Tender For Desired Work As Per E-Tender Distribution On Tonne Basis For Providing Electricity Supply As Per The Prescribed Roster In The Extended Iglas Nagar Panchayat Under The Area Of Electricity Distribution Division-Iv Iglas.
Tender Overview
Project Description
Desired Work As Per E-Tender Distribution On Tonne Basis For Providing Electricity Supply As Per The Prescribed Roster In The Extended Iglas Nagar Panchayat Under The Area Of Electricity Distribution Division-Iv Iglas.
BOQ
| Sl. No. | Item Description |
| 1 | ST Pole 11 Mtr. Long |
| 2 | PCC Pole 8.5 Mtr. Long |
| 3 | Stone Pad (300x300x75 mm) |
| 4 | Top channel (125x65x2240mm) |
| 5 | Dropper channel (100x50x2028mm) |
| 6 | V-Type Steel cross arm with clamp |
| 7 | 11 KV Pin insulator with pin complete |
| 8 | 11 KV Disc insulator with fitting |
| 9 | LT Clamp with nut & bolts for PCC Pole with neutral |
| 10 | M.S. Angle (75x75x6x2028mm) (T/F Base) |
| 11 | M.S. T-off channel with clamp B&N (100x50x1300mm) |
| 12 | F-Bracket for fitting top channel |
| 13 | Holding Clamp with bolt nut |
| 14 | Danger Board with clamp N&B |
| 15 | Stay Complete |
| 16 | Earthing Complete |
| 17 | Distribution Box with clamp |
| 18 | ABC 3x95 + 1x70 + 1x16 Sq.mm. |
| 19 | ABC 3x120 + 1x95 + 1x16 Sq.mm. |
| 20 | End Clamp |
| 21 | Eye Hook with suspension clamp |
| 22 | LT Insulator with pearsing |
| 23 | Bolt, Nut & Washers |
| 24 | 11/0.4 KV 400 KVA Transformer |
| 25 | 11/0.4 KV 100 KVA Transformer |
| 26 | 11/0.4 KV 250 KVA Transformer |
| 27 | 11/0.4 KV 63 KVA Transformer |
| 28 | LT XLE Cable AL. 1x400 Sq.mm. |
| 29 | LT XLE Cable AL. 3.5 x 240 Sq.mm. |
| 30 | PVC Cable 3.5*x70 Sq.mm. |
| 31 | 11 KV VCB O/G CTR 200/100/5A 350 MVA |
| 32 | Phase wire ACSR Dog Conductor |
| 33 | Body and neutral earthing of following L.T. distribution Transformers installed by digging of pit up to water level depth (approx. 100’) and then inserting1-1/4\" dia G.I. pipe of \"B\" grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer including the cost of arrangement of all material, labourer, T&P, carrier etc. required for proper completion of work. |
| 34 | 11/0.4 KV 400 KVA Transformer |
| 35 | 11/0.4 KV 250 KVA Transformer |
| 36 | 11/0.4 KV 63 KVA Transformer |
| 37 | Construction of following Transformer of Plinth of size 5’x5x4’ above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly after that a retaining wall of 9” width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. jall of 12 mm M.S. tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the Plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer. It including the cost of all material, labour T&P, carrier etc. required for proper completion of work. |
| 38 | 11/0.4 KV 400 KVA Transformer |
| 39 | 11/0.4 KV 250 KVA Transformer |
| 40 | 11/0.4 KV 63 KVA Transformer |
| 41 | FABRICATION & ERECTION OF FENCING AND CONSTRUCTION OF RETAINING WALL AROUNDFOLLOWING CAPACITY T/FThe complete 11/0.4 KV Substation shall be provided with two meter height fencing and retaining wall around the substation. One No. Gate with proper locking arrangement for entry of personnel shall also be provided. The fencing shall be made of 50x25 mm x10 SWG rectangular welded mesh of wire mesh in length. Wire mesh shall be fixed on panels made of 50x50x6 mm M.S. Angle. The wire mesh on panels will be supported by 25x3 mm M.S. flat on all the bracings diagonally and 50x6 M.S. Flat horizontally at the center of the panel. The panel will be joined by bolts & nuts of appropriate size with each other and on the main support on corners including supply of all material, labour, carrier and T & P etc. required for proper completion of work. The painting of complete fencing shall also be done with one coat of red oxide primer and two coat of synthetic green paint. For construction of retaining wall around the fencing, excavation of earth shall be done in foundation in ordinary soil including disposal of surplus earth at some suitable distance. The dimension of excavation shall be 1m wide, 0.45 m deep and suitable length as per wire mesh. After excavation of earth a cement concreted pad shall be laid in foundation. Concreting shall be done with Ist class brick ballast, coarse sand and cement in proportion of 8:4:1. First class brickwork shall also be done in foundation and super structure in 1:6 Cement and coarse sand including necessary cutting and moulding of bricks in foundation depth of wall 0.30 m, thickness of wall 0.35 m & superstructure brick work thickness of wall 0.23 m & depths 0.30 m including supply of all material, labour, carrier and T & P etc. required for proper completion of work. |
| 42 | 11/0.4 KV 400 KVA Transformer |
| 43 | 11/0.4 KV 250 KVA Transformer |
| 44 | 11/0.4 KV 63 KVA Transformer |
| 45 | Demounting & carriage of following capacity transformer due to overloaded including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work. |
| 46 | 11/0.4 KV 100 KVA Transformer |
| 47 | 11/0.4 KV 250 KVA Transformer |
| 48 | 11/0.4 KV 25 KVA Transformer |
| 49 | Dismantling and removal of existing conductor/cable/GI Wire from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. |
| 50 | ABC 3x120 + 1x95 + 1x16 Sq.mm. |
| 51 | Concreating of Pole |
| 52 | Concreating of Stay |
| 53 | Guarding of11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work. |
| 54 | Dismanteling of old damaged 11 KV VCBs (O/G CTR 200/100/5A 350 MVA) after opening its 11 KV cable connection removing earthing bus bar CTs and taking it out side switch yard.the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender