pump house. |
2134 | Complete overhauling of MAX Flow Make 41 MM-14 Pump Model, 14stage Centrifugal Horizontal Pump having discharge 150 LPM at 300 M head & 25 HP Motor as per below spare parts at Paun Stage Istpumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
2135 | Impeller: Bronze |
2136 | Shaft SS |
2137 | Neckring: CI |
2138 | Long Bushwith check nut GM+Nikkle |
2139 | Short Bush CI |
2140 | Shaft Key carbon |
2141 | Bearing bracket CI |
2142 | Gland Bush CI |
2143 | MS Coupling 8 hole 9” dia |
2144 | Diffuser CI |
2145 | Bearing 3307 |
2146 | Bearing 6306 |
2147 | Grease plate CI |
2148 | MS Coupling 8hole 9” dia |
2149 | Gland Dori |
2150 | Repairing of Suction and delivery |
2151 | Bearing |
2152 | Grease |
2153 | Champion Packing |
2154 | Hole tight |
2155 | Spray tight |
2156 | Rubber Coupling |
2157 | Firkki Rubber |
2158 | Casing |
2159 | Tri Rod |
2160 | Cartage of Pump complete |
2161 | S/O of Pump Sction |
2162 | S/O Pump |
2163 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
2164 | Transportation and labour charges for cartage of material from road head to pump house. |
2165 | Complete overhauling of MAX Flow Make 41 MM-14 Pump Model, 14stage Centrifugal Horizontal Pump having discharge 150 LPM at 300 M head & 25 HP Motor as per below spare parts at Paun Stage-IInd pumping Station under division Pithoragarh. Dismantling of above pump with all labour, T&P etc complete |
2166 | Impeller: Bronze |
2167 | Shaft SS |
2168 | Neckring: CI |
2169 | Long Bushwith check nut GM+Nikkle |
2170 | Short Bush CI |
2171 | Shaft Key carbon |
2172 | Bearing bracket CI |
2173 | Gland Bush CI |
2174 | MS Coupling 8 hole 9” dia |
2175 | Diffuser CI |
2176 | Bearing 3307 |
2177 | Bearing 6306 |
2178 | Grease plate CI |
2179 | MS Coupling 8hole 9” dia |
2180 | Gland Dori |
2181 | Repairing of Suction and delivery |
2182 | Bearing |
2183 | Grease |
2184 | Champion Packing |
2185 | Hole tight |
2186 | Spray tight |
2187 | Rubber Coupling |
2188 | S/O of Pump Suction |
2189 | S/O of Pump |
2190 | Tri Rod |
2191 | Cartage of Pump complete |
2192 | Labour charges for overhauling of above pump with supplied spare parts and making alignment of above pump with motor on base plate and testing of pump on full load. |
2193 | Transportation and labour charges for cartage of material from road head to pump house. |
2194 | Neckring SmallComplete ovehaulling of Kirloskarmake Centrifugal horizontal pump having discharge 200 LPM at 100 M head operated by 15 HP Motor as perbelow spare parts at Hureti Pumping station under divison Pithoragarh. Dismantling of above pump with all labour, T&P etc complete. |
2195 | Impleller Bronze |
2196 | Shaft :SS |
2197 | Neckring GM |
2198 | Long Bush with check nut GM+Nikle |
2199 | Short Buh |
2200 | Firki SS |
2201 | Shaft Key Carbon |
2202 | Gland Bush GM |
2203 | Bush Bracket GM |
2204 | BrassBush for Housing CI |
2205 | Pressure Plate GM |
2206 | Balancing Disc GM |
2207 | Sleeve |
2208 | Casing CI |
2209 | Repairing of Suction and delivery |
2210 | Beaing bracket CI |
2211 | MS Coupling |
2212 | Rubber Coupling |
2213 | Coupling Stud |
2214 | Brass Oil Ring |
2215 | Champion Packing |
2216 | Grease |
2217 | Hole Tight |
2218 | Spray Fot Nut bolt |
2219 | Gland Dori |
2220 | Mobile Oil |
2221 | Gland Bush Rubber |
2222 | 15HP Submercible Pump Complete |
2223 | Gate valve 25 mm |
2224 | Reflex valve 60mm |
2225 | Nut Bolt |
2226 | Casing |
2227 | Labour charge for overhailling of above pump with supllied spare parts and making alignment of above pump with motor on the base plate and testing of pump on full load |
2228 | Trasportation and labour charge for cartage of material from road head to pump house distance 150 Mt |
2229 | Others Item Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingopening of all nut bolts of Flanges proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixingproper packing required nut and boltsand testing of TEEcomplete all at Ghat Clear water Pumping station. |
2230 | Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingall opening of all nut bolts of Flanges of proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixing proper packing required nut and boltsand testing of TEEcomplete all at Matela Pumping station. |
2231 | Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingallFlanges of proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts andtesting of TEEcomplete all at Gurna Pumping station . |
2232 | Complete Repairingof TEE 300 mmX 300 mm X 150 mm includingallFlanges of proper size as required at site ,Cutting all types of od MSERWpipes from Risingmainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts andtesting of TEEcomplete all at Hanuman Mandir Pumping station. |
2233 | Complete Repairingof Sluice Valve includingall opening of all nut bolts ofFlanges of proper size as required at site ,Cutting all types of od MSERW pipes from Rising mainpipesin proper positionin welding with flanzes,threading ofspendle rod ,making bush , fixing proper packing required nut and bolts andtestingcomplete all. Ghat Clear water Pumping station,Matela Pumping station,Gurna Pumping station & Hanuman Mandir Pumping station. |
2234 | Complete Repairingof Suction Valve including opening of all nut bolts of allFlanges of proper size as required at site ,Cutting all types of od pipes from Supply mainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts and and testing of TEEcomplete all. Ghat Clear water Pumping station,Matela Pumping station,Gurna Pumping station & Hanuman Mandir Pumping station. |
2235 | Complete Repairingof Non ReturningValve includingopening of all nut bolts of allFlanges of proper size as required at site ,Cutting all types of od pipes from Supply mainpipesin proper positionin welding with flanzes, fixing proper packing required nut and bolts & repairing of rod and and testing of TEEcomplete all. Ghat Clear water Pumping station,Matela Pumping station,Gurna Pumping station & Hanuman Mandir Pumping station. |
2236 | Complete Repairingof Air Valve includingall opening of all nut bolts of Flanges of proper size as required at site ,Cutting all types of od pipes from Supply mainpipesin proper positionin welding with flanzes, fixingproper packing required nut and bolts and and testing of TEEcomplete allRising Main pipe line fromGhat Clear water Pumping station ToHanuman Mandir Pumping station. |
2237 | S/F of NRV heavy duty 150 mm |
2238 | S/F of Suction valve 150mm |
2239 | S/Fof Delivery valve150 mm |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail