Indian Oil Corporation Limited-IOCL has published Tender For Installation Of Additional Sump Tank And Sump Pump Under Phbpl Augmentation-Ii Project At Paradip. Submission Date for this Tender is 02-11-2023. Pump Supply Tenders in paradip Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | MECHANICAL |
2 | Vertical centrifugal pumping unit (API610-VS1 type) with pump, frame, Mechanical seal, coupling between pump & motor, coupling guard between pump & motor , weather proof & Flame proof motor complete as per specification with companion flanges (WNRF). Q=25 m3/hr, H=75 MCL at Discharge Nozzle |
3 | BEARING FOR PUMP -Q=25 m3/hr, H=75 MCL at Discharge Nozzle |
4 | COMPL SET OF GSKT /O-RING -Q=25 m3/hr, H=75 MCL at Discharge Nozzle |
5 | COMPLETE MECHANICAL SEAL SUMP PUMP -Q=25 m3/hr, H=75 MCL at Discharge Nozzle |
6 | CASE WEAR RING -Q=25 m3/hr, H=75 MCL at Discharge Nozzle |
7 | MOTOR BEARINGS (DE + NDE)-Q=25 m3/hr, H=75 MCL at Discharge Nozzle MOTOR BEARINGS (DE + NDE) |
8 | MOTOR COOLING FAN-Q=25 m3/hr, H=75 MCL at Discharge Nozzle |
9 | "Sump Pump Installation: Taking delivery of the following pumping units with electrical motors from designated location within station premises, shifting/transporting to site, placing over Sump Tank Nozzle, assembling together all sub-assemblies, alignment, grouting, levelling, checking, providing assistance for taking trial run of electrical motor on no-load, coupling the pump & motor, carrying out the trial run of the complete unit, testing, making final alignment and complete work in all respects in accordance with the relevant drawings, manufacturer"s installation instruction, specifications and instructions of Site Engineer / EIC. Note: Weight of equipment is indicative only, Payment shall be done based on actual weight of equipment " Sump Pump_A.i.7 |
10 | Supply of Sump tank at respective locations as per technical specifications of the tender: Supply and delivery of 20 KL FRP Sump tank _V.1 |
11 | Sump Tank Installation: Taking delivery of Sump tank from designated godown / stockpile, shifting/transporting within station premises, placing on pre-constructed foundation, installation of auxiliary mountings and fittings, dressing and making good of the foundation, grouting, cleaning and flushing with water, draining, testing, completing the work in all respects in accordance with the relevant drawings, manufacturer"s installation instruction, specifications and instructions of Site Engineer / EIC (Foundation work shall be paid separately under relevant items of Civil works). FRP Sump Tank 20Kl capacity _C1 |
12 | Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document. 4.500" ODx 0.237" WT (Sch.STD) ASTM A 106 Gr B bare Pipe _I.2 |
13 | Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document. 3.500" ODx 0.216" WT (Sch.STD) ASTM A 106 Gr B _I.3 |
14 | Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document. 2.375" ODx 0.218" WT (Sch.XS) ASTM A 106 Gr B bare pipe_I.4 |
15 | Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document. 1.315" ODx 0.179"WT (Sch.XS) ASTM A 106 Gr B Bare pipe_I.6 |
16 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document: 4" ANSI 150# 90 deg LR Bends_E.130 |
17 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document: 3" ANSI 150# 90 deg LR Bends_E.131 |
18 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document: 2" ANSI 150# 90 deg LR Bends_E.132 |
19 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document: 1" ANSI 150# 90 deg LR Bends_E.133 |
20 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document: 3" ANSI 150# Equal Tee_E.88 |
21 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document: 4" x 3" ANSI 150# Un Equal Tee_E.28 |
22 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document: 3" x 2" ANSI 150# Un Equal Tee_E.31 |
23 | Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document: 3" x 1" ANSI 150# Un Equal Tee_E.32 |
24 | Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document: 3", WNRF FLANGE, ANSI - 150# (B 16.5)_C.13 |
25 | Above ground process piping: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both from outside & inside station premises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD 3.5" OD x 0.216"WT ASTM A 106 Gr B /A333 _D8 |
26 | Above ground process piping: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both from outside & inside station premises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD 2.375" OD x 0.218"WT ASTM A 106 Gr B /A333 _D9 |
27 | Above ground process piping: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both from outside & inside station premises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD 1.315" OD x 0.179"WT ASTM A 106 Gr B /A333_D11 |
28 | Under ground piping for Process piping (with PU/3LPE Coating): Taking delivery of bare Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises transporting the same to site, fabrication and erection of underground piping including cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pessure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, valves, vessels, in-line instruments etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials,Equipment etc, holiday detection of the coating, cleaning of coated pipes by water flushing after cleaning by compresed air,hydrostatic testing of each section to the specified pressure, draining the water, tie-in, back filling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour, materials equipment and consumable necessary to perform the work (other than those specifically undertaken to be supplied by the owner under the contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC. In case of 3LPE coated pipes, weld joints shall be PU coated.Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD Note:- Charges for applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy for exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc shall be paid under separate SOR Item. 4.5" OD x 0.237"WT ASTM A 106 Gr B/A333 -U/G_F8 |
29 | Under ground piping for Process piping (with PU/3LPE Coating): Taking delivery of bare Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises transporting the same to site, fabrication and erection of underground piping including cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pessure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, valves, vessels, in-line instruments etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials,Equipment etc, holiday detection of the coating, cleaning of coated pipes by water flushing after cleaning by compresed air,hydrostatic testing of each section to the specified pressure, draining the water, tie-in, back filling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour, materials equipment and consumable necessary to perform the work (other than those specifically undertaken to be supplied by the owner under the contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC. In case of 3LPE coated pipes, weld joints shall be PU coated.Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD Note:- Charges for applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy for exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc shall be paid under separate SOR Item. 3.5" OD x 0.216"WT ASTM A 106 Gr B/A333 -U/G _F9 |
30 | Under ground piping for Process piping (with PU/3LPE Coating): Taking delivery of bare Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises transporting the same to site, fabrication and erection of underground piping including cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pessure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, valves, vessels, in-line instruments etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials,Equipment etc, holiday detection of the coating, cleaning of coated pipes by water flushing after cleaning by compresed air,hydrostatic testing of each section to the specified pressure, draining the water, tie-in, back filling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour, materials equipment and consumable necessary to perform the work (other than those specifically undertaken to be supplied by the owner under the contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC. In case of 3LPE coated pipes, weld joints shall be PU coated.Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD Note:- Charges for applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy for exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc shall be paid under separate SOR Item. 2.375" OD x 0.218"WT ASTM A 106 Gr B/A333 -U/G _F10 |
31 | Under ground piping for Process piping (with PU/3LPE Coating): Taking delivery of bare Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises transporting the same to site, fabrication and erection of underground piping including cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pessure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, valves, vessels, in-line instruments etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials,Equipment etc, holiday detection of the coating, cleaning of coated pipes by water flushing after cleaning by compresed air,hydrostatic testing of each section to the specified pressure, draining the water, tie-in, back filling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour, materials equipment and consumable necessary to perform the work (other than those specifically undertaken to be supplied by the owner under the contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC. In case of 3LPE coated pipes, weld joints shall be PU coated.Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD Note:- Charges for applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy for exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc shall be paid under separate SOR Item. 1.315" OD x 0.179"WT ASTM A 106 Gr B/A333 -U/G_F12 |
32 | Radiographic Inspection: Inspection of welding by radiographic method on all types of piping including processing of films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor"s cost. In case where radiography is not possible: v) Verification by utrasonic testing shall be done at contractors cost. vi) Magenetic particle inspection as and where required shall be done at Contractors cost. 4" NB Pipe Joints RT_M9 |
33 | Radiographic Inspection: Inspection of welding by radiographic method on all types of piping including processing of films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor"s cost. In case where radiography is not possible: v) Verification by utrasonic testing shall be done at contractors cost. vi) Magenetic particle inspection as and where required shall be done at Contractors cost. 3" NB Pipe Joints RT_M10 |
34 | Radiographic Inspection: Inspection of welding by radiographic method on all types of piping including processing of films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor"s cost. In case where radiography is not possible: v) Verification by utrasonic testing shall be done at contractors cost. vi) Magenetic particle inspection as and where required shall be done at Contractors cost. 2" NB Pipe Joints RT_M11 |
35 | Radiographic Inspection: Inspection of welding by radiographic method on all types of piping including processing of films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor"s cost. In case where radiography is not possible: v) Verification by utrasonic testing shall be done at contractors cost. vi) Magenetic particle inspection as and where required shall be done at Contractors cost. 1" NB Pipe Joints RT_M13 |
36 | Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document: 3" x ANSI 150# HOV F/F API 6D Gate Valve_O.5 |
37 | "Valves: Taking delivery of valves of all types and pressure rating from the designated location within station premises, transporting the same to site, erecting above ground on preconstructed foundations or underground including earth work in excavation and filling for under ground valves at elevations specified in the drawings, priming and painting of above ground valves, PU Painting of under ground portions (if applicable) including all inputs, labour, material and consumable (other than those specifically undertaken to be supplied by the owner) and completing the work in all respects in accordance with the drawings, manufacturer"s installation instructions and specifications and instructions of the Site Engineer / EIC." 3" ANSI 150# HOV F/F API 6D Gate Valve_J49 |
38 | Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document: 3"x ANSI 150# F/F BS-1868 Swing Check Valve_O.49 |
39 | "Valves: Taking delivery of valves of all types and pressure rating from the designated location within station premises, transporting the same to site, erecting above ground on preconstructed foundations or underground including earth work in excavation and filling for under ground valves at elevations specified in the drawings, priming and painting of above ground valves, PU Painting of under ground portions (if applicable) including all inputs, labour, material and consumable (other than those specifically undertaken to be supplied by the owner) and completing the work in all respects in accordance with the drawings, manufacturer"s installation instructions and specifications and instructions of the Site Engineer / EIC." 3"x ANSI 150# F/F API 6D Swing Check Valve_J119 |
40 | Supply and Erection of Structural Steel:_A |
41 | Painting: Zinc Ethyl Slicate Primer_D1 |
42 | Painting: High Build EPOXY MIO_D2 |
43 | Painting: Isocynate Aliphatic Poly Urethene(PU)_D3 |
44 | PU /liquid epoxy Coating of under ground piping: Polyurethane Coating(PU)/ Liquid Epoxy Coating _E1 |
45 | CIVIL |
46 | Cleaning of manholes and removal of chokage in sanitary sewer or CRWS manholes and its allied connection by rodding, steaming, watering manually or by any applied means, making necessary connection of hoses etc. all as per direction of Engineer-in-Charge including plugging and dewatering of manholes removal of muck, sludge, floating materials etc. and disposing, the same to dumping pit within owner"s premises as directed with all buckets, ropes, wooden plugs, tools, tackles, consumables, safety equipment pumps, hoses, operative labour etc. complete. Manholes of depth beyond 3.0M |
47 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, all works up to any lead and lift, as directed by the Engineer-in-Charge : |
48 | In all kinds of soil |
49 | Open timbering in trenches including strutting and shoring complete. [Note: Measurements to be taken of the face area timbered] : |
50 | Depth exceeding 3.0 m but not exceeding 4.5 m |
51 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m. |
52 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
53 | CONCRETE WORK : |
54 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
55 | 1:2:4 [1 cement : 2 coarse sand (Zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources] |
56 | 1:3:6 (1 cement : 3 coarse sand (Zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) |
57 | REINFORCED CEMENT CONCRETE : |
58 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
59 | 1:1.5:3 [1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources] |
60 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : |
61 | Thermo-Mechanically Treated bars of grade Fe-500D or more |
62 | Supplying and laying flat brick soling in foundation trench, in floors, garages, sumps, etc., with bricks of class designation 50 laid to proper slope, level and grade etc. filling of the joints with sand etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge. |
63 | T&I |
64 | Supply of Flow Switch, As Per Tender Specifcaition |
65 | Thermal type, spherical tip, for 3 IN 150# Line. [ SAP Code : 8106881124] |
66 | INSTALLATION OF FLOW SWITCH: Installation and testing of Flow switch. This includes mounting of termination box as per the drawings, specification and instruction of Engineer in-charge/ Site Engineer. |
67 | Supply of Level Switch- As per tender Specification |
68 | Level Switch -SIL 2 [ SAP Code 8131025444] |
69 | INSTALLATION OF LEVEL SWITCH: Installation, assistance in testing and commissioning of Level Switch of various lengths as per drawings, specifications and the directions of Engineer in-charge/ Site engineer. The scope shall include installation, assistance in testing and commissioning of Level Switch (LS) on sump tank / fuel tank/ surge relief tank / transmix tanks etc. as per the OEM recommendations, vendor drawings, directions of engineer in-charge/site engineer and other apporved drawings. |
70 | Supply of Level Transmitter- As per Tender Specifciation |
71 | For under ground liquid tank applications -Guided Wave [SAP Code 8126610604] |
72 | INSTALLATION OF LEVEL TRANSMITTER: Installation and testing of Level Transmitter (of all types i.e contact type / non contact type etc.). The scope shall include installation, assistance in testing and commissioning of Level Transmitter (LT) on sump tank / crude oil fuel tank / fire water tank / surge relief tank / ransmix tanks etc. along with tank bottom display (having independent stand, canopy etc.) as per the OEM recommendations, vendor drawings, directions of engineer in-charge/site engineer and other apporved drawings. in-charge/ Site Engineer. |
73 | Supply of Pressure Indicators (PI) of the range 0 to 10 Kg / Cm2 as per the technical specifications attached in the Tender. |
74 | Installation, testing and commissioning of Pressure Indicator (PI) of various ratings as per drawings, recoomendations of OEM and directions of Engineer in-charge/ Site engineer |