| 1 | Road Work |
| 2 | Earthwork in Hill Road (Hill Side Cutting) |
| 3 | Excavation in soil in Hilly Area by mechanical means, Excavation in soil in Hilly Area by mechanical means Without useinng Dozer including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as |
| 4 | Excavation in Hilly Areas in Ordinary Rock by mechanical means not requiring blasting (With out Dozer) Excavation in hilly area in ordinary rock not requiring blasting by mechanical means without using Dozer including cutting and trimming of slopes and di |
| 5 | Excavation in Hilly Areas in Hard Rock requiring blasting, Excavation in hilly areas in hard rock requiring blasting, by mechanical meanswithout using Dozer , lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2. |
| 6 | Construction of Walls/ Brest walls/ Retaining walls |
| 7 | Excavation in foundation for Parapet in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction |
| 8 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704,1202 & 1203 of MORD Specifiction |
| 9 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) |
| 10 | Construction of scuppers catch pit wing wall etc. |
| 11 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction |
| 12 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:4.8 (Hand mixing) |
| 13 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204. Random rubble masonry In cement mortar (1:5). |
| 14 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) R.C.C grade M 25 |
| 15 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 &1202(The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision\"2014) and IS 1786:2008 clause no. 1.6) |
| 16 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704,1202 & 1203 of MORD Specifiction |
| 17 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203Nominal mix 1:2:4 (Hand mixing) |
| 18 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) |
| 19 | Construction ofKuchha and pucca drain |
| 20 | Construction ofKuchha drain |
| 21 | Construction of pucca drain |
| 22 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction |
| 23 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3.6 (Hand mixing) |
| 24 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203Nominal mix 1:2:4 (Hand mixing) |
| 25 | Miscellaneous items such as edge stone , view points, water points etc.Kilometre Stone, Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 |
| 26 | 5th Kilometre Stone (precast) |
| 27 | Ordinary Kilometer Stone (Precast) |
| 28 | 200 m stone (precast) |
| 29 | Providing edge stones of Size 450x350x100 mm on valley side of formation as per drawing and technical specification clause 1608.2.6 |
| 30 | Constructions of parapats on outer side of sharp curve and both side of scupper in cement plum masonary with 40% plum and 60% 1:2:4 cement concrete including necessary earth work, supply of material,labour, T&p as required for proper completion work. |
| 31 | Excavation in foundation for Parapet in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction |
| 32 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3.6 (Hand mixing) |
| 33 | Cement plum Masonry with 40% plum & 60% 1:2:4 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications |
| 34 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203Nominal mix 1:2:4 (Hand mixing) |
| 35 | Loose Stone |
| 36 | White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915 |
| 37 | WBM Grading 1 Providing, laying, spreading and compacting stone aggregates of specific sizesto water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405 |
| 38 | Muck disposal. |
| 39 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter |
| 40 | Removal ofUnsuitable Soil with Disposal upto 1000 m Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid s |
| 41 | Bridge Work |
| 42 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Mechanical Means |
| 43 | Hard rock ( blasting prohibited ) |
| 44 | Plain cement concrete in open foundation complete as per drawing and technical specifications. PCC Grade M15 |
| 45 | Reinforced cement concrete in open foundation complete as per drawing and technical specifications. RCC Grade M 30 Using Batching Plant, Transit Mixer and Concrete Pump |
| 46 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications |
| 47 | Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M 30 Using Batching Plant, Transit Mixer and Concrete Pump |
| 48 | Up to 5.0 M. |
| 49 | 5.0 to 10.0 M. |
| 50 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications |
| 51 | Supplying, fitting and fixing in position true to line and level POT-PTFE bearing tonne consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications (Including the Cost of Bearing Assembly) |
| 52 | Furnishing and Placing Reinforced cement concrete in super-structure as per drawing and Technical Specification RCC Grade M 30 Using Concrete Mixer For solid slab super-structure (hight 5 to 10 meter) |
| 53 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 54 | Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification |
| 55 | Supply and fabrication of steel truss bridge as per detailed drawing attached including supply of all structural steel E-250 confirming IS 226 - 1969 required for proper completion of the bridge including ground errection of the bridge and one coat of approved quality anticirrosive (red oxide) paint of confirming IS 5660, all T&P, nuts and bolts, washers and also including supply and fixing of shop rivets required as per drawing, required equipment shall be arranged by the contractor at his own cost which shall be taken back by the contractor after satisfactory execution of the job, the rates shall include ground errection in the workshop and its dismentling after inspection, approval and removing defects, match marking of all parts, numbering and proper stacking in the premises of workshop before cartage to site of work. The work shall be executed in accordance to IS - 1915. The rates shall include cost of all material, its wastage, cutting, bending if required, welding, making holes, shop riveting, labour, T&P etc. required for proper completion of the work. including cost of cartage from workshop to Bridge Site including safe stacking of parts. |
| 56 | Erection of Steel Truss (Girder) Bridge (up to 60m span) as per drawing with required camber including cartage of fabricated parts from the place of stack near site including submission of launching plan by the contractor, (duly vetted by a recognised reputable institution/ consultant if required) and approved by the engineer-in-charge. Service bolts to used shall be of approved make. The rate including of cost of all labour, T&P, equipments, civil work and consumables, cost of arranging, fabricating, errecting and dismantling of erection scheme including the cost of its designing, revising, supervision by contractor\"s designeer at site during erection, also including cost of all safety measures and necessary insurances of bridge and labours for proper completion of the work as per MORTH specification no. 1905 with due regard of mansoon and as per directions of the engineer-incharge. |
| 57 | Drainage Spouts complete as per drawing and Technical specification |
| 58 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications |
| 59 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification |
| 60 | Reinforced cement concrete (M-30) approach slab including formwork but excluding reinforcement steel, complete as per drawing and Technical specification |
| 61 | Providing and laying of strip seal expansion joint catering to maximum horizontal movement upto 70 mm ( complete as per approved drawings and standard specifications ) to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation |
| 62 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 63 | Painting on Steel Surfaces Providing and applying two coats of readymix paint of approved brand on steel suface after through cleaning of surface to give an even. |
| 64 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification. |
| 65 | Supply and Fixing of 16 - 24mm dia P.F. make 10.6grade HSFG High Strength Friction Grip Bolt to IS 3757:1985 latest to grade 10.9S with High Strength Friction Grip nut to IS 6623:2004 latest to grade 10S and high Strength Friction 2 No. washer including cost of all material, Labour, Fixing at site, all taxes, T&P etc required foe Proper completion of the work |
| 66 | Providing & Fixing 25 mm dia 1.8 m. long rock anchoring including supply of all materials T & P etc Complete in all respect. |
| 67 | Doing load test on bridge span as per IRC code provision, inclusive of mobilization, loading, field measurement & submission of report complete in all respect. |
| 68 | Protection Work Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Mechanical Means |
| 69 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions). |
| 70 | Approach Road |
| 71 | Hill Side Cutting Excavation in Hilly Areas in Soil by mechanical meansExcavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 |
| 72 | Excavation in Hilly Areas in Ordinary Rock by mechanical means not requiring blastingExcavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2 |
| 73 | Excavation in hilly areas in hard rock requiring blasting, by mechanical means, lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2. |
| 74 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing ofides and bottom and backfilling in trenches with excavated suitable material |
| 75 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction |
| 76 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 77 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) |