Tender For Work Contract For Aoh Of Boilers- Pressure Parts Of Unit 3 At 2X660 Mw, Sstpp, Mppgcl, Dongalia.
Tender Overview
Project Description
Tender For Work Contract For Aoh Of Boilers- Pressure Parts Of Unit 3 At 2X660 Mw, Sstpp, Mppgcl, Dongalia.--1 Section-A 2 Preparation Of Quick Erect Scaffolding System ( Cup-Lock System ) In Boiler Furnace: 3 Internal Cleaning Of Boiler Ii Nd Pass 4 Cleaning Of Ash From Economizer Hopper, Dead Chamber, Cat House Dog House 5 Preparation Of Scaffolding In Boiler Horizontal Pass ( Screen Tubes, Re-Heater Hanger, Super Heater Hanger Tubes ) 6 Preparation Of Scaffolding Above Economizer Hopper For Inspection Of Economiser Lower Bank Coils. 7 Preparation Of Scaffolding At Ww Ring Header For Inspection Of Ring Header & Refixing / Replacement Of Orifices. 8 Inspection Of Complete Boiler Pressure Parts ( I St & Ii Nd Pass ) 9 Inspection / Repair Of All Peep Holes In Boiler 10 Cleaning And Repair Of All Wind Boxes 11 Servicing Of Secondary / Additional Air Port Dampers 12 Preparation Of Scaffolding In Bottom Ash Hopper And Front / Rear S- Panel Backside, Covering The S- Panel Completely With Sheets For Simultaneous Checking, Repairing Work In Bottom Ash Area And Furnace Togather: 13 Dye Penetrationn Test ( Dpt ) 14 Transportation Of Ash, Scraps, Debris And Other Waste Material ( Incl. Loading. / Unloading ) 15 Thorough Cleaning Of Boiler From Inside By Using Hydro-Jet Cleaning Method. 16 Complete External Cleaning Of The Boiler From Top To Bottom 17 Section-B 18 Rectification, Replacement And Refixing Of Protection Sleeve ( Shielding ) In Various Areas Of Boiler Tubes. 19 Preparation Of Boiler Tube Surface For Tube Thickness Survey 20 ( Section-C ) Welding Of Hp Joints And Alighmentof Boiler Tubes / Coils / Banks 21 Water Wall Tubes ( Primary And Secondary Pass ) / Rifle Tubes, Screen Tubes, Hanger Tubes Etc. 22 Primary Super Heater Tubes 23 Secondary Super Heater Tubes 24 Tertiary Super Heater Tubes 25 Primary Superheater Support / Hanger Tubes 26 Primary Reheater Support / Hanger Tubes 27 Primary And Secondary Reheater Tubes 28 Roof Tubes 29 Economizer Support Tubes 30 Economizer Coils In Reheater And Superheater Pass 31 Alignment Of Coils Oftertiary / Final Superheaters 32 Alignment Of Coils Ofsecondary Superheaters 33 Alignment Of Coils Ofsecondry / Final Reheaters 34 Alignment Of Coil Of Economizer 35 Alignment Of Coil Of Primary Superheater 36 Alignment Of Primary Reheater Coil 37 Welding Of Fins 38 Re-Enforcement Of Welded Joints 39 Checking And Rectification Of Supports / Hangers Of Critical Pipe Lines 40 Checking And Rectification Of Expansion Indicator In Boiler Area 41 ( Section-D ) Application / Repair Of Refractory ( Whytheat C / Whytheat C Patch ) / Bsf Blanket At Various Locations Of Boiler 42 Bottom Ash Hopper Gr-C 43 Pent House, Doors & Windows Etc. ( Additional Air Port / Waterwall Tubes ) Gr.-C / Htc 44 Man Holes, Peep Holes, Roof Seal Boxes Gr-C 45 Hydraulic Test Of Boiler Pressure Part & Preparation For Boiler Light Up 46 ( Section-E ) 47 Complete Servicing / Overhauling Of Hp Valves ( Miv / Mov ) 48 >25 Mm & Upto 50 Mm 49 >50Mm & Upto 100 Mm 50 >100 Mm & Upto200 Mm 51 Above 200 Mm 52 Complete Servicing Of Control Valves ( Excluding Actuator ) . 53 >25 Mm & Upto 50 Mm 54 >50Mm & Upto 100 Mm 55 >100 Mm & Upto200 Mm 56 Above 200 Mm
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Nov-2023 | Third Extension of due date | Date | 28-Nov-2023 |
| 2 | 30-Oct-2023 | First Extension of due date | Date | 08-Nov-2023 |
| 3 | 09-Nov-2023 | Second Extension of due date | Date | 20-Nov-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | SECTION-A |
| 2 | PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE: |
| 3 | INTERNAL CLEANING OF BOILER II ND PASS |
| 4 | CLEANING OF ASH FROM ECONOMIZER HOPPER, DEAD CHAMBER, CAT HOUSE DOG HOUSE |
| 5 | PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, RE-HEATER HANGER, SUPER HEATER HANGER TUBES) |
| 6 | PREPARATION OF SCAFFOLDING ABOVE ECONOMIZER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS. |
| 7 | PREPARATION OF SCAFFOLDING AT WW RING HEADER FOR INSPECTION OF RING HEADER & REFIXING/REPLACEMENT OF ORIFICES. |
| 8 | INSPECTION OF COMPLETE BOILER PRESSURE PARTS (I ST & II ND PASS) |
| 9 | INSPECTION/REPAIR OF ALL PEEP HOLES IN BOILER |
| 10 | CLEANING AND REPAIR OF All WIND BOXES |
| 11 | SERVICING OF SECONDARY/ADDITIONAL AIR PORT DAMPERS |
| 12 | PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER AND FRONT/REAR S- PANEL BACKSIDE, COVERING THE S- PANEL COMPLETELY WITH SHEETS FOR SIMULTANEOUS CHECKING, REPAIRING WORK IN BOTTOM ASH AREA AND FURNACE TOGATHER: |
| 13 | DYE PENETRATIONN TEST (DPT) |
| 14 | TRANSPORTATION OF ASH, SCRAPS, DEBRIS AND OTHER WASTE MATERIAL (INCL. LOADING. /UNLOADING) |
| 15 | THOROUGH CLEANING OF BOILER FROM INSIDE BY USING HYDRO-JET CLEANING METHOD. |
| 16 | COMPLETE EXTERNAL CLEANING OF THE BOILER FROM TOP TO BOTTOM |
| 17 | SECTION-B |
| 18 | RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES. |
| 19 | PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY |
| 20 | (Section-C) WELDING OF HP JOINTS AND ALIGHMENTOF BOILER TUBES/COILS/BANKS |
| 21 | WATER WALL TUBES (PRIMARY AND SECONDARY PASS)/RIFLE TUBES, SCREEN TUBES, HANGER TUBES ETC. |
| 22 | PRIMARY SUPER HEATER TUBES |
| 23 | SECONDARY SUPER HEATER TUBES |
| 24 | TERTIARY SUPER HEATER TUBES |
| 25 | PRIMARY SUPERHEATER SUPPORT/HANGER TUBES |
| 26 | PRIMARY REHEATER SUPPORT/HANGER TUBES |
| 27 | PRIMARY AND SECONDARY REHEATER TUBES |
| 28 | ROOF TUBES |
| 29 | ECONOMIZER SUPPORT TUBES |
| 30 | ECONOMIZER COILS IN REHEATER AND SUPERHEATER PASS |
| 31 | ALIGNMENT OF COILS OFTERTIARY/FINAL SUPERHEATERS |
| 32 | ALIGNMENT OF COILS OFSECONDARY SUPERHEATERS |
| 33 | ALIGNMENT OF COILS OFSECONDRY/FINAL REHEATERS |
| 34 | ALIGNMENT OF COIL OF ECONOMIZER |
| 35 | ALIGNMENT OF COIL OF PRIMARY SUPERHEATER |
| 36 | ALIGNMENT OF PRIMARY REHEATER COIL |
| 37 | WELDING OF FINS |
| 38 | RE-ENFORCEMENT OF WELDED JOINTS |
| 39 | CHECKING AND RECTIFICATION OF SUPPORTS/HANGERS OF CRITICAL PIPE LINES |
| 40 | CHECKING AND RECTIFICATION OF EXPANSION INDICATOR IN BOILER AREA |
| 41 | (Section-D) APPLICATION/REPAIR OF REFRACTORY (WHYTHEAT C/WHYTHEAT C PATCH) / BSF BLANKET AT VARIOUS LOCATIONS OF BOILER |
| 42 | BOTTOM ASH HOPPER GR-C |
| 43 | PENT HOUSE, DOORS & WINDOWS ETC. (ADDITIONAL AIR PORT/WATERWALL TUBES) GR.-C/HTC |
| 44 | MAN HOLES, PEEP HOLES, ROOF SEAL BOXES GR-C |
| 45 | HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP |
| 46 | (SECTION-E) |
| 47 | COMPLETE SERVICING/OVERHAULING OF HP VALVES (MIV/MOV) |
| 48 | >25 mm & upto 50 mm |
| 49 | >50mm & upto 100 mm |
| 50 | >100 mm & upto200 mm |
| 51 | Above 200 mm |
| 52 | COMPLETE SERVICING OF CONTROL VALVES (EXCLUDING ACTUATOR). |
| 53 | >25 mm & upto 50 mm |
| 54 | >50mm & upto 100 mm |
| 55 | >100 mm & upto200 mm |
| 56 | Above 200 mm |
| 57 | REPLACEMENT OF VALVES (WELDED TYPE) |
| 58 | Upto 25 mm |
| 59 | >25 mm & upto 50 mm |
| 60 | >50mm & upto 100 mm |
| 61 | (SECTION-F) COMPLETE SERVICING OF SPRING-LOADED SAFETY VALVES |
| 62 | WATER SEPARATOR SV |
| 63 | MAIN STEAM LINES SV |
| 64 | CRH LINES SV |
| 65 | HRHLINES SV |
| 66 | ELECTROMATIC RELIEF VALVE AND PILOT VALVE |
| 67 | (SECTION G) |
| 68 | PREPARATION OF HP TUBE BENDS |
| 69 | REPAIR OF PENT HOUSE/SKIN CASING OF BOILER |
| 70 | REPAIRING OF DEAD CHAMBER |
| 71 | (SECTION H) APPLICATION OF THERMAL INSULATION |
| 72 | COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE |
| 73 | STEAM AND WATER PIPING |
| 74 | ESP |
| 75 | AIR HEATER & HOPPER |
| 76 | FUEL OIL AND ITS STEAM PIPING INCLUDING HEATERS FILTERS ETC. |
| 77 | (SECTION -I) |
| 78 | SERVICING OF MAIN STEAM STOP VALVE |
| 79 | SECTION-J |
| 80 | COMPLETE OVERHAULING & RESETTING OF WATER WALL SOOT BLOWER: - |
| 81 | COMPLETE OVERHAULING & RESETTING OF LONG RETRACTABLE SOOT BLOWER: - |
| 82 | (SECTION -K) INSTALLATION AND MAINTENANCE OF CCTV CAMERA TO DIFFERENT LOCATIONS OF BOILER |
| 83 | work of installation and implementation of CCTV surveillance system during AOH |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents