Public Health Engineering Department-PHED has published Execution Of Balanceworks Related To “Coverage Of 38 Villages Of Rwss Manaklao-Daijar-Banar Constituency Luni, Osian & Bhopalgarh District Jodhpur Viz. Rcc Cwr / Ohsrs, Providing, Laying, Jointing Of Transmission Mains, Cluster Distribution System, Vi. Submission Date for this Tender is 02-01-2024. Water Pipe Line Tenders in jodhpur Rajasthan. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-Oct-2023 | 1st Amendment | Date | 19-12-2023 |
2 | 20-Dec-2023 | Amendment No 2 | Date | 02-01-2024 |
Sl. No. | Item Description |
1 | DI K-7 Pipeline : Rising Main / Cluster / Distribution Pipelines Providing,lowering, Laying, aligning fixing in position and jointing in trenches Ductile Iron(DI) ISI marked K-7 grade S&S pipes as per IS 8329-2000 (ammended upto date) with internal cement mortar lining suitable for potable water with rubber ring (EPDM) joints as per IS 5382-1985 including all taxes (Central&local) transportation and freight charges inspection charges loading / unloading charges stacking of pipes including cost of labour and material, specials (Tee,Bend etc.)sectional testing, and commissioning ofpipe lines, including earthwork, bedding, construction of anchors blocks, thrust blocks, cross walls, transverse blocks, pipe support structures; road /canal /NH /Oil & Gas pipeline crossing works; repairs of crossed roads/canals/NH, cross drainage crossing works;dismantling and reconstruction of all types of roads; installation of specials; clearing the site;disinfections etc. complete in all respect as per the specification & scope of work for following diameter. |
2 | 80 mm dia K-7 |
3 | 60% on supply |
4 | 20 % on laying |
5 | 10% on Hydro testing |
6 | 5% on pre comissioning |
7 | 5% Trial Run |
8 | 100 mm dia K-7 |
9 | 60% on supply |
10 | 20 % on laying |
11 | 10% on Hydro testing |
12 | 5% on pre comissioning |
13 | 5% Trial Run |
14 | 150 mm dia K-7 |
15 | 60% on supply |
16 | 20 % on laying |
17 | 10% on Hydro testing |
18 | 5% on pre comissioning |
19 | 5% Trial Run |
20 | 200 mm dia K-7 |
21 | 60% on supply |
22 | 20 % on laying |
23 | 10% on Hydro testing |
24 | 5% on pre comissioning |
25 | 5% Trial Run |
26 | 250 mm dia K-7 |
27 | 60% on supply |
28 | 20 % on laying |
29 | 10% on Hydro testing |
30 | 5% on pre comissioning |
31 | 5% Trial Run |
32 | 300 mm dia K-7 |
33 | 60% on supply |
34 | 20 % on laying |
35 | 10% on Hydro testing |
36 | 5% on pre comissioning |
37 | 5% Trial Run |
38 | 350 mm dia K-7 |
39 | 60% on supply |
40 | 20 % on laying |
41 | 10% on Hydro testing |
42 | 5% on pre comissioning |
43 | 5% Trial Run |
44 | 400 mm dia K-7 |
45 | 20 % on laying |
46 | 10% on Hydro testing |
47 | 5% on pre comissioning |
48 | 5% Trial Run |
49 | 450 mm dia PE -80 PN-6 |
50 | 60% on supply |
51 | 20 % on laying |
52 | 10% on Hydro testing |
53 | 5% on pre comissioning |
54 | 5% Trial Run |
55 | HDPE PN 6 PE 80 Pipeline : Cluster / Distribution Pipelines Providing,lowering,laying and jointing in trenches,standard lengths HDPE ISI marked pipes of following grade and nominal diameter as per Is: 4984 :1995 (amended upto date) with necessary jointing material like mechanical connecters,i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and jointing pipes in proper position including all specials by butt fusion/ electro fusion welding method ,including all taxes (Central and local ), tranportation and frieght charges, inspection charges, dismantling and reconstruction of all types of roads; loading/inloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.),satisfactory hydraulic testing,disinfection etc. complete as per technical specifications and direction of Enginer in-charge includingearth work |
56 | 75 mm dia PE -80 PN-6 |
57 | 60% on supply |
58 | 20 % on laying |
59 | 10% on Hydro testing |
60 | 5% on pre comissioning |
61 | 5% Trial Run |
62 | 90 mm dia PE -80 PN-6 |
63 | 60% on supply |
64 | 20 % on laying |
65 | 10% on Hydro testing |
66 | 5% on pre comissioning |
67 | 5% Trial Run |
68 | 110 mm dia PE -80 PN-6 |
69 | 60% on supply |
70 | 20 % on laying |
71 | 10% on Hydro testing |
72 | 5% on pre comissioning |
73 | 5% Trial Run |
74 | 125 mm dia PE -80 PN-6 |
75 | 60% on supply |
76 | 20 % on laying |
77 | 10% on Hydro testing |
78 | 5% on pre comissioning |
79 | 5% Trial Run |
80 | 140 mm dia PE -80 PN-6 |
81 | 60% on supply |
82 | 20 % on laying |
83 | 10% on Hydro testing |
84 | 5% on pre comissioning |
85 | 5% Trial Run |
86 | 160 mm dia PE -80 PN-6 |
87 | 60% on supply |
88 | 20 % on laying |
89 | 10% on Hydro testing |
90 | 5% on pre comissioning |
91 | 5% Trial Run |
92 | 180 mm dia PE -80 PN-6 |
93 | 60% on supply |
94 | 20 % on laying |
95 | 10% on Hydro testing |
96 | 5% on pre comissioning |
97 | 5% Trial Run |
98 | 200 mm dia PE -80 PN-6 |
99 | 20 % on laying |
100 | 10% on Hydro testing |
101 | 5% on pre comissioning |
102 | 5% Trial Run |
103 | 225 mm dia PE -80 PN-6 |
104 | 60% on supply |
105 | 20 % on laying |
106 | 10% on Hydro testing |
107 | 5% on pre comissioning |
108 | 5% Trial Run |
109 | Railway Crossings : Railway crossing of the pipelines, complete job as per scope, specifications and approved drawing of Railways. Job will include all required fees, lease amount, labour & material, construction cost etc. complete job. |
110 | Highway Crossings : NH/SH/NHAI/MDR road crossing of the pipelines, complete job as per scope, specifications and approved drawing. Job will include all required fees, lease amount, labour & material, construction cost etc. complete job. |
111 | House Connections: Providing Household Tap Connectionas per technical specification and approved drawing as per relevant IS code (amended up to date) from uPVC/DI/AC/MS/GI pipe line up to consumer meter/premises by using PVC/MS saddle piece (Complete job).This job includes digging out suitable size of pits and trench for laying service line in all kinds of soil (excluding road); depositing and refilling of pit & jhiri with watering & ramming /compacting in layers and disposal of surplus excavated soil as directed with in a lead of 100 meter ; providing & fixing of all fitting duly approved in accordance withspecification for potable water including MS/PVC saddle piece, gunmetal ferrule 4.0 mm , GM Full-way Valve (IS:778 Mark) or wheel valveand specials, below ground level 20 mm nominal dia MDPE pipe PE80 PN 16 as per ISO 4427 / 20 mm nominaldia PPR-C (Three layered) pipePN16 SDR 7.4 (IS:15801:2008) (ISI mark) and above ground level using 20 mm dia PPR-C pipe with standard PPR fittings/ 15 mm dia GI pipe with fittings in the premises for fixing a tap / meter box (excluding),including accessories with flushing, cleaning, disinfecting and testing of pipe line complete required for making of service connection complete in all respect including labour charges . The service line should be laid at least 45 cm below ground level. Complete job including dismantling and reconstruction of all types of roads. |
112 | 75 %after making functional household water connection and repairing of Roads |
113 | 20 % after 7 days of water supply being available through the connection and making entry of consumer in IMIS website. |
114 | 5% Trail Run |
115 | Supply & installation of Electromagnetic Flow meters including the cost of sluice valve, dismantling joints/expansion bellow,specials; pipes; pressure gauge; etc. complete, as per the scope of work and specifications, complete in all respect size: Location : rising mains at respective Pump House |
116 | 80 mm |
117 | 100 mm |
118 | 125 mm |
119 | 150 mm |
120 | 200 mm |
121 | 300 mm |
122 | Supply & installation of Bulk Flow meterswith removable mechanism class "B" confirming to ISO:4064:2005/ IS: 2373of approved make of following dia sized pipelines and specifications complete:Media : Water (Clear ), Temp. 50 deg., Pr. rating: PN16, Protection type: IP- 68,Body Material : IS-210 Gr. FG-200, Accuracy Class :Class B (±2 % @ Nominal flow rate), Magnetic Drive,Dry Dial, Epoxy powder coated, Pulse out put option, Anti-magnetic protection including all materials and making connection with existing pipeline required for Bulk Flow Meter including cutting the existing pipeline including the cost of sluice valve, dismantling joints/expansion bellow,specials; pipes; pressure gauge; etc. complete, as per the scope of work and specifications, complete in all respect size: Location : Near 20 ESRs and 37 VTCs. The work at VTCs will also include all type of piping work and minor civil repair work etc. to make good existing VTC structures. |
123 | 100 mm |
124 | 125mm |
125 | 150 mm |
126 | 200 mm |
127 | 250 mm |
128 | 300 mm |
129 | 400 mm |
130 | Supply and installation of manually operated sectionlising & scour valve DI D/F Resilient seated (soft seated) Sluice Valves (Gate Valves) , and Stain less steel AISI 304 Expansion bellows of 10/16 bar rating with tie rods/dismantling joints as per direction EIC complete in all respect as per the scope of work and specification.For sizes |
131 | 100mm |
132 | 30% on Installation |
133 | 5% on pre comissioning |
134 | 5% on Trial run |
135 | 150mm |
136 | 30% on Installation |
137 | 5% on pre comissioning |
138 | 5% on Trial run |
139 | 200mm |
140 | 30% on Installation |
141 | 5% on pre comissioning |
142 | 5% on Trial run |
143 | 250mm |
144 | 30% on Installation |
145 | 5% on pre comissioning |
146 | 5% on Trial run |
147 | 300mm |
148 | 30% on Installation |
149 | 5% on pre comissioning |
150 | 5% on Trial run |
151 | 350mm |
152 | 30% on Installation |
153 | 5% on pre comissioning |
154 | 5% on Trial run |
155 | 450mm |
156 | 30% on Installation |
157 | 5% on pre comissioning |
158 | 5% on Trial run |
159 | Supply and installation of manually operated CI D/F Sluice Valves , as per IS 14846 10/16 bar rating with tie rods/dismantling joints as per direction EIC complete in all respect as per the scope of work and specification.For sizes |
160 | 80mm |
161 | 30% on Installation |
162 | 5% on pre comissioning |
163 | 5% on Trial run |
164 | 100mm |
165 | 30% on Installation |
166 | 5% on pre comissioning |
167 | 5% on Trial run |
168 | 125 mm |
169 | 30% on Installation |
170 | 5% on pre comissioning |
171 | 5% on Trial run |
172 | 150mm |
173 | 30% on Installation |
174 | 5% on pre comissioning |
175 | 5% on Trial run |
176 | 200mm |
177 | 30% on Installation |
178 | 5% on pre comissioning |
179 | 5% on Trial run |
180 | 250mm |
181 | 30% on Installation |
182 | 5% on pre comissioning |
183 | 5% on Trial run |
184 | 300 mm |
185 | 30% on Installation |
186 | 5% on pre comissioning |
187 | 5% on Trial run |
188 | 350mm |
189 | 30% on Installation |
190 | 5% on pre comissioning |
191 | 5% on Trial run |
192 | 400 mm |
193 | 30% on Installation |
194 | 5% on pre comissioning |
195 | 5% on Trial run |
196 | Construction of Chamber for Sluice Valve complete in all respect as per the scope of work and specification. |
197 | Chambers for 100 mm to 150 mm |
198 | Chambers for 200 mm to 300 mm |
199 | Chambers for 350 mm to 600 mm |
200 | Supply and installation of manually operated sectionlising & scour valve DI D/F Resilient seatedSupply & installation of DI Body Flanged End Tamper proof Kinetic Air Valve of min. PN1.6 with isolating sluice valves, with cost of specials etc., as per the scope of work and specifications & drawings, complete in all respect. |
201 | 25mm |
202 | 30% on Installation |
203 | 5% on pre comissioning |
204 | 5% on Trial run |
205 | 50mm |
206 | 30% on Installation |
207 | 5% on pre comissioning |
208 | 5% on Trial run |
209 | 80mm |
210 | 30% on Installation |
211 | 5% on pre comissioning |
212 | 5% on Trial run |
213 | 100mm |
214 | 30% on Installation |
215 | 5% on pre comissioning |
216 | 5% on Trial run |
217 | Construction of Air valve chamber/pillar , as per the scope of work and specifications & drawings, complete in all respect |
218 | Air valve Pillars |
219 | Pump House (Civil Works):- Design & Construction of pump house buildingin RCC framed structureas per requirement shown in drawing, scope of work & Specification including all associated civil works likedry pit, connection to CWR/RWR through inlet pipe, pumping machinery foundation, thrust block in pump house, control room, supports work for header main, etc.The construction shall include the cost of providing MS girder for the OHT, civil works for installation of pump and panels, cable trenches, drainage lines, plinth protection, etc. to complete the scope of work given in tender document and the work of construction of thrust blocks, anchors etc., within/outside the pump house and construction of chambers for electromagnetic flow meters and valves as per Scope of work & Technical Specifications given in Tender Document, at |
220 | Clear Water Pumping Station at BanarHead workFor Installation of 3W+3S Pumps & 2 pumps for future) Minimum area of 60 sqm |
221 | Clear Water Pumping Station at Naiyo ki PayuHead workFor Installation of 2W+2S Pumps & 2 pumps for future) Minimum area of 48 sqm |
222 | Clear Water Pumping Station at Manaklao Head work(Exetension of existing pump house) For Installation of 6W+6S Pumps & 2 pumps for future) Minimum area of 80 sqm |
223 | Clear Water Pumping Station at Palri-Khichiya Head workFor Installation of 3W+3S Pumps & 2 pumps for future) Minimum area of 60 sqm |
224 | Pump House - Mechanical and Electrical Equipment & Accessories: - Designing, Providing, installation, testing, trial run and commissioning of following pumps & energy efficient motors with base plate and other accessories, as per the scope of work & specifications given: Discharge and Tentative duty Head of pumpsets are as under: |
225 | Centrifugal horizontal split casing pumps & motor all other accessories of following duty conditions |
226 | Manaklao Pumping Station Clear Water Pumping Station at Manaklao to 450mm line 125.74 LPS /62 m head/156.66 KW (1W+1S), Total 313.32 KW |
227 | Banar Pumping Station |
228 | For ESR Banar 36.98 LPS / 30 m head/22.38 KW (1W+1S), Total 44.76 KW |
229 | For Nandra-Kallan CWR 23.92 LPS/30 m head/14.92 KW (1W+1S) Total 29.84 KW |
230 | Centrifugal Mono Block pumps & motor all other accessories of following duty conditions |
231 | Banar Pumping Station |
232 | For Deoliyan & Vishnoyo KD 5.80 LPS/48 m head/5.595 KW (1W+1S), Total 11.19 KW |
233 | Manaklao Pumping Station |
234 | For ESR Manai 4.53 LPS / 75 m head/7.46 KW (1W+1S), Total 14.92 KW |
235 | For ESR Basni Karwar 2.4 LPS/39 m head/3.73 KW (1W+1S), Total 7.46 KW |
236 | For ESR Rampura Bhatiyan 7.14 LPS/52 m head/7.46 KW (1W+1S), Total 14.92 KW |
237 | For CWR Palri-Khichiya Head work 11.16 LPS/58 m head/14.92 KW (1W+1S), Total 29.84 KW |
238 | Ralawas & Jajiwal Bhatiyan 18.26 LPS/57 m head/22.38 KW) (1W+1S) Total 44.76 KW |
239 | Naiyo ki Piou Pumping Station |
240 | For ESR Naiyo ki Paiyu 11.22 LPS / 30 m head/7.46 KW (1W+1S), Total 14.92 KW |
241 | For ESR Jajiwal Bhramna 9.69 LPS/39 m head/7.46 KW (1W+1S) Total 14.92 KW |
242 | Palri-Khichiya Pumping Station |
243 | ForESR Palri-Khichiya 14.55 LPS / 30 m head/9.325 KW (1W+1S), Total 18.65 KW |
244 | For ESR Palri Mangaliya 7.78 LPS/47 m head/7.46 KW (1W+1S), Total 14.92 KW |
245 | Distribution for Palri Natha & Palri Panwara 6.94 LPS/55 m head/7.46 KW (1W+1S) Total 14.92 KW |
246 | Nandra Kallan Pumping Station |
247 | Uchiyara CWR & kharda Randhir ESR 12.85 LPS / 66 m head/18.65 KW (1W+1S), Total 37.30 KW |
248 | Jajiwal Kallan Pumping Station |
249 | Distribuion for Jaiwal Kallan-Bhandariya Kallan and Kakarla 19.58 LPS / 30 m head/14.92 KW (1W+1S), Total 29.84 KW |
250 | Designing, providing, laying, jointing & testing of MS piping work complete job including suction / delivery piping, header pipes with provision of future expansion, pipes to pump inlets includes compound gauge, gate valve & dismantling joint, Sluice Valves and integral starter of Class PN 1.6 on suction & delivery individual common header with dismantalling joints, all fittings etc. complete, delivery manifold, outlet pipes with specials, one sluice valve, one butterfly valve with dismantling joint on individual and common delivery header, one dual plate check valve , expansion bellow, fittings, and other accessories as per scope of work and specifications as mentioned in the tender document and as per enclosed drawings, forfollowing pumping stations. |
251 | Clear Water Pumping Station At Banar Head work |
252 | Clear Water Pumping Station At Naiyo ki PiayuHead work |
253 | Clear Water Pumping Station At Manaklao Head work |
254 | Clear Water Pumping Station At Palri KhichiyanHead work |
255 | Existing Clear Water Pumping Station At Jajiwal Kallan Head work |
256 | Existing Clear Water Pumping Station At Nandra Kallan Head work |
257 | Motor control panels for the pumps as per given scope of work and specifications for allmotors forfollowing pumping stations. (DOL starters for the motors upto 5 KW, Star Delta starters for motors beyond 5 KW and up to 30KW and soft starters above 30KW) |
258 | Clear Water Pumping Station At Banar Head work |
259 | Clear Water Pumping Station At Naiyo ki PiayuHead work |
260 | Clear Water Pumping Station At Manaklao Head work |
261 | Clear Water Pumping Station At Palri KhichiyanHead work |
262 | Existing Clear Water Pumping Station At Jajiwal Kallan Head work |
263 | Existing Clear Water Pumping Station At Nandra Kallan Head work |
264 | APFC panel as per given scope of work and specifications for the pumping station forfollowing pumping stations. |
265 | Clear Water Pumping Station At Banar Head work |
266 | Clear Water Pumping Station At Naiyo ki PiayuHead work |
267 | Clear Water Pumping Station At Manaklao Head work |
268 | Clear Water Pumping Station At Palri KhichiyanHead work |
269 | Existing Clear Water Pumping Station At Jajiwal Kallan Head work |
270 | Existing Clear Water Pumping Station At Nandra Kallan Head work |
271 | LT cables with cable trays and accessories for motors & electrical equipment to be provided in pump houses as per given scope of work and specifications forfollowing pumping stations. |
272 | Clear Water Pumping Station At Banar Head work |
273 | Clear Water Pumping Station At Naiyo ki PiayuHead work |
274 | Clear Water Pumping Station At Manaklao Head work |
275 | Clear Water Pumping Station At Palri KhichiyanHead work |
276 | Existing Clear Water Pumping Station At Jajiwal Kallan Head work |
277 | Existing Clear Water Pumping Station At Nandra Kallan Head work |
278 | Submersible type dewatering pump (10KLH,10 mt head), 1W+1S with level control switch & all necessary electric accessories. The work also includes drainage piping up to nearest drain outside pump house building. |
279 | Design and supply installation of Earthing system for LT equipments, instrumentation and motors to be installed in the contractat pumping station. |
280 | Clear Water Pumping Station At Banar Head work |
281 | Clear Water Pumping Station At Naiyo ki PiayuHead work |
282 | Clear Water Pumping Station At Manaklao Head work |
283 | Clear Water Pumping Station At Palri KhichiyanHead work |
284 | Existing Clear Water Pumping Station At Jajiwal Kallan Head work |
285 | Existing Clear Water Pumping Station At Nandra Kallan Head work |
286 | Supply & Installation of manually operated O.H.T.cranes with Electric hoists as per scope of the work and specifications for following pumping stations. |
287 | Clear Water Pumping Station At Banar Head work |
288 | Clear Water Pumping Station At Naiyo ki PiayuHead work |
289 | Clear Water Pumping Station At Manaklao Head work |
290 | Clear Water Pumping Station At Palri KhichiyanHead work |
291 | Providing & installation of pressure sensor, transmitter and indicator on each delivery common header pipe installed in the pump house on 16 rising mains and level sensor for total 20 ESRs and 6 CWRs including instrumentation control panel, complete in all respect as per given scope of work and specifications. |
292 | Clear Water Reservior: Design & Construction of RCC Clear Water reservoirs, as per specifications including fixing inlet; outlet & overflow pipes, installation of valves on inlet & outlet pipes, puddle collars, duck foot bends, pipe interconnecting the incoming & out going mains with all specials, water indicator, plinth protection works, with inter connection with existing system finishing, testing and commissioning complete as per the specifications and scope of work at following Head Works |
293 | At Banar Head Work-750 KL ( balance work) |
294 | At Palri - Khichaiyan-250 KL |
295 | At Naiyo Ki Piayu-250 KL ( balance work) |
296 | Construction of Elevated ServiceReservoirDesign & Construction of Over Head Service reservoirs of requiredstaging, as per specifications including fixing inlet; outlet; washout & overflow pipes, installation of valves on inlet; outlet; washout & overflow pipes, puddle collars, duck foot bends, pipe interconnecting with the incoming & out going mains with all specials; water indicator,remote monitoring device with remote meter reading system at head works necessary instrumentation works, specifications and drawing plinth protection works on each SR / ESR, finishing,testing with multi purpose room in each ESR campus, commissioning complete as per the specifications and scope of work of following capacities at: |
297 | Manai-150KL, 20 m staging ( balance work) |
298 | Basni Karwar-100 KL,24 m staging |
299 | Palri Mangliya -250 KL ,20 m staging ( balance work) |
300 | Jajiwal Bhatiyan -150 KL,22 m staging ( balance work) |
301 | Jajiwal Gehlota-150 KL ,18 m staging ( balance work) |
302 | Thabukara -150 KL ,18 m staging( balance work) |
303 | Daijar -350 KL,20 m staging ( balance work) |
304 | Kharda-Randhir -250 KL ,20 m staging( balance work) |
305 | Vishnoiyo KD-75 KL ,18 m staging ( balance work) |
306 | Deoliya -100 KL ,18 m staging ( balance work) |
307 | Design, providing, installation and testing commissioning of SCADA System for Automation in Project as per scope of work and specifications. |
308 | SCADA Master Control Station atManaklao |
309 | SCADA Local Control Stations at following locations including CWRs at respective Pump House |
310 | Pumping stationManaklao and WTP Mananklao |
311 | Pumping station Palari khichiya |
312 | Pumping stationNaiyo ki Piou |
313 | Pumping station Banar |
314 | Pumping station Jajiwal Kallan |
315 | Pumping station Nandra Kallan |
316 | Remote Stations at 37 VTCs for data transfer of Flow and pressure to LCS and MCS |
317 | Remote Stations at 20 ESRsfor data transfer of water level to LCS and MCS |
318 | Construction of Boundary wall at Nandra Kallan (Extension), Jajiwal Kallan (Extension), Palri Khichiyan PS and at10 No ESR sites including Gates, Cowcatcher,etc. as per scope and specification, as per 1direction of EIC. |
319 | Campus development at Palri Khichiyan and Naiyo ki Paiyu head works including general grading of the campus,Horticulture water supply, sanitation arrangement, Construction of RCC (M-20) approach roadat IPS head works etc. |
320 | Construction of roof top rain water harvesting structure 40 KL capacity tanka at Govt. building |
321 | Raising of height 1.2 mtr of existing Boundary Wall with 1.8 mtr barbed wired fencing at Banar HW. This includes raising of height over the existing boundary wall with erection of GI barbed wire fancing on it.Complete work as per specification and scope of work. |
322 | Reparing of WTP at Manakalo HW.Makingthe plant operation through PLC/SCADA for automation, including installation of new electrically operated sluice valvesof WTP. Installation of ultrasonic flow meter on raw water inlet channel.Calibration and rectification of existing parashall flume with SS flume or new construction if required. Installatioon of new 600 mm EM Flow Meter on 800 mm incomer pipeline. All valves and flow meter shall be integrated with SCADA for automation and monitoring. Necessary Panels, Consols, wiring desktop computer etc. shall be part of job as per standard practice.New PACl storage and dosing mechanism includingone month storagein yard and one day storagein chemical house for dosing. Also include all required pumps, piping, cabling, tanks etc. complete job for PACl storage and handling/dosing. Complete job as per scope of work |
323 | Reparing of RWR (Diggi) at Manaklao HW. Reparing of damaged side lining as per scope of work. |
324 | Tools and tackles a per scope of work. Complete |
325 | Spare parts for Pipeline, Mechanical/Electrical/Instrumentation works complete job as per scoppe of work |
326 | O & M of complete Project for 10 years including existing components Cost for Basic Service Charges, Administration and Management, Running of Office, Staff Quarters, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Cost of material required for maintenance & repairs, Cost of Lubricants, cost of required chemicals (PACl, Lime, Chlorine etc.), bleaching powder (if necessary), Consumables, Spare Parts (if the spare parts supplied to PHED are used in emergency)as per Scope of Work & terms & conditions of contract. Complete job for 10 years after 1 year defect liability period including all required man power, chemicals, consumables, repairs, replacements etc. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy