Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #40147726

Tender For Water Supply With Fhtc Under8 Works Under Jjm Multi Village Scheme- Oddanchatram Block - Tn-05-01

Issued by Local Bodies · oddanchatram, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Oct 2023
0 days left
EMD
29000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
oddanchatram → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Water Supply With Fhtc Under8 Works Under Jjm Multi Village Scheme- Oddanchatram Block - Tn-05-01

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 16-Oct-2023 TENDER EXTEND Date 26-Oct-2023

BOQ

Name of Work: Water supply with FHTC under8 Works under JJM Multi Village Scheme- Oddanchatram Block - TN-05-01
Sl. No. Item Description
11. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Alayagoundanpatty H/OAmbilikkai.(74 FHTC)Estimate Amount Rs.5.80 Lakhs
2Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
363mm PVC pipe 4 Kg/sq.cm
4Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers.
563mm PVC pipe 4 Kg/sq.cm
6Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers.
763mm PVC pipe 4 Kg/sq.cm
8Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers.
963mm PVC pipe 4 Kg/sq.cm
10Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
11Supply of 63mm PVC Coupling
12Supply of 63mm PVC Tee
13Supply of 63mmPVC Bend
14Supply of 63mmPVC Elbow
15Supply of 50mm uPVC Ball valve
16Supply of Solvent cement
17FHTCS Connection
18Supply of 63mm x 20mm dia PVC Saddle piece
19Supply of 15mm dia Brass Ferrule
20Supply of20mm dia PVC FTA
21Supply of20mm dia PVC Elbow
22Supply of 15mm dia Brass Flow control valve
23Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m)
24Supply of 15mm GI B Class Pipe (1.50m)
25Supply of 15mm GI Elbow
26Supply of 15mm Brass Ball valve
27Supply of 15mm GI Coupling
28Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type)
29Labour Chargers for 15mm dia GI pipe Cutting
30Labour Chargersfor15mm dia GI pipe threading
31Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10)
32Earthwork Excavation for 20mm dia PVC Pipe
33Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete
34Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete
35Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of
36Pipe Testing charges
3763mm dia PVC Pipe
38Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete
39GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}
402. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Santhipuram H/OAmbilikkai.(64 FHTC)Estimate Amount Rs.5.15 Lakhs
41Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
4263mm PVC pipe 4 Kg/sq.cm
43Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers.
4463mm PVC pipe 4 Kg/sq.cm
45Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers.
4663mm PVC pipe 4 Kg/sq.cm
47Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers.
4863mm PVC pipe 4 Kg/sq.cm
49Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
50Supply of 63mm PVC Coupling
51Supply of 63mm PVC Tee
52Supply of 63mmPVC Bend
53Supply of 63mmPVC Elbow
54Supply of 50mm uPVC Ball valve
55Supply of Solvent cement
56FHTCS Connection
57Supply of 63mm x 20mm dia PVC Saddle piece
58Supply of 15mm dia Brass Ferrule
59Supply of20mm dia PVC FTA
60Supply of20mm dia PVC Elbow
61Supply of 15mm dia Brass Flow control valve
62Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m)
63Supply of 15mm GI B Class Pipe (1.50m)
64Supply of 15mm GI Elbow
65Supply of 15mm Brass Ball valve
66Supply of 15mm GI Coupling
67Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type)
68Labour Chargers for 15mm dia GI pipe Cutting
69Labour Chargersfor15mm dia GI pipe threading
70Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10)
71Earthwork Excavation for 20mm dia PVC Pipe
72Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete
73Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete
74Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of
75Pipe Testing charges
7663mm dia PVC Pipe
77Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete
78GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}
793. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Poolampatty H/OAmbilikkai.(26 FHTC)Estimate Amount Rs.2.17 Lakhs
80Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
8163mm PVC pipe 4 Kg/sq.cm
82Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers.
8363mm PVC pipe 4 Kg/sq.cm
84Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers.
8563mm PVC pipe 4 Kg/sq.cm
86Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers.
8763mm PVC pipe 4 Kg/sq.cm
88Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
89Supply of 63mm PVC Coupling
90Supply of 63mm PVC Tee
91Supply of 63mmPVC Bend
92Supply of 63mmPVC Elbow
93Supply of 50mm uPVC Ball valve
94Supply of Solvent cement
95FHTCS Connection
96Supply of 63mm x 20mm dia PVC Saddle piece
97Supply of 15mm dia Brass Ferrule
98Supply of20mm dia PVC FTA
99Supply of20mm dia PVC Elbow
100Supply of 15mm dia Brass Flow control valve
101Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m)
102Supply of 15mm GI B Class Pipe (1.50m)
103Supply of 15mm GI Elbow
104Supply of 15mm Brass Ball valve
105Supply of 15mm GI Coupling
106Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type)
107Labour Chargers for 15mm dia GI pipe Cutting
108Labour Chargersfor15mm dia GI pipe threading
109Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10)
110Earthwork Excavation for 20mm dia PVC Pipe
111Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete
112Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete
113Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of
114Pipe Testing charges
11563mm dia PVC Pipe
116Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete
117GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}
1184. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Sanarpathi H/OAmbilikkai.(56 FHTC)Estimate Amount Rs.4.43 Lakhs
119Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
12063mm PVC pipe 4 Kg/sq.cm
121Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers.
12263mm PVC pipe 4 Kg/sq.cm
123Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers.
12463mm PVC pipe 4 Kg/sq.cm
125Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers.
12663mm PVC pipe 4 Kg/sq.cm
127Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
128Supply of 63mm PVC Coupling
129Supply of 63mm PVC Tee
130Supply of 63mmPVC Bend
131Supply of 63mmPVC Elbow
132Supply of 50mm uPVC Ball valve
133Supply of Solvent cement
134FHTCS Connection
135Supply of 63mm x 20mm dia PVC Saddle piece
136Supply of 15mm dia Brass Ferrule
137Supply of20mm dia PVC FTA
138Supply of20mm dia PVC Elbow
139Supply of 15mm dia Brass Flow control valve
140Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m)
141Supply of 15mm GI B Class Pipe (1.50m)
142Supply of 15mm GI Elbow
143Supply of 15mm Brass Ball valve
144Supply of 15mm GI Coupling
145Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type)
146Labour Chargers for 15mm dia GI pipe Cutting
147Labour Chargersfor15mm dia GI pipe threading
148Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10)
149Earthwork Excavation for 20mm dia PVC Pipe
150Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete
151Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete
152Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of
153Pipe Testing charges
15463mm dia PVC Pipe
155Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete
156GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}
1575. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Ambilikkai H/OAmbilikkai.(128 FHTC)Estimate Amount Rs.9.50 Lakhs
158Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
15963mm PVC pipe 4 Kg/sq.cm
160Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers.
16163mm PVC pipe 4 Kg/sq.cm
162Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers.
16363mm PVC pipe 4 Kg/sq.cm
164Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers.
16563mm PVC pipe 4 Kg/sq.cm
166Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
167Supply of 63mm PVC Coupling
168Supply of 63mm PVC Tee
169Supply of 63mmPVC Bend
170Supply of 63mmPVC Elbow
171Supply of 50mm uPVC Ball valve
172Supply of Solvent cement
173FHTCS Connection
174Supply of 63mm x 20mm dia PVC Saddle piece
175Supply of 15mm dia Brass Ferrule
176Supply of20mm dia PVC FTA
177Supply of20mm dia PVC Elbow
178Supply of 15mm dia Brass Flow control valve
179Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m)
180Supply of 15mm GI B Class Pipe (1.50m)
181Supply of 15mm GI Elbow
182Supply of 15mm Brass Ball valve
183Supply of 15mm GI Coupling
184Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type)
185Labour Chargers for 15mm dia GI pipe Cutting
186Labour Chargersfor15mm dia GI pipe threading
187Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10)
188Earthwork Excavation for 20mm dia PVC Pipe
189Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete
190Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete
191Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of
192Pipe Testing charges
19363mm dia PVC Pipe
194Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete
195GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}
1966. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Nallurpatty H/OAmbilikkai.(5 FHTC)Estimate Amount Rs.0.45 Lakhs
197Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
19863mm PVC pipe 4 Kg/sq.cm
199Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers.
20063mm PVC pipe 4 Kg/sq.cm
201Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers.
20263mm PVC pipe 4 Kg/sq.cm
203Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers.
20463mm PVC pipe 4 Kg/sq.cm
205Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
206Supply of 63mm PVC Coupling
207Supply of 63mm PVC Tee
208Supply of 50mm uPVC Ball valve
209Supply of Solvent cement
210FHTCS Connection
211Supply of 63mm x 20mm dia PVC Saddle piece
212Supply of 15mm dia Brass Ferrule
213Supply of20mm dia PVC FTA
214Supply of20mm dia PVC Elbow
215Supply of 15mm dia Brass Flow control valve
216Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m)
217Supply of 15mm GI B Class Pipe (1.50m)
218Supply of 15mm GI Elbow
219Supply of 15mm Brass Ball valve
220Supply of 15mm GI Coupling
221Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type)
222Labour Chargers for 15mm dia GI pipe Cutting
223Labour Chargersfor15mm dia GI pipe threading
224Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10)
225Earthwork Excavation for 20mm dia PVC Pipe
226Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete
227Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete
228Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of
229Pipe Testing charges
23063mm dia PVC Pipe
231Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete
232GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}
2337. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Senkattupudur H/OAmbilikkai.(5 FHTC)Estimate Amount Rs.0.45 Lakhs
234Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
23563mm PVC pipe 4 Kg/sq.cm
236Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers.
23763mm PVC pipe 4 Kg/sq.cm
238Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers.
23963mm PVC pipe 4 Kg/sq.cm
240Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers.
24163mm PVC pipe 4 Kg/sq.cm
242Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
243Supply of 63mm PVC Coupling
244Supply of 63mm PVC Tee
245Supply of 50mm uPVC Ball valve
246Supply of Solvent cement
247FHTCS Connection
248Supply of 63mm x 20mm dia PVC Saddle piece
249Supply of 15mm dia Brass Ferrule
250Supply of20mm dia PVC FTA
251Supply of20mm dia PVC Elbow
252Supply of 15mm dia Brass Flow control valve
253Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m)
254Supply of 15mm GI B Class Pipe (1.50m)
255Supply of 15mm GI Elbow
256Supply of 15mm Brass Ball valve
257Supply of 15mm GI Coupling
258Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type)
259Labour Chargers for 15mm dia GI pipe Cutting
260Labour Chargersfor15mm dia GI pipe threading
261Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10)
262Earthwork Excavation for 20mm dia PVC Pipe
263Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete
264Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete
265Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of
266Pipe Testing charges
26763mm dia PVC Pipe
268Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete
269GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}
2708. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Thangachiyammapatty H/O Thangachiyammapatty.(10 FHTC)Estimate Amount Rs.0.90 Lakhs
271Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
27263mm PVC pipe 4 Kg/sq.cm
273Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers.
27463mm PVC pipe 4 Kg/sq.cm
275Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers.
27663mm PVC pipe 4 Kg/sq.cm
277Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers.
27863mm PVC pipe 4 Kg/sq.cm
279Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers.
280Supply of 63mm PVC Coupling
281Supply of 63mm PVC Tee
282Supply of 63mmPVC Bend
283Supply of 63mmPVC Elbow
284Supply of 50mm uPVC Ball valve
285Supply of Solvent cement
286FHTCS Connection
287Supply of 63mm x 20mm dia PVC Saddle piece
288Supply of 15mm dia Brass Ferrule
289Supply of20mm dia PVC FTA
290Supply of20mm dia PVC Elbow
291Supply of 15mm dia Brass Flow control valve
292Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m)
293Supply of 15mm GI B Class Pipe (1.50m)
294Supply of 15mm GI Elbow
295Supply of 15mm Brass Ball valve
296Supply of 15mm GI Coupling
297Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type)
298Labour Chargers for 15mm dia GI pipe Cutting
299Labour Chargersfor15mm dia GI pipe threading
300Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10)
301Earthwork Excavation for 20mm dia PVC Pipe
302Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete
303Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete
304Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of
305Pipe Testing charges
30663mm dia PVC Pipe
307Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete
308GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}

AI Tender Summary

OUR REF NO 40147726
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 26-10-2023
Authority
Authority Name Rural Development And Panchayats Department
Work Description Water Supply With Fhtc Under8 Works Under Jjm Multi Village Scheme- Oddanchatram Block - Tn-05-01
Basic Detail
Tender No 720/2023/B4/190.09.2023
Bidding Type Tender
Location
City oddanchatram
State Tamil Nadu
Key Dates
Publish Date 16 Oct 2023
Submission Date 26 Oct 2023
Open Date 26 Oct 2023
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 29000
Exemption Not Available
Document List
Tendernotice_3.pdf
Tendernotice_2.pdf
Tendernotice_1.pdf
BOQ_450242.xls
22017596-c272-4226-bfed-33425d4a1db9.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 16, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 26, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 26, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 26, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_3.pdf

pdf

Tendernotice_2.pdf

pdf

Tendernotice_1.pdf

xls

BOQ_450242.xls

html

22017596-c272-4226-bfed-33425d4a1db9.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders