Tender For Water Supply With Fhtc Under8 Works Under Jjm Multi Village Scheme- Oddanchatram Block - Tn-05-01
Tender Overview
Project Description
Water Supply With Fhtc Under8 Works Under Jjm Multi Village Scheme- Oddanchatram Block - Tn-05-01
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 16-Oct-2023 | TENDER EXTEND | Date | 26-Oct-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | 1. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Alayagoundanpatty H/OAmbilikkai.(74 FHTC)Estimate Amount Rs.5.80 Lakhs |
| 2 | Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 3 | 63mm PVC pipe 4 Kg/sq.cm |
| 4 | Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers. |
| 5 | 63mm PVC pipe 4 Kg/sq.cm |
| 6 | Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers. |
| 7 | 63mm PVC pipe 4 Kg/sq.cm |
| 8 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers. |
| 9 | 63mm PVC pipe 4 Kg/sq.cm |
| 10 | Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 11 | Supply of 63mm PVC Coupling |
| 12 | Supply of 63mm PVC Tee |
| 13 | Supply of 63mmPVC Bend |
| 14 | Supply of 63mmPVC Elbow |
| 15 | Supply of 50mm uPVC Ball valve |
| 16 | Supply of Solvent cement |
| 17 | FHTCS Connection |
| 18 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 19 | Supply of 15mm dia Brass Ferrule |
| 20 | Supply of20mm dia PVC FTA |
| 21 | Supply of20mm dia PVC Elbow |
| 22 | Supply of 15mm dia Brass Flow control valve |
| 23 | Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m) |
| 24 | Supply of 15mm GI B Class Pipe (1.50m) |
| 25 | Supply of 15mm GI Elbow |
| 26 | Supply of 15mm Brass Ball valve |
| 27 | Supply of 15mm GI Coupling |
| 28 | Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type) |
| 29 | Labour Chargers for 15mm dia GI pipe Cutting |
| 30 | Labour Chargersfor15mm dia GI pipe threading |
| 31 | Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10) |
| 32 | Earthwork Excavation for 20mm dia PVC Pipe |
| 33 | Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete |
| 34 | Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete |
| 35 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of |
| 36 | Pipe Testing charges |
| 37 | 63mm dia PVC Pipe |
| 38 | Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete |
| 39 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 40 | 2. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Santhipuram H/OAmbilikkai.(64 FHTC)Estimate Amount Rs.5.15 Lakhs |
| 41 | Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 42 | 63mm PVC pipe 4 Kg/sq.cm |
| 43 | Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers. |
| 44 | 63mm PVC pipe 4 Kg/sq.cm |
| 45 | Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers. |
| 46 | 63mm PVC pipe 4 Kg/sq.cm |
| 47 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers. |
| 48 | 63mm PVC pipe 4 Kg/sq.cm |
| 49 | Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 50 | Supply of 63mm PVC Coupling |
| 51 | Supply of 63mm PVC Tee |
| 52 | Supply of 63mmPVC Bend |
| 53 | Supply of 63mmPVC Elbow |
| 54 | Supply of 50mm uPVC Ball valve |
| 55 | Supply of Solvent cement |
| 56 | FHTCS Connection |
| 57 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 58 | Supply of 15mm dia Brass Ferrule |
| 59 | Supply of20mm dia PVC FTA |
| 60 | Supply of20mm dia PVC Elbow |
| 61 | Supply of 15mm dia Brass Flow control valve |
| 62 | Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m) |
| 63 | Supply of 15mm GI B Class Pipe (1.50m) |
| 64 | Supply of 15mm GI Elbow |
| 65 | Supply of 15mm Brass Ball valve |
| 66 | Supply of 15mm GI Coupling |
| 67 | Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type) |
| 68 | Labour Chargers for 15mm dia GI pipe Cutting |
| 69 | Labour Chargersfor15mm dia GI pipe threading |
| 70 | Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10) |
| 71 | Earthwork Excavation for 20mm dia PVC Pipe |
| 72 | Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete |
| 73 | Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete |
| 74 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of |
| 75 | Pipe Testing charges |
| 76 | 63mm dia PVC Pipe |
| 77 | Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete |
| 78 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 79 | 3. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Poolampatty H/OAmbilikkai.(26 FHTC)Estimate Amount Rs.2.17 Lakhs |
| 80 | Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 81 | 63mm PVC pipe 4 Kg/sq.cm |
| 82 | Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers. |
| 83 | 63mm PVC pipe 4 Kg/sq.cm |
| 84 | Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers. |
| 85 | 63mm PVC pipe 4 Kg/sq.cm |
| 86 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers. |
| 87 | 63mm PVC pipe 4 Kg/sq.cm |
| 88 | Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 89 | Supply of 63mm PVC Coupling |
| 90 | Supply of 63mm PVC Tee |
| 91 | Supply of 63mmPVC Bend |
| 92 | Supply of 63mmPVC Elbow |
| 93 | Supply of 50mm uPVC Ball valve |
| 94 | Supply of Solvent cement |
| 95 | FHTCS Connection |
| 96 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 97 | Supply of 15mm dia Brass Ferrule |
| 98 | Supply of20mm dia PVC FTA |
| 99 | Supply of20mm dia PVC Elbow |
| 100 | Supply of 15mm dia Brass Flow control valve |
| 101 | Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m) |
| 102 | Supply of 15mm GI B Class Pipe (1.50m) |
| 103 | Supply of 15mm GI Elbow |
| 104 | Supply of 15mm Brass Ball valve |
| 105 | Supply of 15mm GI Coupling |
| 106 | Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type) |
| 107 | Labour Chargers for 15mm dia GI pipe Cutting |
| 108 | Labour Chargersfor15mm dia GI pipe threading |
| 109 | Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10) |
| 110 | Earthwork Excavation for 20mm dia PVC Pipe |
| 111 | Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete |
| 112 | Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete |
| 113 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of |
| 114 | Pipe Testing charges |
| 115 | 63mm dia PVC Pipe |
| 116 | Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete |
| 117 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 118 | 4. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Sanarpathi H/OAmbilikkai.(56 FHTC)Estimate Amount Rs.4.43 Lakhs |
| 119 | Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 120 | 63mm PVC pipe 4 Kg/sq.cm |
| 121 | Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers. |
| 122 | 63mm PVC pipe 4 Kg/sq.cm |
| 123 | Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers. |
| 124 | 63mm PVC pipe 4 Kg/sq.cm |
| 125 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers. |
| 126 | 63mm PVC pipe 4 Kg/sq.cm |
| 127 | Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 128 | Supply of 63mm PVC Coupling |
| 129 | Supply of 63mm PVC Tee |
| 130 | Supply of 63mmPVC Bend |
| 131 | Supply of 63mmPVC Elbow |
| 132 | Supply of 50mm uPVC Ball valve |
| 133 | Supply of Solvent cement |
| 134 | FHTCS Connection |
| 135 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 136 | Supply of 15mm dia Brass Ferrule |
| 137 | Supply of20mm dia PVC FTA |
| 138 | Supply of20mm dia PVC Elbow |
| 139 | Supply of 15mm dia Brass Flow control valve |
| 140 | Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m) |
| 141 | Supply of 15mm GI B Class Pipe (1.50m) |
| 142 | Supply of 15mm GI Elbow |
| 143 | Supply of 15mm Brass Ball valve |
| 144 | Supply of 15mm GI Coupling |
| 145 | Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type) |
| 146 | Labour Chargers for 15mm dia GI pipe Cutting |
| 147 | Labour Chargersfor15mm dia GI pipe threading |
| 148 | Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10) |
| 149 | Earthwork Excavation for 20mm dia PVC Pipe |
| 150 | Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete |
| 151 | Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete |
| 152 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of |
| 153 | Pipe Testing charges |
| 154 | 63mm dia PVC Pipe |
| 155 | Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete |
| 156 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 157 | 5. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Ambilikkai H/OAmbilikkai.(128 FHTC)Estimate Amount Rs.9.50 Lakhs |
| 158 | Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 159 | 63mm PVC pipe 4 Kg/sq.cm |
| 160 | Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers. |
| 161 | 63mm PVC pipe 4 Kg/sq.cm |
| 162 | Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers. |
| 163 | 63mm PVC pipe 4 Kg/sq.cm |
| 164 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers. |
| 165 | 63mm PVC pipe 4 Kg/sq.cm |
| 166 | Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 167 | Supply of 63mm PVC Coupling |
| 168 | Supply of 63mm PVC Tee |
| 169 | Supply of 63mmPVC Bend |
| 170 | Supply of 63mmPVC Elbow |
| 171 | Supply of 50mm uPVC Ball valve |
| 172 | Supply of Solvent cement |
| 173 | FHTCS Connection |
| 174 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 175 | Supply of 15mm dia Brass Ferrule |
| 176 | Supply of20mm dia PVC FTA |
| 177 | Supply of20mm dia PVC Elbow |
| 178 | Supply of 15mm dia Brass Flow control valve |
| 179 | Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m) |
| 180 | Supply of 15mm GI B Class Pipe (1.50m) |
| 181 | Supply of 15mm GI Elbow |
| 182 | Supply of 15mm Brass Ball valve |
| 183 | Supply of 15mm GI Coupling |
| 184 | Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type) |
| 185 | Labour Chargers for 15mm dia GI pipe Cutting |
| 186 | Labour Chargersfor15mm dia GI pipe threading |
| 187 | Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10) |
| 188 | Earthwork Excavation for 20mm dia PVC Pipe |
| 189 | Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete |
| 190 | Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete |
| 191 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of |
| 192 | Pipe Testing charges |
| 193 | 63mm dia PVC Pipe |
| 194 | Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete |
| 195 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 196 | 6. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Nallurpatty H/OAmbilikkai.(5 FHTC)Estimate Amount Rs.0.45 Lakhs |
| 197 | Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 198 | 63mm PVC pipe 4 Kg/sq.cm |
| 199 | Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers. |
| 200 | 63mm PVC pipe 4 Kg/sq.cm |
| 201 | Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers. |
| 202 | 63mm PVC pipe 4 Kg/sq.cm |
| 203 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers. |
| 204 | 63mm PVC pipe 4 Kg/sq.cm |
| 205 | Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 206 | Supply of 63mm PVC Coupling |
| 207 | Supply of 63mm PVC Tee |
| 208 | Supply of 50mm uPVC Ball valve |
| 209 | Supply of Solvent cement |
| 210 | FHTCS Connection |
| 211 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 212 | Supply of 15mm dia Brass Ferrule |
| 213 | Supply of20mm dia PVC FTA |
| 214 | Supply of20mm dia PVC Elbow |
| 215 | Supply of 15mm dia Brass Flow control valve |
| 216 | Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m) |
| 217 | Supply of 15mm GI B Class Pipe (1.50m) |
| 218 | Supply of 15mm GI Elbow |
| 219 | Supply of 15mm Brass Ball valve |
| 220 | Supply of 15mm GI Coupling |
| 221 | Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type) |
| 222 | Labour Chargers for 15mm dia GI pipe Cutting |
| 223 | Labour Chargersfor15mm dia GI pipe threading |
| 224 | Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10) |
| 225 | Earthwork Excavation for 20mm dia PVC Pipe |
| 226 | Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete |
| 227 | Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete |
| 228 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of |
| 229 | Pipe Testing charges |
| 230 | 63mm dia PVC Pipe |
| 231 | Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete |
| 232 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 233 | 7. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Senkattupudur H/OAmbilikkai.(5 FHTC)Estimate Amount Rs.0.45 Lakhs |
| 234 | Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 235 | 63mm PVC pipe 4 Kg/sq.cm |
| 236 | Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers. |
| 237 | 63mm PVC pipe 4 Kg/sq.cm |
| 238 | Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers. |
| 239 | 63mm PVC pipe 4 Kg/sq.cm |
| 240 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers. |
| 241 | 63mm PVC pipe 4 Kg/sq.cm |
| 242 | Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 243 | Supply of 63mm PVC Coupling |
| 244 | Supply of 63mm PVC Tee |
| 245 | Supply of 50mm uPVC Ball valve |
| 246 | Supply of Solvent cement |
| 247 | FHTCS Connection |
| 248 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 249 | Supply of 15mm dia Brass Ferrule |
| 250 | Supply of20mm dia PVC FTA |
| 251 | Supply of20mm dia PVC Elbow |
| 252 | Supply of 15mm dia Brass Flow control valve |
| 253 | Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m) |
| 254 | Supply of 15mm GI B Class Pipe (1.50m) |
| 255 | Supply of 15mm GI Elbow |
| 256 | Supply of 15mm Brass Ball valve |
| 257 | Supply of 15mm GI Coupling |
| 258 | Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type) |
| 259 | Labour Chargers for 15mm dia GI pipe Cutting |
| 260 | Labour Chargersfor15mm dia GI pipe threading |
| 261 | Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10) |
| 262 | Earthwork Excavation for 20mm dia PVC Pipe |
| 263 | Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete |
| 264 | Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete |
| 265 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of |
| 266 | Pipe Testing charges |
| 267 | 63mm dia PVC Pipe |
| 268 | Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete |
| 269 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
| 270 | 8. Implementation of Jal Jeevan Mission to provide Functional Household Tap Connection to Rural Households at Thangachiyammapatty H/O Thangachiyammapatty.(10 FHTC)Estimate Amount Rs.0.90 Lakhs |
| 271 | Supply and delivary of the following sizes of PVC/GI pipeswith confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 272 | 63mm PVC pipe 4 Kg/sq.cm |
| 273 | Earth work excavation in all types of Strata for laying of the following sizes of PVC & GI pipes, with the standard following trench width and depth etc.,complete and as directed by dept.officers. |
| 274 | 63mm PVC pipe 4 Kg/sq.cm |
| 275 | Lowering of following sizes of PVC/GI pipes and specials in the trench and laying to proper grade and alingnment etc.,complete and as directed by dept.officers. |
| 276 | 63mm PVC pipe 4 Kg/sq.cm |
| 277 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.officers. |
| 278 | 63mm PVC pipe 4 Kg/sq.cm |
| 279 | Supply and delivary of the following sizes of PVC/GI specials confirming to IS and other specifications at site of work including all taxes, loading, unloading, freight, stacking, transit and insurance etc.,complete as directed by the dept.officers. |
| 280 | Supply of 63mm PVC Coupling |
| 281 | Supply of 63mm PVC Tee |
| 282 | Supply of 63mmPVC Bend |
| 283 | Supply of 63mmPVC Elbow |
| 284 | Supply of 50mm uPVC Ball valve |
| 285 | Supply of Solvent cement |
| 286 | FHTCS Connection |
| 287 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 288 | Supply of 15mm dia Brass Ferrule |
| 289 | Supply of20mm dia PVC FTA |
| 290 | Supply of20mm dia PVC Elbow |
| 291 | Supply of 15mm dia Brass Flow control valve |
| 292 | Supply of 20mm dia PVC pipe 10kg/sq.cm (6.0m) |
| 293 | Supply of 15mm GI B Class Pipe (1.50m) |
| 294 | Supply of 15mm GI Elbow |
| 295 | Supply of 15mm Brass Ball valve |
| 296 | Supply of 15mm GI Coupling |
| 297 | Supply of 15mm Brass chromium plated screw down Tap 15mm Dia (Heavy Type) |
| 298 | Labour Chargers for 15mm dia GI pipe Cutting |
| 299 | Labour Chargersfor15mm dia GI pipe threading |
| 300 | Precast RCC Fountain Post (0.15x0.15x1.20) and CC Platform (0.75x0.75x0.10) |
| 301 | Earthwork Excavation for 20mm dia PVC Pipe |
| 302 | Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete |
| 303 | Laying and Jointing 15mm dia GI medium pipe to proper grade and alignment including all charges etc.,complete |
| 304 | Refilling with excavated earth other than sand in layers of 15cm watered well rammed and consolidated after the pipes and Pipes and specials are laid, jointed and tested etc., and removing and depositing the surplus earth at the place shown by the dept.of |
| 305 | Pipe Testing charges |
| 306 | 63mm dia PVC Pipe |
| 307 | Towards the cost of painting and lettering of Name board with scheme details including all charges etc.,complete |
| 308 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender