Rehabilitation Of Khanna Disty Rd 0-11000 By Concrete Lining Including Pucca Structure
Tender Overview
Project Description
Rehabilitation Of Khanna Disty Rd 0-11000 By Concrete Lining Including Pucca Structure
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 16-Oct-2023 | corrigendum | Financial Bid | 30-Oct-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Ordinary jungle clearance of both banks of running Disty. Minors and Drains with discharge upto 9 cs including boudary road (Discharge exceeding 4.5 cum/s.) |
| 2 | Excavation of soil( any type ) using hydraulic excavator CK 90 excavation with hydraulic excavator of 0.9 cum capacity including cutting trimming bottom and side slopes in accordance with requirement of grades and cross sections, including all lift and combined lead up to 60 mtr. |
| 3 | Excavation of soil using hydraulic exavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankments locations with all location with all lifts and leads avg leads8.42 km last 5.32 km katcha |
| 4 | Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications |
| 5 | Dressing and prepration of sub grade for side slopes. |
| 6 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing (0 to 1.5 mtr depth) |
| 7 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing ( 1.5 to 3.0 mtr depth) |
| 8 | Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. |
| 9 | Dressing of dowel along water carrying channel in addition to payment of dressed earth work. |
| 10 | Laying 1:3 (cement: water) cement slurry with cement @ 2.25 kg/sqms as on prepared bedand side slopes before laying concrete |
| 11 | Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km (For Trapozoidal Section and Cup Section of all radius) For Sleeper |
| 12 | Cement concrete lining 10cm thick or less with mechanical paver for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km (For Concrete lining on bed and on side slopes upto vertical height 2.0m including supply, carriage of loading and unloading of material complete in al respect |
| 13 | Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km (For Trapozoidal Section and Cup Section of all radius) For coping |
| 14 | Shuttering for faces of concrete foundation andfoundation beam and plinth beam (Verticalor battering) |
| 15 | Filling of Contraction / Construction jionts sealing compound including supply carriage of material complete in all respect as per design / drawing and PWD specifications |
| 16 | Dressing of Earthwork (New) |
| 17 | Extra bitumen painting at 0.69 per sqm (on sleeper) |
| 18 | Dag Belling single kassi stroke minimum 7.5 cm depth complete in all respect as per deisgn/drawing and PWD specifications |
| 19 | Earth work involved in dismantling of Outlet \"H\" upto 0.5 mtr |
| 20 | Dismantling of APM of type outlet involved dismantling cement masonry and RCC slab with‘H’ upto 0.50 mt. |
| 21 | Adjusting new APM block in correct ‘y’ and fixing in position. |
| 22 | Cemen concrete 1:4:8 with stine aggregate 40mm gauge mixing by mechanical means unsing concrete mixer volumetric type |
| 23 | First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth. |
| 24 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. |
| 25 | HYSD deformed (Ribbed /Tor Steel Bar) Bars FE 550 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position cmplete in all respect. |
| 26 | Extra labour for dressing of bricks for outlet with ‘H’ upto 0.50 mt |
| 27 | Providing APM cast iron block complete in all respect including supply of pig iron, casting and pattern making as per ISI specification no 7986-1976 |
| 28 | Earthwork in exacavation of foundations of bridges, culverts building including handling of material with a combined lead of 15 mtr dressing of bed and sides stacking the excavated soil from the edge of exacavation and subsequent filling around for ordinary gravel soil involving pick work |
| 29 | 12.5 mm thick cement plaster 1:4 |
| 30 | Providing and placing in horizontal layers filtering media screened, washed and cleaned as described below:-Bajri (Coarse)screened, cleaned and washed and graded from 20mm to 25mm (fromPathankot or approved equivalent quarry) |
| 31 | Bajri screened, cleaned and washed and graded from 6mm to 20mm (from Pathankot or approved equivalent quarry). |
| 32 | Coarse sand screened, cleaned and washed and graded from 3mm to 6mm (fromPathankot or approved equivalent quarry) |
| 33 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer – in-charge, upto 90 metre depth below ground level. (c)400 mm dia. |
| 34 | Supplying,assembling,lowering and fixing in vertical position in bore well,unplasticized PVC medium well casing (CM) pipe of required dia. conforming to IS: 12818-2010 including required hire and labour charges,fitting and accessories etc. all complete for all depths as per direction of Engineer-in-charge. (c)200mm Nominal size dia. |
| 35 | Supplying,assembling,lowering and fixing in vertical position in bore well,unplasticized PVC medium well screen(RMS)pipe with ribs conforming to IS: 12818- 2010 including required hire and labour charges,fitting and accessories etc. all complete for all depths as per direction of Engineer-in-charge. (c)200mm Nominal size dia. |
| 36 | Supplying at quarry site of gravel of 1/16\" to 1/8\" sizes including pouring and packing in the annular space between the pipes assembly and the bore.The gravel should be free from dust,dirt or the vegetables manner as per IS 4097/1967 with latest amendments |
| 37 | Back filling behind abutment,wing wall and return wall complete as per drawing and Techanical Specifications. (A) Granular material |
| 38 | Supply and fixing of well cap having thread to fix on housing pipe complete in all respects. (c) 200 mm internal diameter |
| 39 | Supply and fixing of M.S. Clamp of size to 150 x 12 mm made out of MS flat 1.52 m long suitable to fit housing pipe including the cost nut and Bolts of suitable size complete in all respects. |
| 40 | Providing and laying 60 mm thick factory made cement concrete interlocking Paver blocks of M-35 grade machine made rubber moulded smooth finish with strong vibratory process or with vibrohydraulic compaction machine and of approved size and design / shape laid in Ordinary Grey Colour and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-inCharge for Non-traffic areas and streets having width less than 3.05 mtr( Also not to used over foothaths) |
| 41 | Dismantling of Brick work in cement sand mortar/lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means) |
| 42 | Dismantling of PCC including T&P scaffolding wherever necessary, sorting thedismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means) |
| 43 | PlainlReinforced cement concrete (RCC Grade 30 ) in sub-structure complete as perdrawing and MORT&H MoRT&H Specifications 1500, 1700 and 2200 With BatchingPlant, Transit Mixer and Concrete Pump Height up to 5m |
| 44 | PlainlReinforced cement concrete (RCC Grade M25 ) in sub-structure complete as perdrawing and MORT&H MoRT&H Specifications 1500, 1700 and 2200 With BatchingPlant, Transit Mixer and Concrete Pump Height up to 5m |
| 45 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as perdrawing and MoRT&H Specifications |
| 46 | Filling Stone or Spall ( on level) |
| 47 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall andreturn wall to the full height compacted to a firm condition complete as per drawing andTechnical Specification. |
| 48 | Painting on concrete surface Providing and applying 2 coats of water based cement paintto unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. |
| 49 | Painting New letters and figures on black synthetic enamel paint to an even shade on surface |
| 50 | Drainage Spouts complete as per drawing no. SD/205 and MoRT&H MoRT&H specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges) |
| 51 | Reinforced Cement Concrete Crash Barrier Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians,constructed with M-40 grade concrete with HYSD reinforcement conforming toIRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled withpre-moulded asphalt filler board, keyed to the structure on which it is built andinstalled as per design given in the enclosure to MOST circular No. RW/NH-33022/1/94-DO Ill dated 24 June 1994 as per dimensions in the approved drawing andat locations directed by the Engineer, all as specified |
| 52 | Hazard Marker sign board 300x900mm rectangular as per IRC 67- 2012 with highintensity Microprismatic grade retro reflective Sheeting type IV as per ASTM D 4956 09and IRC 67 2012, fixed over 4mm thick Aluminium Composite Material (ACM) sheeting having skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 firmly fixed to ground including foundation concrete M-25 of |
| 53 | Advance Direction sign board 1200x1800mm rectangular as per IRC 67- 2012 with highintensity Microprismatic grade retro reflective Sheeting as per ASTM D 4956 – 09 and asper IRC 67 – 2012. |
| 54 | Cement concrete 1:2:4 with stone ballast or shingle mixing by mechanical means usingconcrete mixer volumetric type |
| 55 | C. Conc. 1:3:6 (M-10) with stone ballast using concrete mixer volume metric type |
| 56 | Providing and laying 80 mm thick factory made cement concrete interlocking Pavingblocks of M40 grade manufactured by block making machine equipped with steel mould clamped to a strong vibratory table with hydraulic pressure for compaction of concrete as per IRC SP 63 -2014 and of approved size and design / shape laid in Ordinary GreyColour and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-inCharge |
| 57 | Preparation of plastered or concrete surface for painting (including sand papering thesurface) using ready mixed cement based wall putty by applying two or more coats toget required finish |
| 58 | Applying priming coat with cement primer in all shades on newly plastered or concrete exterior surface |
| 59 | Raking out joints in lime or cement mortar and preparing the surface for repointing or replastering including disposal of rubish to the dumping ground within 50 m lead (excluding the cost of scraping of plaster and replastering). |
| 60 | Excavation in Soil (any type) using Hydraulic ExcavatorCK 90 and Tippers with Disposal up to 450 metres.Excavation for roadwork in soil with hydraulic excavatorof 0.9 cum bucket capacity including cutting andloading in tippers, trimming bottom and side slopes, inaccordance with requirements of lines, grades andcross sections, and transporting to the embankmentlocation within all lifts and lead up to 450m |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender