Supply Of Miscellaneous Medium Voltage Switchgear Panels For Msb Unit For Nrep As Per Technical Specifications For Numaligarh Refinery Limited, Assam, India. , Supply Of Miscellaneous Medium Voltage Switchgear Panels For Msp Unit For Nrep , Design, Detail Engineering, Procurement, Manufacturing, Testing & Inspection, Fat As Per Itp At Vendors Works, Packing, Forwarding And Supply Till Site Including Commissioning Spares, Special Tools & Tackles , Consumables Andaccessories For Following Miscellaneous Medium Voltage Switchgear Panels For Msp Unit As Per Specification In Mr 1U64-Ss16-Asb-504 ( 415V, 800 A, 50 Ka For 1 Sec. Switchboard ) , Design, Detail Engineering, Procurement, Manufacturing, Testing & Inspection, Fat As Per Itp At Vendors Works, Packing, Forwarding And Supply Till Site Including Commissioning Spares, Special Tools & Tackles , Consumables Andaccessories For Following Miscellaneous Medium Voltage Switchgear Panels For Msp Unit As Per Specification In Mr 1U64-Ss16-Mldb-503 ( 415V, 800 A, 20 Ka For 1 Sec. Switchboard ) , Design, Detail Engineering, Procurement, Manufacturing, Testing & Inspection, Fat As Per Itp At Vendors Works, Packing, Forwarding And Supply Till Site Including Commissioning Spares, Special Tools & Tackles , Consumables Andaccessories For Following Miscellaneous Medium Voltage Switchgear Panels For Msp Unit As Per Specification In Mr 1U64-Ss16-Emldb-504 ( 415V, 100 A, 10 Ka For 1 Sec. Switchboard ) , Licensed Copy Of The Relay Programming / Operating Software Alongwith Associated Interfacing Cable For Numerical Relays And Meters , Required Hardware Such As Ethernet Switches, Converters, Cables Etc.For Interface With Ecs , Charges For Mandatory Spares For The Complete Lot ( List As Per Mr ) , Charges For Spare Parts For Two Year Operation ( List As Per Mr ) ( It Will Not Be Considered For Price Evaluation ) , Charges For Site Supervision Of Erection / Installation And Testing For Supply Of Miscellaneous Medium Voltage Switchgear Panels For Msp Unit For Nrep As Per Mr For 20 ( Twenty ) Man-Days For Complete Lot Shall Be Considered , Per Diem Charges For Upto 8 Hours Work On Normal Working Days. , Overtime Rate / Hour Beyond Normal 8 Hours Work On Normal Working Days. , Overtime Rate / Hour For Work On Weekly Off Days / Holidays ( As Applicable To Refinery Site ) .