Rural Development And Panchayats Department has published Tender For Construction Of Bicycle Shelter At Pum School Periyakuthagai In Ayakkaranpulam 1 Panchayat.. Submission Date for this Tender is 26-10-2023. PEB Tenders in vedaranyam Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Construction of Bicycle Shelter @ PUM School Periyakuthagai in Ayakkaranpulam 1 Panchayat. |
2 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation etc., complete |
3 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for fillingetc.complete, |
4 | Cement concrete 1:4:8 mix (one cement four sand and Eight hard broken stone) using 40mm ISSHBG metal etc., complete. |
5 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyanceetc., complete. Upto basement |
6 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement |
7 | Cement concrete 1:2:4 mix (one cement four sand and Eight hard broken stone) using 40mm ISSHBG metal etc., complete. |
8 | Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., for Shuttering. |
9 | Supply and fabrication of steel including cost and conveyance of steels to worksite including labour charges etc., complete. |
10 | Supply of Truss Materials |
11 | Supplying and fixing colour coated galvanised sheet for roofing including all labour charges for fixing necessary bolts, nuts, screws etc., complete |
12 | Labour Charge for Pipes & Trusses |
13 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 18% for other than Earth Quantity |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail