Tender For Underground Lt Overhead Line In Edd-1 Azamgarh, Azamgarh-Uttar Pradesh

Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Underground Lt Overhead Line In Edd-1 Azamgarh. Submission Date for this Tender is 19-10-2023. Overhead Line Tenders in Azamgarh Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

40179133
Corrigendum : Tender For Underground Lt Overhead Line In Edd-1 Azamgarh
Open Tender
Indian
Uttar Pradesh
Azamgarh
19-10-2023

Tender Details

Underground Lt Overhead Line In Edd-1 Azamgarh-2 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Bp4952 ) 3 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Bp5095 ) 4 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Bp5095 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 5 Digging Of Trench And Restoration - ( Project No-Pube.Az.Bp5095 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 6 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Bp5095 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 7 Internel Wiring Of Panel - ( Project No-Pube.Az.Bp5095 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 8 Repairing Of A Type Panel - ( Project No-Pube.Az.Bp5095 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 9 Repairing Of B Type Panel - ( Project No-Pube.Az.Bp5095 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 10 Repairing Of C Type Panel - ( Project No-Pube.Az.Bp5095 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 11 Rrr Of A Type Panel - ( Project No-Pube.Az.Bp5095 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 12 Rrr Of B Type Panel - ( Project No-Pube.Az.Bp5095 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 13 Rrr Of C Type Panel - ( Project No-Pube.Az.Bp5095 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 14 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Bp5096 ) 15 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Bp5096 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 16 Digging Of Trench And Restoration - ( Project No-Pube.Az.Bp5096 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 17 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Bp5096 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 18 Internel Wiring Of Panel - ( Project No-Pube.Az.Bp5096 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 19 Repairing Of A Type Panel - ( Project No-Pube.Az.Bp5096 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 20 Repairing Of B Type Panel - ( Project No-Pube.Az.Bp5096 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 21 Repairing Of C Type Panel - ( Project No-Pube.Az.Bp5096 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 22 Rrr Of A Type Panel - ( Project No-Pube.Az.Bp5096 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 23 Rrr Of B Type Panel - ( Project No-Pube.Az.Bp5096 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 24 Rrr Of C Type Panel - ( Project No-Pube.Az.Bp5096 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 25 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Bp5101 ) 26 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Bp5101 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 27 Digging Of Trench And Restoration - ( Project No-Pube.Az.Bp5101 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 28 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Bp5101 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 29 Internel Wiring Of Panel - ( Project No-Pube.Az.Bp5101 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 30 Repairing Of A Type Panel - ( Project No-Pube.Az.Bp5101 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 31 Repairing Of B Type Panel - ( Project No-Pube.Az.Bp5101 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 32 Repairing Of C Type Panel - ( Project No-Pube.Az.Bp5101 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 33 Rrr Of A Type Panel - ( Project No-Pube.Az.Bp5101 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 34 Rrr Of B Type Panel - ( Project No-Pube.Az.Bp5101 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 35 Rrr Of C Type Panel - ( Project No-Pube.Az.Bp5101 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 36 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si4909 ) 37 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si4932 ) 38 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si4973 ) 39 Basbar Maintenance In Side Panel ( Project No-Pube.Az.Si5066 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 40 Digging Of Trench And Restoration ( Project No-Pube.Az.Si5066 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 41 Erection & Laying Of Lt Cable ( Project No-Pube.Az.Si5066 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 42 Internel Wiring Of Panel ( Project No-Pube.Az.Si5066 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 43 Repairing Of A Type Panel ( Project No-Pube.Az.Si5066 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 44 Repairing Of B Type Panel ( Project No-Pube.Az.Si5066 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 45 Repairing Of C Type Panel ( Project No-Pube.Az.Si5066 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 46 Rrr Of A Type Panel ( Project No-Pube.Az.Si5066 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 47 Rrr Of B Type Panel ( Project No-Pube.Az.Si5066 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 48 Rrr Of C Type Panel ( Project No-Pube.Az.Si5066 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 49 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5072 ) 50 Basbar Maintenance In Side Panel ( Project No-Pube.Az.Si5072 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 51 Digging Of Trench And Restoration ( Project No-Pube.Az.Si5072 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 52 Erection & Laying Of Lt Cable ( Project No-Pube.Az.Si5072 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 53 Internel Wiring Of Panel ( Project No-Pube.Az.Si5072 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 54 Repairing Of A Type Panel ( Project No-Pube.Az.Si5072 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 55 Repairing Of B Type Panel ( Project No-Pube.Az.Si5072 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 56 Repairing Of C Type Panel ( Project No-Pube.Az.Si5072 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 57 Rrr Of A Type Panel ( Project No-Pube.Az.Si5072 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 58 Rrr Of B Type Panel ( Project No-Pube.Az.Si5072 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 59 Rrr Of C Type Panel ( Project No-Pube.Az.Si5072 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 60 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5073 ) 61 Basbar Maintenance In Side Panel ( Project No-Pube.Az.Si5073 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 62 Digging Of Trench And Restoration ( Project No-Pube.Az.Si5073 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 63 Erection & Laying Of Lt Cable ( Project No-Pube.Az.Si5073 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 64 Internel Wiring Of Panel ( Project No-Pube.Az.Si5073 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 65 Repairing Of A Type Panel ( Project No-Pube.Az.Si5073 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 66 Repairing Of B Type Panel ( Project No-Pube.Az.Si5073 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 67 Repairing Of C Type Panel ( Project No-Pube.Az.Si5073 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 68 Rrr Of A Type Panel ( Project No-Pube.Az.Si5073 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 69 Rrr Of B Type Panel ( Project No-Pube.Az.Si5073 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 70 Rrr Of C Type Panel ( Project No-Pube.Az.Si5073 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 71 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5079 ) 72 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5079 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 73 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5079 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 74 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5079 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 75 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5079 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 76 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5079 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 77 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5079 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 78 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5079 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 79 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5079 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 80 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5079 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 81 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5079 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 82 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5092 ) 83 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5092 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 84 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5092 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 85 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5092 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 86 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5092 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 87 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5092 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 88 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5092 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 89 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5092 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 90 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5092 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 91 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5092 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 92 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5092 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 93 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5093 ) 94 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5093 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 95 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5093 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 96 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5093 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 97 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5093 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 98 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5093 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 99 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5093 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 100 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5093 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 101 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5093 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 102 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5093 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 103 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5093 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 104 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5104 ) 105 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5104 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 106 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5104 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 107 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5104 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 108 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5104 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 109 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5104 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 110 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5104 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 111 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5104 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 112 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5104 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 113 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5104 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 114 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5104 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 115 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5107 ) 116 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5107 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 117 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5107 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 118 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5107 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 119 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5107 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 120 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5107 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 121 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5107 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 122 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5107 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 123 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5107 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 124 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5107 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 125 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5107 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 126 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5108 ) 127 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5108 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 128 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5108 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 129 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5108 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 130 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5108 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 131 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5108 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 132 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5108 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 133 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5108 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 134 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5108 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 135 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5108 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 136 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5108 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 137 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5110 ) 138 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5110 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 139 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5110 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 140 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5110 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 141 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5110 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 142 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5110 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 143 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5110 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 144 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5110 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 145 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5110 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 146 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5110 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 147 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5110 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 148 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5142 ) 149 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5142 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 150 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5142 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 151 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5142 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 152 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5142 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 153 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5142 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 154 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5142 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 155 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5142 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 156 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5142 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 157 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5142 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 158 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5142 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 159 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5143 ) 160 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5143 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 161 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5143 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 162 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5143 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 163 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5143 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 164 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5143 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 165 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5143 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 166 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5143 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 167 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5143 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 168 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5143 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 169 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5182 ) 170 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5182 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 171 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5182 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 172 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5182 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 173 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5182 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 174 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5182 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 175 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5182 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 176 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5182 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 177 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5182 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 178 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5182 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 179 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5182 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 180 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5183 ) 181 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5183 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 182 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5183 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 183 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5183 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 184 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5183 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 185 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5183 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 186 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5183 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 187 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5183 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 188 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5183 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 189 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5183 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 190 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5183 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 191 Cartage & Erection Charges ( Of Materials As Uploaded In Tender, Project Wise Material To Be Erected As Uploaded In Tender ) ( Project N0-Pube.Az.Si5185 ) 192 Basbar Maintenance In Side Panel - ( Project No-Pube.Az.Si5185 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 193 Digging Of Trench And Restoration - ( Project No-Pube.Az.Si5185 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 194 Erection & Laying Of Lt Cable - ( Project No-Pube.Az.Si5185 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 195 Internel Wiring Of Panel - ( Project No-Pube.Az.Si5185 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 196 Repairing Of A Type Panel - ( Project No-Pube.Az.Si5185 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 197 Repairing Of B Type Panel - ( Project No-Pube.Az.Si5185 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 198 Repairing Of C Type Panel - ( Project No-Pube.Az.Si5185 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 199 Rrr Of A Type Panel - ( Project No-Pube.Az.Si5185 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 200 Rrr Of B Type Panel - ( Project No-Pube.Az.Si5185 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate ) 201 Rrr Of C Type Panel - ( Project No-Pube.Az.Si5185 ) ( Labor Charges And Required Material For Maintainance Must Be Included In Quoted Rate )

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 12-10-2023 Tender fee Fee 19-10-2023

Key Value

Document Fees
INR 5900 /-
EMD
INR 138000.0 /-
Tender Value
INR 1.38 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail