}

Execution Of Balanceworks Related To “Coverage Of 38 Villages Of Rwss Manaklao-Daijar-Banar Constituency Luni, Osian & Bhopalgarh District Jodhpur Viz. Rcc Cwr / Ohsrs, Providing, Laying, Jointing Of Transmission Mains, Cluster Distribution System, Vi, jodhpur-Rajasthan

Public Health Engineering Department-PHED has published Execution Of Balanceworks Related To “Coverage Of 38 Villages Of Rwss Manaklao-Daijar-Banar Constituency Luni, Osian & Bhopalgarh District Jodhpur Viz. Rcc Cwr / Ohsrs, Providing, Laying, Jointing Of Transmission Mains, Cluster Distribution System, Vi. Submission Date for this Tender is 02-01-2024. Water Pipe Line Tenders in jodhpur Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

40040419
Corrigendum : Execution Of Balanceworks Related To “Coverage Of 38 Villages Of Rwss Manaklao-Daijar-Banar Constituency Luni, Osian & Bhopalgarh District Jodhpur Viz. Rcc Cwr / Ohsrs, Providing, Laying, Jointing Of Transmission Mains, Cluster Distribution System, Vi
Open Tender
Indian
Rajasthan
jodhpur
02-01-2024

Tender Details

Execution Of Balanceworks Related To “Coverage Of 38 Villages Of Rwss Manaklao-Daijar-Banar Constituency Luni, Osian & Bhopalgarh District Jodhpur Viz. Rcc Cwr / Ohsrs, Providing, Laying, Jointing Of Transmission Mains, Cluster Distribution System, Village Distribution System And Providing Functional Household Tap Water Connections ( Fhtcs ) Including Geo-Tagging Complete Job As Per Scope & Specifications On Single Point Responsibility Basis Turnkey Lump Sum Contract Including Necessary Design And Operation & Maintenance For 10 Years ( Upto Vtc ) After 1 Year Defect Liability Period Under Jal Jeevan Mission ( Jjm )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 30-Oct-2023 1st Amendment Date 19-12-2023
2 20-Dec-2023 Amendment No 2 Date 02-01-2024

Key Value

Document Fees
INR 20000 /-
EMD
INR 8268000.0 /-
Tender Value
INR 41.34 Crore /-

BOQ Items

Name of Work: Execution of balanceworks related to “Coverage of 38 villages of RWSS MANAKLAO-DAIJAR-BANAR Constituency Luni, Osian & Bhopalgarh District JODHPUR viz. RCC CWR/OHSRs, P/L/J of Transmission mains, Cluster distribution system, Village distribution system and providing Functional Household Tap water Connections (FHTCs) including Geo-tagging complete job as per scope & specifications on Single Point Responsibility Basis Turnkey Lump sum contract including necessary Design and Operation & maintenance for 10 years (upto VTC) after 1 year defect liability period under Jal Jeevan Mission (JJM)
Sl. No. Item Description
1DI K-7 Pipeline : Rising Main / Cluster / Distribution Pipelines Providing,lowering, Laying, aligning fixing in position and jointing in trenches Ductile Iron(DI) ISI marked K-7 grade S&S pipes as per IS 8329-2000 (ammended upto date) with internal cement mortar lining suitable for potable water with rubber ring (EPDM) joints as per IS 5382-1985 including all taxes (Central&local) transportation and freight charges inspection charges loading / unloading charges stacking of pipes including cost of labour and material, specials (Tee,Bend etc.)sectional testing, and commissioning ofpipe lines, including earthwork, bedding, construction of anchors blocks, thrust blocks, cross walls, transverse blocks, pipe support structures; road /canal /NH /Oil & Gas pipeline crossing works; repairs of crossed roads/canals/NH, cross drainage crossing works;dismantling and reconstruction of all types of roads; installation of specials; clearing the site;disinfections etc. complete in all respect as per the specification & scope of work for following diameter.
280 mm dia K-7
360% on supply
420 % on laying
510% on Hydro testing
65% on pre comissioning
75% Trial Run
8100 mm dia K-7
960% on supply
1020 % on laying
1110% on Hydro testing
125% on pre comissioning
135% Trial Run
14150 mm dia K-7
1560% on supply
1620 % on laying
1710% on Hydro testing
185% on pre comissioning
195% Trial Run
20200 mm dia K-7
2160% on supply
2220 % on laying
2310% on Hydro testing
245% on pre comissioning
255% Trial Run
26250 mm dia K-7
2760% on supply
2820 % on laying
2910% on Hydro testing
305% on pre comissioning
315% Trial Run
32300 mm dia K-7
3360% on supply
3420 % on laying
3510% on Hydro testing
365% on pre comissioning
375% Trial Run
38350 mm dia K-7
3960% on supply
4020 % on laying
4110% on Hydro testing
425% on pre comissioning
435% Trial Run
44400 mm dia K-7
4520 % on laying
4610% on Hydro testing
475% on pre comissioning
485% Trial Run
49450 mm dia PE -80 PN-6
5060% on supply
5120 % on laying
5210% on Hydro testing
535% on pre comissioning
545% Trial Run
55HDPE PN 6 PE 80 Pipeline : Cluster / Distribution Pipelines Providing,lowering,laying and jointing in trenches,standard lengths HDPE ISI marked pipes of following grade and nominal diameter as per Is: 4984 :1995 (amended upto date) with necessary jointing material like mechanical connecters,i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and jointing pipes in proper position including all specials by butt fusion/ electro fusion welding method ,including all taxes (Central and local ), tranportation and frieght charges, inspection charges, dismantling and reconstruction of all types of roads; loading/inloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.),satisfactory hydraulic testing,disinfection etc. complete as per technical specifications and direction of Enginer in-charge includingearth work
5675 mm dia PE -80 PN-6
5760% on supply
5820 % on laying
5910% on Hydro testing
605% on pre comissioning
615% Trial Run
6290 mm dia PE -80 PN-6
6360% on supply
6420 % on laying
6510% on Hydro testing
665% on pre comissioning
675% Trial Run
68110 mm dia PE -80 PN-6
6960% on supply
7020 % on laying
7110% on Hydro testing
725% on pre comissioning
735% Trial Run
74125 mm dia PE -80 PN-6
7560% on supply
7620 % on laying
7710% on Hydro testing
785% on pre comissioning
795% Trial Run
80140 mm dia PE -80 PN-6
8160% on supply
8220 % on laying
8310% on Hydro testing
845% on pre comissioning
855% Trial Run
86160 mm dia PE -80 PN-6
8760% on supply
8820 % on laying
8910% on Hydro testing
905% on pre comissioning
915% Trial Run
92180 mm dia PE -80 PN-6
9360% on supply
9420 % on laying
9510% on Hydro testing
965% on pre comissioning
975% Trial Run
98200 mm dia PE -80 PN-6
9920 % on laying
10010% on Hydro testing
1015% on pre comissioning
1025% Trial Run
103225 mm dia PE -80 PN-6
10460% on supply
10520 % on laying
10610% on Hydro testing
1075% on pre comissioning
1085% Trial Run
109Railway Crossings : Railway crossing of the pipelines, complete job as per scope, specifications and approved drawing of Railways. Job will include all required fees, lease amount, labour & material, construction cost etc. complete job.
110Highway Crossings : NH/SH/NHAI/MDR road crossing of the pipelines, complete job as per scope, specifications and approved drawing. Job will include all required fees, lease amount, labour & material, construction cost etc. complete job.
111House Connections: Providing Household Tap Connectionas per technical specification and approved drawing as per relevant IS code (amended up to date) from uPVC/DI/AC/MS/GI pipe line up to consumer meter/premises by using PVC/MS saddle piece (Complete job).This job includes digging out suitable size of pits and trench for laying service line in all kinds of soil (excluding road); depositing and refilling of pit & jhiri with watering & ramming /compacting in layers and disposal of surplus excavated soil as directed with in a lead of 100 meter ; providing & fixing of all fitting duly approved in accordance withspecification for potable water including MS/PVC saddle piece, gunmetal ferrule 4.0 mm , GM Full-way Valve (IS:778 Mark) or wheel valveand specials, below ground level 20 mm nominal dia MDPE pipe PE80 PN 16 as per ISO 4427 / 20 mm nominaldia PPR-C (Three layered) pipePN16 SDR 7.4 (IS:15801:2008) (ISI mark) and above ground level using 20 mm dia PPR-C pipe with standard PPR fittings/ 15 mm dia GI pipe with fittings in the premises for fixing a tap / meter box (excluding),including accessories with flushing, cleaning, disinfecting and testing of pipe line complete required for making of service connection complete in all respect including labour charges . The service line should be laid at least 45 cm below ground level. Complete job including dismantling and reconstruction of all types of roads.
11275 %after making functional household water connection and repairing of Roads
11320 % after 7 days of water supply being available through the connection and making entry of consumer in IMIS website.
1145% Trail Run
115Supply & installation of Electromagnetic Flow meters including the cost of sluice valve, dismantling joints/expansion bellow,specials; pipes; pressure gauge; etc. complete, as per the scope of work and specifications, complete in all respect size: Location : rising mains at respective Pump House
11680 mm
117100 mm
118125 mm
119150 mm
120200 mm
121300 mm
122Supply & installation of Bulk Flow meterswith removable mechanism class "B" confirming to ISO:4064:2005/ IS: 2373of approved make of following dia sized pipelines and specifications complete:Media : Water (Clear ), Temp. 50 deg., Pr. rating: PN16, Protection type: IP- 68,Body Material : IS-210 Gr. FG-200, Accuracy Class :Class B (±2 % @ Nominal flow rate), Magnetic Drive,Dry Dial, Epoxy powder coated, Pulse out put option, Anti-magnetic protection including all materials and making connection with existing pipeline required for Bulk Flow Meter including cutting the existing pipeline including the cost of sluice valve, dismantling joints/expansion bellow,specials; pipes; pressure gauge; etc. complete, as per the scope of work and specifications, complete in all respect size: Location : Near 20 ESRs and 37 VTCs. The work at VTCs will also include all type of piping work and minor civil repair work etc. to make good existing VTC structures.
123100 mm
124125mm
125150 mm
126200 mm
127250 mm
128300 mm
129400 mm
130Supply and installation of manually operated sectionlising & scour valve DI D/F Resilient seated (soft seated) Sluice Valves (Gate Valves) , and Stain less steel AISI 304 Expansion bellows of 10/16 bar rating with tie rods/dismantling joints as per direction EIC complete in all respect as per the scope of work and specification.For sizes
131100mm
13230% on Installation
1335% on pre comissioning
1345% on Trial run
135150mm
13630% on Installation
1375% on pre comissioning
1385% on Trial run
139200mm
14030% on Installation
1415% on pre comissioning
1425% on Trial run
143250mm
14430% on Installation
1455% on pre comissioning
1465% on Trial run
147300mm
14830% on Installation
1495% on pre comissioning
1505% on Trial run
151350mm
15230% on Installation
1535% on pre comissioning
1545% on Trial run
155450mm
15630% on Installation
1575% on pre comissioning
1585% on Trial run
159Supply and installation of manually operated CI D/F Sluice Valves , as per IS 14846 10/16 bar rating with tie rods/dismantling joints as per direction EIC complete in all respect as per the scope of work and specification.For sizes
16080mm
16130% on Installation
1625% on pre comissioning
1635% on Trial run
164100mm
16530% on Installation
1665% on pre comissioning
1675% on Trial run
168125 mm
16930% on Installation
1705% on pre comissioning
1715% on Trial run
172150mm
17330% on Installation
1745% on pre comissioning
1755% on Trial run
176200mm
17730% on Installation
1785% on pre comissioning
1795% on Trial run
180250mm
18130% on Installation
1825% on pre comissioning
1835% on Trial run
184300 mm
18530% on Installation
1865% on pre comissioning
1875% on Trial run
188350mm
18930% on Installation
1905% on pre comissioning
1915% on Trial run
192400 mm
19330% on Installation
1945% on pre comissioning
1955% on Trial run
196Construction of Chamber for Sluice Valve complete in all respect as per the scope of work and specification.
197Chambers for 100 mm to 150 mm
198Chambers for 200 mm to 300 mm
199Chambers for 350 mm to 600 mm
200Supply and installation of manually operated sectionlising & scour valve DI D/F Resilient seatedSupply & installation of DI Body Flanged End Tamper proof Kinetic Air Valve of min. PN1.6 with isolating sluice valves, with cost of specials etc., as per the scope of work and specifications & drawings, complete in all respect.
20125mm
20230% on Installation
2035% on pre comissioning
2045% on Trial run
20550mm
20630% on Installation
2075% on pre comissioning
2085% on Trial run
20980mm
21030% on Installation
2115% on pre comissioning
2125% on Trial run
213100mm
21430% on Installation
2155% on pre comissioning
2165% on Trial run
217Construction of Air valve chamber/pillar , as per the scope of work and specifications & drawings, complete in all respect
218Air valve Pillars
219Pump House (Civil Works):- Design & Construction of pump house buildingin RCC framed structureas per requirement shown in drawing, scope of work & Specification including all associated civil works likedry pit, connection to CWR/RWR through inlet pipe, pumping machinery foundation, thrust block in pump house, control room, supports work for header main, etc.The construction shall include the cost of providing MS girder for the OHT, civil works for installation of pump and panels, cable trenches, drainage lines, plinth protection, etc. to complete the scope of work given in tender document and the work of construction of thrust blocks, anchors etc., within/outside the pump house and construction of chambers for electromagnetic flow meters and valves as per Scope of work & Technical Specifications given in Tender Document, at
220Clear Water Pumping Station at BanarHead workFor Installation of 3W+3S Pumps & 2 pumps for future) Minimum area of 60 sqm
221Clear Water Pumping Station at Naiyo ki PayuHead workFor Installation of 2W+2S Pumps & 2 pumps for future) Minimum area of 48 sqm
222Clear Water Pumping Station at Manaklao Head work(Exetension of existing pump house) For Installation of 6W+6S Pumps & 2 pumps for future) Minimum area of 80 sqm
223Clear Water Pumping Station at Palri-Khichiya Head workFor Installation of 3W+3S Pumps & 2 pumps for future) Minimum area of 60 sqm
224Pump House - Mechanical and Electrical Equipment & Accessories: - Designing, Providing, installation, testing, trial run and commissioning of following pumps & energy efficient motors with base plate and other accessories, as per the scope of work & specifications given: Discharge and Tentative duty Head of pumpsets are as under:
225Centrifugal horizontal split casing pumps & motor all other accessories of following duty conditions
226Manaklao Pumping Station Clear Water Pumping Station at Manaklao to 450mm line 125.74 LPS /62 m head/156.66 KW (1W+1S), Total 313.32 KW
227Banar Pumping Station
228For ESR Banar 36.98 LPS / 30 m head/22.38 KW (1W+1S), Total 44.76 KW
229For Nandra-Kallan CWR 23.92 LPS/30 m head/14.92 KW (1W+1S) Total 29.84 KW
230Centrifugal Mono Block pumps & motor all other accessories of following duty conditions
231Banar Pumping Station
232For Deoliyan & Vishnoyo KD 5.80 LPS/48 m head/5.595 KW (1W+1S), Total 11.19 KW
233Manaklao Pumping Station
234For ESR Manai 4.53 LPS / 75 m head/7.46 KW (1W+1S), Total 14.92 KW
235For ESR Basni Karwar 2.4 LPS/39 m head/3.73 KW (1W+1S), Total 7.46 KW
236For ESR Rampura Bhatiyan 7.14 LPS/52 m head/7.46 KW (1W+1S), Total 14.92 KW
237For CWR Palri-Khichiya Head work 11.16 LPS/58 m head/14.92 KW (1W+1S), Total 29.84 KW
238Ralawas & Jajiwal Bhatiyan 18.26 LPS/57 m head/22.38 KW) (1W+1S) Total 44.76 KW
239Naiyo ki Piou Pumping Station
240For ESR Naiyo ki Paiyu 11.22 LPS / 30 m head/7.46 KW (1W+1S), Total 14.92 KW
241For ESR Jajiwal Bhramna 9.69 LPS/39 m head/7.46 KW (1W+1S) Total 14.92 KW
242Palri-Khichiya Pumping Station
243ForESR Palri-Khichiya 14.55 LPS / 30 m head/9.325 KW (1W+1S), Total 18.65 KW
244For ESR Palri Mangaliya 7.78 LPS/47 m head/7.46 KW (1W+1S), Total 14.92 KW
245Distribution for Palri Natha & Palri Panwara 6.94 LPS/55 m head/7.46 KW (1W+1S) Total 14.92 KW
246Nandra Kallan Pumping Station
247Uchiyara CWR & kharda Randhir ESR 12.85 LPS / 66 m head/18.65 KW (1W+1S), Total 37.30 KW
248Jajiwal Kallan Pumping Station
249Distribuion for Jaiwal Kallan-Bhandariya Kallan and Kakarla 19.58 LPS / 30 m head/14.92 KW (1W+1S), Total 29.84 KW
250Designing, providing, laying, jointing & testing of MS piping work complete job including suction / delivery piping, header pipes with provision of future expansion, pipes to pump inlets includes compound gauge, gate valve & dismantling joint, Sluice Valves and integral starter of Class PN 1.6 on suction & delivery individual common header with dismantalling joints, all fittings etc. complete, delivery manifold, outlet pipes with specials, one sluice valve, one butterfly valve with dismantling joint on individual and common delivery header, one dual plate check valve , expansion bellow, fittings, and other accessories as per scope of work and specifications as mentioned in the tender document and as per enclosed drawings, forfollowing pumping stations.
251Clear Water Pumping Station At Banar Head work
252Clear Water Pumping Station At Naiyo ki PiayuHead work
253Clear Water Pumping Station At Manaklao Head work
254Clear Water Pumping Station At Palri KhichiyanHead work
255Existing Clear Water Pumping Station At Jajiwal Kallan Head work
256Existing Clear Water Pumping Station At Nandra Kallan Head work
257Motor control panels for the pumps as per given scope of work and specifications for allmotors forfollowing pumping stations. (DOL starters for the motors upto 5 KW, Star Delta starters for motors beyond 5 KW and up to 30KW and soft starters above 30KW)
258Clear Water Pumping Station At Banar Head work
259Clear Water Pumping Station At Naiyo ki PiayuHead work
260Clear Water Pumping Station At Manaklao Head work
261Clear Water Pumping Station At Palri KhichiyanHead work
262Existing Clear Water Pumping Station At Jajiwal Kallan Head work
263Existing Clear Water Pumping Station At Nandra Kallan Head work
264APFC panel as per given scope of work and specifications for the pumping station forfollowing pumping stations.
265Clear Water Pumping Station At Banar Head work
266Clear Water Pumping Station At Naiyo ki PiayuHead work
267Clear Water Pumping Station At Manaklao Head work
268Clear Water Pumping Station At Palri KhichiyanHead work
269Existing Clear Water Pumping Station At Jajiwal Kallan Head work
270Existing Clear Water Pumping Station At Nandra Kallan Head work
271LT cables with cable trays and accessories for motors & electrical equipment to be provided in pump houses as per given scope of work and specifications forfollowing pumping stations.
272Clear Water Pumping Station At Banar Head work
273Clear Water Pumping Station At Naiyo ki PiayuHead work
274Clear Water Pumping Station At Manaklao Head work
275Clear Water Pumping Station At Palri KhichiyanHead work
276Existing Clear Water Pumping Station At Jajiwal Kallan Head work
277Existing Clear Water Pumping Station At Nandra Kallan Head work
278Submersible type dewatering pump (10KLH,10 mt head), 1W+1S with level control switch & all necessary electric accessories. The work also includes drainage piping up to nearest drain outside pump house building.
279Design and supply installation of Earthing system for LT equipments, instrumentation and motors to be installed in the contractat pumping station.
280Clear Water Pumping Station At Banar Head work
281Clear Water Pumping Station At Naiyo ki PiayuHead work
282Clear Water Pumping Station At Manaklao Head work
283Clear Water Pumping Station At Palri KhichiyanHead work
284Existing Clear Water Pumping Station At Jajiwal Kallan Head work
285Existing Clear Water Pumping Station At Nandra Kallan Head work
286Supply & Installation of manually operated O.H.T.cranes with Electric hoists as per scope of the work and specifications for following pumping stations.
287Clear Water Pumping Station At Banar Head work
288Clear Water Pumping Station At Naiyo ki PiayuHead work
289Clear Water Pumping Station At Manaklao Head work
290Clear Water Pumping Station At Palri KhichiyanHead work
291Providing & installation of pressure sensor, transmitter and indicator on each delivery common header pipe installed in the pump house on 16 rising mains and level sensor for total 20 ESRs and 6 CWRs including instrumentation control panel, complete in all respect as per given scope of work and specifications.
292Clear Water Reservior: Design & Construction of RCC Clear Water reservoirs, as per specifications including fixing inlet; outlet & overflow pipes, installation of valves on inlet & outlet pipes, puddle collars, duck foot bends, pipe interconnecting the incoming & out going mains with all specials, water indicator, plinth protection works, with inter connection with existing system finishing, testing and commissioning complete as per the specifications and scope of work at following Head Works
293At Banar Head Work-750 KL ( balance work)
294At Palri - Khichaiyan-250 KL
295At Naiyo Ki Piayu-250 KL ( balance work)
296Construction of Elevated ServiceReservoirDesign & Construction of Over Head Service reservoirs of requiredstaging, as per specifications including fixing inlet; outlet; washout & overflow pipes, installation of valves on inlet; outlet; washout & overflow pipes, puddle collars, duck foot bends, pipe interconnecting with the incoming & out going mains with all specials; water indicator,remote monitoring device with remote meter reading system at head works necessary instrumentation works, specifications and drawing plinth protection works on each SR / ESR, finishing,testing with multi purpose room in each ESR campus, commissioning complete as per the specifications and scope of work of following capacities at:
297Manai-150KL, 20 m staging ( balance work)
298Basni Karwar-100 KL,24 m staging
299Palri Mangliya -250 KL ,20 m staging ( balance work)
300Jajiwal Bhatiyan -150 KL,22 m staging ( balance work)
301Jajiwal Gehlota-150 KL ,18 m staging ( balance work)
302Thabukara -150 KL ,18 m staging( balance work)
303Daijar -350 KL,20 m staging ( balance work)
304Kharda-Randhir -250 KL ,20 m staging( balance work)
305Vishnoiyo KD-75 KL ,18 m staging ( balance work)
306Deoliya -100 KL ,18 m staging ( balance work)
307Design, providing, installation and testing commissioning of SCADA System for Automation in Project as per scope of work and specifications.
308SCADA Master Control Station atManaklao
309SCADA Local Control Stations at following locations including CWRs at respective Pump House
310Pumping stationManaklao and WTP Mananklao
311Pumping station Palari khichiya
312Pumping stationNaiyo ki Piou
313Pumping station Banar
314Pumping station Jajiwal Kallan
315Pumping station Nandra Kallan
316Remote Stations at 37 VTCs for data transfer of Flow and pressure to LCS and MCS
317Remote Stations at 20 ESRsfor data transfer of water level to LCS and MCS
318Construction of Boundary wall at Nandra Kallan (Extension), Jajiwal Kallan (Extension), Palri Khichiyan PS and at10 No ESR sites including Gates, Cowcatcher,etc. as per scope and specification, as per 1direction of EIC.
319Campus development at Palri Khichiyan and Naiyo ki Paiyu head works including general grading of the campus,Horticulture water supply, sanitation arrangement, Construction of RCC (M-20) approach roadat IPS head works etc.
320Construction of roof top rain water harvesting structure 40 KL capacity tanka at Govt. building
321Raising of height 1.2 mtr of existing Boundary Wall with 1.8 mtr barbed wired fencing at Banar HW. This includes raising of height over the existing boundary wall with erection of GI barbed wire fancing on it.Complete work as per specification and scope of work.
322Reparing of WTP at Manakalo HW.Makingthe plant operation through PLC/SCADA for automation, including installation of new electrically operated sluice valvesof WTP. Installation of ultrasonic flow meter on raw water inlet channel.Calibration and rectification of existing parashall flume with SS flume or new construction if required. Installatioon of new 600 mm EM Flow Meter on 800 mm incomer pipeline. All valves and flow meter shall be integrated with SCADA for automation and monitoring. Necessary Panels, Consols, wiring desktop computer etc. shall be part of job as per standard practice.New PACl storage and dosing mechanism includingone month storagein yard and one day storagein chemical house for dosing. Also include all required pumps, piping, cabling, tanks etc. complete job for PACl storage and handling/dosing. Complete job as per scope of work
323Reparing of RWR (Diggi) at Manaklao HW. Reparing of damaged side lining as per scope of work.
324Tools and tackles a per scope of work. Complete
325Spare parts for Pipeline, Mechanical/Electrical/Instrumentation works complete job as per scoppe of work
326O & M of complete Project for 10 years including existing components Cost for Basic Service Charges, Administration and Management, Running of Office, Staff Quarters, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Cost of material required for maintenance & repairs, Cost of Lubricants, cost of required chemicals (PACl, Lime, Chlorine etc.), bleaching powder (if necessary), Consumables, Spare Parts (if the spare parts supplied to PHED are used in emergency)as per Scope of Work & terms & conditions of contract. Complete job for 10 years after 1 year defect liability period including all required man power, chemicals, consumables, repairs, replacements etc.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail