Power Development Department has published Supply, Installation, Testing And Commissioning Of 63-Kva Substations At Kharipora Parigam &Sirnoo Road (Bridge) Dalipora Road Pulwama And Installation, Testing And Commissioning Of 25-Kva, 63-Kva Substations At Circular Road Near Malikpora Link Road Cros. Submission Date for this Tender is 23-10-2023. Substation Tenders in pulwama Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply, Installation, Testing & commissioning of11/0.433kV, 3-phase, 63KVADistribution Transformer with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, andwith LV Cable Box having detachable Aluminium Gland plate. Transformer should have arrangement for vertical Take off |
2 | Installation, Testing & commissioning of11/0.433kV, 3-phase, 63KVADistribution Transformer with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, andwith LV Cable Box having detachable Aluminium Gland plate. Transformer should have arrangement for vertical Take off |
3 | Installation, Testing & commissioning of 11/0.433kV, 3-phase, 25KVADistribution Transformer with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, andwith LV Cable Box having detachable Aluminium Gland plate. Transformer should have arrangement for vertical Take off |
4 | Installation, Testing & commissioning of9 Mtr. Long Pole(ST-410 SP33) |
5 | Supply, Installation, Testing & commissioning of 8 Mtr. Long Pole(ST-410 SP15) |
6 | Installation, Testing & commissioning ofACSR 0.05 Conductor (50 mm² ACSR Conductor) |
7 | Installation, Testing & commissioning ofMucki clamps/LT Shackles with insulators |
8 | Installation, Testing & commissioning ofG I Channel/Angle/Flat iron for cross,braces of sizes including clamps and GI Nut Bolts |
9 | Installation, Testing & commissioning of Fabricated GI iron (75x40x6mm) V-Cross Arm with Top Pin Holder. |
10 | Installation, Testing & commissioning of11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
11 | Installation, Testing & commissioning of11 kV Horn Gap Fuse Set 3 Phase 200A |
12 | Installation, Testing & commissioning of11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
13 | Installation, Testing & commissioning ofGapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type |
14 | Installation, Testing & commissioning of185 mm2 Single Phase Cable,1.1K V Grade, PVC Insulated Stranded Conductor FRLS type |
15 | Installation, Testing & commissioning ofLT Fuse set |
16 | Earthing of substation --Excavation of earth pit ofdia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
17 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip. |
18 | Painting of Poles Red Oxide |
19 | Painting of Poles Aluminium Paint |
20 | Cement bottoming of poles 1:2:4 mix as per REC standards .5cum /pole |
21 | Cement bottoming of poles 1:2:4 mix as per REC standards 0.45cum /pole |
22 | Providing of Danger Plates with Clamps for 9 meter HT Poles |
23 | computerized site plan of work"sdepicting complete details of works along with land marks on 12X18 inch good qualitypaper sheet |
24 | GEO tagged photographs ofsize not less than 8x6 incheson good quality photopaper (along with soft copy ). |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail