| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Resistivity Survey |
| 3 | Pit Digging for water arrangement of Boring |
| 4 | Water arrangement of Boring |
| 5 | Drilling of pilot bore 450 mm dia G.L to 63 mtr B.G.L. by DC machine |
| 6 | 150 mm MS Pipe 10KGF sloted |
| 7 | Lowering of housing pipe PVC |
| 8 | Transporation |
| 9 | MS Well Plug 175 mm |
| 10 | MS Clamp175 mm. |
| 11 | MS End Cap 175 mm.PVC |
| 12 | MS Garder Frame 100mmx100mm |
| 13 | 2H.P Solar Pump with control panel complite |
| 14 | Pea Gravel 1.6 mm to 4.8 mm.size |
| 15 | Development of Tube well by air compressor 350 PSI |
| 16 | Development of Tube well by OP unit |
| 17 | 3Hp Submersible Pump ISI Mark |
| 18 | Penal Starter DOL. |
| 19 | 63 mm UPVC Column Pipe |
| 20 | PVC Flate Cable Copper 4Sqr.mm |
| 21 | 40 mm dia PVC Pipe |
| 22 | provision forexcavating trenchesof required with for pipes calbles, etc including excavation for sockets, and dressing of sides , ramming ofbolloms, depth upto 1.5m, including getting out the excavated soil, and then returning the soil asrequired, in layers not exceeding 20cm in depth,including, consolidating each deposited layer by ramming, watering,etc. |
| 23 | Pump instalation |
| 24 | Laying of HDPE Pipe plumbing charges to complete the job at site. |
| 25 | submersible Chamber Cement Concrete 0.75x0-75x:12 m. (Platform for Submersible pump Including supply of all material&P etc. Required for proper Completion of work) |
| 26 | Platform construcation 1.50x1.50x1.50 Mtr. Cement, C Sand, Bricks etc. All Comp. With drainage upto exit |
| 27 | Supply installation & maintenance forof hot dipgalvanized steel structure of minimum weight of 650 kg &cater to minimum 150 km/hour wind seepd on suitable solidfoundation made of reinforced cement concrete being enough to hold the weight of structure & 5000 litre HDPE water tank at 3 metre hight on structure & structure also having the provisions for holding HDPE water tank & Solar panel mounting structure withmanual tracking to install solar panels at minimum 5 meters high from the grounf. |
| 28 | supply of water tank 3Layer capasiti 3000 Lete |
| 29 | supply of water tank 3Layer capasiti 2000 Lete |
| 30 | supply of water tank 3Layer capasiti 1000 Lete |
| 31 | Sign borad |
| 32 | Stand port |