}

Tender For Annual Rate Contract For Repairing Of Different Capacity Motor In Executive Engineer Uttarakhand Jal Sansthan, Division Pithoragarh, pithoragarh-Uttarakhand

Drinking Water And Sanitation Department has published Tender For Annual Rate Contract For Repairing Of Different Capacity Motor In Executive Engineer Uttarakhand Jal Sansthan, Division Pithoragarh. Submission Date for this Tender is 27-10-2023. Road Work Tenders in pithoragarh Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

40278564
Tender For Annual Rate Contract For Repairing Of Different Capacity Motor In Executive Engineer Uttarakhand Jal Sansthan, Division Pithoragarh
Open Tender
Indian
Uttarakhand
pithoragarh
27-10-2023

Tender Details

Annual Rate Contract For Repairing Of Different Capacity Motor In Executive Engineer Uttarakhand Jal Sansthan, Division Pithoragarh-3 Complete Rewinding of Stators winding of Jyoti Make 60 HP, 3 Phase, AC induction Motor (1470 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Thuligad Pumping Station under Division Pithoragarh. Motor Wire Atlas 4 Funny 5 Varnish 6 Nomex Paper 7 Sleeve 8 Glass tape 9 Cotton tap 10 Fiber glass/ Cloth Paper 11 Copper Lugs (200 Amp) 12 Greasing for above motor pump set 13 Grease Plate 14 Mobil Oil 15 Bearing 7316 16 Bearing 6211 17 Bearing 6312 18 95 Amp Copper Lugs 19 Connection Plate with Thured 20 Terminal Insulator 21 Labour charges for cutting and cleaning of old wire of motor 22 Deduction of old copper wire scrap 23 Deduction of old Iron scrap 24 Deduction of old GM 25 Labour charges for fitting, rewinding installation and testing of above motor on full load 26 Repairing of end cover for above motor 27 Supply of fan for above motor 28 Ranga 29 Lock 30 Grease 31 Rotor Shaft repair 32 Riched Coupling 33 Riched bearing 34 Motor Bearing welding work 35 Cartage of Rotor 36 Dismantling and fitting of end cover 37 Varnishing for above overheat Motor 38 Complete Rewinding of Rotor dor above motor 39 Transportation and labourcharges for cartage of material from Meerut to Pithoragarh Kasani Station 40 Complete Rewinding of Stators winding of ABB Make/ Jyoti make180 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Kasani Pumping Station under Division Pithoragarh. Motor Wire Atlas 41 Funny 42 Varnish 43 Nomex Paper 8 MM 44 Sleeve 45 Glass tape 46 Cotton tap 47 Copper Lugs (300 Amp) 48 Fiber glass Tape 49 Grease Plate 50 Mobil Oil 51 Bearing 6316 52 Bearing NU 318 53 Connection Plate 54 Greasing for above motor pump set 55 Labour charges for cutting and cleaning of old wire of motor 56 Deduction of old copper wire scrap 57 Deduction of old Iron scrap 58 Deduction of old GM 59 Labour charges for fitting, rewinding installation and testing of above motor on full load 60 Repairing of end cover for above motor 61 Supply of meter Fom 62 Grease 63 Nomex paper 10mm 64 Cloth paper 65 Ranga 66 Shaft lock 67 Motor pump ceiling 68 Deduction of old iron scrap 69 Deduction of old GM 70 Repairing of Rotor shaft 71 Rotor varnishing 72 Motor Shaft lock 73 Key carbon 74 Repair of end cover 75 Complete Motor cartage Kasani to pump house 76 Supply of fan for above motor 77 Dismantling and fitting of end cover 78 Varnishing for above overheat Motor 79 Complete Rewinding of Rotor for above motor 80 Transportation and labourcharges for cartage of material from Meerut to Kasani road head 81 Complete Rewinding of Stators winding of KirloskarMake/ABB Make 30 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at RaiPumping Station under Division Pithoragarh. Motor Wire Atlas 82 Funny 83 Varnish 84 Nomex Paper 8 mm 85 Copper Lugs (50 Amp) 86 Sleeve 87 Glass tape 88 Cotton tap 89 Fiber glass tape 90 Grease Plate 91 Mobil Oil 92 Bearing 6310 93 Bearing 6311 94 M.S. Coupling 8 Hole 95 8’ Rubber Coupling 96 Greasing for above motor pump set 97 Labour charges for cutting and cleaning of old wire of motor 98 Deduction of old copper wire scrap 99 Labour charges for fitting, rewinding installation and testing of above motor on full load 100 Supply of end cover for above motor 101 Supply of fan for above motor 102 Repair of Suction 103 Repair of Delivery 104 Grease 105 Ranga 106 Shaft lock 107 Deduction of old iron scrap 108 Deduction of old GM 109 Connection plate 110 Cloth paper 111 Complete Motor cartage 112 Roter greesing 113 Roter shaft repair 114 End cover repair 115 Nomex paper 10 mm 116 Fiber glass cloth paper 117 Dismantling and fitting of end cover 118 Varnishing for above overheat Motor 119 Complete Rewinding of Rotor for above motor 120 Transportation and labourcharges for cartage of material from Meerut to pumping station Rai 121 Complete Rewinding of Stators winding of KirloskarMake 12.5 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at ChheraPumping Station under Division Pithoragarh. Motor Wire Atlas 122 Funny 123 Varnish 124 Nomex Paper 125 Sleeve 126 Glass tape 127 Cotton tap 128 Fiber glass tap 129 Grease Plate 130 Cloth Paper 131 Bearing 6310 132 Bearing 6309 133 M.S. Coupling 134 M.S. Coupling Rubber 135 Greasing for above motor pump set 136 Copper Lugs (50 Amp) 137 Labour charges for cutting and cleaning of old wire of motor 138 Deduction of old copper wire scrap 139 Labour charges for fitting, rewinding installation and testing of above motor on full load 140 Supply of end cover for above motor 141 Supply of fan for above motor 142 Dismantling and fitting of end cover 143 Varnishing for above overheat Motor 144 Shaft lock 145 Grease 146 Rubber coupling 147 M.S. 8 Hole coupling 148 MS Stud 149 MS Coupling Nut Bolt 150 Connection plate 151 Roter varnishing 152 End cover repairing 153 Cartage of Motor road head to pump house chhera 154 Complete Rewinding of Rotor dor above motor 155 Transportation and labourcharges for cartage of material from Meerut to pump house station Chhera 156 Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage Ist (Ghatyudi)Pumping Station under Division Pithoragarh. Motor Wire Atlas 157 Funny 158 Varnish 159 Nomex Paper 160 Sleeve 161 Glass tape 162 Cotton tap 163 Fiber glass tap 164 Cloth fiber 165 Copper Lugs (100 Amp) 166 Grease Plate 167 Bearing 6310 168 8 Hole M.S Coupling 169 Grease 170 Shaft lock 171 Rubber coupling 172 Coupling nut bolt 173 Complete motor cartage 174 Rubber coupling 175 Connection plate 176 Rotor varnishing 177 Repair of end cover 178 Rotor shaft repair 179 Labour charges for cutting and cleaning of old wire of motor 180 Deduction of old copper wire scrap 181 Deduction of old Iron scrap 182 Deduction of old GM 183 Labour charges for fitting, rewinding installation and testing of above motor on full load 184 Supply of end cover for above motor 185 Supply of fan for above motor 186 Dismantling and fitting of end cover 187 Varnishing for above overheat Motor 188 Complete Rewinding of Rotor for above motor 189 Transportation and labourcharges for cartage of material from Meerut to Pump house Hyupani Pumping station road head (Ghatyudi) 190 Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage IInd (Hyupani)Pumping Station under Division Pithoragarh. Motor Wire Atlas 191 Funny 192 Varnish 193 Nomex Paper 194 Sleeve 195 Glass tape 196 Cotton tap 197 Fiber glass tap 198 Cloth Paper 199 Copper Lugs (100 Amp) 200 Grease Plate 201 Bearing 6310 202 8 Hole M.S Coupling 203 Grease 204 Connection Plate 205 Rubber coupling 206 Roter shaft lock 207 Rotor Greasing 208 Repair of end cover 209 Rotor shaft repair 210 Shaft Lock 211 Motor Fom 212 Complete Motor cartage 213 Coupling nut bolt 214 Labour charges for cutting and cleaning of old wire of motor 215 Deduction of old copper wire scrap 216 Deduction of old Iron scrap 217 Deduction of old GM 218 Labour charges for fitting, rewinding installation and testing of above motor on full load 219 Supply of end cover for above motor 220 Supply of fan for above motor 221 Dismantling and fitting of end cover 222 Varnishing for above overheat Motor 223 Complete Rewinding of Rotor for above motor 224 Transportation and labourcharges for cartage of material from Meerut to Pump house Paun. 225 Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIst Pumping Station under Division Pithoragarh. Motor Wire Atlas 226 Funny 227 Varnish 01Bottle 228 Nomex Paper 229 Sleeve 230 Glass tape 231 Cotton tap 232 Fiber glass tap 233 Copper Lugs (100 Amp) 234 Grease Plate 235 Grease 236 Labour charges for cutting and cleaning of old wire of motor 237 Deduction of old copper wire scrap 238 Motor Varnshing 239 MS Coupling 240 Motor greasing 241 Rubber coupling 242 Coupling Nut Bolt 243 Connection Plate 244 Rotor shaft lock 245 Rotor Varnishing 246 Repair end cover 247 Rotor shaft repair 248 Shaft Lock 249 Motor fan 250 Complete Motor cartage road head to pump house. 251 Labour charges for fitting, rewinding installation and testing of above motor on full load 252 Supply of end cover for above motor 253 Supply of fan for above motor 254 Dismantling and fitting of end cover 255 Varnishing for above overheat Motor 256 Complete Rewinding of Rotor forabove motor 257 material 258 Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIInd Pumping Station under Division Pithoragarh. Motor Wire Atlas 259 Funny 260 Varnish 261 Nomex Paper 262 Sleeve 263 Glass tape 264 Cotton tap 265 Fiber glass 266 Copper Lugs (100 Amp) 267 Grease Plate 268 Grease 269 Labour charges for cutting and cleaning of old wire of motor 270 Deduction of old copper wire scrap 271 Fiber glass cloth paper 272 Repair of end cover 273 Deduction of old Iron scrap 274 Deduction of old GM 275 Connection plate 276 Rotor shaft lock 277 S/O End Cover 278 Repair of end cover 279 Rotor shaft repair 280 Shaft lock 281 Supply of Motor Fan 282 Motor Fan 283 Bearing Bracket 284 Suction repairing 285 Delivery Repairing 286 Complete Motor cartage roas head to pump house. 287 Labour charges for fitting, rewinding installation and testing of above motor on full load 288 Supply of end cover for above motor 289 Supply of fan for above motor 290 Dismantling and fitting of end cover 291 Varnishing for above overheat Motor 292 Complete Rewinding of Rotor for above motor 293 Transportation and labourcharges for cartage of material from road head to pump house. 294 Complete Rewinding of Stators winding of NGEF Make/ ABB Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas 295 Funny 296 Varnish 297 Nomex Paper 298 Sleeve 299 Glass tape 300 Cotton tap 301 Fiber glass 302 Bearing 303 Labour charges for cutting and cleaning of old wire of motor 304 Deduction of old copper wire scrap 305 Deduction of old Iron scrap 306 Deduction of old GM 307 Labour charges for fitting, rewinding installation and testing of above motor on full load 308 Repairing of end cover for above motor 309 Supply of fan for above motor 310 Dismantling and fitting of end cover 311 Copper Lugs 312 Varnishing for above overheat Motor 313 Complete Rewinding of Rotor dor above motor 314 Greasing for above motor pump set 315 Transportation and labourcharges for cartage of material from road head to pump house. 316 Roter Shaft Repairing 317 Complete Rewinding of Stators winding of Jyoti Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas 318 Funny 319 Varnish 320 Nomex Paper 321 Sleeve 322 Glass tape 323 Cotton tap 324 Fiber glass 325 Bearing 326 Labour charges for cutting and cleaning of old wire of motor 327 Deduction of old copper wire scrap 328 Deduction of old Iron scrap 329 Deduction of old GM 330 Labour charges for fitting, rewinding installation and testing of above motor on full load 331 Repairing of end cover for above motor 332 Supply of fan for above motor 333 Dismantling and fitting of end cover 334 Copper Lugs (100 Amp) 335 Varnishing for above overheat Motor 336 Complete Rewinding of Rotor dor above motor 337 Greasing for above motor pump set 338 Transportation and labourcharges for cartage of material from road head to pump house. 339 Complete Rewinding of Stators winding of ABBMake 150 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Clearwater Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas 340 Funny 341 Varnish 342 Nomex Paper 343 Sleeve 344 Glass tape 345 Cotton tap 346 Fiber glass 347 Grease Plate 348 Labour charges for cutting and cleaning of old wire of motor 349 Deduction of old copper wire scrap 350 Labour charges for fitting, rewinding installation and testing of above motor on full load 351 Repairing of end cover for above motor 352 Supply of fan for above motor 353 Dismantling and fitting of end cover 354 Deduction of old Iron scrap 355 Deduction of old GM 356 Bearing 357 Grease 358 Ranga 359 Rotor cleaning & varnishing 360 End cover Bearing 361 Diffuser 362 Copper Lugs (225 Amp) 363 Varnishing for above overheat Motor 364 Complete Rewinding of Rotor dor above motor 365 Greasing for above motor pump set 366 Transportation and labourcharges for cartage of material from road head to pump house. 367 Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Matela Pumping Station under Division Pithoragarh. Motor Wire Atlas 368 Funny 369 Varnish 370 Nomex Paper 371 Sleeve 372 Glass tape 373 Cotton tap 374 Fiber glass 375 Grease Plate 376 Mobil Oil 377 Labour charges for cutting and cleaning of old wire of motor 378 Deduction of old copper wire scrap 379 Deduction of old Iron scrap 380 Deduction of old GM 381 Labour charges for fitting, rewinding installation and testing of above motor on full load 382 Repairing of end cover for above motor 383 Supply of fan for above motor 384 Dismantling and fitting of end cover 385 Copper Lugs (300 Amp) 386 Varnishing for above overheat Motor 387 Complete Rewinding of Rotor for above motor 388 Greasing for above motor pump set 389 Transportation and labourcharges for cartage of material from road head to pump house. 390 Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction slip ring Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GurnaPumping Station under Division Pithoragarh. Motor Wire Atlas 391 Funny 392 Varnish 393 Nomex Paper 394 Sleeve 395 Glass tape 396 Cotton tap 397 Fiber glass 398 Grease Plate 399 Mobil Oil 400 Labour charges for cutting and cleaning of old wire of motor 401 Deduction of old copper wire scrap 402 Deduction of old Iron scrap 403 Deduction of old GM 404 Copper Lugs (300 Amp) 405 Labour charges for fitting, rewinding, installation and testing of above motor on full load 406 Repairing of end cover for above motor 407 Supply of fan for above motor 408 Dismantling and fitting of end cover 409 Varnishing for above overheat Motor 410 Complete Rewinding of Rotor dor above motor 411 Greasing for above motor pump set 412 Transportation and labourcharges for cartage of material from road head to pump house. 413 Complete Rewinding of Stators winding of ABB Make 125 HP, 3 Phase, AC induction Motor (1450 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hanuman Mandir Pumping Station under Division Pithoragarh. Motor Wire Atlas 414 Funny 415 Varnish 416 Nomex Paper 417 Sleeve 418 Glass tape 419 Cotton tap 420 Fiber glass 421 Grease Plate 422 Mobil Oil 423 Labour charges for cutting and cleaning of old wire of motor 424 Deduction of old copper wire scrap 425 Deduction of old Iron scrap 426 Deduction of old GM 427 Copper Lugs (300 Amp) 428 Labour charges for fitting, rewinding, installation and testing of above motor on full load 429 Repairing of end cover for above motor 430 Labour charges for fitting, rewinding installation and testing of above motor on full load 431 Supply of fan for above motor 432 Dismantling and fitting of end cover 433 Varnishing for above overheat Motor 434 Complete Rewinding of Rotor dor above motor 435 Transportation and labourcharges for cartage of material from road head to pump house. 436 Complete Rewinding of Stators winding of KirloaskarMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas 437 Funny 438 Varnish 439 Nomex Paper 440 Sleeve 441 Glass tape 442 Cotton tap 443 Fiber glass 444 Copper Lugs (50 Amp) 445 Motor Sheet 446 Motor Cover 447 Motor Fan 448 Champion Packing 449 Grease Plate 450 Grease 451 Supply of end cover for above motor 452 Deduction of old copper wire scrap 453 Deduction of old Iron scrap 454 Deduction of old GM 455 Labour charges for cutting and cleaning of old wire of motor 456 Labour charges for fitting, rewinding, installation and testing of above motor on full load 457 Transportation and labourcharges for cartage of material from road head to pump house. 458 Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas 459 Funny 460 Varnish 461 Nomex Paper 462 Sleeve 463 Glass tape 464 Cotton tap 465 Fiber glass 466 Copper Lugs (50 Amp) 467 Motor Sheet 468 Motor Cover 469 Motor Fan 470 Champion Packing 471 Bearing 6311 472 Grease Plate 473 Grease 474 Supply of end cover for above motor 475 Labour charges for cutting and cleaning of old wire of motor 476 Deduction of old copper wire scrap 477 Deduction of old Iron scrap 478 Deduction of old GM 479 Labour charges for fitting, rewinding, installation and testing of above motor on full load 480 Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load. 481 Transportation and labourcharges for cartage of material from road head to pump house. 482 Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage Ist under Division Pithoragarh. 483 Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot IIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas 484 Funny 485 Varnish 486 Nomex Paper 487 Sleeve 488 Glass tape 489 Cotton tap 490 Fiber glass 491 Copper Lugs (50 Amp) 492 Motor Sheet 493 Motor Cover 494 Motor Fan 495 Champion Packing 496 Bearing 6311 497 Grease Plate 498 Grease 499 Supply of end cover for above motor 500 Deduction of old copper wire scrap 501 Deduction of old Iron scrap 502 Deduction of old GM 503 Labour charges for cutting and cleaning of old wire of motor 504 Labour charges for fitting, rewinding, installation and testing of above motor on full load 505 Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load. 506 Transportation and labourcharges for cartage of material from road head to pump house. 507 Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage IInd under Division Pithoragarh. 508 Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIstStagePumping Station under Division Pithoragarh. Motor Wire Atlas 509 Funny 510 Varnish 511 Nomex Paper 512 Sleeve 513 Glass tape 514 Cotton tap 515 Fiber glass 516 Grease Plate 517 Labour charges for cutting and cleaning of old wire of motor 518 Deduction of old copper wire scrap 519 Deduction of old Iron scrap 520 Deduction of old GM 521 Labour charges for fitting, rewinding, installation and testing of above motor on full load 522 Supply of end cover for above motor 523 Supply of fan cover 524 Dismenteling and fitting of end cover 525 Varnishing for above overheat Motor 526 Complete rewinding of Rotor for above motor 527 Greasing for above motor pump set 528 Copper Lugs ( 300 Amp) 529 Transportation and labourcharges for cartage of material from road head to pump house. 530 Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas 531 Funny 532 Varnish 533 Nomex Paper 534 Sleeve 535 Glass tape 536 Cotton tap 537 Fiber glass 538 Grease Plate 539 Labour charges for cutting and cleaning of old wire of motor 540 Deduction of old copper wire scrap 541 Deduction of old Iron scrap 542 Deduction of old GM 543 Labour charges for fitting, rewinding, installation and testing of above motor on full load 544 Supply of end cover for above motor 545 Supply of fan cover 546 Dismenteling and fitting of end cover 547 Varnishing for above overheat Motor 548 Complete rewinding of Rotor for above motor 549 Greasing for above motor pump set 550 Copper Lugs ( 300 Amp) 551 Transportation and labourcharges for cartage of material from road head to pump house. 552 Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIIrdStagePumping Station under Division Pithoragarh. Motor Wire Atlas 553 Funny 554 Varnish 555 Nomex Paper 556 Sleeve 557 Glass tape 558 Cotton tap 559 Fiber glass 560 Grease Plate 561 Labour charges for cutting and cleaning of old wire of motor 562 Deduction of old copper wire scrap 563 Deduction of old Iron scrap 564 Deduction of old GM 565 Labour charges for fitting, rewinding, installation and testing of above motor on full load 566 Supply of end cover for above motor 567 Supply of fan cover 568 Dismenteling and fitting of end cover 569 Varnishing for above overheat Motor 570 Complete rewinding of Rotor for above motor 571 Greasing for above motor pump set 572 Copper Lugs ( 300 Amp) 573 Transportation and labourcharges for cartage of material from road head to pump house. 574 Complete Rewinding of Stators winding of JyotiMake 15 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at FutsilPumping Station Gangolihat under Division Pithoragarh. Motor Wire Atlas 575 Funny 576 Varnish 577 Nomex Paper 578 Sleeve 579 Glass tape 580 Cotton tap 581 Fiber glass 582 Grease Plate 583 Grease 584 Labour charges for cutting and cleaning of old wire of motor 585 Deduction of old copper wire scrap 586 Deduction of old Iron scrap 587 Deduction of old GM 588 Copper Lugs (Amp) 589 Labour charges for fitting, rewinding, installation and testing of above motor on full load 590 Supply of end cover for above motor 591 Supply of fan cover 592 Dismenteling and fitting of end cover 593 Varnishing for above overheat Motor 594 Complete rewinding of Rotor for above motor 595 Greasing for above motor pump set 596 Transportation and labourcharges for cartage of material from road head to pump house. 597 Complete Rewinding of Stators winding of ABBMake 100 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at MarsoliPumping Stationunder Division Pithoragarh. Motor Wire Atlas 598 Funny 599 Varnish 600 Nomex Paper 601 Sleeve 602 Glass tape 603 Cotton tap 604 Fiber glass 605 Bearing 6316 C3 (DE) 606 Bearing 6316 C3 (DE) 607 Grease Plate 608 Labour charges for cutting and cleaning of old wire of motor 609 Deduction of old copper wire scrap 610 Deduction of old Iron scrap 611 Deduction of old GM 612 Copper Lugs (Amp) 613 Labour charges for fitting, rewinding, installation and testing of above motor on full load 614 Supply of end cover for above motor 615 Supply of fan cover 616 Dismenteling and fitting of end cover 617 Varnishing for above overheat Motor 618 Complete rewinding of Rotor for above motor 619 Greasing for above motor pump set 620 Transportation and labourcharges for cartage of material from road head to pump house. 621 Complete rewinding of Stators winding of Kirloskar Make 15HP 3 Phasse, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete all respect at Hudeti Pumping Station under Division Pithoragarh.Motor Wore Atlas 622 Funny 623 Varnish 624 Nomex Paper 625 Sleeve 626 Glass Tape 627 Cotton Tape 628 Fiber Glass 629 Grease Plate 630 Grease 631 Labour charges for cutting and cleaning of old wore of motor 632 Deduction of old copper wire 633 Deduction of old Iron scrap 634 Deduction of old GM 635 Copper Lugs (50 Amp) 636 Labour charges for fitting, rewinding, installation and testing of above motor on full load 637 Supply of end cover for above motor 638 Supply of fan for above motor 639 Dismantelling and fitting of end cover 640 Varnishing for above over heat motor 641 Complete rewinding of Rotor for above motor 642 Greasing for above motor pump set 643 Transportation and labour charges for cartge of material from road head to pump house distance 150 Meter 644 Other Parts Main Switch 200 Amp 645 Main Switch 250 Amp 646 Main Switch 125 Amp 647 Complete overhaulling OCB 648 Complete overhaulling of ACB 600 Amp 649 Complete overhaulling of ACB 1200 Amp 650 HRC Fuse 100 Amp 651 HRC Fuse 250 Amp 652 Clamp Brass 1000 Amp 653 Complete overhaulling of Kilbarn Make Starter with all spare parts 654 Valve repairingwork 60 to 400 HP 655 Valve repairing work 15 to 30 HP 656 Annual Maintenance Work 657 Copper Lugs 50 Amp 658 Copper Lugs 95 Amp 659 Copper Lugs 120 Amp 660 Copper Lugs150 Amp 661 Copper Lugs 200 Amp 662 Copper Lugs 300 Amp 663 Copper Lugs 400 Amp 664 Volt Meter 665 Amp Meter 666 Financial Year 2024-25 667 Complete Rewinding of Stators winding of Jyoti Make 60 HP, 3 Phase, AC induction Motor (1470 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Thuligad Pumping Station under Division Pithoragarh. Motor Wire Atlas 668 Funny 669 Varnish 670 Nomex Paper 671 Sleeve 672 Glass tape 673 Cotton tap 674 Fiber glass/ Cloth Paper 675 Copper Lugs (200 Amp) 676 Greasing for above motor pump set 677 Grease Plate 678 Mobil Oil 679 Bearing 7316 680 Bearing 6211 681 Bearing 6312 682 95 Amp Copper Lugs 683 Connection Plate with Thured 684 Terminal Insulator 685 Labour charges for cutting and cleaning of old wire of motor 686 Deduction of old copper wire scrap 687 Deduction of old Iron scrap 688 Deduction of old GM 689 Labour charges for fitting, rewinding installation and testing of above motor on full load 690 Repairing of end cover for above motor 691 Supply of fan for above motor 692 Ranga 693 Lock 694 Grease 695 Rotor Shaft repair 696 Riched Coupling 697 Riched bearing 698 Motor Bearing welding work 699 Cartage of Rotor 700 Dismantling and fitting of end cover 701 Varnishing for above overheat Motor 702 Complete Rewinding of Rotor dor above motor 703 Transportation and labourcharges for cartage of material from Meerut to Pithoragarh Kasani Station 704 Complete Rewinding of Stators winding of ABB Make/ Jyoti make180 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Kasani Pumping Station under Division Pithoragarh. Motor Wire Atlas 705 Funny 706 Varnish 707 Nomex Paper 8 MM 708 Sleeve 709 Glass tape 710 Cotton tap 711 Copper Lugs (300 Amp) 712 Fiber glass Tape 713 Grease Plate 714 Mobil Oil 715 Bearing 6316 716 Bearing NU 318 717 Connection Plate 718 Greasing for above motor pump set 719 Labour charges for cutting and cleaning of old wire of motor 720 Deduction of old copper wire scrap 721 Deduction of old Iron scrap 722 Deduction of old GM 723 Labour charges for fitting, rewinding installation and testing of above motor on full load 724 Repairing of end cover for above motor 725 Supply of meter Fom 726 Grease 727 Nomex paper 10mm 728 Cloth paper 729 Ranga 730 Shaft lock 731 Motor pump ceiling 732 Deduction of old iron scrap 733 Deduction of old GM 734 Repairing of Rotor shaft 735 Rotor varnishing 736 Motor Shaft lock 737 Key carbon 738 Repair of end cover 739 Complete Motor cartage Kasani to pump house 740 Supply of fan for above motor 741 Dismantling and fitting of end cover 742 Varnishing for above overheat Motor 743 Complete Rewinding of Rotor for above motor 744 Transportation and labourcharges for cartage of material from Meerut to Kasani road head 745 Complete Rewinding of Stators winding of KirloskarMake/ABB Make 30 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at RaiPumping Station under Division Pithoragarh. Motor Wire Atlas 746 Funny 747 Varnish 748 Nomex Paper 8 mm 749 Copper Lugs (50 Amp) 750 Sleeve 751 Glass tape 752 Cotton tap 753 Fiber glass tape 754 Grease Plate 755 Mobil Oil 756 Bearing 6310 757 Bearing 6311 758 M.S. Coupling 8 Hole 759 8’ Rubber Coupling 760 Greasing for above motor pump set 761 Labour charges for cutting and cleaning of old wire of motor 762 Deduction of old copper wire scrap 763 Labour charges for fitting, rewinding installation and testing of above motor on full load 764 Supply of end cover for above motor 765 Supply of fan for above motor 766 Repair of Suction 767 Repair of Delivery 768 Grease 769 Ranga 770 Shaft lock 771 Deduction of old iron scrap 772 Deduction of old GM 773 Connection plate 774 Cloth paper 775 Complete Motor cartage 776 Roter greesing 777 Roter shaft repair 778 End cover repair 779 Nomex paper 10 mm 780 Fiber glass cloth paper 781 Dismantling and fitting of end cover 782 Varnishing for above overheat Motor 783 Complete Rewinding of Rotor for above motor 784 Transportation and labourcharges for cartage of material from Meerut to pumping station Rai 785 Complete Rewinding of Stators winding of KirloskarMake 12.5 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at ChheraPumping Station under Division Pithoragarh. Motor Wire Atlas 786 Funny 787 Varnish 788 Nomex Paper 789 Sleeve 790 Glass tape 791 Cotton tap 792 Fiber glass tap 793 Grease Plate 794 Cloth Paper 795 Bearing 6310 796 Bearing 6309 797 M.S. Coupling 798 M.S. Coupling Rubber 799 Greasing for above motor pump set 800 Copper Lugs (50 Amp) 801 Labour charges for cutting and cleaning of old wire of motor 802 Deduction of old copper wire scrap 803 Labour charges for fitting, rewinding installation and testing of above motor on full load 804 Supply of end cover for above motor 805 Supply of fan for above motor 806 Dismantling and fitting of end cover 807 Varnishing for above overheat Motor 808 Shaft lock 809 Grease 810 Rubber coupling 811 M.S. 8 Hole coupling 812 MS Stud 813 MS Coupling Nut Bolt 814 Connection plate 815 Roter varnishing 816 End cover repairing 817 Cartage of Motor road head to pump house chhera 818 Complete Rewinding of Rotor dor above motor 819 Transportation and labourcharges for cartage of material from Meerut to pump house station Chhera 820 Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage Ist (Ghatyudi)Pumping Station under Division Pithoragarh. Motor Wire Atlas 821 Funny 822 Varnish 823 Nomex Paper 824 Sleeve 825 Glass tape 826 Cotton tap 827 Fiber glass tap 828 Cloth fiber 829 Copper Lugs (100 Amp) 830 Grease Plate 831 Bearing 6310 832 8 Hole M.S Coupling 833 Grease 834 Shaft lock 835 Rubber coupling 836 Coupling nut bolt 837 Complete motor cartage 838 Rubber coupling 839 Connection plate 840 Rotor varnishing 841 Repair of end cover 842 Rotor shaft repair 843 Labour charges for cutting and cleaning of old wire of motor 844 Deduction of old copper wire scrap 845 Deduction of old Iron scrap 846 Deduction of old GM 847 Labour charges for fitting, rewinding installation and testing of above motor on full load 848 Supply of end cover for above motor 849 Supply of fan for above motor 850 Dismantling and fitting of end cover 851 Varnishing for above overheat Motor 852 Complete Rewinding of Rotor for above motor 853 Transportation and labourcharges for cartage of material from Meerut to Pump house Hyupani Pumping station road head (Ghatyudi) 854 Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage IInd (Hyupani)Pumping Station under Division Pithoragarh. Motor Wire Atlas 855 Funny 856 Varnish 857 Nomex Paper 858 Sleeve 859 Glass tape 860 Cotton tap 861 Fiber glass tap 862 Cloth Paper 863 Copper Lugs (100 Amp) 864 Grease Plate 865 Bearing 6310 866 8 Hole M.S Coupling 867 Grease 868 Connection Plate 869 Rubber coupling 870 Roter shaft lock 871 Rotor Greasing 872 Repair of end cover 873 Rotor shaft repair 874 Shaft Lock 875 Motor Fom 876 Complete Motor cartage 877 Coupling nut bolt 878 Labour charges for cutting and cleaning of old wire of motor 879 Deduction of old copper wire scrap 880 Deduction of old Iron scrap 881 Deduction of old GM 882 Labour charges for fitting, rewinding installation and testing of above motor on full load 883 Supply of end cover for above motor 884 Supply of fan for above motor 885 Dismantling and fitting of end cover 886 Varnishing for above overheat Motor 887 Complete Rewinding of Rotor for above motor 888 Transportation and labourcharges for cartage of material from Meerut to Pump house Paun. 889 Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIst Pumping Station under Division Pithoragarh. Motor Wire Atlas 890 Funny 891 Varnish 01Bottle 892 Nomex Paper 893 Sleeve 894 Glass tape 895 Cotton tap 896 Fiber glass tap 897 Copper Lugs (100 Amp) 898 Grease Plate 899 Grease 900 Labour charges for cutting and cleaning of old wire of motor 901 Deduction of old copper wire scrap 902 Motor Varnshing 903 MS Coupling 904 Motor greasing 905 Rubber coupling 906 Coupling Nut Bolt 907 Connection Plate 908 Rotor shaft lock 909 Rotor Varnishing 910 Repair end cover 911 Rotor shaft repair 912 Shaft Lock 913 Motor fan 914 Complete Motor cartage road head to pump house. 915 Labour charges for fitting, rewinding installation and testing of above motor on full load 916 Supply of end cover for above motor 917 Supply of fan for above motor 918 Dismantling and fitting of end cover 919 Varnishing for above overheat Motor 920 Complete Rewinding of Rotor forabove motor 921 material 922 Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIInd Pumping Station under Division Pithoragarh. Motor Wire Atlas 923 Funny 924 Varnish 925 Nomex Paper 926 Sleeve 927 Glass tape 928 Cotton tap 929 Fiber glass 930 Copper Lugs (100 Amp) 931 Grease Plate 932 Grease 933 Labour charges for cutting and cleaning of old wire of motor 934 Deduction of old copper wire scrap 935 Fiber glass cloth paper 936 Repair of end cover 937 Deduction of old Iron scrap 938 Deduction of old GM 939 Connection plate 940 Rotor shaft lock 941 S/O End Cover 942 Repair of end cover 943 Rotor shaft repair 944 Shaft lock 945 Supply of Motor Fan 946 Motor Fan 947 Bearing Bracket 948 Suction repairing 949 Delivery Repairing 950 Complete Motor cartage roas head to pump house. 951 Labour charges for fitting, rewinding installation and testing of above motor on full load 952 Supply of end cover for above motor 953 Supply of fan for above motor 954 Dismantling and fitting of end cover 955 Varnishing for above overheat Motor 956 Complete Rewinding of Rotor for above motor 957 Transportation and labourcharges for cartage of material from road head to pump house. 958 Complete Rewinding of Stators winding of NGEF Make/ ABB Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas 959 Funny 960 Varnish 961 Nomex Paper 962 Sleeve 963 Glass tape 964 Cotton tap 965 Fiber glass 966 Bearing 967 Labour charges for cutting and cleaning of old wire of motor 968 Deduction of old copper wire scrap 969 Deduction of old Iron scrap 970 Deduction of old GM 971 Labour charges for fitting, rewinding installation and testing of above motor on full load 972 Repairing of end cover for above motor 973 Supply of fan for above motor 974 Dismantling and fitting of end cover 975 Copper Lugs 976 Varnishing for above overheat Motor 977 Complete Rewinding of Rotor dor above motor 978 Greasing for above motor pump set 979 Transportation and labourcharges for cartage of material from road head to pump house. 980 Roter Shaft Repairing 981 Complete Rewinding of Stators winding of Jyoti Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas 982 Funny 983 Varnish 984 Nomex Paper 985 Sleeve 986 Glass tape 987 Cotton tap 988 Fiber glass 989 Bearing 990 Labour charges for cutting and cleaning of old wire of motor 991 Deduction of old copper wire scrap 992 Deduction of old Iron scrap 993 Deduction of old GM 994 Labour charges for fitting, rewinding installation and testing of above motor on full load 995 Repairing of end cover for above motor 996 Supply of fan for above motor 997 Dismantling and fitting of end cover 998 Copper Lugs (100 Amp) 999 Varnishing for above overheat Motor 1000 Complete Rewinding of Rotor dor above motor 1001 Greasing for above motor pump set 1002 Transportation and labourcharges for cartage of material from road head to pump house. 1003 Complete Rewinding of Stators winding of ABBMake 150 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Clearwater Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas 1004 Funny 1005 Varnish 1006 Nomex Paper 1007 Sleeve 1008 Glass tape 1009 Cotton tap 1010 Fiber glass 1011 Grease Plate 1012 Labour charges for cutting and cleaning of old wire of motor 1013 Deduction of old copper wire scrap 1014 Labour charges for fitting, rewinding installation and testing of above motor on full load 1015 Repairing of end cover for above motor 1016 Supply of fan for above motor 1017 Dismantling and fitting of end cover 1018 Deduction of old Iron scrap 1019 Deduction of old GM 1020 Bearing 1021 Grease 1022 Ranga 1023 Rotor cleaning & varnishing 1024 End cover Bearing 1025 Diffuser 1026 Copper Lugs (225 Amp) 1027 Varnishing for above overheat Motor 1028 Complete Rewinding of Rotor dor above motor 1029 Greasing for above motor pump set 1030 Transportation and labourcharges for cartage of material from road head to pump house. 1031 Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Matela Pumping Station under Division Pithoragarh. Motor Wire Atlas 1032 Funny 1033 Varnish 1034 Nomex Paper 1035 Sleeve 1036 Glass tape 1037 Cotton tap 1038 Fiber glass 1039 Grease Plate 1040 Mobil Oil 1041 Labour charges for cutting and cleaning of old wire of motor 1042 Deduction of old copper wire scrap 1043 Deduction of old Iron scrap 1044 Deduction of old GM 1045 Labour charges for fitting, rewinding installation and testing of above motor on full load 1046 Repairing of end cover for above motor 1047 Supply of fan for above motor 1048 Dismantling and fitting of end cover 1049 Copper Lugs (300 Amp) 1050 Varnishing for above overheat Motor 1051 Complete Rewinding of Rotor for above motor 1052 Greasing for above motor pump set 1053 Transportation and labourcharges for cartage of material from road head to pump house. 1054 Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction slip ring Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GurnaPumping Station under Division Pithoragarh. Motor Wire Atlas 1055 Funny 1056 Varnish 1057 Nomex Paper 1058 Sleeve 1059 Glass tape 1060 Cotton tap 1061 Fiber glass 1062 Grease Plate 1063 Mobil Oil 1064 Labour charges for cutting and cleaning of old wire of motor 1065 Deduction of old copper wire scrap 1066 Deduction of old Iron scrap 1067 Deduction of old GM 1068 Copper Lugs (300 Amp) 1069 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1070 Repairing of end cover for above motor 1071 Supply of fan for above motor 1072 Dismantling and fitting of end cover 1073 Varnishing for above overheat Motor 1074 Complete Rewinding of Rotor dor above motor 1075 Greasing for above motor pump set 1076 Transportation and labourcharges for cartage of material from road head to pump house. 1077 Complete Rewinding of Stators winding of ABB Make 125 HP, 3 Phase, AC induction Motor (1450 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hanuman Mandir Pumping Station under Division Pithoragarh. Motor Wire Atlas 1078 Funny 1079 Varnish 1080 Nomex Paper 1081 Sleeve 1082 Glass tape 1083 Cotton tap 1084 Fiber glass 1085 Grease Plate 1086 Mobil Oil 1087 Labour charges for cutting and cleaning of old wire of motor 1088 Deduction of old copper wire scrap 1089 Deduction of old Iron scrap 1090 Deduction of old GM 1091 Copper Lugs (300 Amp) 1092 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1093 Repairing of end cover for above motor 1094 Labour charges for fitting, rewinding installation and testing of above motor on full load 1095 Supply of fan for above motor 1096 Dismantling and fitting of end cover 1097 Varnishing for above overheat Motor 1098 Complete Rewinding of Rotor dor above motor 1099 Transportation and labourcharges for cartage of material from road head to pump house. 1100 Complete Rewinding of Stators winding of KirloaskarMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas 1101 Funny 1102 Varnish 1103 Nomex Paper 1104 Sleeve 1105 Glass tape 1106 Cotton tap 1107 Fiber glass 1108 Copper Lugs (50 Amp) 1109 Motor Sheet 1110 Motor Cover 1111 Motor Fan 1112 Champion Packing 1113 Grease Plate 1114 Grease 1115 Supply of end cover for above motor 1116 Deduction of old copper wire scrap 1117 Deduction of old Iron scrap 1118 Deduction of old GM 1119 Labour charges for cutting and cleaning of old wire of motor 1120 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1121 Transportation and labourcharges for cartage of material from road head to pump house. 1122 Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas 1123 Funny 1124 Varnish 1125 Nomex Paper 1126 Sleeve 1127 Glass tape 1128 Cotton tap 1129 Fiber glass 1130 Copper Lugs (50 Amp) 1131 Motor Sheet 1132 Motor Cover 1133 Motor Fan 1134 Champion Packing 1135 Bearing 6311 1136 Grease Plate 1137 Grease 1138 Supply of end cover for above motor 1139 Labour charges for cutting and cleaning of old wire of motor 1140 Deduction of old copper wire scrap 1141 Deduction of old Iron scrap 1142 Deduction of old GM 1143 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1144 Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load. 1145 Transportation and labourcharges for cartage of material from road head to pump house. 1146 Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage Ist under Division Pithoragarh. 1147 Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot IIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas 1148 Funny 1149 Varnish 1150 Nomex Paper 1151 Sleeve 1152 Glass tape 1153 Cotton tap 1154 Fiber glass 1155 Copper Lugs (50 Amp) 1156 Motor Sheet 1157 Motor Cover 1158 Motor Fan 1159 Champion Packing 1160 Bearing 6311 1161 Grease Plate 1162 Grease 1163 Supply of end cover for above motor 1164 Deduction of old copper wire scrap 1165 Deduction of old Iron scrap 1166 Deduction of old GM 1167 Labour charges for cutting and cleaning of old wire of motor 1168 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1169 Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load. 1170 Transportation and labourcharges for cartage of material from road head to pump house. 1171 Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage IInd under Division Pithoragarh. 1172 Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIstStagePumping Station under Division Pithoragarh. Motor Wire Atlas 1173 Funny 1174 Varnish 1175 Nomex Paper 1176 Sleeve 1177 Glass tape 1178 Cotton tap 1179 Fiber glass 1180 Grease Plate 1181 Labour charges for cutting and cleaning of old wire of motor 1182 Deduction of old copper wire scrap 1183 Deduction of old Iron scrap 1184 Deduction of old GM 1185 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1186 Supply of end cover for above motor 1187 Supply of fan cover 1188 Dismenteling and fitting of end cover 1189 Varnishing for above overheat Motor 1190 Complete rewinding of Rotor for above motor 1191 Greasing for above motor pump set 1192 Copper Lugs ( 300 Amp) 1193 Transportation and labourcharges for cartage of material from road head to pump house. 1194 Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas 1195 Funny 1196 Varnish 1197 Nomex Paper 1198 Sleeve 1199 Glass tape 1200 Cotton tap 1201 Fiber glass 1202 Grease Plate 1203 Labour charges for cutting and cleaning of old wire of motor 1204 Deduction of old copper wire scrap 1205 Deduction of old Iron scrap 1206 Deduction of old GM 1207 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1208 Supply of end cover for above motor 1209 Supply of fan cover 1210 Dismenteling and fitting of end cover 1211 Varnishing for above overheat Motor 1212 Complete rewinding of Rotor for above motor 1213 Greasing for above motor pump set 1214 Copper Lugs ( 300 Amp) 1215 Transportation and labourcharges for cartage of material from road head to pump house. 1216 Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIIrdStagePumping Station under Division Pithoragarh. Motor Wire Atlas 1217 Funny 1218 Varnish 1219 Nomex Paper 1220 Sleeve 1221 Glass tape 1222 Cotton tap 1223 Fiber glass 1224 Grease Plate 1225 Labour charges for cutting and cleaning of old wire of motor 1226 Deduction of old copper wire scrap 1227 Deduction of old Iron scrap 1228 Deduction of old GM 1229 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1230 Supply of end cover for above motor 1231 Supply of fan cover 1232 Dismenteling and fitting of end cover 1233 Varnishing for above overheat Motor 1234 Complete rewinding of Rotor for above motor 1235 Greasing for above motor pump set 1236 Copper Lugs ( 300 Amp) 1237 Transportation and labourcharges for cartage of material from road head to pump house. 1238 Complete Rewinding of Stators winding of JyotiMake 15 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at FutsilPumping Station Gangolihat under Division Pithoragarh. Motor Wire Atlas 1239 Funny 1240 Varnish 1241 Nomex Paper 1242 Sleeve 1243 Glass tape 1244 Cotton tap 1245 Fiber glass 1246 Grease Plate 1247 Grease 1248 Labour charges for cutting and cleaning of old wire of motor 1249 Deduction of old copper wire scrap 1250 Deduction of old Iron scrap 1251 Deduction of old GM 1252 Copper Lugs (Amp) 1253 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1254 Supply of end cover for above motor 1255 Supply of fan cover 1256 Dismenteling and fitting of end cover 1257 Varnishing for above overheat Motor 1258 Complete rewinding of Rotor for above motor 1259 Greasing for above motor pump set 1260 Transportation and labourcharges for cartage of material from road head to pump house. 1261 Complete Rewinding of Stators winding of ABBMake 100 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at MarsoliPumping Stationunder Division Pithoragarh. Motor Wire Atlas 1262 Funny 1263 Varnish 1264 Nomex Paper 1265 Sleeve 1266 Glass tape 1267 Cotton tap 1268 Fiber glass 1269 Bearing 6316 C3 (DE) 1270 Bearing 6316 C3 (DE) 1271 Grease Plate 1272 Labour charges for cutting and cleaning of old wire of motor 1273 Deduction of old copper wire scrap 1274 Deduction of old Iron scrap 1275 Deduction of old GM 1276 Copper Lugs (Amp) 1277 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1278 Supply of end cover for above motor 1279 Supply of fan cover 1280 Dismenteling and fitting of end cover 1281 Varnishing for above overheat Motor 1282 Complete rewinding of Rotor for above motor 1283 Greasing for above motor pump set 1284 Transportation and labourcharges for cartage of material from road head to pump house. 1285 Complete rewinding of Stators winding of Kirloskar Make 15HP 3 Phasse, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete all respect at Hudeti Pumping Station under Division Pithoragarh.Motor Wore Atlas 1286 Funny 1287 Varnish 1288 Nomex Paper 1289 Sleeve 1290 Glass Tape 1291 Cotton Tape 1292 Fiber Glass 1293 Grease Plate 1294 Grease 1295 Labour charges for cutting and cleaning of old wore of motor 1296 Deduction of old copper wire 1297 Deduction of old Iron scrap 1298 Deduction of old GM 1299 Copper Lugs (50 Amp) 1300 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1301 Supply of end cover for above motor 1302 Supply of fan for above motor 1303 Dismantelling and fitting of end cover 1304 Varnishing for above over heat motor 1305 Complete rewinding of Rotor for above motor 1306 Greasing for above motor pump set 1307 Transportation and labour charges for cartge of material from road head to pump house distance 150 Meter 1308 Other Parts Main Switch 200 Amp 1309 Main Switch 250 Amp 1310 Main Switch 125 Amp 1311 Complete overhaulling OCB 1312 Complete overhaulling of ACB 600 Amp 1313 Complete overhaulling of ACB 1200 Amp 1314 HRC Fuse 100 Amp 1315 HRC Fuse 250 Amp 1316 Clamp Brass 1000 Amp 1317 Complete overhaulling of Kilbarn Make Starter with all spare parts 1318 Valve repairingwork 60 to 400 HP 1319 Valve repairing work 15 to 30 HP 1320 Annual Maintenance Work 1321 Copper Lugs 50 Amp 1322 Copper Lugs 95 Amp 1323 Copper Lugs 120 Amp 1324 Copper Lugs150 Amp 1325 Copper Lugs 200 Amp 1326 Copper Lugs 300 Amp 1327 Copper Lugs 400 Amp 1328 Volt Meter 1329 Amp Meter 1330 Financial Year 2025-26 1331 Complete Rewinding of Stators winding of Jyoti Make 60 HP, 3 Phase, AC induction Motor (1470 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Thuligad Pumping Station under Division Pithoragarh. Motor Wire Atlas 1332 Funny 1333 Varnish 1334 Nomex Paper 1335 Sleeve 1336 Glass tape 1337 Cotton tap 1338 Fiber glass/ Cloth Paper 1339 Copper Lugs (200 Amp) 1340 Greasing for above motor pump set 1341 Grease Plate 1342 Mobil Oil 1343 Bearing 7316 1344 Bearing 6211 1345 Bearing 6312 1346 95 Amp Copper Lugs 1347 Connection Plate with Thured 1348 Terminal Insulator 1349 Labour charges for cutting and cleaning of old wire of motor 1350 Deduction of old copper wire scrap 1351 Deduction of old Iron scrap 1352 Deduction of old GM 1353 Labour charges for fitting, rewinding installation and testing of above motor on full load 1354 Repairing of end cover for above motor 1355 Supply of fan for above motor 1356 Ranga 1357 Lock 1358 Grease 1359 Rotor Shaft repair 1360 Riched Coupling 1361 Riched bearing 1362 Motor Bearing welding work 1363 Cartage of Rotor 1364 Dismantling and fitting of end cover 1365 Varnishing for above overheat Motor 1366 Complete Rewinding of Rotor dor above motor 1367 Transportation and labourcharges for cartage of material from Meerut to Pithoragarh Kasani Station 1368 Complete Rewinding of Stators winding of ABB Make/ Jyoti make180 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Kasani Pumping Station under Division Pithoragarh. Motor Wire Atlas 1369 Funny 1370 Varnish 1371 Nomex Paper 8 MM 1372 Sleeve 1373 Glass tape 1374 Cotton tap 1375 Copper Lugs (300 Amp) 1376 Fiber glass Tape 1377 Grease Plate 1378 Mobil Oil 1379 Bearing 6316 1380 Bearing NU 318 1381 Connection Plate 1382 Greasing for above motor pump set 1383 Labour charges for cutting and cleaning of old wire of motor 1384 Deduction of old copper wire scrap 1385 Deduction of old Iron scrap 1386 Deduction of old GM 1387 Labour charges for fitting, rewinding installation and testing of above motor on full load 1388 Repairing of end cover for above motor 1389 Supply of meter Fom 1390 Grease 1391 Nomex paper 10mm 1392 Cloth paper 1393 Ranga 1394 Shaft lock 1395 Motor pump ceiling 1396 Deduction of old iron scrap 1397 Deduction of old GM 1398 Repairing of Rotor shaft 1399 Rotor varnishing 1400 Motor Shaft lock 1401 Key carbon 1402 Repair of end cover 1403 Complete Motor cartage Kasani to pump house 1404 Supply of fan for above motor 1405 Dismantling and fitting of end cover 1406 Varnishing for above overheat Motor 1407 Complete Rewinding of Rotor for above motor 1408 Transportation and labourcharges for cartage of material from Meerut to Kasani road head 1409 Complete Rewinding of Stators winding of KirloskarMake/ABB Make 30 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at RaiPumping Station under Division Pithoragarh. Motor Wire Atlas 1410 Funny 1411 Varnish 1412 Nomex Paper 8 mm 1413 Copper Lugs (50 Amp) 1414 Sleeve 1415 Glass tape 1416 Cotton tap 1417 Fiber glass tape 1418 Grease Plate 1419 Mobil Oil 1420 Bearing 6310 1421 Bearing 6311 1422 M.S. Coupling 8 Hole 1423 8’ Rubber Coupling 1424 Greasing for above motor pump set 1425 Labour charges for cutting and cleaning of old wire of motor 1426 Deduction of old copper wire scrap 1427 Labour charges for fitting, rewinding installation and testing of above motor on full load 1428 Supply of end cover for above motor 1429 Supply of fan for above motor 1430 Repair of Suction 1431 Repair of Delivery 1432 Grease 1433 Ranga 1434 Shaft lock 1435 Deduction of old iron scrap 1436 Deduction of old GM 1437 Connection plate 1438 Cloth paper 1439 Complete Motor cartage 1440 Roter greesing 1441 Roter shaft repair 1442 End cover repair 1443 Nomex paper 10 mm 1444 Fiber glass cloth paper 1445 Dismantling and fitting of end cover 1446 Varnishing for above overheat Motor 1447 Complete Rewinding of Rotor for above motor 1448 Transportation and labourcharges for cartage of material from Meerut to pumping station Rai 1449 Complete Rewinding of Stators winding of KirloskarMake 12.5 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at ChheraPumping Station under Division Pithoragarh. Motor Wire Atlas 1450 Funny 1451 Varnish 1452 Nomex Paper 1453 Sleeve 1454 Glass tape 1455 Cotton tap 1456 Fiber glass tap 1457 Grease Plate 1458 Cloth Paper 1459 Bearing 6310 1460 Bearing 6309 1461 M.S. Coupling 1462 M.S. Coupling Rubber 1463 Greasing for above motor pump set 1464 Copper Lugs (50 Amp) 1465 Labour charges for cutting and cleaning of old wire of motor 1466 Deduction of old copper wire scrap 1467 Labour charges for fitting, rewinding installation and testing of above motor on full load 1468 Supply of end cover for above motor 1469 Supply of fan for above motor 1470 Dismantling and fitting of end cover 1471 Varnishing for above overheat Motor 1472 Shaft lock 1473 Grease 1474 Rubber coupling 1475 M.S. 8 Hole coupling 1476 MS Stud 1477 MS Coupling Nut Bolt 1478 Connection plate 1479 Roter varnishing 1480 End cover repairing 1481 Cartage of Motor road head to pump house chhera 1482 Complete Rewinding of Rotor dor above motor 1483 Transportation and labourcharges for cartage of material from Meerut to pump house station Chhera 1484 Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage Ist (Ghatyudi)Pumping Station under Division Pithoragarh. Motor Wire Atlas 1485 Funny 1486 Varnish 1487 Nomex Paper 1488 Sleeve 1489 Glass tape 1490 