Kerala State Electronics Development Corporation Limited-KELTRON has published Rate Contract For The Installation Of Various Types Of Traffic Signals, Road Warning Blinkers And Led Street Lights. Submission Date for this Tender is 23-10-2023. Civil Work Tenders in Thiruvananthapuram Kerala. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | ITEM No.: 1. SUPPLY OF MATERIALS 1. Supply of PVC pipe a) 2" (50mm) dia |
2 | b) 3" (75mm) dia |
3 | c) 4" (100mm) dia |
4 | 2. Supply of GI pipe (ISI) Class B a) 1.5" (38mm) dia |
5 | b) 2" (50mm)dia |
6 | c) 3" (75mm) dia |
7 | d) 4" (100mm) dia |
8 | 3. Supply of 8 SWGGI wire for overhead cabling |
9 | 4. Supply of 14 SWGGI wire for earthing |
10 | 5. Supply of Cable glands 20mm/25mm/30mm suitable for cable termination in Controller |
11 | 6. Supply of HDPE pipe (As per IS:4984:1995) a) 2" (50mm)dia |
12 | b) 3" (75mm) dia |
13 | c) 4" (100mm) dia |
14 | ITEM No.: 2. CIVIL WORK 7. Excavation of trench and refilling the same after laying GI/PVC pipe of various diameter a) Soft cutting 1" x 0.5" |
15 | b) Semi Hard cutting 1" x 0.5" |
16 | c) Hard cutting (carriage way/rock surface) 1" x 0.5" |
17 | 8. Excavation of trench and refilling the same (without pipe laying) a) Soft cutting 1" x 0.5" |
18 | b) Semi Hard cutting 1" x 0.5" |
19 | c) Hard cutting (carriage way/rock surface) 1" x 0.5" |
20 | 9. Restoration Charges including material cost for excavated portion of the carriage way with 1:2:4 PCC |
21 | 10. Asphalting and Restoration Charges including material cost for excavated portion of the carriage way |
22 | 11. Excavation of RCC/PCC surface including island median etc. |
23 | 12. Trenchless horizontal drilling under the road surface including laying of HDPE pipe of dia a) 2" (50mm)dia |
24 | b) 3" (75mm) dia |
25 | c) 4" (100mm) dia |
26 | 13. Slot cutting 40mm width 200mm depth (saw cut) on carriage way for laying of control cable where standard excavation is not permitted. This is inclusive of slot cutting, slot cleaning bedding of control cable and refilling with PCC/ hot bitumen seal |
27 | 14. Slot cutting 4mm width 20 mm depth (saw cut) on carriage way for laying of loop cable for vehicle sensor placement or any other purpose. This is inclusive of slot cutting, slot cleaning, bedding of loop cable and refilling with hot bitumen seal /cold sealant |
28 | 15. Laying of PVC/GI pipe of various diameters in trenches (1" x 0.5") |
29 | 16. Construction of controller plinth size 70cm x 50cm x 75cm (single brick construction with plastering on outside surface with 1:6 cement mortar, fixing of controller mounting frame with 4 Nos. of M 10 x 120mm bolts and painting two coatsgolden yellow paint with black stripes over a coat of cement primer etc. all complete |
30 | 17. Supply & Installation of Name Board on Plinth: Black granite of Size – 12mm thickness & Dimensions – 600mm x 450mm engraved with the matter informed and painted with golden paint |
31 | 18. Construction of foundation and basement for battery box (8 Nos. of battery) of size 60cm x 60cm x20cm with brick in 1:6 Cement mortarincluding plastering all around top for fixing battery box and painting two coatsgolden yellow paint with black stripes over a coat of cement primer etc. all complete |
32 | 19. Construction of foundation and basement for battery box (2 Nos. of battery) of size 30cm x30cm x20cm with brick in C:M 1:4 including plastering all around top for fixing battery box and painting two coatsgolden yellow paint with black stripes over a coat of cement primer etc. all complete |
33 | 20. Erection and painting with two coats of Golden yellow paint/Silverof single cantilever pole over foundation specification enclosed including the base and painting two coatsgolden yellow paint with black stripes on base all complete |
34 | 21. Erection and painting with two coats of Golden yellow/Silverpaint of single cantilever pole with 4/2 SPV Panels as per foundation specification enclosed including construction of the base and painting two coats of golden yellow paint with black stripes over a coat of cement primer on base all complete |
35 | 22. Erection and painting with two coats of Golden yellow/Silverpaint of 6 mtr. long pole as per foundation spec including construction of the base and painting two coats of golden yellow paint with black stripesover a coat of cement primer all complete |
36 | 23. Erection and painting with two coats of Golden yellow/Silverpaint of7/9 mtr long pole with 4/2 SPV panelsas per foundation spec including construction of the baseand painting two coats ofgolden yellow paint with black stripes over a coat of cement primer all complete |
37 | 24. Assembly of 1Mtr long Solar panel frame to standard pole/Cantilever Pole |
38 | 25. Assembly of 3Mtr long Solar panel frame to standard pole |
39 | 26. Fixing of Solar panel on Panel frame (per panel) |
40 | 27. Fixing of controller on a) Pole |
41 | b) Plinth |
42 | 28. Fixing of meter box/junction box |
43 | 29. Fixing of Digital Count Down a) On Standard Pole/Cantilever Pole bottom portion Clock |
44 | b) On Cantilever Pole overhang |
45 | 30. Fixing of Vehicle Sensing Camera a) On Standard Pole/Cantilever Pole bottom portion |
46 | b) On Cantilever Pole overhang |
47 | 31. Assembly of signal heads 2/3/4/5 aspects -per set |
48 | 32. Mounting of assembled signal heads 2/3/4/5 ona) Standard Pole/CL Pole Bottom |
49 | b) On Overhang of Cantilever Pole |
50 | 33. Fixing of Pole Cap on Standard Pole /Cantilever pole |
51 | 34. Fixing of Keltron logo / Name plate onpole |
52 | 35. Construction of Circular foundation of 2 mtrs. dia at the bottom of the pole |
53 | 36. Construction of circular barrier platform of dia 2 mtrs and height 1 mtr. with cement concrete 1:2:4 using 20mm metal and plastering all around the surface and top including2 coat of golden yellow paint with black stripes over a coat of cement primer |
54 | ITEM No.: 3. ELECTRICAL WORK 37. Cable laying charges a) 2/3/4 core armoured/unarmoured |
55 | b) 6 core armoured/unarmoured |
56 | c) 12/14 core armoured/unarmoured |
57 | 38.Laying of overhead cable with 8 SWG GI wire through pipes, poles and looping etc. including handling charges complete. Running length of bunch of cable tied to 8SWG GI wire properly tied at a height of not less than 7 mtrs. from road surface |
58 | 39. Pole wiring charges a) On Standard Pole |
59 | b) On Cantilever Pole |
60 | 40. Wiring of signal aspects and interconnecting the aspects on assemblies |
61 | 41. Earthing as per specification (KSEB standard) a) Controller/Battery Box |
62 | b) Pole |
63 | 42. Fixing of cable glands in controller and glanding of cables all inclusive |
64 | 43. Termination and wiring of cables in controller |
65 | 44. Wiring and inter connection of Solar panel on panel frame (per panel) |
66 | 45. Termination of Solar panel cables in Battery Box (per panel assembly) |
67 | 46. Wiring of battery box per batteryincluding battery handling charges and CCU wiring |
68 | 47. Wiring of Digital Countdown clock |
69 | 48. Wiring of Vehicle Sensing Camera |
70 | ITEM No.: 4. ERECTION OF POLES ON FOUNDATION (Erection of Traffic Signal poles by bolting on RCC foundation, including construction of RCC foundation with materials, tools, curing) 49. Construction of RCC foundation as per specification enclosed with materials, tools, curing etc. excluding reinforcement structure and bolts |
71 | 50. Construction of RCC foundationas per specification enclosed with materials, tools, curing etc. including reinforcement structure and bolts |
72 | 51. Bolting of Standard pole on foundation |
73 | 52. Bolting of Standard pole with Solar panel attachment on foundation |
74 | 53. Bolting of Cantilever polewithout Solar Panel attachment on foundation |
75 | 54. Bolting of Cantilever pole with solar panel attachment on foundation |
76 | ITEM No.: 5. SOLAR BLINKER [1 to 20 Nos.]55. Assembly and Erection of 6Mtr. standard pole with 1 Mtr. long panel frame with the following diameter:a) 2.5" (50mm) |
77 | b) 3" (75mm) |
78 | c) 4"(100mm) |
79 | 56. Assembly and Erection of 9Mtr Cantilever pole with 1 Mtr long panel frame |
80 | 57. Fixing of SPV panel to panel frame (per panel) |
81 | 58. Wiring and termination of cable at solar panel(per panel) |
82 | 59. Fixing of Signal assembly on blinker Pole (per signal head) |
83 | 60. Wiring of Signal assembly (per signal head) |
84 | 61. Fixing of controller box on blinker Pole |
85 | 62. Fixing of Warning Board size 2mtr long and above |
86 | 63. Construction of Plinth for Pole |
87 | 64. Painting with two coats of golden yellow/Silverto solar frame, pole, plinth, clamps etc. all complete |
88 | ITEM No.: 6. SOLAR BLINKER [above 20 Nos.] 65. Assembly and Erection of 6Mtr. standard pole with 1 Mtr. long panel frame with the following diameter:a) 2.5" (50mm ) |
89 | b) 3" (75mm) |
90 | c) 4"(100mm) |
91 | 66. Assembly and Erection of 9Mtr. Cantilever pole with 1 Mtr. long panel frame |
92 | 67. Fixing of SPV panel to panel frame (per panel) |
93 | 68. Wiring and termination of cable at solar panel (per panel) |
94 | 69. Fixing of Signal assembly on blinker Pole (per signal head) |
95 | 70. Wiring of Signal assembly (per signal head) |
96 | 71. Fixing of controller box on blinker Pole |
97 | 72. Fixing of Warning Board size 2mtr long and above |
98 | 73.Construction of Plinth for Pole |
99 | 74. Painting with two coats of golden yellow/Silverto solar frame, pole, plinth, clamps etc. all complete |
100 | ITEM No: 7. SOLAR STREET LIGHT (1-20 Nos.) 75. Assembly and Erection of 3" dia 6Mtr. long standard pole with 1 Mtr long panel frame |
101 | 76. Assembly and Erection of 4" dia standard pole more than 6 mtr long with 1 Mtr long panel frame |
102 | 77. Assembly and Erection of 8 to 10 Mtr. long Octagonal polewithsolar panel frame (single or double) on Foundation bolts including RCC foundation and bolting structure |
103 | 78. Fixing of SPV panel on panel frame (per panel) |
104 | 79. Wiring and termination of cable at solar panel (per panel) |
105 | 80. Fixing of LED luminaire on bend and fixing on pole |
106 | 81. Pole wiring charges including drawing of cable through pole |
107 | 82. Wiring of LED Luminaire |
108 | 83. Fixing of battery box on Pole |
109 | 84. Construction of foundation and basement for battery box of size 30cm x30cm x20cm with brick in C:M 1:6 including plastering all around top, fixing of battery box and painting two coatsgolden yellow paint with black stripes over a coat of cement primer etc. all complete |
110 | 85. Wiring of Battery box including CCU and battery |
111 | 86. Construction of Plinth for Pole |
112 | 87. Painting with two coats of paint of suitable colour onsolar frame, pole, plinth, clamps etc. all complete |
113 | 88. Fixing and wiring of conventional powered LED luminaire on existing KSEB pole excluding KSEB supervision charges (suitable clamp will be provided by KELTRON) |
114 | 89. Fixing and wiring ofconventional powered LED luminaire on existing KSEB pole including KSEB supervision charges (suitable clamp will be provided by KELTRON) |
115 | 90. Transportation of Materials at site |
116 | ITEM No.: 8. SOLAR STREET LIGHT (above 20 Nos.) 91. Assembly and Erection of 3" dia 6 Mtr. long standard pole with 1 Mtr long panel frame |
117 | 92. Assembly and Erection of 4" dia standard pole more than 6 mtr long with 1 Mtr. long panel frame |
118 | 93. Assembly and Erection of 8 to 10 Mtr. long Octagonal polewithsolar panel frame (single or double) on Foundation bolts including RCC foundation and bolting structure |
119 | 94. Fixing of SPV panel on panel frame (per panel) |
120 | 95. Wiring and termination of cable at solar panel (per panel) |
121 | 96. Fixing of LED luminaire on pole |
122 | 97. Pole wiring charges including drawing of cable through pole |
123 | 98. Wiring of LED Luminaire |
124 | 99. Fixing of battery box on Pole |
125 | 100. Construction of foundation and basement for battery box of size 30cmx30cmx20cm with brick in C:M 1:6 including plastering all around top, fixing of battery box and painting two coatsgolden yellow paint with black stripes over a coat of cement primer etc. all complete |
126 | 101. Wiring of Battery box including CCU and battery |
127 | 102. Construction of Plinth for Pole |
128 | 103. Painting with two coats of paint of suitable colour to solar frame, pole, plinth, clamps etc. all complete |
129 | 104. Fixing and wiring of conventional powered LED luminaire on existing KSEB pole excluding KSEB supervision charges (suitable clamp will be provided by KELTRON) |
130 | 105. Fixing and wiring ofconventional powered LED luminaire on existing KSEB pole including KSEB supervision charges(suitable clamp will be provided by KELTRON) |
131 | ITEM No.: 9. MINI MAST LIGHT SYSTEMS (1-10 Nos.) 106. Assembly and Erection of 4" dia 6Mtr. long standard pole with mast assembly with: a) 3 Nos. of LED luminaires |
132 | b) 4 Nos. of LED luminaires |
133 | c) 6 Nos. of LED luminaires |
134 | 107. Assembly and Erection of 4" dia 8Mtr. long standard pole with mast assembly with:a) 3 Nos. of LED luminaires |
135 | b) 4 Nos. of LED luminaires |
136 | c) 6 Nos. of LED luminaires |
137 | 108. Assembly and Erection of 8 to 10 Mtr. long Octagonal pole on Foundation bolts including RCC foundation and bolting structurewith mast assembly with: a) 3 Nos. of LED luminaires |
138 | b) 4 Nos. of LED luminaires |
139 | c) 6 Nos. of LED luminaires |
140 | 109. Fixing of LED luminaire on mast arm |
141 | 110. Pole wiring charges including drawing of cable through pole |
142 | 111. Wiring of LED Luminaire |
143 | 112. Wiring & Fixing of Junction Box on Pole |
144 | 113. Construction of foundation and basement for standard pole of size 30cmx30cmx20cm with brick in C:M 1:6 including plastering all around top, painting two coatsgolden yellow paint with black stripes over a coat of cement primer etc. all complete |
145 | 114. Painting with two coats of paint of suitable colour onstandard pole, mast & clamps etc. all complete |
146 | 115. Availingnew KSEB Electric Connectionat Pole Point excluding KSEB statutory payments (KSEB charges will be paid extra on producing the actual receipt from KSEB) |
147 | 116. Earthling of Pole as per specification |
148 | ITEM No.: 10. MINI MAST LIGHT SYSTEMS (above 10 Nos.)117. Assembly and Erection of 4" dia 6Mtr. long standard pole with mast assembly with: a) 3 Nos. of LED luminaires |
149 | b) 4 Nos. of LED luminaires |
150 | c) 6 Nos. of LED luminaires |
151 | 118. Assembly and Erection of 4" dia 8Mtr. long standard pole with mast assembly with: a) 3 Nos. of LED luminaires |
152 | b) 4 Nos. of LED luminaires |
153 | c) 6 Nos. of LED luminaires |
154 | 119. Assembly and Erection of 8 to 10Mtr. long Octagonal pole on Foundation bolts including RCC foundation and bolting structure with mast assembly with: a) 3 Nos. of LED luminaires |
155 | b) 4 Nos. of LED luminaires |
156 | c) 6 Nos. of LED luminaires |
157 | 120. Fixing of LED luminaire on mast arm |
158 | 121. Pole wiring charges including drawing of cable through pole |
159 | 122. Wiring of LED Luminaire |
160 | 123. Wiring & Fixing of Junction Box on Pole |
161 | 124. Construction of foundation and basement for standard pole of size 30cmx30cmx20cm with brick in C:M 1:6 including plastering all around top, painting two coatsgolden yellow paint with black stripes over a coat of cement primer etc. all complete |
162 | 125. Painting with two coats of paint of suitable colour onstandard pole, mast & clamps etc. all complete |
163 | 126. Availingnew KSEB Electric Connectionat Pole Point excluding KSEB statutory payments (KSEB charges will be paid extra on producing the actual receipt from KSEB) |
164 | 127. Earthing of Pole as per specification |
165 | ITEM No.: 11. LED STREET LIGHT 128. Fixing and wiring of conventional powered LED luminaire on existing KSEB pole including KSEB supervision charges (suitable clamp will be provided by KELTRON) |
166 | 129. Dismantling & Transportation of old Street Lights and subsequent Fixing & wiring of conventional powered LED luminaire on existing KSEB pole including KSEB charges |
167 | 130. Transportation of Materials at site |
168 | ITEM No.: 12. ADDITIONAL WORK FOR REPAIR & MAINTENANCE OF TRAFFIC SIGNAL131. Labour Charge (day time) / person |
169 | 132. Labour Charge (night time) / person |
170 | 133. Crane Charge |
171 | 134. Transportation of Tools (Trivandrum) |
172 | 135. Transportation ofTools & Labour (Outside Trivandrum) |
173 | 136. Paint for Poles and Controller (Including brush and Turpentine etc.) |
174 | 137. Material for fixing one Standard Pole (Including auto, loading and unloading etc.) |
175 | 138. Material for fixing one Cantilever Pole |
176 | 139. Material for fixing Controller / Battery box |
177 | 140. Breaker Charge |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy