| 1 | (Gate No.1) |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge, Ordinary soil. |
| 3 | Brick on edge flooring with bricks of class designation 7.5 on a bed of12 mm cement mortar, including filling the joints with same mortar, withcommon burnt clay non modular bricks: In Prop.1:6 |
| 4 | Providing and laying in position cement concrete of specified grade excluding. In Prop.1:3:6 |
| 5 | (Gable wall Academic Part.I 2nd floor) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars. |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 8 | Providing and laying in position specified grade of reinforced cement oncrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from naturalsources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 9 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. |
| 10 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) |
| 11 | Providing and applying white cement based wall putty ( Berger/ JK/ Birla) of average thickness1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 12 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade. New work ( Two or more coats ) over and including water thinnable priming coats with distemperprimer |
| 13 | (Girls hostel 1st & 2nd floor\" near Common room & Warden room) |
| 14 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars. |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 16 | Providing and laying in position specified grade of reinforced cement oncrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from naturalsources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 17 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. |
| 18 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: In prop:1:6 |
| 19 | 12 mm cement plaster of mix : 1:6 (In Prop:-1 cement: 6 fine sand) |
| 20 | Finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade New work ( Two or more coats ) applied @ 1.43 lits/ 10 sqm over and includingpriming coats exterior primer applied @ 2.20 kg/10 sqm. |
| 21 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion,(i) Single socketed pipes. 75 mmdia. |