|
| 1 | Supply of Shackle Insulator 100x115mm with N&B |
| 2 | Supply of Stay Insulator 90x65mm |
| 3 | Supply of MS Nut & Bolts 16x180mm |
| 4 | Supply of Lug Alu Alloy 120Sqmm |
| 5 | Supply of PP & Clamp With Nut & Bolt ST Pole Sp-23 (MS Flat 50x6mm) |
| 6 | Supply of Stay Clamp With N&B Sp-23(MS Flat 50x6mm) |
| 7 | Supply of Stay Clamp with N&B ST pOleSp-21 (MS Flat 50x6mm) |
| 8 | Supply ofEarth Wire Clamp With N&B ST Pole SP-23 (MS Flat 50x6mm) |
| 9 | Supply ofEarth Wire Clamp With N&B ST Pole SP-21 (MS Flat 50x6mm) |
| 10 | Supply of LT Clamp with N&B St Pole SP-21(MS Flat 50x6mm) |
| 11 | Supply of Bracing Clamp Top with N&B St Pole Sp-23 (MS Flat 50x6mm) |
| 12 | Supply of Bracing Clamp Bottom with N&B St Pole Sp-23 (MS Flat 50x6mm) |
| 13 | Cartage Sp-21/23 Pole (100-150 Km) |
| 14 | Cartage of Petty Material (100-150 km) |
| 15 | Cartage of 100 KVA DTR (100-150 Km) |
| 16 | Head load Cartage Sp-21/23,(1-3 Km) |
| 17 | Head load Cartage of Material(1-3 Km) |
| 18 | Headload Cartage of 100 KVA DTR (1-3 Km) |
| 19 | Excavation of Pit for Pole |
| 20 | Errection of Single Sp-21 Pole |
| 21 | Erection of Single Sp-23 Pole |
| 22 | Erection of Sp-23 Double Pole |
| 23 | Erection of SP-23 Four Pole |
| 24 | Grouting of Pole |
| 25 | Muffing of Pole |
| 26 | Excavation of pit for Stay Set |
| 27 | Errection of LT Stay Set |
| 28 | Erection of 11 KV Stay Set |
| 29 | Grouting of Stay Set |
| 30 | Laying of Weasel Conductor in HT Line |
| 31 | Laying of 3P 4W LT Line Weasel |
| 32 | Erection of Earthing Rod |
| 33 | T-off Connection Complete 11 KV Line |
| 34 | Fabrication of Steel |
| 35 | Lopping & Chopping of Tree Branches |
| 36 | Inst. Of 100 KVA DTR on pole Structire |
| 37 | Fixing of TPMO |
| 38 | Finxing of Fuse Set |
| 39 | Fixing of Lightning Arrestor |
| 40 | Installation of LT PRMC |
| 41 | Laying of LT PVC Cables (Up to 150 Sqmm) |