Cotton tap 1491 Fiber glass tap 1492 Cloth fiber 1493 Copper Lugs (100 Amp) 1494 Grease Plate 1495 Bearing 6310 1496 8 Hole M.S Coupling 1497 Grease 1498 Shaft lock 1499 Rubber coupling 1500 Coupling nut bolt 1501 Complete motor cartage 1502 Rubber coupling 1503 Connection plate 1504 Rotor varnishing 1505 Repair of end cover 1506 Rotor shaft repair 1507 Labour charges for cutting and cleaning of old wire of motor 1508 Deduction of old copper wire scrap 1509 Deduction of old Iron scrap 1510 Deduction of old GM 1511 Labour charges for fitting, rewinding installation and testing of above motor on full load 1512 Supply of end cover for above motor 1513 Supply of fan for above motor 1514 Dismantling and fitting of end cover 1515 Varnishing for above overheat Motor 1516 Complete Rewinding of Rotor for above motor 1517 Transportation and labourcharges for cartage of material from Meerut to Pump house Hyupani Pumping station road head (Ghatyudi) 1518 Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage IInd (Hyupani)Pumping Station under Division Pithoragarh. Motor Wire Atlas 1519 Funny 1520 Varnish 1521 Nomex Paper 1522 Sleeve 1523 Glass tape 1524 Cotton tap 1525 Fiber glass tap 1526 Cloth Paper 1527 Copper Lugs (100 Amp) 1528 Grease Plate 1529 Bearing 6310 1530 8 Hole M.S Coupling 1531 Grease 1532 Connection Plate 1533 Rubber coupling 1534 Roter shaft lock 1535 Rotor Greasing 1536 Repair of end cover 1537 Rotor shaft repair 1538 Shaft Lock 1539 Motor Fom 1540 Complete Motor cartage 1541 Coupling nut bolt 1542 Labour charges for cutting and cleaning of old wire of motor 1543 Deduction of old copper wire scrap 1544 Deduction of old Iron scrap 1545 Deduction of old GM 1546 Labour charges for fitting, rewinding installation and testing of above motor on full load 1547 Supply of end cover for above motor 1548 Supply of fan for above motor 1549 Dismantling and fitting of end cover 1550 Varnishing for above overheat Motor 1551 Complete Rewinding of Rotor for above motor 1552 Transportation and labourcharges for cartage of material from Meerut to Pump house Paun. 1553 Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIst Pumping Station under Division Pithoragarh. Motor Wire Atlas 1554 Funny 1555 Varnish 01Bottle 1556 Nomex Paper 1557 Sleeve 1558 Glass tape 1559 Cotton tap 1560 Fiber glass tap 1561 Copper Lugs (100 Amp) 1562 Grease Plate 1563 Grease 1564 Labour charges for cutting and cleaning of old wire of motor 1565 Deduction of old copper wire scrap 1566 Motor Varnshing 1567 MS Coupling 1568 Motor greasing 1569 Rubber coupling 1570 Coupling Nut Bolt 1571 Connection Plate 1572 Rotor shaft lock 1573 Rotor Varnishing 1574 Repair end cover 1575 Rotor shaft repair 1576 Shaft Lock 1577 Motor fan 1578 Complete Motor cartage road head to pump house. 1579 Labour charges for fitting, rewinding installation and testing of above motor on full load 1580 Supply of end cover for above motor 1581 Supply of fan for above motor 1582 Dismantling and fitting of end cover 1583 Varnishing for above overheat Motor 1584 Complete Rewinding of Rotor forabove motor 1585 material 1586 Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIInd Pumping Station under Division Pithoragarh. Motor Wire Atlas 1587 Funny 1588 Varnish 1589 Nomex Paper 1590 Sleeve 1591 Glass tape 1592 Cotton tap 1593 Fiber glass 1594 Copper Lugs (100 Amp) 1595 Grease Plate 1596 Grease 1597 Labour charges for cutting and cleaning of old wire of motor 1598 Deduction of old copper wire scrap 1599 Fiber glass cloth paper 1600 Repair of end cover 1601 Deduction of old Iron scrap 1602 Deduction of old GM 1603 Connection plate 1604 Rotor shaft lock 1605 S/O End Cover 1606 Repair of end cover 1607 Rotor shaft repair 1608 Shaft lock 1609 Supply of Motor Fan 1610 Motor Fan 1611 Bearing Bracket 1612 Suction repairing 1613 Delivery Repairing 1614 Complete Motor cartage roas head to pump house. 1615 Labour charges for fitting, rewinding installation and testing of above motor on full load 1616 Supply of end cover for above motor 1617 Supply of fan for above motor 1618 Dismantling and fitting of end cover 1619 Varnishing for above overheat Motor 1620 Complete Rewinding of Rotor for above motor 1621 Transportation and labourcharges for cartage of material from road head to pump house. 1622 Complete Rewinding of Stators winding of NGEF Make/ ABB Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas 1623 Funny 1624 Varnish 1625 Nomex Paper 1626 Sleeve 1627 Glass tape 1628 Cotton tap 1629 Fiber glass 1630 Bearing 1631 Labour charges for cutting and cleaning of old wire of motor 1632 Deduction of old copper wire scrap 1633 Deduction of old Iron scrap 1634 Deduction of old GM 1635 Labour charges for fitting, rewinding installation and testing of above motor on full load 1636 Repairing of end cover for above motor 1637 Supply of fan for above motor 1638 Dismantling and fitting of end cover 1639 Copper Lugs 1640 Varnishing for above overheat Motor 1641 Complete Rewinding of Rotor dor above motor 1642 Greasing for above motor pump set 1643 Transportation and labourcharges for cartage of material from road head to pump house. 1644 Roter Shaft Repairing 1645 Complete Rewinding of Stators winding of Jyoti Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas 1646 Funny 1647 Varnish 1648 Nomex Paper 1649 Sleeve 1650 Glass tape 1651 Cotton tap 1652 Fiber glass 1653 Bearing 1654 Labour charges for cutting and cleaning of old wire of motor 1655 Deduction of old copper wire scrap 1656 Deduction of old Iron scrap 1657 Deduction of old GM 1658 Labour charges for fitting, rewinding installation and testing of above motor on full load 1659 Repairing of end cover for above motor 1660 Supply of fan for above motor 1661 Dismantling and fitting of end cover 1662 Copper Lugs (100 Amp) 1663 Varnishing for above overheat Motor 1664 Complete Rewinding of Rotor dor above motor 1665 Greasing for above motor pump set 1666 Transportation and labourcharges for cartage of material from road head to pump house. 1667 Complete Rewinding of Stators winding of ABBMake 150 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Clearwater Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas 1668 Funny 1669 Varnish 1670 Nomex Paper 1671 Sleeve 1672 Glass tape 1673 Cotton tap 1674 Fiber glass 1675 Grease Plate 1676 Labour charges for cutting and cleaning of old wire of motor 1677 Deduction of old copper wire scrap 1678 Labour charges for fitting, rewinding installation and testing of above motor on full load 1679 Repairing of end cover for above motor 1680 Supply of fan for above motor 1681 Dismantling and fitting of end cover 1682 Deduction of old Iron scrap 1683 Deduction of old GM 1684 Bearing 1685 Grease 1686 Ranga 1687 Rotor cleaning & varnishing 1688 End cover Bearing 1689 Diffuser 1690 Copper Lugs (225 Amp) 1691 Varnishing for above overheat Motor 1692 Complete Rewinding of Rotor dor above motor 1693 Greasing for above motor pump set 1694 Transportation and labourcharges for cartage of material from road head to pump house. 1695 Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Matela Pumping Station under Division Pithoragarh. Motor Wire Atlas 1696 Funny 1697 Varnish 1698 Nomex Paper 1699 Sleeve 1700 Glass tape 1701 Cotton tap 1702 Fiber glass 1703 Grease Plate 1704 Mobil Oil 1705 Labour charges for cutting and cleaning of old wire of motor 1706 Deduction of old copper wire scrap 1707 Deduction of old Iron scrap 1708 Deduction of old GM 1709 Labour charges for fitting, rewinding installation and testing of above motor on full load 1710 Repairing of end cover for above motor 1711 Supply of fan for above motor 1712 Dismantling and fitting of end cover 1713 Copper Lugs (300 Amp) 1714 Varnishing for above overheat Motor 1715 Complete Rewinding of Rotor for above motor 1716 Greasing for above motor pump set 1717 Transportation and labourcharges for cartage of material from road head to pump house. 1718 Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction slip ring Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GurnaPumping Station under Division Pithoragarh. Motor Wire Atlas 1719 Funny 1720 Varnish 1721 Nomex Paper 1722 Sleeve 1723 Glass tape 1724 Cotton tap 1725 Fiber glass 1726 Grease Plate 1727 Mobil Oil 1728 Labour charges for cutting and cleaning of old wire of motor 1729 Deduction of old copper wire scrap 1730 Deduction of old Iron scrap 1731 Deduction of old GM 1732 Copper Lugs (300 Amp) 1733 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1734 Repairing of end cover for above motor 1735 Supply of fan for above motor 1736 Dismantling and fitting of end cover 1737 Varnishing for above overheat Motor 1738 Complete Rewinding of Rotor dor above motor 1739 Greasing for above motor pump set 1740 Transportation and labourcharges for cartage of material from road head to pump house. 1741 Complete Rewinding of Stators winding of ABB Make 125 HP, 3 Phase, AC induction Motor (1450 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hanuman Mandir Pumping Station under Division Pithoragarh. Motor Wire Atlas 1742 Funny 1743 Varnish 1744 Nomex Paper 1745 Sleeve 1746 Glass tape 1747 Cotton tap 1748 Fiber glass 1749 Grease Plate 1750 Mobil Oil 1751 Labour charges for cutting and cleaning of old wire of motor 1752 Deduction of old copper wire scrap 1753 Deduction of old Iron scrap 1754 Deduction of old GM 1755 Copper Lugs (300 Amp) 1756 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1757 Repairing of end cover for above motor 1758 Labour charges for fitting, rewinding installation and testing of above motor on full load 1759 Supply of fan for above motor 1760 Dismantling and fitting of end cover 1761 Varnishing for above overheat Motor 1762 Complete Rewinding of Rotor dor above motor 1763 Transportation and labourcharges for cartage of material from road head to pump house. 1764 Complete Rewinding of Stators winding of KirloaskarMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas 1765 Funny 1766 Varnish 1767 Nomex Paper 1768 Sleeve 1769 Glass tape 1770 Cotton tap 1771 Fiber glass 1772 Copper Lugs (50 Amp) 1773 Motor Sheet 1774 Motor Cover 1775 Motor Fan 1776 Champion Packing 1777 Grease Plate 1778 Grease 1779 Supply of end cover for above motor 1780 Deduction of old copper wire scrap 1781 Deduction of old Iron scrap 1782 Deduction of old GM 1783 Labour charges for cutting and cleaning of old wire of motor 1784 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1785 Transportation and labourcharges for cartage of material from road head to pump house. 1786 Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas 1787 Funny 1788 Varnish 1789 Nomex Paper 1790 Sleeve 1791 Glass tape 1792 Cotton tap 1793 Fiber glass 1794 Copper Lugs (50 Amp) 1795 Motor Sheet 1796 Motor Cover 1797 Motor Fan 1798 Champion Packing 1799 Bearing 6311 1800 Grease Plate 1801 Grease 1802 Supply of end cover for above motor 1803 Labour charges for cutting and cleaning of old wire of motor 1804 Deduction of old copper wire scrap 1805 Deduction of old Iron scrap 1806 Deduction of old GM 1807 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1808 Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load. 1809 Transportation and labourcharges for cartage of material from road head to pump house. 1810 Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage Ist under Division Pithoragarh. 1811 Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot IIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas 1812 Funny 1813 Varnish 1814 Nomex Paper 1815 Sleeve 1816 Glass tape 1817 Cotton tap 1818 Fiber glass 1819 Copper Lugs (50 Amp) 1820 Motor Sheet 1821 Motor Cover 1822 Motor Fan 1823 Champion Packing 1824 Bearing 6311 1825 Grease Plate 1826 Grease 1827 Supply of end cover for above motor 1828 Deduction of old copper wire scrap 1829 Deduction of old Iron scrap 1830 Deduction of old GM 1831 Labour charges for cutting and cleaning of old wire of motor 1832 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1833 Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load. 1834 Transportation and labourcharges for cartage of material from road head to pump house. 1835 Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage IInd under Division Pithoragarh. 1836 Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIstStagePumping Station under Division Pithoragarh. Motor Wire Atlas 1837 Funny 1838 Varnish 1839 Nomex Paper 1840 Sleeve 1841 Glass tape 1842 Cotton tap 1843 Fiber glass 1844 Grease Plate 1845 Labour charges for cutting and cleaning of old wire of motor 1846 Deduction of old copper wire scrap 1847 Deduction of old Iron scrap 1848 Deduction of old GM 1849 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1850 Supply of end cover for above motor 1851 Supply of fan cover 1852 Dismenteling and fitting of end cover 1853 Varnishing for above overheat Motor 1854 Complete rewinding of Rotor for above motor 1855 Greasing for above motor pump set 1856 Copper Lugs ( 300 Amp) 1857 Transportation and labourcharges for cartage of material from road head to pump house. 1858 Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas 1859 Funny 1860 Varnish 1861 Nomex Paper 1862 Sleeve 1863 Glass tape 1864 Cotton tap 1865 Fiber glass 1866 Grease Plate 1867 Labour charges for cutting and cleaning of old wire of motor 1868 Deduction of old copper wire scrap 1869 Deduction of old Iron scrap 1870 Deduction of old GM 1871 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1872 Supply of end cover for above motor 1873 Supply of fan cover 1874 Dismenteling and fitting of end cover 1875 Varnishing for above overheat Motor 1876 Complete rewinding of Rotor for above motor 1877 Greasing for above motor pump set 1878 Copper Lugs ( 300 Amp) 1879 Transportation and labourcharges for cartage of material from road head to pump house. 1880 Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIIrdStagePumping Station under Division Pithoragarh. Motor Wire Atlas 1881 Funny 1882 Varnish 1883 Nomex Paper 1884 Sleeve 1885 Glass tape 1886 Cotton tap 1887 Fiber glass 1888 Grease Plate 1889 Labour charges for cutting and cleaning of old wire of motor 1890 Deduction of old copper wire scrap 1891 Deduction of old Iron scrap 1892 Deduction of old GM 1893 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1894 Supply of end cover for above motor 1895 Supply of fan cover 1896 Dismenteling and fitting of end cover 1897 Varnishing for above overheat Motor 1898 Complete rewinding of Rotor for above motor 1899 Greasing for above motor pump set 1900 Copper Lugs ( 300 Amp) 1901 Transportation and labourcharges for cartage of material from road head to pump house. 1902 Complete Rewinding of Stators winding of JyotiMake 15 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at FutsilPumping Station Gangolihat under Division Pithoragarh. Motor Wire Atlas 1903 Funny 1904 Varnish 1905 Nomex Paper 1906 Sleeve 1907 Glass tape 1908 Cotton tap 1909 Fiber glass 1910 Grease Plate 1911 Grease 1912 Labour charges for cutting and cleaning of old wire of motor 1913 Deduction of old copper wire scrap 1914 Deduction of old Iron scrap 1915 Deduction of old GM 1916 Copper Lugs (Amp) 1917 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1918 Supply of end cover for above motor 1919 Supply of fan cover 1920 Dismenteling and fitting of end cover 1921 Varnishing for above overheat Motor 1922 Complete rewinding of Rotor for above motor 1923 Greasing for above motor pump set 1924 Transportation and labourcharges for cartage of material from road head to pump house. 1925 Complete Rewinding of Stators winding of ABBMake 100 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at MarsoliPumping Stationunder Division Pithoragarh. Motor Wire Atlas 1926 Funny 1927 Varnish 1928 Nomex Paper 1929 Sleeve 1930 Glass tape 1931 Cotton tap 1932 Fiber glass 1933 Bearing 6316 C3 (DE) 1934 Bearing 6316 C3 (DE) 1935 Grease Plate 1936 Labour charges for cutting and cleaning of old wire of motor 1937 Deduction of old copper wire scrap 1938 Deduction of old Iron scrap 1939 Deduction of old GM 1940 Copper Lugs (Amp) 1941 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1942 Supply of end cover for above motor 1943 Supply of fan cover 1944 Dismenteling and fitting of end cover 1945 Varnishing for above overheat Motor 1946 Complete rewinding of Rotor for above motor 1947 Greasing for above motor pump set 1948 Transportation and labourcharges for cartage of material from road head to pump house. 1949 Complete rewinding of Stators winding of Kirloskar Make 15HP 3 Phasse, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete all respect at Hudeti Pumping Station under Division Pithoragarh.Motor Wore Atlas 1950 Funny 1951 Varnish 1952 Nomex Paper 1953 Sleeve 1954 Glass Tape 1955 Cotton Tape 1956 Fiber Glass 1957 Grease Plate 1958 Grease 1959 Labour charges for cutting and cleaning of old wore of motor 1960 Deduction of old copper wire 1961 Deduction of old Iron scrap 1962 Deduction of old GM 1963 Copper Lugs (50 Amp) 1964 Labour charges for fitting, rewinding, installation and testing of above motor on full load 1965 Supply of end cover for above motor 1966 Supply of fan for above motor 1967 Dismantelling and fitting of end cover 1968 Varnishing for above over heat motor 1969 Complete rewinding of Rotor for above motor 1970 Greasing for above motor pump set 1971 Transportation and labour charges for cartge of material from road head to pump house distance 150 Meter 1972 Other Parts Main Switch 200 Amp 1973 Main Switch 250 Amp 1974 Main Switch 125 Amp 1975 Complete overhaulling OCB 1976 Complete overhaulling of ACB 600 Amp 1977 Complete overhaulling of ACB 1200 Amp 1978 HRC Fuse 100 Amp 1979 HRC Fuse 250 Amp 1980 Clamp Brass 1000 Amp 1981 Complete overhaulling of Kilbarn Make Starter with all spare parts 1982 Valve repairingwork 60 to 400 HP 1983 Valve repairing work 15 to 30 HP 1984 Annual Maintenance Work 1985 Copper Lugs 50 Amp 1986 Copper Lugs 95 Amp 1987 Copper Lugs 120 Amp 1988 Copper Lugs150 Amp 1989 Copper Lugs 200 Amp 1990 Copper Lugs 300 Amp 1991 Copper Lugs 400 Amp 1992 Volt Meter 1993 Amp Meter

Key Value

Document Fees
INR 1180 /-
EMD
INR 50000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work : Annual Rate Contract For Repairing Of Different Capacity Motor In Executive Engineer Uttarakhand Jal Sansthan, Division Pithoragarh
Sl. No. Item Description
1Rates for Annual Rate Contract For Repairing Of Different Capacity Motor In Executive Engineer Uttarakhand Jal Sansthan, Division Pithoragarh
2Financial Year 2023-24
3Complete Rewinding of Stators winding of Jyoti Make 60 HP, 3 Phase, AC induction Motor (1470 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Thuligad Pumping Station under Division Pithoragarh. Motor Wire Atlas
4Funny
5Varnish
6Nomex Paper
7Sleeve
8Glass tape
9Cotton tap
10Fiber glass/ Cloth Paper
11Copper Lugs (200 Amp)
12Greasing for above motor pump set
13Grease Plate
14Mobil Oil
15Bearing 7316
16Bearing 6211
17Bearing 6312
1895 Amp Copper Lugs
19Connection Plate with Thured
20Terminal Insulator
21Labour charges for cutting and cleaning of old wire of motor
22Deduction of old copper wire scrap
23Deduction of old Iron scrap
24Deduction of old GM
25Labour charges for fitting, rewinding installation and testing of above motor on full load
26Repairing of end cover for above motor
27Supply of fan for above motor
28Ranga
29Lock
30Grease
31Rotor Shaft repair
32Riched Coupling
33Riched bearing
34Motor Bearing welding work
35Cartage of Rotor
36Dismantling and fitting of end cover
37Varnishing for above overheat Motor
38Complete Rewinding of Rotor dor above motor
39Transportation and labourcharges for cartage of material from Meerut to Pithoragarh Kasani Station
40Complete Rewinding of Stators winding of ABB Make/ Jyoti make180 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Kasani Pumping Station under Division Pithoragarh. Motor Wire Atlas
41Funny
42Varnish
43Nomex Paper 8 MM
44Sleeve
45Glass tape
46Cotton tap
47Copper Lugs (300 Amp)
48Fiber glass Tape
49Grease Plate
50Mobil Oil
51Bearing 6316
52Bearing NU 318
53Connection Plate
54Greasing for above motor pump set
55Labour charges for cutting and cleaning of old wire of motor
56Deduction of old copper wire scrap
57Deduction of old Iron scrap
58Deduction of old GM
59Labour charges for fitting, rewinding installation and testing of above motor on full load
60Repairing of end cover for above motor
61Supply of meter Fom
62Grease
63Nomex paper 10mm
64Cloth paper
65Ranga
66Shaft lock
67Motor pump ceiling
68Deduction of old iron scrap
69Deduction of old GM
70Repairing of Rotor shaft
71Rotor varnishing
72Motor Shaft lock
73Key carbon
74Repair of end cover
75Complete Motor cartage Kasani to pump house
76Supply of fan for above motor
77Dismantling and fitting of end cover
78Varnishing for above overheat Motor
79Complete Rewinding of Rotor for above motor
80Transportation and labourcharges for cartage of material from Meerut to Kasani road head
81Complete Rewinding of Stators winding of KirloskarMake/ABB Make 30 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at RaiPumping Station under Division Pithoragarh. Motor Wire Atlas
82Funny
83Varnish
84Nomex Paper 8 mm
85Copper Lugs (50 Amp)
86Sleeve
87Glass tape
88Cotton tap
89Fiber glass tape
90Grease Plate
91Mobil Oil
92Bearing 6310
93Bearing 6311
94M.S. Coupling 8 Hole
958’ Rubber Coupling
96Greasing for above motor pump set
97Labour charges for cutting and cleaning of old wire of motor
98Deduction of old copper wire scrap
99Labour charges for fitting, rewinding installation and testing of above motor on full load
100Supply of end cover for above motor
101Supply of fan for above motor
102Repair of Suction
103Repair of Delivery
104Grease
105Ranga
106Shaft lock
107Deduction of old iron scrap
108Deduction of old GM
109Connection plate
110Cloth paper
111Complete Motor cartage
112Roter greesing
113Roter shaft repair
114End cover repair
115Nomex paper 10 mm
116Fiber glass cloth paper
117Dismantling and fitting of end cover
118Varnishing for above overheat Motor
119Complete Rewinding of Rotor for above motor
120Transportation and labourcharges for cartage of material from Meerut to pumping station Rai
121Complete Rewinding of Stators winding of KirloskarMake 12.5 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at ChheraPumping Station under Division Pithoragarh. Motor Wire Atlas
122Funny
123Varnish
124Nomex Paper
125Sleeve
126Glass tape
127Cotton tap
128Fiber glass tap
129Grease Plate
130Cloth Paper
131Bearing 6310
132Bearing 6309
133M.S. Coupling
134M.S. Coupling Rubber
135Greasing for above motor pump set
136Copper Lugs (50 Amp)
137Labour charges for cutting and cleaning of old wire of motor
138Deduction of old copper wire scrap
139Labour charges for fitting, rewinding installation and testing of above motor on full load
140Supply of end cover for above motor
141Supply of fan for above motor
142Dismantling and fitting of end cover
143Varnishing for above overheat Motor
144Shaft lock
145Grease
146Rubber coupling
147M.S. 8 Hole coupling
148MS Stud
149MS Coupling Nut Bolt
150Connection plate
151Roter varnishing
152End cover repairing
153Cartage of Motor road head to pump house chhera
154Complete Rewinding of Rotor dor above motor
155Transportation and labourcharges for cartage of material from Meerut to pump house station Chhera
156Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage Ist (Ghatyudi)Pumping Station under Division Pithoragarh. Motor Wire Atlas
157Funny
158Varnish
159Nomex Paper
160Sleeve
161Glass tape
162Cotton tap
163Fiber glass tap
164Cloth fiber
165Copper Lugs (100 Amp)
166Grease Plate
167Bearing 6310
1688 Hole M.S Coupling
169Grease
170Shaft lock
171Rubber coupling
172Coupling nut bolt
173Complete motor cartage
174Rubber coupling
175Connection plate
176Rotor varnishing
177Repair of end cover
178Rotor shaft repair
179Labour charges for cutting and cleaning of old wire of motor
180Deduction of old copper wire scrap
181Deduction of old Iron scrap
182Deduction of old GM
183Labour charges for fitting, rewinding installation and testing of above motor on full load
184Supply of end cover for above motor
185Supply of fan for above motor
186Dismantling and fitting of end cover
187Varnishing for above overheat Motor
188Complete Rewinding of Rotor for above motor
189Transportation and labourcharges for cartage of material from Meerut to Pump house Hyupani Pumping station road head (Ghatyudi)
190Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage IInd (Hyupani)Pumping Station under Division Pithoragarh. Motor Wire Atlas
191Funny
192Varnish
193Nomex Paper
194Sleeve
195Glass tape
196Cotton tap
197Fiber glass tap
198Cloth Paper
199Copper Lugs (100 Amp)
200Grease Plate
201Bearing 6310
2028 Hole M.S Coupling
203Grease
204Connection Plate
205Rubber coupling
206Roter shaft lock
207Rotor Greasing
208Repair of end cover
209Rotor shaft repair
210Shaft Lock
211Motor Fom
212Complete Motor cartage
213Coupling nut bolt
214Labour charges for cutting and cleaning of old wire of motor
215Deduction of old copper wire scrap
216Deduction of old Iron scrap
217Deduction of old GM
218Labour charges for fitting, rewinding installation and testing of above motor on full load
219Supply of end cover for above motor
220Supply of fan for above motor
221Dismantling and fitting of end cover
222Varnishing for above overheat Motor
223Complete Rewinding of Rotor for above motor
224Transportation and labourcharges for cartage of material from Meerut to Pump house Paun.
225Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIst Pumping Station under Division Pithoragarh. Motor Wire Atlas
226Funny
227Varnish 01Bottle
228Nomex Paper
229Sleeve
230Glass tape
231Cotton tap
232Fiber glass tap
233Copper Lugs (100 Amp)
234Grease Plate
235Grease
236Labour charges for cutting and cleaning of old wire of motor
237Deduction of old copper wire scrap
238Motor Varnshing
239MS Coupling
240Motor greasing
241Rubber coupling
242Coupling Nut Bolt
243Connection Plate
244Rotor shaft lock
245Rotor Varnishing
246Repair end cover
247Rotor shaft repair
248Shaft Lock
249Motor fan
250Complete Motor cartage road head to pump house.
251Labour charges for fitting, rewinding installation and testing of above motor on full load
252Supply of end cover for above motor
253Supply of fan for above motor
254Dismantling and fitting of end cover
255Varnishing for above overheat Motor
256Complete Rewinding of Rotor forabove motor
257material
258Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIInd Pumping Station under Division Pithoragarh. Motor Wire Atlas
259Funny
260Varnish
261Nomex Paper
262Sleeve
263Glass tape
264Cotton tap
265Fiber glass
266Copper Lugs (100 Amp)
267Grease Plate
268Grease
269Labour charges for cutting and cleaning of old wire of motor
270Deduction of old copper wire scrap
271Fiber glass cloth paper
272Repair of end cover
273Deduction of old Iron scrap
274Deduction of old GM
275Connection plate
276Rotor shaft lock
277S/O End Cover
278Repair of end cover
279Rotor shaft repair
280Shaft lock
281Supply of Motor Fan
282Motor Fan
283Bearing Bracket
284Suction repairing
285Delivery Repairing
286Complete Motor cartage roas head to pump house.
287Labour charges for fitting, rewinding installation and testing of above motor on full load
288Supply of end cover for above motor
289Supply of fan for above motor
290Dismantling and fitting of end cover
291Varnishing for above overheat Motor
292Complete Rewinding of Rotor for above motor
293Transportation and labourcharges for cartage of material from road head to pump house.
294Complete Rewinding of Stators winding of NGEF Make/ ABB Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas
295Funny
296Varnish
297Nomex Paper
298Sleeve
299Glass tape
300Cotton tap
301Fiber glass
302Bearing
303Labour charges for cutting and cleaning of old wire of motor
304Deduction of old copper wire scrap
305Deduction of old Iron scrap
306Deduction of old GM
307Labour charges for fitting, rewinding installation and testing of above motor on full load
308Repairing of end cover for above motor
309Supply of fan for above motor
310Dismantling and fitting of end cover
311Copper Lugs
312Varnishing for above overheat Motor
313Complete Rewinding of Rotor dor above motor
314Greasing for above motor pump set
315Transportation and labourcharges for cartage of material from road head to pump house.
316Roter Shaft Repairing
317Complete Rewinding of Stators winding of Jyoti Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas
318Funny
319Varnish
320Nomex Paper
321Sleeve
322Glass tape
323Cotton tap
324Fiber glass
325Bearing
326Labour charges for cutting and cleaning of old wire of motor
327Deduction of old copper wire scrap
328Deduction of old Iron scrap
329Deduction of old GM
330Labour charges for fitting, rewinding installation and testing of above motor on full load
331Repairing of end cover for above motor
332Supply of fan for above motor
333Dismantling and fitting of end cover
334Copper Lugs (100 Amp)
335Varnishing for above overheat Motor
336Complete Rewinding of Rotor dor above motor
337Greasing for above motor pump set
338Transportation and labourcharges for cartage of material from road head to pump house.
339Complete Rewinding of Stators winding of ABBMake 150 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Clearwater Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas
340Funny
341Varnish
342Nomex Paper
343Sleeve
344Glass tape
345Cotton tap
346Fiber glass
347Grease Plate
348Labour charges for cutting and cleaning of old wire of motor
349Deduction of old copper wire scrap
350Labour charges for fitting, rewinding installation and testing of above motor on full load
351Repairing of end cover for above motor
352Supply of fan for above motor
353Dismantling and fitting of end cover
354Deduction of old Iron scrap
355Deduction of old GM
356Bearing
357Grease
358Ranga
359Rotor cleaning & varnishing
360End cover Bearing
361Diffuser
362Copper Lugs (225 Amp)
363Varnishing for above overheat Motor
364Complete Rewinding of Rotor dor above motor
365Greasing for above motor pump set
366Transportation and labourcharges for cartage of material from road head to pump house.
367Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Matela Pumping Station under Division Pithoragarh. Motor Wire Atlas
368Funny
369Varnish
370Nomex Paper
371Sleeve
372Glass tape
373Cotton tap
374Fiber glass
375Grease Plate
376Mobil Oil
377Labour charges for cutting and cleaning of old wire of motor
378Deduction of old copper wire scrap
379Deduction of old Iron scrap
380Deduction of old GM
381Labour charges for fitting, rewinding installation and testing of above motor on full load
382Repairing of end cover for above motor
383Supply of fan for above motor
384Dismantling and fitting of end cover
385Copper Lugs (300 Amp)
386Varnishing for above overheat Motor
387Complete Rewinding of Rotor for above motor
388Greasing for above motor pump set
389Transportation and labourcharges for cartage of material from road head to pump house.
390Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction slip ring Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GurnaPumping Station under Division Pithoragarh. Motor Wire Atlas
391Funny
392Varnish
393Nomex Paper
394Sleeve
395Glass tape
396Cotton tap
397Fiber glass
398Grease Plate
399Mobil Oil
400Labour charges for cutting and cleaning of old wire of motor
401Deduction of old copper wire scrap
402Deduction of old Iron scrap
403Deduction of old GM
404Copper Lugs (300 Amp)
405Labour charges for fitting, rewinding, installation and testing of above motor on full load
406Repairing of end cover for above motor
407Supply of fan for above motor
408Dismantling and fitting of end cover
409Varnishing for above overheat Motor
410Complete Rewinding of Rotor dor above motor
411Greasing for above motor pump set
412Transportation and labourcharges for cartage of material from road head to pump house.
413Complete Rewinding of Stators winding of ABB Make 125 HP, 3 Phase, AC induction Motor (1450 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hanuman Mandir Pumping Station under Division Pithoragarh. Motor Wire Atlas
414Funny
415Varnish
416Nomex Paper
417Sleeve
418Glass tape
419Cotton tap
420Fiber glass
421Grease Plate
422Mobil Oil
423Labour charges for cutting and cleaning of old wire of motor
424Deduction of old copper wire scrap
425Deduction of old Iron scrap
426Deduction of old GM
427Copper Lugs (300 Amp)
428Labour charges for fitting, rewinding, installation and testing of above motor on full load
429Repairing of end cover for above motor
430Labour charges for fitting, rewinding installation and testing of above motor on full load
431Supply of fan for above motor
432Dismantling and fitting of end cover
433Varnishing for above overheat Motor
434Complete Rewinding of Rotor dor above motor
435Transportation and labourcharges for cartage of material from road head to pump house.
436Complete Rewinding of Stators winding of KirloaskarMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas
437Funny
438Varnish
439Nomex Paper
440Sleeve
441Glass tape
442Cotton tap
443Fiber glass
444Copper Lugs (50 Amp)
445Motor Sheet
446Motor Cover
447Motor Fan
448Champion Packing
449Grease Plate
450Grease
451Supply of end cover for above motor
452Deduction of old copper wire scrap
453Deduction of old Iron scrap
454Deduction of old GM
455Labour charges for cutting and cleaning of old wire of motor
456Labour charges for fitting, rewinding, installation and testing of above motor on full load
457Transportation and labourcharges for cartage of material from road head to pump house.
458Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas
459Funny
460Varnish
461Nomex Paper
462Sleeve
463Glass tape
464Cotton tap
465Fiber glass
466Copper Lugs (50 Amp)
467Motor Sheet
468Motor Cover
469Motor Fan
470Champion Packing
471Bearing 6311
472Grease Plate
473Grease
474Supply of end cover for above motor
475Labour charges for cutting and cleaning of old wire of motor
476Deduction of old copper wire scrap
477Deduction of old Iron scrap
478Deduction of old GM
479Labour charges for fitting, rewinding, installation and testing of above motor on full load
480Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load.
481Transportation and labourcharges for cartage of material from road head to pump house.
482Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage Ist under Division Pithoragarh.
483Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot IIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas
484Funny
485Varnish
486Nomex Paper
487Sleeve
488Glass tape
489Cotton tap
490Fiber glass
491Copper Lugs (50 Amp)
492Motor Sheet
493Motor Cover
494Motor Fan
495Champion Packing
496Bearing 6311
497Grease Plate
498Grease
499Supply of end cover for above motor
500Deduction of old copper wire scrap
501Deduction of old Iron scrap
502Deduction of old GM
503Labour charges for cutting and cleaning of old wire of motor
504Labour charges for fitting, rewinding, installation and testing of above motor on full load
505Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load.
506Transportation and labourcharges for cartage of material from road head to pump house.
507Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage IInd under Division Pithoragarh.
508Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIstStagePumping Station under Division Pithoragarh. Motor Wire Atlas
509Funny
510Varnish
511Nomex Paper
512Sleeve
513Glass tape
514Cotton tap
515Fiber glass
516Grease Plate
517Labour charges for cutting and cleaning of old wire of motor
518Deduction of old copper wire scrap
519Deduction of old Iron scrap
520Deduction of old GM
521Labour charges for fitting, rewinding, installation and testing of above motor on full load
522Supply of end cover for above motor
523Supply of fan cover
524Dismenteling and fitting of end cover
525Varnishing for above overheat Motor
526Complete rewinding of Rotor for above motor
527Greasing for above motor pump set
528Copper Lugs ( 300 Amp)
529Transportation and labourcharges for cartage of material from road head to pump house.
530Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas
531Funny
532Varnish
533Nomex Paper
534Sleeve
535Glass tape
536Cotton tap
537Fiber glass
538Grease Plate
539Labour charges for cutting and cleaning of old wire of motor
540Deduction of old copper wire scrap
541Deduction of old Iron scrap
542Deduction of old GM
543Labour charges for fitting, rewinding, installation and testing of above motor on full load
544Supply of end cover for above motor
545Supply of fan cover
546Dismenteling and fitting of end cover
547Varnishing for above overheat Motor
548Complete rewinding of Rotor for above motor
549Greasing for above motor pump set
550Copper Lugs ( 300 Amp)
551Transportation and labourcharges for cartage of material from road head to pump house.
552Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIIrdStagePumping Station under Division Pithoragarh. Motor Wire Atlas
553Funny
554Varnish
555Nomex Paper
556Sleeve
557Glass tape
558Cotton tap
559Fiber glass
560Grease Plate
561Labour charges for cutting and cleaning of old wire of motor
562Deduction of old copper wire scrap
563Deduction of old Iron scrap
564Deduction of old GM
565Labour charges for fitting, rewinding, installation and testing of above motor on full load
566Supply of end cover for above motor
567Supply of fan cover
568Dismenteling and fitting of end cover
569Varnishing for above overheat Motor
570Complete rewinding of Rotor for above motor
571Greasing for above motor pump set
572Copper Lugs ( 300 Amp)
573Transportation and labourcharges for cartage of material from road head to pump house.
574Complete Rewinding of Stators winding of JyotiMake 15 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at FutsilPumping Station Gangolihat under Division Pithoragarh. Motor Wire Atlas
575Funny
576Varnish
577Nomex Paper
578Sleeve
579Glass tape
580Cotton tap
581Fiber glass
582Grease Plate
583Grease
584Labour charges for cutting and cleaning of old wire of motor
585Deduction of old copper wire scrap
586Deduction of old Iron scrap
587Deduction of old GM
588Copper Lugs (Amp)
589Labour charges for fitting, rewinding, installation and testing of above motor on full load
590Supply of end cover for above motor
591Supply of fan cover
592Dismenteling and fitting of end cover
593Varnishing for above overheat Motor
594Complete rewinding of Rotor for above motor
595Greasing for above motor pump set
596Transportation and labourcharges for cartage of material from road head to pump house.
597Complete Rewinding of Stators winding of ABBMake 100 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at MarsoliPumping Stationunder Division Pithoragarh. Motor Wire Atlas
598Funny
599Varnish
600Nomex Paper
601Sleeve
602Glass tape
603Cotton tap
604Fiber glass
605Bearing 6316 C3 (DE)
606Bearing 6316 C3 (DE)
607Grease Plate
608Labour charges for cutting and cleaning of old wire of motor
609Deduction of old copper wire scrap
610Deduction of old Iron scrap
611Deduction of old GM
612Copper Lugs (Amp)
613Labour charges for fitting, rewinding, installation and testing of above motor on full load
614Supply of end cover for above motor
615Supply of fan cover
616Dismenteling and fitting of end cover
617Varnishing for above overheat Motor
618Complete rewinding of Rotor for above motor
619Greasing for above motor pump set
620Transportation and labourcharges for cartage of material from road head to pump house.
621Complete rewinding of Stators winding of Kirloskar Make 15HP 3 Phasse, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete all respect at Hudeti Pumping Station under Division Pithoragarh. Motor Wore Atlas
622Funny
623Varnish
624Nomex Paper
625Sleeve
626Glass Tape
627Cotton Tape
628Fiber Glass
629Grease Plate
630Grease
631Labour charges for cutting and cleaning of old wore of motor
632Deduction of old copper wire
633Deduction of old Iron scrap
634Deduction of old GM
635Copper Lugs (50 Amp)
636Labour charges for fitting, rewinding, installation and testing of above motor on full load
637Supply of end cover for above motor
638Supply of fan for above motor
639Dismantelling and fitting of end cover
640Varnishing for above over heat motor
641Complete rewinding of Rotor for above motor
642Greasing for above motor pump set
643Transportation and labour charges for cartge of material from road head to pump house distance 150 Meter
644Other Parts Main Switch 200 Amp
645Main Switch 250 Amp
646Main Switch 125 Amp
647Complete overhaulling OCB
648Complete overhaulling of ACB 600 Amp
649Complete overhaulling of ACB 1200 Amp
650HRC Fuse 100 Amp
651HRC Fuse 250 Amp
652Clamp Brass 1000 Amp
653Complete overhaulling of Kilbarn Make Starter with all spare parts
654Valve repairingwork 60 to 400 HP
655Valve repairing work 15 to 30 HP
656Annual Maintenance Work
657Copper Lugs 50 Amp
658Copper Lugs 95 Amp
659Copper Lugs 120 Amp
660Copper Lugs150 Amp
661Copper Lugs 200 Amp
662Copper Lugs 300 Amp
663Copper Lugs 400 Amp
664Volt Meter
665Amp Meter
666Financial Year 2024-25
667Complete Rewinding of Stators winding of Jyoti Make 60 HP, 3 Phase, AC induction Motor (1470 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Thuligad Pumping Station under Division Pithoragarh. Motor Wire Atlas
668Funny
669Varnish
670Nomex Paper
671Sleeve
672Glass tape
673Cotton tap
674Fiber glass/ Cloth Paper
675Copper Lugs (200 Amp)
676Greasing for above motor pump set
677Grease Plate
678Mobil Oil
679Bearing 7316
680Bearing 6211
681Bearing 6312
68295 Amp Copper Lugs
683Connection Plate with Thured
684Terminal Insulator
685Labour charges for cutting and cleaning of old wire of motor
686Deduction of old copper wire scrap
687Deduction of old Iron scrap
688Deduction of old GM
689Labour charges for fitting, rewinding installation and testing of above motor on full load
690Repairing of end cover for above motor
691Supply of fan for above motor
692Ranga
693Lock
694Grease
695Rotor Shaft repair
696Riched Coupling
697Riched bearing
698Motor Bearing welding work
699Cartage of Rotor
700Dismantling and fitting of end cover
701Varnishing for above overheat Motor
702Complete Rewinding of Rotor dor above motor
703Transportation and labourcharges for cartage of material from Meerut to Pithoragarh Kasani Station
704Complete Rewinding of Stators winding of ABB Make/ Jyoti make180 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Kasani Pumping Station under Division Pithoragarh. Motor Wire Atlas
705Funny
706Varnish
707Nomex Paper 8 MM
708Sleeve
709Glass tape
710Cotton tap
711Copper Lugs (300 Amp)
712Fiber glass Tape
713Grease Plate
714Mobil Oil
715Bearing 6316
716Bearing NU 318
717Connection Plate
718Greasing for above motor pump set
719Labour charges for cutting and cleaning of old wire of motor
720Deduction of old copper wire scrap
721Deduction of old Iron scrap
722Deduction of old GM
723Labour charges for fitting, rewinding installation and testing of above motor on full load
724Repairing of end cover for above motor
725Supply of meter Fom
726Grease
727Nomex paper 10mm
728Cloth paper
729Ranga
730Shaft lock
731Motor pump ceiling
732Deduction of old iron scrap
733Deduction of old GM
734Repairing of Rotor shaft
735Rotor varnishing
736Motor Shaft lock
737Key carbon
738Repair of end cover
739Complete Motor cartage Kasani to pump house
740Supply of fan for above motor
741Dismantling and fitting of end cover
742Varnishing for above overheat Motor
743Complete Rewinding of Rotor for above motor
744Transportation and labourcharges for cartage of material from Meerut to Kasani road head
745Complete Rewinding of Stators winding of KirloskarMake/ABB Make 30 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at RaiPumping Station under Division Pithoragarh. Motor Wire Atlas
746Funny
747Varnish
748Nomex Paper 8 mm
749Copper Lugs (50 Amp)
750Sleeve
751Glass tape
752Cotton tap
753Fiber glass tape
754Grease Plate
755Mobil Oil
756Bearing 6310
757Bearing 6311
758M.S. Coupling 8 Hole
7598’ Rubber Coupling
760Greasing for above motor pump set
761Labour charges for cutting and cleaning of old wire of motor
762Deduction of old copper wire scrap
763Labour charges for fitting, rewinding installation and testing of above motor on full load
764Supply of end cover for above motor
765Supply of fan for above motor
766Repair of Suction
767Repair of Delivery
768Grease
769Ranga
770Shaft lock
771Deduction of old iron scrap
772Deduction of old GM
773Connection plate
774Cloth paper
775Complete Motor cartage
776Roter greesing
777Roter shaft repair
778End cover repair
779Nomex paper 10 mm
780Fiber glass cloth paper
781Dismantling and fitting of end cover
782Varnishing for above overheat Motor
783Complete Rewinding of Rotor for above motor
784Transportation and labourcharges for cartage of material from Meerut to pumping station Rai
785Complete Rewinding of Stators winding of KirloskarMake 12.5 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at ChheraPumping Station under Division Pithoragarh. Motor Wire Atlas
786Funny
787Varnish
788Nomex Paper
789Sleeve
790Glass tape
791Cotton tap
792Fiber glass tap
793Grease Plate
794Cloth Paper
795Bearing 6310
796Bearing 6309
797M.S. Coupling
798M.S. Coupling Rubber
799Greasing for above motor pump set
800Copper Lugs (50 Amp)
801Labour charges for cutting and cleaning of old wire of motor
802Deduction of old copper wire scrap
803Labour charges for fitting, rewinding installation and testing of above motor on full load
804Supply of end cover for above motor
805Supply of fan for above motor
806Dismantling and fitting of end cover
807Varnishing for above overheat Motor
808Shaft lock
809Grease
810Rubber coupling
811M.S. 8 Hole coupling
812MS Stud
813MS Coupling Nut Bolt
814Connection plate
815Roter varnishing
816End cover repairing
817Cartage of Motor road head to pump house chhera
818Complete Rewinding of Rotor dor above motor
819Transportation and labourcharges for cartage of material from Meerut to pump house station Chhera
820Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage Ist (Ghatyudi)Pumping Station under Division Pithoragarh. Motor Wire Atlas
821Funny
822Varnish
823Nomex Paper
824Sleeve
825Glass tape
826Cotton tap
827Fiber glass tap
828Cloth fiber
829Copper Lugs (100 Amp)
830Grease Plate
831Bearing 6310
8328 Hole M.S Coupling
833Grease
834Shaft lock
835Rubber coupling
836Coupling nut bolt
837Complete motor cartage
838Rubber coupling
839Connection plate
840Rotor varnishing
841Repair of end cover
842Rotor shaft repair
843Labour charges for cutting and cleaning of old wire of motor
844Deduction of old copper wire scrap
845Deduction of old Iron scrap
846Deduction of old GM
847Labour charges for fitting, rewinding installation and testing of above motor on full load
848Supply of end cover for above motor
849Supply of fan for above motor
850Dismantling and fitting of end cover
851Varnishing for above overheat Motor
852Complete Rewinding of Rotor for above motor
853Transportation and labourcharges for cartage of material from Meerut to Pump house Hyupani Pumping station road head (Ghatyudi)
854Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage IInd (Hyupani)Pumping Station under Division Pithoragarh. Motor Wire Atlas
855Funny
856Varnish
857Nomex Paper
858Sleeve
859Glass tape
860Cotton tap
861Fiber glass tap
862Cloth Paper
863Copper Lugs (100 Amp)
864Grease Plate
865Bearing 6310
8668 Hole M.S Coupling
867Grease
868Connection Plate
869Rubber coupling
870Roter shaft lock
871Rotor Greasing
872Repair of end cover
873Rotor shaft repair
874Shaft Lock
875Motor Fom
876Complete Motor cartage
877Coupling nut bolt
878Labour charges for cutting and cleaning of old wire of motor
879Deduction of old copper wire scrap
880Deduction of old Iron scrap
881Deduction of old GM
882Labour charges for fitting, rewinding installation and testing of above motor on full load
883Supply of end cover for above motor
884Supply of fan for above motor
885Dismantling and fitting of end cover
886Varnishing for above overheat Motor
887Complete Rewinding of Rotor for above motor
888Transportation and labourcharges for cartage of material from Meerut to Pump house Paun.
889Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIst Pumping Station under Division Pithoragarh. Motor Wire Atlas
890Funny
891Varnish 01Bottle
892Nomex Paper
893Sleeve
894Glass tape
895Cotton tap
896Fiber glass tap
897Copper Lugs (100 Amp)
898Grease Plate
899Grease
900Labour charges for cutting and cleaning of old wire of motor
901Deduction of old copper wire scrap
902Motor Varnshing
903MS Coupling
904Motor greasing
905Rubber coupling
906Coupling Nut Bolt
907Connection Plate
908Rotor shaft lock
909Rotor Varnishing
910Repair end cover
911Rotor shaft repair
912Shaft Lock
913Motor fan
914Complete Motor cartage road head to pump house.
915Labour charges for fitting, rewinding installation and testing of above motor on full load
916Supply of end cover for above motor
917Supply of fan for above motor
918Dismantling and fitting of end cover
919Varnishing for above overheat Motor
920Complete Rewinding of Rotor forabove motor
921material
922Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIInd Pumping Station under Division Pithoragarh. Motor Wire Atlas
923Funny
924Varnish
925Nomex Paper
926Sleeve
927Glass tape
928Cotton tap
929Fiber glass
930Copper Lugs (100 Amp)
931Grease Plate
932Grease
933Labour charges for cutting and cleaning of old wire of motor
934Deduction of old copper wire scrap
935Fiber glass cloth paper
936Repair of end cover
937Deduction of old Iron scrap
938Deduction of old GM
939Connection plate
940Rotor shaft lock
941S/O End Cover
942Repair of end cover
943Rotor shaft repair
944Shaft lock
945Supply of Motor Fan
946Motor Fan
947Bearing Bracket
948Suction repairing
949Delivery Repairing
950Complete Motor cartage roas head to pump house.
951Labour charges for fitting, rewinding installation and testing of above motor on full load
952Supply of end cover for above motor
953Supply of fan for above motor
954Dismantling and fitting of end cover
955Varnishing for above overheat Motor
956Complete Rewinding of Rotor for above motor
957Transportation and labourcharges for cartage of material from road head to pump house.
958Complete Rewinding of Stators winding of NGEF Make/ ABB Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas
959Funny
960Varnish
961Nomex Paper
962Sleeve
963Glass tape
964Cotton tap
965Fiber glass
966Bearing
967Labour charges for cutting and cleaning of old wire of motor
968Deduction of old copper wire scrap
969Deduction of old Iron scrap
970Deduction of old GM
971Labour charges for fitting, rewinding installation and testing of above motor on full load
972Repairing of end cover for above motor
973Supply of fan for above motor
974Dismantling and fitting of end cover
975Copper Lugs
976Varnishing for above overheat Motor
977Complete Rewinding of Rotor dor above motor
978Greasing for above motor pump set
979Transportation and labourcharges for cartage of material from road head to pump house.
980Roter Shaft Repairing
981Complete Rewinding of Stators winding of Jyoti Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas
982Funny
983Varnish
984Nomex Paper
985Sleeve
986Glass tape
987Cotton tap
988Fiber glass
989Bearing
990Labour charges for cutting and cleaning of old wire of motor
991Deduction of old copper wire scrap
992Deduction of old Iron scrap
993Deduction of old GM
994Labour charges for fitting, rewinding installation and testing of above motor on full load
995Repairing of end cover for above motor
996Supply of fan for above motor
997Dismantling and fitting of end cover
998Copper Lugs (100 Amp)
999Varnishing for above overheat Motor
1000Complete Rewinding of Rotor dor above motor
1001Greasing for above motor pump set
1002Transportation and labourcharges for cartage of material from road head to pump house.
1003Complete Rewinding of Stators winding of ABBMake 150 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Clearwater Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas
1004Funny
1005Varnish
1006Nomex Paper
1007Sleeve
1008Glass tape
1009Cotton tap
1010Fiber glass
1011Grease Plate
1012Labour charges for cutting and cleaning of old wire of motor
1013Deduction of old copper wire scrap
1014Labour charges for fitting, rewinding installation and testing of above motor on full load
1015Repairing of end cover for above motor
1016Supply of fan for above motor
1017Dismantling and fitting of end cover
1018Deduction of old Iron scrap
1019Deduction of old GM
1020Bearing
1021Grease
1022Ranga
1023Rotor cleaning & varnishing
1024End cover Bearing
1025Diffuser
1026Copper Lugs (225 Amp)
1027Varnishing for above overheat Motor
1028Complete Rewinding of Rotor dor above motor
1029Greasing for above motor pump set
1030Transportation and labourcharges for cartage of material from road head to pump house.
1031Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Matela Pumping Station under Division Pithoragarh. Motor Wire Atlas
1032Funny
1033Varnish
1034Nomex Paper
1035Sleeve
1036Glass tape
1037Cotton tap
1038Fiber glass
1039Grease Plate
1040Mobil Oil
1041Labour charges for cutting and cleaning of old wire of motor
1042Deduction of old copper wire scrap
1043Deduction of old Iron scrap
1044Deduction of old GM
1045Labour charges for fitting, rewinding installation and testing of above motor on full load
1046Repairing of end cover for above motor
1047Supply of fan for above motor
1048Dismantling and fitting of end cover
1049Copper Lugs (300 Amp)
1050Varnishing for above overheat Motor
1051Complete Rewinding of Rotor for above motor
1052Greasing for above motor pump set
1053Transportation and labourcharges for cartage of material from road head to pump house.
1054Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction slip ring Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GurnaPumping Station under Division Pithoragarh. Motor Wire Atlas
1055Funny
1056Varnish
1057Nomex Paper
1058Sleeve
1059Glass tape
1060Cotton tap
1061Fiber glass
1062Grease Plate
1063Mobil Oil
1064Labour charges for cutting and cleaning of old wire of motor
1065Deduction of old copper wire scrap
1066Deduction of old Iron scrap
1067Deduction of old GM
1068Copper Lugs (300 Amp)
1069Labour charges for fitting, rewinding, installation and testing of above motor on full load
1070Repairing of end cover for above motor
1071Supply of fan for above motor
1072Dismantling and fitting of end cover
1073Varnishing for above overheat Motor
1074Complete Rewinding of Rotor dor above motor
1075Greasing for above motor pump set
1076Transportation and labourcharges for cartage of material from road head to pump house.
1077Complete Rewinding of Stators winding of ABB Make 125 HP, 3 Phase, AC induction Motor (1450 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hanuman Mandir Pumping Station under Division Pithoragarh. Motor Wire Atlas
1078Funny
1079Varnish
1080Nomex Paper
1081Sleeve
1082Glass tape
1083Cotton tap
1084Fiber glass
1085Grease Plate
1086Mobil Oil
1087Labour charges for cutting and cleaning of old wire of motor
1088Deduction of old copper wire scrap
1089Deduction of old Iron scrap
1090Deduction of old GM
1091Copper Lugs (300 Amp)
1092Labour charges for fitting, rewinding, installation and testing of above motor on full load
1093Repairing of end cover for above motor
1094Labour charges for fitting, rewinding installation and testing of above motor on full load
1095Supply of fan for above motor
1096Dismantling and fitting of end cover
1097Varnishing for above overheat Motor
1098Complete Rewinding of Rotor dor above motor
1099Transportation and labourcharges for cartage of material from road head to pump house.
1100Complete Rewinding of Stators winding of KirloaskarMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas
1101Funny
1102Varnish
1103Nomex Paper
1104Sleeve
1105Glass tape
1106Cotton tap
1107Fiber glass
1108Copper Lugs (50 Amp)
1109Motor Sheet
1110Motor Cover
1111Motor Fan
1112Champion Packing
1113Grease Plate
1114Grease
1115Supply of end cover for above motor
1116Deduction of old copper wire scrap
1117Deduction of old Iron scrap
1118Deduction of old GM
1119Labour charges for cutting and cleaning of old wire of motor
1120Labour charges for fitting, rewinding, installation and testing of above motor on full load
1121Transportation and labourcharges for cartage of material from road head to pump house.
1122Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas
1123Funny
1124Varnish
1125Nomex Paper
1126Sleeve
1127Glass tape
1128Cotton tap
1129Fiber glass
1130Copper Lugs (50 Amp)
1131Motor Sheet
1132Motor Cover
1133Motor Fan
1134Champion Packing
1135Bearing 6311
1136Grease Plate
1137Grease
1138Supply of end cover for above motor
1139Labour charges for cutting and cleaning of old wire of motor
1140Deduction of old copper wire scrap
1141Deduction of old Iron scrap
1142Deduction of old GM
1143Labour charges for fitting, rewinding, installation and testing of above motor on full load
1144Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load.
1145Transportation and labourcharges for cartage of material from road head to pump house.
1146Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage Ist under Division Pithoragarh.
1147Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot IIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas
1148Funny
1149Varnish
1150Nomex Paper
1151Sleeve
1152Glass tape
1153Cotton tap
1154Fiber glass
1155Copper Lugs (50 Amp)
1156Motor Sheet
1157Motor Cover
1158Motor Fan
1159Champion Packing
1160Bearing 6311
1161Grease Plate
1162Grease
1163Supply of end cover for above motor
1164Deduction of old copper wire scrap
1165Deduction of old Iron scrap
1166Deduction of old GM
1167Labour charges for cutting and cleaning of old wire of motor
1168Labour charges for fitting, rewinding, installation and testing of above motor on full load
1169Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load.
1170Transportation and labourcharges for cartage of material from road head to pump house.
1171Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage IInd under Division Pithoragarh.
1172Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIstStagePumping Station under Division Pithoragarh. Motor Wire Atlas
1173Funny
1174Varnish
1175Nomex Paper
1176Sleeve
1177Glass tape
1178Cotton tap
1179Fiber glass
1180Grease Plate
1181Labour charges for cutting and cleaning of old wire of motor
1182Deduction of old copper wire scrap
1183Deduction of old Iron scrap
1184Deduction of old GM
1185Labour charges for fitting, rewinding, installation and testing of above motor on full load
1186Supply of end cover for above motor
1187Supply of fan cover
1188Dismenteling and fitting of end cover
1189Varnishing for above overheat Motor
1190Complete rewinding of Rotor for above motor
1191Greasing for above motor pump set
1192Copper Lugs ( 300 Amp)
1193Transportation and labourcharges for cartage of material from road head to pump house.
1194Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas
1195Funny
1196Varnish
1197Nomex Paper
1198Sleeve
1199Glass tape
1200Cotton tap
1201Fiber glass
1202Grease Plate
1203Labour charges for cutting and cleaning of old wire of motor
1204Deduction of old copper wire scrap
1205Deduction of old Iron scrap
1206Deduction of old GM
1207Labour charges for fitting, rewinding, installation and testing of above motor on full load
1208Supply of end cover for above motor
1209Supply of fan cover
1210Dismenteling and fitting of end cover
1211Varnishing for above overheat Motor
1212Complete rewinding of Rotor for above motor
1213Greasing for above motor pump set
1214Copper Lugs ( 300 Amp)
1215Transportation and labourcharges for cartage of material from road head to pump house.
1216Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIIrdStagePumping Station under Division Pithoragarh. Motor Wire Atlas
1217Funny
1218Varnish
1219Nomex Paper
1220Sleeve
1221Glass tape
1222Cotton tap
1223Fiber glass
1224Grease Plate
1225Labour charges for cutting and cleaning of old wire of motor
1226Deduction of old copper wire scrap
1227Deduction of old Iron scrap
1228Deduction of old GM
1229Labour charges for fitting, rewinding, installation and testing of above motor on full load
1230Supply of end cover for above motor
1231Supply of fan cover
1232Dismenteling and fitting of end cover
1233Varnishing for above overheat Motor
1234Complete rewinding of Rotor for above motor
1235Greasing for above motor pump set
1236Copper Lugs ( 300 Amp)
1237Transportation and labourcharges for cartage of material from road head to pump house.
1238Complete Rewinding of Stators winding of JyotiMake 15 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at FutsilPumping Station Gangolihat under Division Pithoragarh. Motor Wire Atlas
1239Funny
1240Varnish
1241Nomex Paper
1242Sleeve
1243Glass tape
1244Cotton tap
1245Fiber glass
1246Grease Plate
1247Grease
1248Labour charges for cutting and cleaning of old wire of motor
1249Deduction of old copper wire scrap
1250Deduction of old Iron scrap
1251Deduction of old GM
1252Copper Lugs (Amp)
1253Labour charges for fitting, rewinding, installation and testing of above motor on full load
1254Supply of end cover for above motor
1255Supply of fan cover
1256Dismenteling and fitting of end cover
1257Varnishing for above overheat Motor
1258Complete rewinding of Rotor for above motor
1259Greasing for above motor pump set
1260Transportation and labourcharges for cartage of material from road head to pump house.
1261Complete Rewinding of Stators winding of ABBMake 100 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at MarsoliPumping Stationunder Division Pithoragarh. Motor Wire Atlas
1262Funny
1263Varnish
1264Nomex Paper
1265Sleeve
1266Glass tape
1267Cotton tap
1268Fiber glass
1269Bearing 6316 C3 (DE)
1270Bearing 6316 C3 (DE)
1271Grease Plate
1272Labour charges for cutting and cleaning of old wire of motor
1273Deduction of old copper wire scrap
1274Deduction of old Iron scrap
1275Deduction of old GM
1276Copper Lugs (Amp)
1277Labour charges for fitting, rewinding, installation and testing of above motor on full load
1278Supply of end cover for above motor
1279Supply of fan cover
1280Dismenteling and fitting of end cover
1281Varnishing for above overheat Motor
1282Complete rewinding of Rotor for above motor
1283Greasing for above motor pump set
1284Transportation and labourcharges for cartage of material from road head to pump house.
1285Complete rewinding of Stators winding of Kirloskar Make 15HP 3 Phasse, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete all respect at Hudeti Pumping Station under Division Pithoragarh. Motor Wore Atlas
1286Funny
1287Varnish
1288Nomex Paper
1289Sleeve
1290Glass Tape
1291Cotton Tape
1292Fiber Glass
1293Grease Plate
1294Grease
1295Labour charges for cutting and cleaning of old wore of motor
1296Deduction of old copper wire
1297Deduction of old Iron scrap
1298Deduction of old GM
1299Copper Lugs (50 Amp)
1300Labour charges for fitting, rewinding, installation and testing of above motor on full load
1301Supply of end cover for above motor
1302Supply of fan for above motor
1303Dismantelling and fitting of end cover
1304Varnishing for above over heat motor
1305Complete rewinding of Rotor for above motor
1306Greasing for above motor pump set
1307Transportation and labour charges for cartge of material from road head to pump house distance 150 Meter
1308Other Parts Main Switch 200 Amp
1309Main Switch 250 Amp
1310Main Switch 125 Amp
1311Complete overhaulling OCB
1312Complete overhaulling of ACB 600 Amp
1313Complete overhaulling of ACB 1200 Amp
1314HRC Fuse 100 Amp
1315HRC Fuse 250 Amp
1316Clamp Brass 1000 Amp
1317Complete overhaulling of Kilbarn Make Starter with all spare parts
1318Valve repairingwork 60 to 400 HP
1319Valve repairing work 15 to 30 HP
1320Annual Maintenance Work
1321Copper Lugs 50 Amp
1322Copper Lugs 95 Amp
1323Copper Lugs 120 Amp
1324Copper Lugs150 Amp
1325Copper Lugs 200 Amp
1326Copper Lugs 300 Amp
1327Copper Lugs 400 Amp
1328Volt Meter
1329Amp Meter
1330Financial Year 2025-26
1331Complete Rewinding of Stators winding of Jyoti Make 60 HP, 3 Phase, AC induction Motor (1470 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Thuligad Pumping Station under Division Pithoragarh. Motor Wire Atlas
1332Funny
1333Varnish
1334Nomex Paper
1335Sleeve
1336Glass tape
1337Cotton tap
1338Fiber glass/ Cloth Paper
1339Copper Lugs (200 Amp)
1340Greasing for above motor pump set
1341Grease Plate
1342Mobil Oil
1343Bearing 7316
1344Bearing 6211
1345Bearing 6312
134695 Amp Copper Lugs
1347Connection Plate with Thured
1348Terminal Insulator
1349Labour charges for cutting and cleaning of old wire of motor
1350Deduction of old copper wire scrap
1351Deduction of old Iron scrap
1352Deduction of old GM
1353Labour charges for fitting, rewinding installation and testing of above motor on full load
1354Repairing of end cover for above motor
1355Supply of fan for above motor
1356Ranga
1357Lock
1358Grease
1359Rotor Shaft repair
1360Riched Coupling
1361Riched bearing
1362Motor Bearing welding work
1363Cartage of Rotor
1364Dismantling and fitting of end cover
1365Varnishing for above overheat Motor
1366Complete Rewinding of Rotor dor above motor
1367Transportation and labourcharges for cartage of material from Meerut to Pithoragarh Kasani Station
1368Complete Rewinding of Stators winding of ABB Make/ Jyoti make180 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Kasani Pumping Station under Division Pithoragarh. Motor Wire Atlas
1369Funny
1370Varnish
1371Nomex Paper 8 MM
1372Sleeve
1373Glass tape
1374Cotton tap
1375Copper Lugs (300 Amp)
1376Fiber glass Tape
1377Grease Plate
1378Mobil Oil
1379Bearing 6316
1380Bearing NU 318
1381Connection Plate
1382Greasing for above motor pump set
1383Labour charges for cutting and cleaning of old wire of motor
1384Deduction of old copper wire scrap
1385Deduction of old Iron scrap
1386Deduction of old GM
1387Labour charges for fitting, rewinding installation and testing of above motor on full load
1388Repairing of end cover for above motor
1389Supply of meter Fom
1390Grease
1391Nomex paper 10mm
1392Cloth paper
1393Ranga
1394Shaft lock
1395Motor pump ceiling
1396Deduction of old iron scrap
1397Deduction of old GM
1398Repairing of Rotor shaft
1399Rotor varnishing
1400Motor Shaft lock
1401Key carbon
1402Repair of end cover
1403Complete Motor cartage Kasani to pump house
1404Supply of fan for above motor
1405Dismantling and fitting of end cover
1406Varnishing for above overheat Motor
1407Complete Rewinding of Rotor for above motor
1408Transportation and labourcharges for cartage of material from Meerut to Kasani road head
1409Complete Rewinding of Stators winding of KirloskarMake/ABB Make 30 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at RaiPumping Station under Division Pithoragarh. Motor Wire Atlas
1410Funny
1411Varnish
1412Nomex Paper 8 mm
1413Copper Lugs (50 Amp)
1414Sleeve
1415Glass tape
1416Cotton tap
1417Fiber glass tape
1418Grease Plate
1419Mobil Oil
1420Bearing 6310
1421Bearing 6311
1422M.S. Coupling 8 Hole
14238’ Rubber Coupling
1424Greasing for above motor pump set
1425Labour charges for cutting and cleaning of old wire of motor
1426Deduction of old copper wire scrap
1427Labour charges for fitting, rewinding installation and testing of above motor on full load
1428Supply of end cover for above motor
1429Supply of fan for above motor
1430Repair of Suction
1431Repair of Delivery
1432Grease
1433Ranga
1434Shaft lock
1435Deduction of old iron scrap
1436Deduction of old GM
1437Connection plate
1438Cloth paper
1439Complete Motor cartage
1440Roter greesing
1441Roter shaft repair
1442End cover repair
1443Nomex paper 10 mm
1444Fiber glass cloth paper
1445Dismantling and fitting of end cover
1446Varnishing for above overheat Motor
1447Complete Rewinding of Rotor for above motor
1448Transportation and labourcharges for cartage of material from Meerut to pumping station Rai
1449Complete Rewinding of Stators winding of KirloskarMake 12.5 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at ChheraPumping Station under Division Pithoragarh. Motor Wire Atlas
1450Funny
1451Varnish
1452Nomex Paper
1453Sleeve
1454Glass tape
1455Cotton tap
1456Fiber glass tap
1457Grease Plate
1458Cloth Paper
1459Bearing 6310
1460Bearing 6309
1461M.S. Coupling
1462M.S. Coupling Rubber
1463Greasing for above motor pump set
1464Copper Lugs (50 Amp)
1465Labour charges for cutting and cleaning of old wire of motor
1466Deduction of old copper wire scrap
1467Labour charges for fitting, rewinding installation and testing of above motor on full load
1468Supply of end cover for above motor
1469Supply of fan for above motor
1470Dismantling and fitting of end cover
1471Varnishing for above overheat Motor
1472Shaft lock
1473Grease
1474Rubber coupling
1475M.S. 8 Hole coupling
1476MS Stud
1477MS Coupling Nut Bolt
1478Connection plate
1479Roter varnishing
1480End cover repairing
1481Cartage of Motor road head to pump house chhera
1482Complete Rewinding of Rotor dor above motor
1483Transportation and labourcharges for cartage of material from Meerut to pump house station Chhera
1484Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage Ist (Ghatyudi)Pumping Station under Division Pithoragarh. Motor Wire Atlas
1485Funny
1486Varnish
1487Nomex Paper
1488Sleeve
1489Glass tape
1490Cotton tap
1491Fiber glass tap
1492Cloth fiber
1493Copper Lugs (100 Amp)
1494Grease Plate
1495Bearing 6310
14968 Hole M.S Coupling
1497Grease
1498Shaft lock
1499Rubber coupling
1500Coupling nut bolt
1501Complete motor cartage
1502Rubber coupling
1503Connection plate
1504Rotor varnishing
1505Repair of end cover
1506Rotor shaft repair
1507Labour charges for cutting and cleaning of old wire of motor
1508Deduction of old copper wire scrap
1509Deduction of old Iron scrap
1510Deduction of old GM
1511Labour charges for fitting, rewinding installation and testing of above motor on full load
1512Supply of end cover for above motor
1513Supply of fan for above motor
1514Dismantling and fitting of end cover
1515Varnishing for above overheat Motor
1516Complete Rewinding of Rotor for above motor
1517Transportation and labourcharges for cartage of material from Meerut to Pump house Hyupani Pumping station road head (Ghatyudi)
1518Complete Rewinding of Stators winding of GECMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hyupani Stage IInd (Hyupani)Pumping Station under Division Pithoragarh. Motor Wire Atlas
1519Funny
1520Varnish
1521Nomex Paper
1522Sleeve
1523Glass tape
1524Cotton tap
1525Fiber glass tap
1526Cloth Paper
1527Copper Lugs (100 Amp)
1528Grease Plate
1529Bearing 6310
15308 Hole M.S Coupling
1531Grease
1532Connection Plate
1533Rubber coupling
1534Roter shaft lock
1535Rotor Greasing
1536Repair of end cover
1537Rotor shaft repair
1538Shaft Lock
1539Motor Fom
1540Complete Motor cartage
1541Coupling nut bolt
1542Labour charges for cutting and cleaning of old wire of motor
1543Deduction of old copper wire scrap
1544Deduction of old Iron scrap
1545Deduction of old GM
1546Labour charges for fitting, rewinding installation and testing of above motor on full load
1547Supply of end cover for above motor
1548Supply of fan for above motor
1549Dismantling and fitting of end cover
1550Varnishing for above overheat Motor
1551Complete Rewinding of Rotor for above motor
1552Transportation and labourcharges for cartage of material from Meerut to Pump house Paun.
1553Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIst Pumping Station under Division Pithoragarh. Motor Wire Atlas
1554Funny
1555Varnish 01Bottle
1556Nomex Paper
1557Sleeve
1558Glass tape
1559Cotton tap
1560Fiber glass tap
1561Copper Lugs (100 Amp)
1562Grease Plate
1563Grease
1564Labour charges for cutting and cleaning of old wire of motor
1565Deduction of old copper wire scrap
1566Motor Varnshing
1567MS Coupling
1568Motor greasing
1569Rubber coupling
1570Coupling Nut Bolt
1571Connection Plate
1572Rotor shaft lock
1573Rotor Varnishing
1574Repair end cover
1575Rotor shaft repair
1576Shaft Lock
1577Motor fan
1578Complete Motor cartage road head to pump house.
1579Labour charges for fitting, rewinding installation and testing of above motor on full load
1580Supply of end cover for above motor
1581Supply of fan for above motor
1582Dismantling and fitting of end cover
1583Varnishing for above overheat Motor
1584Complete Rewinding of Rotor forabove motor
1585material
1586Complete Rewinding of Stators winding of ABBMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Paun StageIInd Pumping Station under Division Pithoragarh. Motor Wire Atlas
1587Funny
1588Varnish
1589Nomex Paper
1590Sleeve
1591Glass tape
1592Cotton tap
1593Fiber glass
1594Copper Lugs (100 Amp)
1595Grease Plate
1596Grease
1597Labour charges for cutting and cleaning of old wire of motor
1598Deduction of old copper wire scrap
1599Fiber glass cloth paper
1600Repair of end cover
1601Deduction of old Iron scrap
1602Deduction of old GM
1603Connection plate
1604Rotor shaft lock
1605S/O End Cover
1606Repair of end cover
1607Rotor shaft repair
1608Shaft lock
1609Supply of Motor Fan
1610Motor Fan
1611Bearing Bracket
1612Suction repairing
1613Delivery Repairing
1614Complete Motor cartage roas head to pump house.
1615Labour charges for fitting, rewinding installation and testing of above motor on full load
1616Supply of end cover for above motor
1617Supply of fan for above motor
1618Dismantling and fitting of end cover
1619Varnishing for above overheat Motor
1620Complete Rewinding of Rotor for above motor
1621Transportation and labourcharges for cartage of material from road head to pump house.
1622Complete Rewinding of Stators winding of NGEF Make/ ABB Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas
1623Funny
1624Varnish
1625Nomex Paper
1626Sleeve
1627Glass tape
1628Cotton tap
1629Fiber glass
1630Bearing
1631Labour charges for cutting and cleaning of old wire of motor
1632Deduction of old copper wire scrap
1633Deduction of old Iron scrap
1634Deduction of old GM
1635Labour charges for fitting, rewinding installation and testing of above motor on full load
1636Repairing of end cover for above motor
1637Supply of fan for above motor
1638Dismantling and fitting of end cover
1639Copper Lugs
1640Varnishing for above overheat Motor
1641Complete Rewinding of Rotor dor above motor
1642Greasing for above motor pump set
1643Transportation and labourcharges for cartage of material from road head to pump house.
1644Roter Shaft Repairing
1645Complete Rewinding of Stators winding of Jyoti Make 30 HP, 3 Phase, AC induction Motor (1465 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Raw water Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas
1646Funny
1647Varnish
1648Nomex Paper
1649Sleeve
1650Glass tape
1651Cotton tap
1652Fiber glass
1653Bearing
1654Labour charges for cutting and cleaning of old wire of motor
1655Deduction of old copper wire scrap
1656Deduction of old Iron scrap
1657Deduction of old GM
1658Labour charges for fitting, rewinding installation and testing of above motor on full load
1659Repairing of end cover for above motor
1660Supply of fan for above motor
1661Dismantling and fitting of end cover
1662Copper Lugs (100 Amp)
1663Varnishing for above overheat Motor
1664Complete Rewinding of Rotor dor above motor
1665Greasing for above motor pump set
1666Transportation and labourcharges for cartage of material from road head to pump house.
1667Complete Rewinding of Stators winding of ABBMake 150 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Clearwater Ghat Pumping Station under Division Pithoragarh. Motor Wire Atlas
1668Funny
1669Varnish
1670Nomex Paper
1671Sleeve
1672Glass tape
1673Cotton tap
1674Fiber glass
1675Grease Plate
1676Labour charges for cutting and cleaning of old wire of motor
1677Deduction of old copper wire scrap
1678Labour charges for fitting, rewinding installation and testing of above motor on full load
1679Repairing of end cover for above motor
1680Supply of fan for above motor
1681Dismantling and fitting of end cover
1682Deduction of old Iron scrap
1683Deduction of old GM
1684Bearing
1685Grease
1686Ranga
1687Rotor cleaning & varnishing
1688End cover Bearing
1689Diffuser
1690Copper Lugs (225 Amp)
1691Varnishing for above overheat Motor
1692Complete Rewinding of Rotor dor above motor
1693Greasing for above motor pump set
1694Transportation and labourcharges for cartage of material from road head to pump house.
1695Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Matela Pumping Station under Division Pithoragarh. Motor Wire Atlas
1696Funny
1697Varnish
1698Nomex Paper
1699Sleeve
1700Glass tape
1701Cotton tap
1702Fiber glass
1703Grease Plate
1704Mobil Oil
1705Labour charges for cutting and cleaning of old wire of motor
1706Deduction of old copper wire scrap
1707Deduction of old Iron scrap
1708Deduction of old GM
1709Labour charges for fitting, rewinding installation and testing of above motor on full load
1710Repairing of end cover for above motor
1711Supply of fan for above motor
1712Dismantling and fitting of end cover
1713Copper Lugs (300 Amp)
1714Varnishing for above overheat Motor
1715Complete Rewinding of Rotor for above motor
1716Greasing for above motor pump set
1717Transportation and labourcharges for cartage of material from road head to pump house.
1718Complete Rewinding of Stators winding of ABBMake 400 HP, 3 Phase, AC induction slip ring Motor (1485 RPM) including supply of all material as super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GurnaPumping Station under Division Pithoragarh. Motor Wire Atlas
1719Funny
1720Varnish
1721Nomex Paper
1722Sleeve
1723Glass tape
1724Cotton tap
1725Fiber glass
1726Grease Plate
1727Mobil Oil
1728Labour charges for cutting and cleaning of old wire of motor
1729Deduction of old copper wire scrap
1730Deduction of old Iron scrap
1731Deduction of old GM
1732Copper Lugs (300 Amp)
1733Labour charges for fitting, rewinding, installation and testing of above motor on full load
1734Repairing of end cover for above motor
1735Supply of fan for above motor
1736Dismantling and fitting of end cover
1737Varnishing for above overheat Motor
1738Complete Rewinding of Rotor dor above motor
1739Greasing for above motor pump set
1740Transportation and labourcharges for cartage of material from road head to pump house.
1741Complete Rewinding of Stators winding of ABB Make 125 HP, 3 Phase, AC induction Motor (1450 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at Hanuman Mandir Pumping Station under Division Pithoragarh. Motor Wire Atlas
1742Funny
1743Varnish
1744Nomex Paper
1745Sleeve
1746Glass tape
1747Cotton tap
1748Fiber glass
1749Grease Plate
1750Mobil Oil
1751Labour charges for cutting and cleaning of old wire of motor
1752Deduction of old copper wire scrap
1753Deduction of old Iron scrap
1754Deduction of old GM
1755Copper Lugs (300 Amp)
1756Labour charges for fitting, rewinding, installation and testing of above motor on full load
1757Repairing of end cover for above motor
1758Labour charges for fitting, rewinding installation and testing of above motor on full load
1759Supply of fan for above motor
1760Dismantling and fitting of end cover
1761Varnishing for above overheat Motor
1762Complete Rewinding of Rotor dor above motor
1763Transportation and labourcharges for cartage of material from road head to pump house.
1764Complete Rewinding of Stators winding of KirloaskarMake 25 HP, 3 Phase, AC induction Motor (2900 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas
1765Funny
1766Varnish
1767Nomex Paper
1768Sleeve
1769Glass tape
1770Cotton tap
1771Fiber glass
1772Copper Lugs (50 Amp)
1773Motor Sheet
1774Motor Cover
1775Motor Fan
1776Champion Packing
1777Grease Plate
1778Grease
1779Supply of end cover for above motor
1780Deduction of old copper wire scrap
1781Deduction of old Iron scrap
1782Deduction of old GM
1783Labour charges for cutting and cleaning of old wire of motor
1784Labour charges for fitting, rewinding, installation and testing of above motor on full load
1785Transportation and labourcharges for cartage of material from road head to pump house.
1786Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot Ist StagePumping Station under Division Pithoragarh. Motor Wire Atlas
1787Funny
1788Varnish
1789Nomex Paper
1790Sleeve
1791Glass tape
1792Cotton tap
1793Fiber glass
1794Copper Lugs (50 Amp)
1795Motor Sheet
1796Motor Cover
1797Motor Fan
1798Champion Packing
1799Bearing 6311
1800Grease Plate
1801Grease
1802Supply of end cover for above motor
1803Labour charges for cutting and cleaning of old wire of motor
1804Deduction of old copper wire scrap
1805Deduction of old Iron scrap
1806Deduction of old GM
1807Labour charges for fitting, rewinding, installation and testing of above motor on full load
1808Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load.
1809Transportation and labourcharges for cartage of material from road head to pump house.
1810Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage Ist under Division Pithoragarh.
1811Complete Rewinding of Stators winding of KirloaskarMake 30 HP, 3 Phase, AC induction Motor (2940 RPM) Squirrel cage Induction Motor at Bankot IIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas
1812Funny
1813Varnish
1814Nomex Paper
1815Sleeve
1816Glass tape
1817Cotton tap
1818Fiber glass
1819Copper Lugs (50 Amp)
1820Motor Sheet
1821Motor Cover
1822Motor Fan
1823Champion Packing
1824Bearing 6311
1825Grease Plate
1826Grease
1827Supply of end cover for above motor
1828Deduction of old copper wire scrap
1829Deduction of old Iron scrap
1830Deduction of old GM
1831Labour charges for cutting and cleaning of old wire of motor
1832Labour charges for fitting, rewinding, installation and testing of above motor on full load
1833Dismentelling Assembling of Motorfitting of supplied bearing accurate alignment & testing of motor on full load.
1834Transportation and labourcharges for cartage of material from road head to pump house.
1835Complete repairing of Roter 30 HP Kirloskar Make 2940 RPM, 3 Phase, Squirrel cage Induction Motor at Bankot Pumping Stage IInd under Division Pithoragarh.
1836Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIstStagePumping Station under Division Pithoragarh. Motor Wire Atlas
1837Funny
1838Varnish
1839Nomex Paper
1840Sleeve
1841Glass tape
1842Cotton tap
1843Fiber glass
1844Grease Plate
1845Labour charges for cutting and cleaning of old wire of motor
1846Deduction of old copper wire scrap
1847Deduction of old Iron scrap
1848Deduction of old GM
1849Labour charges for fitting, rewinding, installation and testing of above motor on full load
1850Supply of end cover for above motor
1851Supply of fan cover
1852Dismenteling and fitting of end cover
1853Varnishing for above overheat Motor
1854Complete rewinding of Rotor for above motor
1855Greasing for above motor pump set
1856Copper Lugs ( 300 Amp)
1857Transportation and labourcharges for cartage of material from road head to pump house.
1858Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIndStagePumping Station under Division Pithoragarh. Motor Wire Atlas
1859Funny
1860Varnish
1861Nomex Paper
1862Sleeve
1863Glass tape
1864Cotton tap
1865Fiber glass
1866Grease Plate
1867Labour charges for cutting and cleaning of old wire of motor
1868Deduction of old copper wire scrap
1869Deduction of old Iron scrap
1870Deduction of old GM
1871Labour charges for fitting, rewinding, installation and testing of above motor on full load
1872Supply of end cover for above motor
1873Supply of fan cover
1874Dismenteling and fitting of end cover
1875Varnishing for above overheat Motor
1876Complete rewinding of Rotor for above motor
1877Greasing for above motor pump set
1878Copper Lugs ( 300 Amp)
1879Transportation and labourcharges for cartage of material from road head to pump house.
1880Complete Rewinding of Stators winding of ABBMake 300 HP, 3 Phase, AC induction Motor (1486 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at GangolihatIIIrdStagePumping Station under Division Pithoragarh. Motor Wire Atlas
1881Funny
1882Varnish
1883Nomex Paper
1884Sleeve
1885Glass tape
1886Cotton tap
1887Fiber glass
1888Grease Plate
1889Labour charges for cutting and cleaning of old wire of motor
1890Deduction of old copper wire scrap
1891Deduction of old Iron scrap
1892Deduction of old GM
1893Labour charges for fitting, rewinding, installation and testing of above motor on full load
1894Supply of end cover for above motor
1895Supply of fan cover
1896Dismenteling and fitting of end cover
1897Varnishing for above overheat Motor
1898Complete rewinding of Rotor for above motor
1899Greasing for above motor pump set
1900Copper Lugs ( 300 Amp)
1901Transportation and labourcharges for cartage of material from road head to pump house.
1902Complete Rewinding of Stators winding of JyotiMake 15 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at FutsilPumping Station Gangolihat under Division Pithoragarh. Motor Wire Atlas
1903Funny
1904Varnish
1905Nomex Paper
1906Sleeve
1907Glass tape
1908Cotton tap
1909Fiber glass
1910Grease Plate
1911Grease
1912Labour charges for cutting and cleaning of old wire of motor
1913Deduction of old copper wire scrap
1914Deduction of old Iron scrap
1915Deduction of old GM
1916Copper Lugs (Amp)
1917Labour charges for fitting, rewinding, installation and testing of above motor on full load
1918Supply of end cover for above motor
1919Supply of fan cover
1920Dismenteling and fitting of end cover
1921Varnishing for above overheat Motor
1922Complete rewinding of Rotor for above motor
1923Greasing for above motor pump set
1924Transportation and labourcharges for cartage of material from road head to pump house.
1925Complete Rewinding of Stators winding of ABBMake 100 HP, 3 Phase, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete in all respect at MarsoliPumping Stationunder Division Pithoragarh. Motor Wire Atlas
1926Funny
1927Varnish
1928Nomex Paper
1929Sleeve
1930Glass tape
1931Cotton tap
1932Fiber glass
1933Bearing 6316 C3 (DE)
1934Bearing 6316 C3 (DE)
1935Grease Plate
1936Labour charges for cutting and cleaning of old wire of motor
1937Deduction of old copper wire scrap
1938Deduction of old Iron scrap
1939Deduction of old GM
1940Copper Lugs (Amp)
1941Labour charges for fitting, rewinding, installation and testing of above motor on full load
1942Supply of end cover for above motor
1943Supply of fan cover
1944Dismenteling and fitting of end cover
1945Varnishing for above overheat Motor
1946Complete rewinding of Rotor for above motor
1947Greasing for above motor pump set
1948Transportation and labourcharges for cartage of material from road head to pump house.
1949Complete rewinding of Stators winding of Kirloskar Make 15HP 3 Phasse, AC induction Motor (2910 RPM) including supply of super enameld copper winding wire, insulating material, connection lead & packing material complete all respect at Hudeti Pumping Station under Division Pithoragarh. Motor Wore Atlas
1950Funny
1951Varnish
1952Nomex Paper
1953Sleeve
1954Glass Tape
1955Cotton Tape
1956Fiber Glass
1957Grease Plate
1958Grease
1959Labour charges for cutting and cleaning of old wore of motor
1960Deduction of old copper wire
1961Deduction of old Iron scrap
1962Deduction of old GM
1963Copper Lugs (50 Amp)
1964Labour charges for fitting, rewinding, installation and testing of above motor on full load
1965Supply of end cover for above motor
1966Supply of fan for above motor
1967Dismantelling and fitting of end cover
1968Varnishing for above over heat motor
1969Complete rewinding of Rotor for above motor
1970Greasing for above motor pump set
1971Transportation and labour charges for cartge of material from road head to pump house distance 150 Meter
1972Other Parts Main Switch 200 Amp
1973Main Switch 250 Amp
1974Main Switch 125 Amp
1975Complete overhaulling OCB
1976Complete overhaulling of ACB 600 Amp
1977Complete overhaulling of ACB 1200 Amp
1978HRC Fuse 100 Amp
1979HRC Fuse 250 Amp
1980Clamp Brass 1000 Amp
1981Complete overhaulling of Kilbarn Make Starter with all spare parts
1982Valve repairingwork 60 to 400 HP
1983Valve repairing work 15 to 30 HP
1984Annual Maintenance Work
1985Copper Lugs 50 Amp
1986Copper Lugs 95 Amp
1987Copper Lugs 120 Amp
1988Copper Lugs150 Amp
1989Copper Lugs 200 Amp
1990Copper Lugs 300 Amp
1991Copper Lugs 400 Amp
1992Volt Meter
1993Amp Meter
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail