| 1 | Carriage of 8.5/9 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) |
| 2 | Carriage of 9/11 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 3 | Carriage of 100/63/25 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends |
| 4 | Carriage of 10/16 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends |
| 5 | Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends. |
| 6 | Dismantling/Removal of existing Single Pole structure on 8.5/9 Mtrs. long PCC pole by opening all relevant accessories. |
| 7 | Dismantling/Removal of existing Single Pole structure on 9/11 Mtrs. long ST pole by opening all relevant accessories and its carriage from site to another place. |
| 8 | Dismantling/Removal of existing Double Pole structure on 8.5/9 Mtrs. long PCC, 11/13 Mtrs. Long ST pole by opening all relevant accessories and its carriage from site to another place. |
| 9 | Erection of single pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. |
| 10 | Erection of single pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. |
| 11 | Erection of Double pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. |
| 12 | Erection of Double pole structure 9/11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms. |
| 13 | Construction of Section pole/“T” pole for L.T./H.T. line on the erected pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labour, T&P, etc. required for proper completion of work. |
| 14 | Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. |
| 15 | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. |
| 16 | Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 17 | Laying, sagging stringing and binding of Arial Bunch Conductor size 3x50/95/120 sqmm. on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 18 | Laying, sagging stringing and binding of LT XLPE Cable 3.5 x 70 sqmm including jumpering as per RESPO manual. |
| 19 | Laying, sagging stringing of LT PVC Cable on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 20 | Fixing of LT Distribution Box of erected pole including jumpering of service cable connectons as per direction by supervising engineer. |
| 21 | Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion. |
| 22 | Chopping of Tree branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc. |
| 23 | Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of supervising engineer. |
| 24 | Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. |
| 25 | Mounting of 100/63/25 KVA Transformer on the Double pole/Plinth structures and connections thereof. |
| 26 | Mounting of 10/16 KVA Transformer on the Double pole/Plinth structures and connections thereof. |
| 27 | Installation of 11 KV Drop out fuse set on various capacity Transformer. |
| 28 | Cutting of Road for making depth foundation for erection of pole. |
| 29 | Removal/Dismantling of consumer’s cable service connection from existing line feeding consumer supply. |
| 30 | Re-installation of consumer’s cable service connection from existing line feeding consumer supply. |
| 31 | Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material. |
| 32 | Carriage of Dismentalled PCC Pole from site to another dump place/J.E. Store with loading & unloading at both ends |
| 33 | Carriage of Dismentalled ST Pole from site to another dump place/J.E. Store with loading & unloading at both ends |
| 34 | Removal/Carriage of Arial Bunch Conductor size 3x50/95/120 sqmm. from site to J.E. Store with loading & unloading at both ends |
| 35 | Removal/Carriage of ACSR Weasel Conductor from site to J.E. Store with loading & unloading at both ends |