| 1 | Dewatering before and during work. |
| 2 | Earth workExcavation inOrdinary Soil withPoclain Machine/Manual etc. |
| 3 | Extra for Slush and Lehal excavation complete. |
| 4 | Dressing and Manual Compaction work of Bunds |
| 5 | Construction of Inlet Nos -03 |
| 6 | Earth workexcavation in ordinary soilLift upto 1.5 m & lead upto 30 m & including filling, watering and ramming of excavated earth |
| 7 | Providingand Laying of Cement Concrete in 1:4:8with Cement, FineSand and 40mm Brick Ballast in foundation Complete in All Respect |
| 8 | R.C.C. Work in 1:2:4with Cement, CoarseSand and 20mm Stone Gritt excluding Reinforcement. |
| 9 | M.S. Tor Steel/Plain in R.C.C. Work including bending for shape. |
| 10 | Supply and laying , Fixing in position the alignment of NP-3, Hume Pipe Complete in all respect. (R.C.C. Hume Pipe Size 600mm) NP-03 (S & S) |
| 11 | Construction of Outlet -01 nos |
| 12 | Earth work in excavation in ordinary soilLift upto 1.5 m & lead upto 30 m & including all. |
| 13 | Supply and Laying of Cement Concrete in 1:4:8 With Cement, Fine Sand and 40mm Brick Ballast in foundation Complete in All Respect |
| 14 | R.C.C. Work in 1:2:4with Cement, CoarseSand and 20mm Stone Gritt excluding Reinforcement. |
| 15 | M.S. Tor Steel/Plain in R.C.C. Work including bending for shape. |
| 16 | Supply/fixingof600mm Dia R.C.C. Hume Pipe NP-3 (S&S Type)Laying of 600mm Dia R.C.C. Hume Pipein position including labour and T&P |
| 17 | Construction of Ramp-01 nos |
| 18 | Earth work in excavation complete with all labour etc. |
| 19 | Supply and Laying of Cement Concrete in 1:4:8 With Cement, Fine Sand and 40mm Brick Ballast in foundation Complete in All Respect |
| 20 | R.C.C. Cement concrete work in 1:2:4 with cement coarse sand and 20 mm Grit Stone Ballast |
| 21 | M.S. Tor Steel/Plain in R.C.C. Work including bending for shape. |
| 22 | Brick Masonary work in 1:4 in Cement and Coarse Sandmortar including all. |
| 23 | Construction of Flag Post-01 nos |
| 24 | Earth work in excavation complete with all labour etc. |
| 25 | Supply and Laying of Cement Concrete in 1:4:8 With Cement, Fine Sand and 40mm Brick Ballast in foundation Complete in All Respect |
| 26 | P.C.C Cement concrete work in 1:2:4 with cement coarse sand and 20 mm Grit Stone Ballast |
| 27 | Brick Masonary work in 1:4 in Cement and Coarse Sandmortar including all. |
| 28 | Supply and Fixing of 20mm Dia G.I. Pipe with lentgh of 3.00m at Flag Post. |
| 29 | Other Work- |
| 30 | Supply and Fixing ofR.C.C. Benches at Site |
| 31 | Painting work at Benches, Inlet, Outlet, Animal Ramp, Flag Post including material and Labour Complete. |
| 32 | Supply and Fixing of Sign/Information Board (Foundation and Ingauration Stone) |