Power Government Departments Closing in 0 days TDR #40040372

Tender For Work Contract For Aoh Of Boilers- Pressure Parts Of Unit 3 At 2X660 Mw, Sstpp, Mppgcl, Dongalia.

Issued by Government Departments · East Nimar, Madhya Pradesh
Tender Value
2.07 Crore
Estimated cost
Bid Submission
28 Nov 2023
0 days left
EMD
2.08 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
East Nimar → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Work Contract For Aoh Of Boilers- Pressure Parts Of Unit 3 At 2X660 Mw, Sstpp, Mppgcl, Dongalia.--1 Section-A 2 Preparation Of Quick Erect Scaffolding System ( Cup-Lock System ) In Boiler Furnace: 3 Internal Cleaning Of Boiler Ii Nd Pass 4 Cleaning Of Ash From Economizer Hopper, Dead Chamber, Cat House Dog House 5 Preparation Of Scaffolding In Boiler Horizontal Pass ( Screen Tubes, Re-Heater Hanger, Super Heater Hanger Tubes ) 6 Preparation Of Scaffolding Above Economizer Hopper For Inspection Of Economiser Lower Bank Coils. 7 Preparation Of Scaffolding At Ww Ring Header For Inspection Of Ring Header & Refixing / Replacement Of Orifices. 8 Inspection Of Complete Boiler Pressure Parts ( I St & Ii Nd Pass ) 9 Inspection / Repair Of All Peep Holes In Boiler 10 Cleaning And Repair Of All Wind Boxes 11 Servicing Of Secondary / Additional Air Port Dampers 12 Preparation Of Scaffolding In Bottom Ash Hopper And Front / Rear S- Panel Backside, Covering The S- Panel Completely With Sheets For Simultaneous Checking, Repairing Work In Bottom Ash Area And Furnace Togather: 13 Dye Penetrationn Test ( Dpt ) 14 Transportation Of Ash, Scraps, Debris And Other Waste Material ( Incl. Loading. / Unloading ) 15 Thorough Cleaning Of Boiler From Inside By Using Hydro-Jet Cleaning Method. 16 Complete External Cleaning Of The Boiler From Top To Bottom 17 Section-B 18 Rectification, Replacement And Refixing Of Protection Sleeve ( Shielding ) In Various Areas Of Boiler Tubes. 19 Preparation Of Boiler Tube Surface For Tube Thickness Survey 20 ( Section-C ) Welding Of Hp Joints And Alighmentof Boiler Tubes / Coils / Banks 21 Water Wall Tubes ( Primary And Secondary Pass ) / Rifle Tubes, Screen Tubes, Hanger Tubes Etc. 22 Primary Super Heater Tubes 23 Secondary Super Heater Tubes 24 Tertiary Super Heater Tubes 25 Primary Superheater Support / Hanger Tubes 26 Primary Reheater Support / Hanger Tubes 27 Primary And Secondary Reheater Tubes 28 Roof Tubes 29 Economizer Support Tubes 30 Economizer Coils In Reheater And Superheater Pass 31 Alignment Of Coils Oftertiary / Final Superheaters 32 Alignment Of Coils Ofsecondary Superheaters 33 Alignment Of Coils Ofsecondry / Final Reheaters 34 Alignment Of Coil Of Economizer 35 Alignment Of Coil Of Primary Superheater 36 Alignment Of Primary Reheater Coil 37 Welding Of Fins 38 Re-Enforcement Of Welded Joints 39 Checking And Rectification Of Supports / Hangers Of Critical Pipe Lines 40 Checking And Rectification Of Expansion Indicator In Boiler Area 41 ( Section-D ) Application / Repair Of Refractory ( Whytheat C / Whytheat C Patch ) / Bsf Blanket At Various Locations Of Boiler 42 Bottom Ash Hopper Gr-C 43 Pent House, Doors & Windows Etc. ( Additional Air Port / Waterwall Tubes ) Gr.-C / Htc 44 Man Holes, Peep Holes, Roof Seal Boxes Gr-C 45 Hydraulic Test Of Boiler Pressure Part & Preparation For Boiler Light Up 46 ( Section-E ) 47 Complete Servicing / Overhauling Of Hp Valves ( Miv / Mov ) 48 >25 Mm & Upto 50 Mm 49 >50Mm & Upto 100 Mm 50 >100 Mm & Upto200 Mm 51 Above 200 Mm 52 Complete Servicing Of Control Valves ( Excluding Actuator ) . 53 >25 Mm & Upto 50 Mm 54 >50Mm & Upto 100 Mm 55 >100 Mm & Upto200 Mm 56 Above 200 Mm

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 21-Nov-2023 Third Extension of due date Date 28-Nov-2023
2 30-Oct-2023 First Extension of due date Date 08-Nov-2023
3 09-Nov-2023 Second Extension of due date Date 20-Nov-2023

BOQ

Name of Work: –Work contract for AOH of Boilers-Pressure Parts of Unit # 3 at 2x660MW, SSTPP, MPPGCL, Dongalia. (T-2023_MPPGC_307872_1)
Sl. No. Item Description
1SECTION-A
2PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE:
3INTERNAL CLEANING OF BOILER II ND PASS
4CLEANING OF ASH FROM ECONOMIZER HOPPER, DEAD CHAMBER, CAT HOUSE DOG HOUSE
5PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, RE-HEATER HANGER, SUPER HEATER HANGER TUBES)
6PREPARATION OF SCAFFOLDING ABOVE ECONOMIZER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS.
7PREPARATION OF SCAFFOLDING AT WW RING HEADER FOR INSPECTION OF RING HEADER & REFIXING/REPLACEMENT OF ORIFICES.
8INSPECTION OF COMPLETE BOILER PRESSURE PARTS (I ST & II ND PASS)
9INSPECTION/REPAIR OF ALL PEEP HOLES IN BOILER
10CLEANING AND REPAIR OF All WIND BOXES
11SERVICING OF SECONDARY/ADDITIONAL AIR PORT DAMPERS
12PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER AND FRONT/REAR S- PANEL BACKSIDE, COVERING THE S- PANEL COMPLETELY WITH SHEETS FOR SIMULTANEOUS CHECKING, REPAIRING WORK IN BOTTOM ASH AREA AND FURNACE TOGATHER:
13DYE PENETRATIONN TEST (DPT)
14TRANSPORTATION OF ASH, SCRAPS, DEBRIS AND OTHER WASTE MATERIAL (INCL. LOADING. /UNLOADING)
15THOROUGH CLEANING OF BOILER FROM INSIDE BY USING HYDRO-JET CLEANING METHOD.
16COMPLETE EXTERNAL CLEANING OF THE BOILER FROM TOP TO BOTTOM
17SECTION-B
18RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.
19PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY
20(Section-C) WELDING OF HP JOINTS AND ALIGHMENTOF BOILER TUBES/COILS/BANKS
21WATER WALL TUBES (PRIMARY AND SECONDARY PASS)/RIFLE TUBES, SCREEN TUBES, HANGER TUBES ETC.
22PRIMARY SUPER HEATER TUBES
23SECONDARY SUPER HEATER TUBES
24TERTIARY SUPER HEATER TUBES
25PRIMARY SUPERHEATER SUPPORT/HANGER TUBES
26PRIMARY REHEATER SUPPORT/HANGER TUBES
27PRIMARY AND SECONDARY REHEATER TUBES
28ROOF TUBES
29ECONOMIZER SUPPORT TUBES
30ECONOMIZER COILS IN REHEATER AND SUPERHEATER PASS
31ALIGNMENT OF COILS OFTERTIARY/FINAL SUPERHEATERS
32ALIGNMENT OF COILS OFSECONDARY SUPERHEATERS
33ALIGNMENT OF COILS OFSECONDRY/FINAL REHEATERS
34ALIGNMENT OF COIL OF ECONOMIZER
35ALIGNMENT OF COIL OF PRIMARY SUPERHEATER
36ALIGNMENT OF PRIMARY REHEATER COIL
37WELDING OF FINS
38RE-ENFORCEMENT OF WELDED JOINTS
39CHECKING AND RECTIFICATION OF SUPPORTS/HANGERS OF CRITICAL PIPE LINES
40CHECKING AND RECTIFICATION OF EXPANSION INDICATOR IN BOILER AREA
41(Section-D) APPLICATION/REPAIR OF REFRACTORY (WHYTHEAT C/WHYTHEAT C PATCH) / BSF BLANKET AT VARIOUS LOCATIONS OF BOILER
42BOTTOM ASH HOPPER GR-C
43PENT HOUSE, DOORS & WINDOWS ETC. (ADDITIONAL AIR PORT/WATERWALL TUBES) GR.-C/HTC
44MAN HOLES, PEEP HOLES, ROOF SEAL BOXES GR-C
45HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
46(SECTION-E)
47COMPLETE SERVICING/OVERHAULING OF HP VALVES (MIV/MOV)
48>25 mm & upto 50 mm
49>50mm & upto 100 mm
50>100 mm & upto200 mm
51Above 200 mm
52COMPLETE SERVICING OF CONTROL VALVES (EXCLUDING ACTUATOR).
53>25 mm & upto 50 mm
54>50mm & upto 100 mm
55>100 mm & upto200 mm
56Above 200 mm
57REPLACEMENT OF VALVES (WELDED TYPE)
58Upto 25 mm
59>25 mm & upto 50 mm
60>50mm & upto 100 mm
61(SECTION-F) COMPLETE SERVICING OF SPRING-LOADED SAFETY VALVES
62WATER SEPARATOR SV
63MAIN STEAM LINES SV
64CRH LINES SV
65HRHLINES SV
66ELECTROMATIC RELIEF VALVE AND PILOT VALVE
67(SECTION G)
68PREPARATION OF HP TUBE BENDS
69REPAIR OF PENT HOUSE/SKIN CASING OF BOILER
70REPAIRING OF DEAD CHAMBER
71(SECTION H) APPLICATION OF THERMAL INSULATION
72COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE
73STEAM AND WATER PIPING
74ESP
75AIR HEATER & HOPPER
76FUEL OIL AND ITS STEAM PIPING INCLUDING HEATERS FILTERS ETC.
77(SECTION -I)
78SERVICING OF MAIN STEAM STOP VALVE
79SECTION-J
80COMPLETE OVERHAULING & RESETTING OF WATER WALL SOOT BLOWER: -
81COMPLETE OVERHAULING & RESETTING OF LONG RETRACTABLE SOOT BLOWER: -
82(SECTION -K) INSTALLATION AND MAINTENANCE OF CCTV CAMERA TO DIFFERENT LOCATIONS OF BOILER
83work of installation and implementation of CCTV surveillance system during AOH

AI Tender Summary

OUR REF NO 40040372
AUTHORITY Government Departments
TENDER VALUE 2.07 Crore
LAST DATE 28-11-2023
Authority
Authority Name Madhya Pradesh Power Generating Company Limited
Work Description Tender For Work Contract For Aoh Of Boilers- Pressure Parts Of Unit 3 At 2X660 Mw, Sstpp, Mppgcl, Dongalia.--1 Section-A 2 Preparation Of Quick Erect Scaffolding System ( Cup-Lock System ) In Boiler Furnace: 3 Internal Cleaning Of Boiler Ii Nd Pass 4 Cleaning Of Ash From Economizer Hopper, Dead Chamber, Cat House Dog House 5 Preparation Of Scaffolding In Boiler Horizontal Pass ( Screen Tubes, Re-Heater Hanger, Super Heater Hanger Tubes ) 6 Preparation Of Scaffolding Above Economizer Hopper For Inspection Of Economiser Lower Bank Coils. 7 Preparation Of Scaffolding At Ww Ring Header For Inspection Of Ring Header & Refixing / Replacement Of Orifices. 8 Inspection Of Complete Boiler Pressure Parts ( I St & Ii Nd Pass ) 9 Inspection / Repair Of All Peep Holes In Boiler 10 Cleaning And Repair Of All Wind Boxes 11 Servicing Of Secondary / Additional Air Port Dampers 12 Preparation Of Scaffolding In Bottom Ash Hopper And Front / Rear S- Panel Backside, Covering The S- Panel Completely With Sheets For Simultaneous Checking, Repairing Work In Bottom Ash Area And Furnace Togather: 13 Dye Penetrationn Test ( Dpt ) 14 Transportation Of Ash, Scraps, Debris And Other Waste Material ( Incl. Loading. / Unloading ) 15 Thorough Cleaning Of Boiler From Inside By Using Hydro-Jet Cleaning Method. 16 Complete External Cleaning Of The Boiler From Top To Bottom 17 Section-B 18 Rectification, Replacement And Refixing Of Protection Sleeve ( Shielding ) In Various Areas Of Boiler Tubes. 19 Preparation Of Boiler Tube Surface For Tube Thickness Survey 20 ( Section-C ) Welding Of Hp Joints And Alighmentof Boiler Tubes / Coils / Banks 21 Water Wall Tubes ( Primary And Secondary Pass ) / Rifle Tubes, Screen Tubes, Hanger Tubes Etc. 22 Primary Super Heater Tubes 23 Secondary Super Heater Tubes 24 Tertiary Super Heater Tubes 25 Primary Superheater Support / Hanger Tubes 26 Primary Reheater Support / Hanger Tubes 27 Primary And Secondary Reheater Tubes 28 Roof Tubes 29 Economizer Support Tubes 30 Economizer Coils In Reheater And Superheater Pass 31 Alignment Of Coils Oftertiary / Final Superheaters 32 Alignment Of Coils Ofsecondary Superheaters 33 Alignment Of Coils Ofsecondry / Final Reheaters 34 Alignment Of Coil Of Economizer 35 Alignment Of Coil Of Primary Superheater 36 Alignment Of Primary Reheater Coil 37 Welding Of Fins 38 Re-Enforcement Of Welded Joints 39 Checking And Rectification Of Supports / Hangers Of Critical Pipe Lines 40 Checking And Rectification Of Expansion Indicator In Boiler Area 41 ( Section-D ) Application / Repair Of Refractory ( Whytheat C / Whytheat C Patch ) / Bsf Blanket At Various Locations Of Boiler 42 Bottom Ash Hopper Gr-C 43 Pent House, Doors & Windows Etc. ( Additional Air Port / Waterwall Tubes ) Gr.-C / Htc 44 Man Holes, Peep Holes, Roof Seal Boxes Gr-C 45 Hydraulic Test Of Boiler Pressure Part & Preparation For Boiler Light Up 46 ( Section-E ) 47 Complete Servicing / Overhauling Of Hp Valves ( Miv / Mov ) 48 >25 Mm & Upto 50 Mm 49 >50Mm & Upto 100 Mm 50 >100 Mm & Upto200 Mm 51 Above 200 Mm 52 Complete Servicing Of Control Valves ( Excluding Actuator ) . 53 >25 Mm & Upto 50 Mm 54 >50Mm & Upto 100 Mm 55 >100 Mm & Upto200 Mm 56 Above 200 Mm
Basic Detail
Tender No WT-2123
Bidding Type Tender
Location
City East Nimar
State Madhya Pradesh
Key Dates
Publish Date 21 Nov 2023
Submission Date 28 Nov 2023
Open Date 30 Nov 2023
Finance
Tender Value 2.07 Crore
Tender Fee 5000
EMD 2.08 Lakhs
Exemption Not Available
Document List
a0e6b922-0339-4e07-8f0a-919c8179dcdc.html
Annexures.pdf
BOQ_369299.xls
Credentials.xls
detailednit.pdf
NIT.pdf
SBDworks_mergedaddendum.pdf
TechnicalBiD.xls
Tendernotice_1.pdf
Tendernotice_2.pdf
Tenderschedulefinal.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 21, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 28, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 08, 2023
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 20, 2023
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 28, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 30, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

a0e6b922-0339-4e07-8f0a-919c8179dcdc.html

pdf

Annexures.pdf

xls

BOQ_369299.xls

xls

Credentials.xls

pdf

detailednit.pdf

pdf

NIT.pdf

pdf

SBDworks_mergedaddendum.pdf

xls

TechnicalBiD.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

pdf

Tenderschedulefinal.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders