Power Boards / Undertakings / PSU Closing in 0 days TDR #40054551

Tender For Wc For Erection Dismantling Maintenance Works In Respect Of Aee/Royapettah Ii Sub Division In Cedc Central.

Issued by Boards / Undertakings / PSU · nungambakkam, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
19 Oct 2023
0 days left
EMD
7080
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
nungambakkam → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Wc For Erection Dismantling Maintenance Works In Respect Of Aee/Royapettah Ii Sub Division In Cedc Central.

BOQ

Name of Work:Works contract for Erection and dismantling of DT, Structure, Pillar, Laying of HT & LT cable for improvement, extension , DCW works and allied works towards attending HT cable fault of 3x300 and 3x120 sqmm, LT cable fault of 4x240, 4x120, service cable fault of 4x25 and 2x16sqmm, Maintenance of DT,Structure and Pillar Maintenance in respect of AEE/Royapettah II (Triplicane, Royapettah II) Sub-division of Mylapore Division of CEDC/Central for a period ofOne year or exhaustion of amountwhich ever is earlier.
Sl. No. Item Description
1ERECTION OF DISTRIBUTION TRANSFORMER STRUCTURE
2Excavation of Structure Pole Pit 2x3x1/6 th of height
3Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole
4Transporting of 9.14 m poles from Road side to pole pit
5Structure pole mass Concreting and coping 0.6x0.6x1.65 for DP structure Including cost of materials and cement.
6Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing.DPDC channel, T.I. Fitting etc., in complete.
7Erection of HG fuse set with transport
8Erection of 11 KV AB switch complete setwith transport
9Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., completeincluding cost of coal and salt
10Erection of Aluminium bus bar pipe complete for H.T.Bus bar arrangements for DP Structure
11For Triple Pole and four pole structure
12Erection of H.T. jumpering in DP structure complete
13Erection of H.T. LAS
14Erection of L.T. LAS
15Erection of DT excluing loading and unloading
16Upto 100 KVA
17Above 100 KVA
18Painting of two coats of Aluminium paints for DP structure and iron materials including cost of paint and distemper etc.
19Loading and unloading of Distribution Transformer at site and store.
20Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading)
21Upto 100 KVA
22Above 100 KVA
23Crane hire charges
24LAYING OF HT CABLE
25Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,
26Normal Road (earth)
27Tar Road
28Concrete Road
29Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites.
303x300 sq mm XLPE (1 drum: 200 m)
313x120 sq mm XLPE (1 drum: 200 m)
32LAYING OF HT CABLE
33Laying of 300 sq mm XLPE cable
34Laying of 120 sq mm XLPE cable
35Covering HT cable by cement \"V\" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size onthe trough
36Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
37Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 empty drums)
38LAYING OF LT CABLE
39Tansport of LT cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites.
40240 sq.mm ( 1 drum - 200 m)
41120 sq. mm ( 1 drum - 500 m)
4225 sq. mm ( 1 drum - 500 m)
4316 sq. mm ( 1 drum - 500 m)
44Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc.
45Normal Road (earth)
46Tar Road
47Concrete Road
48LAYING OF LT CABLE
49Laying of 240 sq.mm cable
50Laying of 120 sq.mm cable
51Laying of 25 sq.mm cable
52Laying of 16 sq.mm cable
53Excavation of 11KV straight joint pit
54Provision of 11KV cable joint
55Provision of LT cable joint
56Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete.
57ERECTION OF PILLAR BOX
58Erection of pillar box including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials,elec. works, transportion, lead, lift etc.,
594/6/8 way, HRC & mini pillar boxes for 2 feet i-e 0.6m
604/6/8 way,HRC & mini pillar boxes for 3 feet i-e 0.9m(Rate for HB/Con)
614/6/8 way, HRC & mini pillar boxes for 4 feet i-e 1.2 m(Rate for HB/Con)
624/6/8 way, HRC & mini pillar boxes for 5 feet i-e 1.5 m(Rate for HB/Con)
63Cleaning & painting with Aluminium paint 2 coats & numbering with fdr details
648 way pillar box/HRC Pillar Box
656 way pillar box/HRC Pillar Box
664 way pillar box/HRC Pillar Box
67Mini way pillar box/HRC Pillar Box
68DISMANTLING OF PILLAR BOX
69Dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
704/6/8 way pillar box/HRC pillar Box
71Mini pillar box/HRC pillar Box
72Metering set loading & unloading
73Loading
74Un loading
75Erection ofmetering sets
76Up to 11 metering set
77A).Loading of poles
789.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each
79B).Un Loading of poles
809.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each
81MAINTENANCE WORK
82Maintenance of DT structure for various capacity (pole mounted structure)
83DP/TP Structure maintenance
84DT maintenance
85Replacement of HT Bushing rod
86Replacement of LT Bushing rod
87Replacement of Gasket
88Structure earthi re - wiring .
89Replacement of Structure earthing in complete without material
90DT structure Yard cleaning
91Numbering of location including cost of paint and labour
92Maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing.
938 way pillar box /6 way pillar box
944 way pillar box
95Mini pillar box
96HRC Fuse Pillar Box
97FixingofMissing Doors in Pillars including materials
98MS Mini Pillar Door
99MS 4 WayPillar Door
100MS 6 Way / 8 wayPillar Door
101FRP 4 Way Pillar Door
102Maintenance of 11 KV ABS only.(Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
10311 KV AB switch at structure in work site
10411 KV AB switch at SS
105DISMANTLING WORKS
106Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles
107Dismantling of damaged 6 way / 4 wayPillar box
108Dismatling of Transformer structure materials
109Dismatling ofAB Switch with HG Fuse set
110Releasingof \" V \" X Arm
111Stacking of materials / Scarp
112Substation Maintenance
113Removing weed in Substation/Office premises per sq.mtr(Jungle Clearance)
114Hot oil circulation for replacement of Tr.oil in Pr.Tr. With filter machine & loading.
115Transporting offilter machine unit& oil drum (to&fro)
116Cleaning of110 KV Breakersincluding CTs and allied maintenance work
117Cleaning of 110 KVLAS
118Cleaning of 110 KVAB Switch and applying Petroleum jelly
119Cleaning of 110 KV Power transformer insulators and other maintenance work
120Cleaning of 110 KV Bus Insulators
121Cleaning of33/ 11 KV Breakersincluding CTs and allied maintenance work
122Cleaning of 33 KV /11 KVLAS
123Cleaning of 33/11 KVAB Switch including tightening of Bolt & Nutt and applying Petroleum jelly
124Cleaning of 33/11 KV KV Power transformer insulators and other maintenance work
125Cleaning of 33/11 KVBus Insulators
126Aluminium painting in33KVstructure
127Aluminium painting in 11KV structure
128Aluminium painting in Power transformer
129Aluminium painting inBreaker
130Erection of AB switch alone for DP Switch

AI Tender Summary

OUR REF NO 40054551
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 19-10-2023
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Wc For Erection Dismantling Maintenance Works In Respect Of Aee/Royapettah Ii Sub Division In Cedc Central.
Basic Detail
Tender No Specn.No. 62/ 2023-24 dt 06.10.23
Bidding Type Tender
Location
City nungambakkam
State Tamil Nadu
Key Dates
Publish Date 06 Oct 2023
Submission Date 19 Oct 2023
Open Date 20 Oct 2023
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 7080
Exemption Not Available
Document List
1157d187-c43e-46f4-bd00-8fd1d5dac6b4.html
BOQ_448794.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 06, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 19, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 20, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

1157d187-c43e-46f4-bd00-8fd1d5dac6b4.html

xls

BOQ_448794.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender