| 1 | SUPPLY OF DISTRIBUTION TRANSFORMERS FOR MSB, GDS & PFCC UNIT FOR NREP PROJECT |
| 2 | Design, detail engineering, procurement, manufacturing, testing & inspection, factory acceptance testing (FAT), packing, forwarding, transportation, route survey (if required), site acceptance testing (SAT) and supply till site including Commissioning spares, Mandatory spares, Special Tools & Tackles, Consumables, 2 Year Operational Spares for DISTRIBUTION TRANSFORMERS FOR MSB UNIT including Online Condition monitoring system for each transformer with common data concentrator along with first fill of oil and 10% extra oil in non-returnable drums as mentioned in this specification to be installed at Numaligarh Refinery Limited(NRL), Assam as specified in Material Requisition.2.0 MVA, 6.6/ 0.433 kV, ONAN, Dyn11, Z=7.5 % (No Negative Tol.), OCTC range ±5% in steps of 2.5% Tag No. for MSB UNIT - 1U64-SS14-TR-331A/B (2 Nos.) & 1U64-SS14-TR-332A/B (2 Nos.) &1U64-SS14-TR-333A/B (2 Nos.) &1U64-SS14-TR-334A/B (2 Nos.) |
| 3 | Design, detail engineering, procurement, manufacturing, testing & inspection, factory acceptance testing (FAT), packing, forwarding, transportation, route survey (if required), site acceptance testing (SAT) and supply till site including Commissioning spares, Mandatory spares, Special Tools & Tackles, Consumables, 2 Year Operational Spares for DISTRIBUTION TRANSFORMERS FOR GDS & PFCC UNIT including Online Condition monitoring system for each transformer with common data concentrator along with first fill of oil and 10% extra oil in non-returnable drums as mentioned in this specification to be installed at Numaligarh Refinery Limited(NRL), Assam as specified in Material Requisition.2.5 MVA, 6.6/0.433 kV, ONAN, Dyn11, Z=7.5% (No Negative Tol)., OCTC range ±5% in steps of 2.5%Tag No. for GDS & PFCC UNIT -1U64-SS15-TR-316A/B (2 Nos.), 1U64-SS15-TR-317A/B (2 Nos.), 1U64-SS15-TR-318A/B(2 Nos.), 1U64-SS15-TR-319A/B (2 Nos.), 1U64-SS15-TR-320A/B (2 Nos.), 1U64-SS15-TR-321A/B (2 Nos.) |
| 4 | Charges for Training for DISTRIBUTION TRANSFORMERS FORMSB, GDS & PFCC UNIT as per MR |
| 5 | Perdiem Charges for Training at Site as mentioned in the MR(For Evaluation 03 Man-Days for MSB & 03 Man-days for GDS_PFCC will be considered) |
| 6 | Perdiem Charges for Training at OEM\"s Work as mentioned in the MR(For Evaluation 02 Man-Days for MSB & 02 Man-days for GDS_PFCC will be considered) |
| 7 | Charges for SITE Supervision of Erection / Installation andTesting for SUPPLY OF DISTRIBUTION TRANSFORMERS FOR MSB, GDS & PFCC UNIT FOR NREP PROJECT(For Evaluation 24 Man-Days for MSB & 36 Man-days for GDS_PFCC will be considered) |
| 8 | Per diem charges for upto 8 hours work on normal working days. |
| 9 | Overtime rate / hour beyond normal 8 hours work on normal working days. |
| 10 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). |