Tender For Strengthening The Road From Puthurai - Perambai Road Km 0/0 - 2/00, viluppuram-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Strengthening The Road From Puthurai - Perambai Road Km 0/0 - 2/00. Submission Date for this Tender is 27-10-2023. Road Work Tenders in viluppuram Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

40205387
Corrigendum : Tender For Strengthening The Road From Puthurai - Perambai Road Km 0/0 - 2/00
Open Tender
Indian
Tamil Nadu
viluppuram
27-10-2023

Tender Details

Tender For Strengthening The Road From Puthurai - Perambai Road Km 0 / 0 - 2 / 00; 1 Strengthening The Road From Puthurai - Perambai Road Km 0 / 0 - 2 / 00 2 Clearing The Scrub Jungles Including All Labour Charges For All Labour Charges Etc Complete. 3 Km 0 / 0 - 2 / 0 4 Picking The Existing Damaged Bt Surface To 3 - 5Cm Deep Inccluding All Labour Charges 5 Km 0 / 0 - 2 / 0 6 Earthwork Excavation In All Classes Of Soils Except Hard Rock Requiring Blasting And Depositing On Bank With All Leads And Lifts As Per Ss20a Including Cost Of All Labour Materials, Tools, Equipments And All Incidental Charges And Sheeting, Shoring And Br 7 Km 0 / 0 - 2 / 0 8 Layingus Gravel Including Cost And Conveyance And Stacking At Site To Departmental Gauge For Taking Pre Measurements By Departmental Officers And Including Labour Charges For Spreading The Gravelas Per Standard Specification Etc. Complete. 9 Km 0 / 0 - 1 / 000 10 Km 1 / 0 - 2 / 000 11 Providing And Laying Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam ( Wmm ) Specification Including Premixing The Material With Water At Omc In Machanical Mix Plant Carriage Of Mixed Material By Tipper To Site Laying In Uniform Layers 250Mm Thick With Pavers In Subbase / Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All Other Incidental Charges Etc., Complete. 12 Km 0 / 0 - 1 / 000 13 Km 1 / 0 - 2 / 000 14 Providing And Laying Of Prime Coat Using Emulsion At The Rate Of 7 Kg Per Ten Square Meter Over The Wmm Surface Preparatory To Another Bituminous Construction Over It. 15 Km 0 / 0 - 2 / 0 16 Providing And Laying Tack Coat Over Wmm Surface ( Treated With Primer ) Using 2.5Kg Of Bitumen Emulsion Rs-1For 10Sqm For Preparatory To Another Bituminous Construction Over It Including Cost Of Material, Labour Charges, Rentals For Machinery, Fuel And All 17 Km 0 / 0 - 2 / 0 18 Providing And Laying Bituminious Macadam 50Mm Thick 19 Km 0 / 0 - 2 / 0 20 Bituminous Concrete 25 Mmthick Using Cmp ( Grade-Ii ) Providing And Laying Bituminious Concrete To 40Mm Thick Using 0.13Cum Of 19.00-9.50Mm. 0.17Cum Of 9.5-2.36 And Below With 50.3Kgs Of Vg30 / Vg40 Heating The Bitumen And Aggregates To Required Temperature And Mixing Them In Required Temperature In Central Hot Mix Plant 20-30 Ton Capacity, Carrying The Mix By Tipper Trucks To Paver Site, Spreading The Mix To Uniform Thickness Of 40Mm With Mechanical Paver To The Specified Grades And Cross Sections And Consolidated By 8-10 Tonnes Vibratory / Phenumatic Roller To The Required Density Etc., Including Labour For Attending To Paver To Site Etc.Including Hire Charges And Fuel Charges Foe 20-30T Cmp With Bitumen Boiler, Tipper Trucks, Paver Finisher / 9M Paver Finisher, Vibratory / Phenumatic Roller And All Other Tools And Plants Required, Including Fuel And All Other Incidental Charges Etc., Complete As Per Specification Using Cmp As Per Clauses 507 Of Morth Part-5 21 Km 0 / 0 - 2 / 0 22 Provision Of 15 Nos Of Rumble Strips Covered With Premix Bituminous Carpet, 15 - 20 Mm High At Centre, 250 Mm Wide Placed At 1 M Center-To-Centre At Approved Locations To Control Speed, Marked With White Strips Of Road Marking Paint. 23 Km 0 / 0 - 2 / 0 24 Painting Lines, Dashes, Arrows, Etc. On Roads In Two Coatson New Work With Ready Mixed Road Marking Paint Conforming To Is:164 On Bituminous / Concrete Surface, Including Cleaning The Surface Of All Dirt, Dust And Other Foreign Matter, Demarcation At Site And Traffic Control As Per Drawing And Technical Specification Clause 1702Road Marking With Hot Applied Thermoplastic Compound With Reflectorising Glass Beads On Bituminous Surface 25 Provision For 60Cm Equilateral Triangular Sign Board Charges 26 Provision For Km Stone 27 Provision For Hm Stone Of Size 75X23x10cm 28 Provision For Citizen Board Cum Name Board Charges 29 Provision For Photographic Charges 30 Towards The Charges For Routline Maintenance Of The Road Work Executed Under Mgsmt Including Dressing Of Berms By Refilling The Gully With The Earth From Borrow Pits, Cleaning Of Wild Seasonal Growth On Berms, Destilting Of Side Drains And Cd Works, White Washing Guard Stones, Painting Of Km, Hm Stones, Parapets, Cutting Of Branches Of Trees, Refixing Displaced Guard Stones, Caution Boards, Speed Limit Boards Etc., With The Periodicity For The Above Activities As Prescribed In Irc-Sp-20:2002 And As Directed By The Departmental Officers Except For The Constructional Defects Which Has To Be Rectified By The Contractor At His Own Cost For Carriageway Width Of 3.00M & 3.75M 31 For The First Year From The Date Of Completion Of Work 32 For The Second Year From The Date Of Cpmpletion Of Work 33 For The Third Year From The Date Of Completion Of Work 34 For The Fourth Year From The Date Of Completion Of Work 35 For The Fifth Year From The Date Of Completion Of Work 36 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 17-Oct-2023 BOQ Correction BOQ 27-10-2023

Key Value

Document Fees
Refer document
EMD
INR 79000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Strengthening the road from Puthurai - Perambai Road Km 0/0 - 2/00
Sl. No. Item Description
1Strengthening the road from Puthurai - Perambai Road Km 0/0 - 2/00
2Clearing the scrub jungles including all labour charges for all labour charges etc complete.
3Km 0/0 - 2/0
4Picking the existing damaged BT surface to 3 - 5cm deep inccluding all labour charges
5Km 0/0 - 2/0
6Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br
7Km 0/0 - 2/0
8LayingUS GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravelas per standard specification etc. complete.
9Km 0/0 - 1/000
10Km 1/0 - 2/000
11Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
12Km 0/0 - 1/000
13Km 1/0 - 2/000
14Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
15Km 0/0 - 2/0
16Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
17Km 0/0 - 2/0
18Providing and laying Bituminious macadam 50mm thick
19Km 0/0 - 2/0
20BITUMINOUS CONCRETE 25 MMTHICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
21Km 0/0 - 2/0
22Provision of 15 nos of rumble strips covered with premix bituminous carpet, 15 - 20 mm high at centre, 250 mm wide placed at 1 m center-to-centre at approved locations to control speed, marked with white strips of road marking paint.
23Km 0/0 - 2/0
24Painting lines, dashes, arrows, etc. on roads in two coatson new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
25Provision for 60cm Equilateral Triangular sign board charges
26Provision for KM stone
27Provision for HM stone of size 75x23x10cm
28Provision for Citizen board cum name board charges
29Provision for photographic charges
30Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
31For the First Year from the date of completion of work
32For the Second Year from the date of cpmpletion of work
33For the Third Year from the date of completion of work
34For the Fourth Year from the date of completion of work
35For the Fifth Year from the date of completion of work
36GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail