Tender For In The Business Plan 2023-24 (20 Crores) In Power Distribution Division-First, Baraut, For The Works Like Capacity Enhancement/Installation Of Distribution Transformers, Line Construction And Installation Of Vcb Etc. On Semi Turnkey Basis.
Tender Overview
Project Description
Tender For In The Business Plan 2023-24 ( 20 Crores ) In Power Distribution Division-First, Baraut, For The Works Like Capacity Enhancement / Installation Of Distribution Transformers, Line Construction And Installation Of Vcb Etc. On Semi Turnkey Basis.-Pcc / Stp Pole / Converter And Other Line Material Received From Centralized Material Mandar Center Baghpat / Baraut / Meerut. Transport Work To Work Site ( Including Loading And Unloading ) - 400 Kva Converter 250 Kva Converter 100 Kva Converter 63 Kva Converter 25 Kva Converter Pcc Pole 8.5 Meter St Pole 11 Meter Acsr Weasel Conductor Asr Rabbit Conductor Ab Conductor 3X50 + 1X35 + 1X16 Sqmm Ab Conductor 3X95+1X70+1X16 Sqmm 11 Kv X0 Lpe Cable ( 3X185 Mm ) 11Kv Pin Insulator With Fittings 11 Kv Disc Insulator With Fittings 11Kv Outgoing Vcb 200 / 100 / 5A 11Kv Outgoing Vcb Ctr 200 / 100 / 5A 11Kv Outgoing Vcb 300 / 150 / 5A 11Kv Incoming Vcb 600 / 300 / 5A Pole By Digging Pit For Construction Of Dilapidated / Long Span / New Line The Act Of Installing. Pcc Pole 8.5 Meter St Pole 11 Meter Laying Of Conductors On Poles Erected For Dilapidated / Long Span / New Line Construction. A.S.S.R. Electrical Conductor Acsr Rabbit Conductor Ab0 Conductor 3X50+1X35+1X16 Sqmm Ab Conductor 3X95+1X70+1X16 Sqmm Laying Work. 11Kv Pin Insulator With Fittings Installation Work Of 11 Kv Disc Insulator With Fittings. Work Of Commissioning The Line By Installing 400 Kba Converter Trolley To Start The Line By Installing 250 Kba Converter At The Base Work . Installation Work Of 100 Kva Transformer On Double Pole Installation Work Of 63 Kva Transformer On Double Pole Installation Work Of 25 Kva Transformer On Double Pole 11Kv Outgoing Vcb 200 / 100 / 5A In Control Room The Work Of Establishing. 11Kv Outgoing Vcb Ctr 200 / 100 / 5A 11Kv Outgoing Vcb 300 / 150 / 5A 11Kv Incoming Vcb 600 / 300 / 5A The Work Of Digging A Pit For 11 Kv X-Lpe Cable ( 3X185 Mm ) And Making A Loop And Laying The Cable Till The Control Room / Double Pole. Digging Pit For 11 Kv Xlpe Cable ( 3X185 Mm ) And The Work Of Laying The Cable By Making A Loop. Materials To Be Provided By The Tenderer. 11Kv Cable Jointing Kit Outdoor 3.5X70 Sqmm 11Kv Cable Jointing Kit Indoor 3X185 Sqmm 11Kv Cable Jointing Kit Outdoor 3X185 Sqmm | 1X400 Sqmm Cable For Lead 11Kv Xlpe Cable ( 3.5X70sq.Mm ) |11 Kv Fuse Set Ms Venal 125X65x1300 T Off 2 A 125X65x3200 Mm 21 125X65x2240 Mm 2 100X50x2240 Mm Hoyo 75X75x6x2028 Mm For T / F Base Dopper Vane 100X50x2028mm Guarding Angle 75X75x6x1600mm 11 X-Arm Clam With Nutbolt F-Bracket F-Clamp Holding Clamp Dead And Clamp With J-Hook Suspension Clamp With J-Hook I-Hook Lt Distrubution Box 1 Phase With Clamp Lt Distrubution Box 3 Phase With Clamp Lt Schakle Insulator Lt Holding Clamp For Pcc / Stp With Nut Bolt Stay Set Complete Earthing Complete Chemical Earthing For Vcb / T.F Gi Wire 6Swg & 10 Swg For Guarding 24 Volt Battery And Battery Charger Stone Pad Copper Busbar Lt Xlpe Cable Unarmoured 3.5X50 Lt Cable 1X240 Sqmm Earthing Complete For Vcb ( Strip ) 33 Kv Lightening Arrestor 33 Kv Vcb With Double T / F Control Penal & Ct 200 / 100 / 1 A With Structer 33 Kv Post Insulator Control Cable 4X2.5 Sqmm Control Cable 2X2.5 Sqmm Gauting Work Of Polo Along With Necessary Materials. Work Of Making Base For 400 / 250 Kva Converter. Fencing Around The Plinth Of 400 / 250 Kva Transformer. Work . Providing Moving Trolley. Material Provided By The Bidder On Line Installation Work As Per Requirement. 11Kv Cable Splicing Kit Indoor 3X185 Sqmm 11Kv Cable Splicing Kit Outdoor 3X185 Sqmm 1X400 Sqmm Cable For Lead 11Kv Xpe Cable ( 3.5X70sq.Mm ) 11 Kv Fuse Set Ms Venal 125X65x1300 T Off 2 Al 125X65x3200 Mm 125X65x2240 Mm 21 100X50x2240 Mm Dopper Benal 100X50x2028mm Yoyo 75X75x6x2028 Mm For T / F Base If Ya 75X75x6x1600 Mm 11 Dl X-Arm Clam With Nutbolt F-Bracket F-Clamp Holding Clamp Dead And Clamp With J-Hook Suspension Clamp With J-Hook I-Hook Lt Distrubution Box 1 Phase With Clamp Lt Distrubution Box 3 Phase With Clamp Lt Schakle Insulator Lt Holding Clamp For Pcc / Stp With Nut Bolt Stay Set Complete Earthing Complete Chemical Earthing For Vcb / T.F Gi Wire 6 Swg & 10 Swg For Guarding 24 Volt Battery And Battery Charger Stone Pad Copper Busbar Lt Xlpe Cable Unarmoured 3.5X50 Lt Cable 1X240 Sqmm Earthing Complete For Vcb ( Strip ) 33 Kv Lightening Arrestor 33 Kv Vcb With Double T / F Control Penal & Ct 200 / 100 / 1 A With Structer 33 Kv Post Insulator Control Cable 4X2.5 Sqmm Control Cable 2X2.5 Sqmm Fencing Work Of Moving Trolley. Dilapidated And Old Electrical Material Removed From The Work Site The Work Of Delivering Safe Electricity To Mandar Centre. ( Loading Including Unloading ) 100 Kva Converter 250 Kva Converter |11 Kv Vcb Scrap 11 Kv Ctr Scrap | 11 Kv Pin Insulator Scrap 11 Kv Disk Insulator Scrap |11 Kv X-Arm Channel Angle Acsr Dog / Weasel Conductor Old & Use | Lt Ab Cable Old & Use Multiple Scrap
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 18-Oct-2023 | Date extenson78 | Date | 26-Oct-2023 |
| 2 | 26-Oct-2023 | extenddate78 | Date | 27-Oct-2023 |
| 3 | 27-Oct-2023 | Dateextenson78-- | Date | 03-Nov-2023 |
| 4 | 03-Nov-2023 | Dateextenson-78-- | Date | 08-Nov-2023 |
| 5 | 08-Nov-2023 | Dateextenson-78..-- | Date | 10-Nov-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | dsUnzh;d`r lkexzh Hk.Mkj dsUnz ckxir@cMkSr@esjB ls ihlhlh@,lVhih iksy@ifjorZd ,oa vU; ykbZu lkexzh izkIr dj dk;Z LFky rd igqpkus dk dk;ZA ¼yksfMax vuyksfMax lfgr½ |
| 2 | 400 dsoh, ifjorZd |
| 3 | 250 dsoh, ifjorZd |
| 4 | 100 dsoh, ifjorZd |
| 5 | 63 dsoh, ifjorZd |
| 6 | 25 dsoh, ifjorZd |
| 7 | ihlhlh iksy 8-5 ehVj |
| 8 | ,l0Vh0 iksy 11 ehVj |
| 9 | ,lh,lvkj ohty dUVDVj |
| 10 | ,0lh0,l0vkj0 jsfcV dUMDVj |
| 11 | ,0ch0 dUMDVj 3x50+1x35+1x16 sqmm |
| 12 | ,0ch0 dUMDVj 3x95+1x70+1x16 sqmm |
| 13 | 11 dsoh ,Dl0,y0ih0bZ0 dsfcy¼3x185 mm) |
| 14 | 11 dsoh fiu bUlqysVj QhfVax lfgr |
| 15 | 11 dsoh fMLd bUlqysVj QhfVax lfgr |
| 16 | 11 dsoh vkmVxksabZx ohlhch 200@100@5 , |
| 17 | 11 dsoh vkmVxksabZx ohlhch lhVhvkj 200@100@5 , |
| 18 | 11 dsoh vkmVxksabZx ohlhch 300@150@5 , |
| 19 | 11 dsoh budfeax ohlhch 600@300@5 , |
| 20 | ttZj@yEcs LiSu@ubZ ykbZu fuekZ.k gsrq x< |
| 21 | ihlhlh iksy 8-5 ehVj |
| 22 | ,l0Vh0 iksy 11 ehVj |
| 23 | ttZj@yEcs LiSu@ubZ ykbZu fuekZ.k gsrq [kMs fd;s x;s iksyks ij dUMDVj fcNkus dk dk;ZA |
| 24 | ,0lh0,l0vkj0 ohty dUVDVj |
| 25 | ,0lh0,l0vkj0 jsfcV dUMDVj |
| 26 | ,0ch0 dUMDVj 3x50+1x35+1x16 sqmm |
| 27 | ,0ch0 dUMDVj 3x95+1x70+1x16 sqmm fcNkus dk dk;ZA |
| 28 | 11 dsoh fiu bUlqysVj QhfVax lfgr |
| 29 | 11 dsoh fMLd bUlqysVj QhfVax lfgr yxkus dk dk;ZA |
| 30 | 400 dsoh, ifjorZd VªkWyh LFkkfir djds ykbZu pkyw djus dk dk;ZA |
| 31 | 250 dsoh, ifjorZd fIyUFk ij LFkkfir djds ykbZu pkyw djus dk dk;ZA |
| 32 | Mcy iksy ij 100 dsoh, ifjorZd LFkkfir djus dk dk;Z |
| 33 | Mcy iksy ij 63 dsoh, ifjorZd LFkkfir djus dk dk;Z |
| 34 | Mcy iksy ij 25 dsoh, ifjorZd LFkkfir djus dk dk;Z |
| 35 | 11 dsoh vkmVxksabZx ohlhch 200@100@5 , dUVªksy :e esa LFkkfir djus dk dk;ZA |
| 36 | 11 dsoh vkmVxksabZx ohlhch lhVhvkj 200@100@5 , |
| 37 | 11 dsoh vkmVxksabZx ohlhch 300@150@5 , |
| 38 | 11 dsoh budfeax ohlhch 600@300@5 , |
| 39 | 11 dsoh ,Dl0,y0ih0bZ0 dsfcy¼3x185 mm) dks x< |
| 40 | 11 dsoh ,Dl0,y0ih0bZ0 dsfcy¼3x185 mm) dks x< |
| 41 | fufonknkrk }kjk miyC/k djk;h tkus okyh lkexzhA |
| 42 | 11 dsoh dsfcy TokbZfVax fdV vkmVMksj 3.5x70 sqmm |
| 43 | 11 dsoh dsfcy TokbZfVax fdV buMksj 3x185 sqmm |
| 44 | 11 dsoh dsfcy TokbZfVax fdV vkmVMksj 3x185 sqmm |
| 45 | 1x400 sqmm Cable for Lead |
| 46 | 11 dsoh ,Dl0,y0ih0bZ0 dsfcy¼3.5x70 sq mm) |
| 47 | 11 KV Fuse Set |
| 48 | ,e0,l0 psuy 125x65x1300 T-off |
| 49 | VkWi psuy 125x65x3200 mm |
| 50 | VkWi psuy 125x65x2240 mm |
| 51 | VkWi psuy 100x50x2240 mm |
| 52 | ,e0,l0 ,sUxy 75x75x6x2028 mm for T/F Base |
| 53 | MkWij psuy 100x50x2028 mm |
| 54 | xkfMax ,Uxy 75x75x6x1600 mm |
| 55 | 11 dsoh X-Arm clam with nutbolt |
| 56 | F-Bracket |
| 57 | F-Clamp |
| 58 | Holding Clamp |
| 59 | Dead and Clamp with J-Hook |
| 60 | Suspension Clamp with J-Hook |
| 61 | I-Hook |
| 62 | LT Distrubution Box 1 Phase with Clamp |
| 63 | LT Distrubution Box 3 Phase with Clamp |
| 64 | LT Schakle insulator |
| 65 | LT Holding Clamp for PCC/STP with Nut bolt |
| 66 | Stay Set Complete |
| 67 | Earthing Complete |
| 68 | Chemical Earthing for VCB/T.F |
| 69 | GI Wire 6SWG & 10 SWG for Guarding |
| 70 | 24 Volt Battery and Battery Charger |
| 71 | Stone Pad |
| 72 | Copper Busbar |
| 73 | LT XLPE Cable unarmoured 3.5x50 |
| 74 | LT Cable 1x240 sqmm |
| 75 | Earthing Complete for VCB (Strip) |
| 76 | 33 KV Lightening Arrestor |
| 77 | 33 KV VCB with double T/F Control Penal & CT 200/100/1 A With structer |
| 78 | 33 KV Post insulator |
| 79 | Control Cable 4x2.5 sqmm |
| 80 | Control Cable 2x2.5 sqmm |
| 81 | iksyks dh xzkmfVax dk dk;Z vko\";d lkexzh lfgrA |
| 82 | 400@250 dsoh, ifjorZd gsrq fIyUFk cukus dk dk;ZA |
| 83 | 400@250 dsoh, ifjorZd dh fIyUFk ds pkjksa vksj QSfUlax djusdk dk;ZA |
| 84 | eqfoax VªkWyh miyC/k djkukA |
| 85 | fufonknkrk }kjk miyC/k djk;h x;h lkexzh ykbZu ij vko\";drkuqlkj yxkus dk dk;ZA |
| 86 | 11 dsoh dsfcy TokbZfVax fdV vkmVMksj 3.5x70 sqmm |
| 87 | 11 dsoh dsfcy TokbZfVax fdV buMksj 3x185 sqmm |
| 88 | 11 dsoh dsfcy TokbZfVax fdV vkmVMksj 3x185 sqmm |
| 89 | 1x400 sqmm Cable for Lead |
| 90 | 11 dsoh ,Dl0,y0ih0bZ0 dsfcy¼3.5x70 sq mm) |
| 91 | 11 KV Fuse Set |
| 92 | ,e0,l0 psuy 125x65x1300 T-off |
| 93 | VkWi psuy 125x65x3200 mm |
| 94 | VkWi psuy 125x65x2240 mm |
| 95 | VkWi psuy 100x50x2240 mm |
| 96 | MkWij psuy 100x50x2028 mm |
| 97 | ,e0,l0 ,sUxy 75x75x6x2028 mm for T/F Base |
| 98 | xkfMax ,Uxy 75x75x6x1600 mm |
| 99 | 11 dsoh X-Arm Clam with nutbolt |
| 100 | F-Bracket |
| 101 | F-Clamp |
| 102 | Holding Clamp |
| 103 | Dead and Clamp with J-Hook |
| 104 | Suspension Clamp with J-Hook |
| 105 | I-Hook |
| 106 | LT Distrubution Box 1 Phase with Clamp |
| 107 | LT Distrubution Box 3 Phase with Clamp |
| 108 | LT Schakle insulator |
| 109 | LT Holding Clamp for PCC/STP with Nut bolt |
| 110 | Stay Set Complete |
| 111 | Earthing Complete |
| 112 | Chemical Earthing for VCB/T.F |
| 113 | GI Wire 6 SWG & 10 SWG for Guarding |
| 114 | 24 Volt Battery and Battery Charger |
| 115 | Stone Pad |
| 116 | Copper Busbar |
| 117 | LT XLPE Cable unarmoured 3.5x50 |
| 118 | LT Cable 1x240 sqmm |
| 119 | Earthing Complete for VCB (Strip) |
| 120 | 33 KV Lightening Arrestor |
| 121 | 33 KV VCB with double T/F Control Penal & CT 200/100/1 A With structer |
| 122 | 33 KV Post insulator |
| 123 | Control Cable 4x2.5 sqmm |
| 124 | Control Cable 2x2.5 sqmm |
| 125 | eqfoax VªkWyh dh QSfUlax dk dk;ZA |
| 126 | dk;Z LFky ls mrkjh x;h ttZj ,oa iqjkuh fo|qr lkexzh dks lqjf{kr fo|qr Hk.Mkj dsUnz esa igqpkus dk dk;ZA¼yksfMax vuyksfMax lfgr½ |
| 127 | 100 dsoh, ifjoZrd |
| 128 | 250 dsoh, ifjoZrd |
| 129 | 11 KV VCB Scrap |
| 130 | 11 KV CTR Scrap |
| 131 | 11 KV Pin Insulator Scrap |
| 132 | 11 KV Disk Insulator Scrap |
| 133 | 11 KV X-Arm |
| 134 | Channel Angle |
| 135 | ACSR Dog/Weasel Conductor old & use |
| 136 | LT AB Cable old & use |
| 137 | Multiple Scrap |
| 138 | uksV& 1- mijksDr dk;Z dz0la0 01 ls 14 rd dh ek=k iw.kZr% vuqekfur gS rFkk dksbZ Hkh dk;Z \"kwU; ls vf/kdre ¼fufonk /kujkf\"k dh lhek ds vUnj½ gks ldrk gSA2- izR;sd dk;Z dk ekiu odZ\"[email protected] dsUnz }kjk fuxZr lkexzh ds xsVikl ds vk/kkj ij fd;k tk;sxkA3- Lohd`r izkDdyu ds vUrxZr dk;Z djk;k tk;sxkA4- jsLiksa ekudksa ds vuqlkj dk;Z djk;k tk;sxkA5- mijksDr dk;Z fctusl Iyku 2023&24¼20 djksM½ esa vfrfjDr ifjorZd ,oa {kerk o`f+) ds ifjorZd yxkus ,oa vU; dk;Z gsrq fd;k tkuk gSA Lohd`r izkDdyu@ekSds LFky dh ck/;rk ds vk/kkj ij vfrfjDr dk;Z Hkh tksMs tk ldrs gS rFkk Lohd`r izkdyu ds vk/kkj ij mijksDr dk;ksaZ esa 20 izfr\"kr dh ?kVkSrjh@c |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed