Tender For I) Widening & Upgradation To Two Lanes With Paved Shoulders Road From Tamenglong To Mahur (Nh-137) In The State Of Assam Starting Near Jiri River (Assam/Manipur Border) At Km 96.870 And Ending Near Hangrum At Km 116.550 (Package – 7) On Epc Mod, Tamenglong-Manipur

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Tender For I) Widening & Upgradation To Two Lanes With Paved Shoulders Road From Tamenglong To Mahur (Nh-137) In The State Of Assam Starting Near Jiri River (Assam/Manipur Border) At Km 96.870 And Ending Near Hangrum At Km 116.550 (Package – 7) On Epc Mod. Submission Date for this Tender is 30-10-2023. Road Work Tenders in Tamenglong Manipur. Bidders can get complete Tender details and download the document.




Tender Notice

40000435
Corrigendum : Tender For I) Widening & Upgradation To Two Lanes With Paved Shoulders Road From Tamenglong To Mahur (Nh-137) In The State Of Assam Starting Near Jiri River (Assam/Manipur Border) At Km 96.870 And Ending Near Hangrum At Km 116.550 (Package – 7) On Epc Mod
Open Tender
Indian
Manipur
Tamenglong
30-10-2023

Tender Details

I ) Widening & Upgradation To Two Lanes With Paved Shoulders Road From Tamenglong To Mahur ( Nh-137 ) In The State Of Assam Starting Near Jiri River ( Assam / Manipur Border ) At Km 96.870 And Ending Near Hangrum At Km 116.550 ( Package – 7 ) On Epc Mode. ( Length-19.68 Km ) Ii ) Widening & Upgradation To Two Lanes With Paved Shoulders Road Fromtamenglong To Mahur ( Nh-137 ) In The State Of Assam Starting From Km 116.480Near Hangrum To Km 136.500 Near Hejaichak ( Package-8 ) On Epc Mode Undernh ( O ) -Ne. ; 1 Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) 2 Team Leader Cum Senior Highway Engineer ( 1 No ) 1*24+1*12=36 3 Resident Cum Highway Engineer ( 2 Nos ) 2*24+1*60=108 4 Bridge / Structural Engineer ( 1Nos ) 1*24+1*12=36 5 Senior Pavement Specialist ( 1 No ) 1*24=24 6 Senior Quality Cum Material Expert ( 2 Nos ) ( 2*24 ) =48 7 Road Safety Expert ( 2 Nos ) 1*8=8 8 Sub-Professional Staff 9 Survey Engineer ( 2 Nos ) ( 2*24+1*8 ) =56 10 Assistant Highway Engineer ( 2 Nos. ) 2*24+1*60=108 11 Cad Expert ( 1 Nos ) .1*8+1*4=12 12 Assistant Bridge Engineer ( 2 Nos ) ( 2*24 ) =48 13 Assistant Quality Cum Material Engineer ( 2 Nos ) 2*24=48 14 Lab Technician ( 4 Nos ) 4*24=96 15 Quantity Surveyor ( 2 No ) ( 2*24+ 1*8 ) =56 16 Support Staff ( Inclusive Of Per Diem Allowance ) 17 Office Manager ( 2 No ) ( 2*24+ 1*60 ) =108 18 Accountant Cum Cashier ( 2No ) ( 2*24+ 1*60 ) =108 19 Steno Cum Computer Operator ( 2 No ) ( 2*24+ 1*60 ) =108 20 Office Boy ( 2 No ) ( 2*24+ 1*60 ) =108 21 Transportation ( Fixed Costs ) 22 Bolero Or Equivalent ( Not More Than 2 Years Old ) ( 2 Nos During Construction Period ) , 2*24=28Rate Per Month 23 Innova / Scorpio Or Equivalent ( Not More Than 2 Years Old ) ( 1 Nos During Maintenance Period / Dlp ) , 1*60=60Rate Per Month 24 Duty Travel To Site ( Fixed Costs ) : Professional And Sub-Professional Staff. The Employer May Require The Key Personnel To Visit The EmployerS Site Offices / Regional Office. The Quoted Amount Against Remuneration Should Include Travel Fare ( Including Hotel Charges, Travel Costs Etc. Complete 25 Forround Trip To EmployerS Head Office 26 Forround Trip To EmployerS Regional Office. 27 Office Rent ( Fixed Costs ) The Rent Cost Includes Electricity And Water Charges, Maintenance, Cleaning, Repairs, Etc. ( Rate Per Month ) 28 During Construction Period ( 2 Nos ) 2*24=48 29 During Maintenance / Dlp Period ( 1 No ) 1*60=60 30 Office Supplies, Utilities And Communication ( Fixed Costs ) , Rate Per Month 31 Office Supplies During Construction Period For 1Offices2*24=48 32 Office Supplies During Maintenance / Dlp Periodfor 1 Office1*60=60 33 Drafting Supplies During Construction Period For 2 Offices2*24=48 34 Drafting Supplies During Maintenance / Dlp Periodfor 1 Office1*60=60 35 Computer Running Costs During Construction Period For 2 Offices2*24=48 36 Computer Running Costs During Maintenance / Dlp Periodfor 1 Office1*60=60 37 Domestic And International Communication During Construction Period For 1 Offices2*24=48 38 Domestic And International Communication During Maintenance / Dlp Periodfor 1 Office1*60=60 39 Office Furniture And Equipment ( Rental ) Office Furniture Shall Include Executive Tables, Chairs, Visitor Chairs, Steel Almirahs, Computer Furniture, Conference Table Etc. Office Equipment Shall Include As A Minimum Of Telephone ( 2 External & 10 Internal Lines ) , Photocopier ( 15Ppm, 12000 Copies Per Month With A3 & A4 Input ) Fax Machine, Pcs ( 5 No., Intel Core 2 Duo E8300, 19’’ Colour Tft, Cache-6Mb, Ram-2 Gb, Hdd-250 Gb, Dvd Writer, Key Board, Optical Scroll Mouse, Ms- Windows Vista Business, Pre-Loaded Anti-Virus Etc. ) , Laser Printers ( 2 No., 14 Ppm, 266 Mhz, 5000 Pages Per Month, 600X600 Dpi Or Better Etc., Engineering Plan Printer ( 1 No. ) , Binding Machine ( 1 No. ) , Plotter A0 Size, Overhead Projector, Ac ( 4 No., 1.5 Ton ) , Water Coolers ( As Required ) Etc., 40 During Construction Period For 2 Nos Of Offices2*24=48 41 During Maintenance / Dlp Periodfor 1 No Of Office1*60=60 42 Reports And Document Printing ( Rate As Per Copy ) 43 Monthly Reports ( Design And Construction ) 44 Half Yearly Reports 45 Various Others Reports As Provided In The Concession Agreement Such As Completion Report 46 Road Survey Equipment 47 Surface Defects Detection And Roughness Measurement Using Network Survey Vehicle 48 Pavement Strength Measurement Using Fwd 49 Bridge Inspection Using Mobile Bridge Inspection Unit 50 Road Signs Inspection Using Retro Reflectometer 51 Contigenciesa Fixed Amount Of Indian Rupees One Million Shall Be Included In The Financial Proposal. ( Fixed As Rs. 10, 00, 000 )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 23-Oct-2023 CORRIGENDUM NO 2 Date 30-10-2023
2 23-Oct-2023 Reply to Pre-Bid Queries Other 30-10-2023
3 23-Oct-2023 CORRIGENDUM NO 1 Other 30-10-2023

Key Value

Document Fees
INR 5900 /-
EMD
INR 200000.0 /-
Tender Value
Refer document

BOQ Items

i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border) at km 96.870 and ending near Hangrum at km 116.550 (Package – 7) on EPC mode. (Length-19.68 km) ii) Widening & Upgradation to two lanes with paved shoulders road fromTamenglong to Mahur (NH-137) in the State of Assam starting from km 116.480near Hangrum to km 136.500 near Hejaichak (Package-8) on EPC mode underNH(O)-NE.
Sl. No. Item Description
1Remuneration for Local Staff (inclusive of per Diem allowance)
2Team Leader Cum Senior Highway Engineer (1 No) 1*24+1*12=36
3Resident cum Highway Engineer (2 Nos) 2*24+1*60=108
4Bridge /Structural Engineer (1Nos) 1*24+1*12=36
5Senior Pavement Specialist (1 No) 1*24=24
6Senior Quality cum Material Expert (2 Nos) (2*24)=48
7Road Safety Expert (2 Nos) 1*8=8
8Sub-Professional Staff
9Survey Engineer (2 Nos) (2*24+1*8)=56
10Assistant Highway Engineer (2 Nos.) 2*24+1*60=108
11CAD Expert (1 Nos).1*8+1*4=12
12Assistant Bridge Engineer (2 Nos) (2*24)=48
13Assistant Quality cum Material Engineer (2 Nos) 2*24=48
14Lab Technician (4 Nos) 4*24=96
15Quantity Surveyor (2 No) (2*24+ 1*8)=56
16Support Staff (inclusive of per diem allowance)
17Office Manager (2 No) (2*24+ 1*60)=108
18Accountant cum Cashier (2No) (2*24+ 1*60)=108
19Steno cum Computer Operator (2 No) (2*24+ 1*60)=108
20Office Boy(2 No) (2*24+ 1*60)=108
21Transportation (Fixed Costs)
22Bolero or equivalent (not more than 2 years old) (2 nos during Construction Period), 2*24=28 Rate per month
23Innova/scorpio or equivalent (not more than 2 years old) (1 nos during Maintenance period/DLP), 1*60=60 Rate per month
24Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer"s Site Offices/Regional Office. The quoted amount against remuneration should include travel fare(including Hotel Charges,travel costs etc. complete
25Forround trip to Employer"s Head Office
26Forround trip to Employer"s regional office.
27Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
28During Construction period (2 Nos) 2*24=48
29During Maintenance /DLP period (1 No) 1*60=60
30Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
31Office Supplies during construction period for 1offices 2*24=48
32Office Supplies during Maintenance /DLP periodfor 1 office 1*60=60
33Drafting Supplies during construction period for 2 offices 2*24=48
34Drafting Supplies during Maintenance /DLP periodfor 1 office 1*60=60
35Computer Running Costs during construction period for 2 offices 2*24=48
36Computer Running Costs during Maintenance /DLP periodfor 1 office 1*60=60
37Domestic and International Communication during construction period for 1 offices 2*24=48
38Domestic and International Communication during Maintenance /DLP periodfor 1 office 1*60=60
39Office Furniture and Equipment (Rental) Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.,
40During Construction period for 2 nos of offices 2*24=48
41During Maintenance /DLP periodfor 1 no of office 1*60=60
42Reports and Document Printing ( rate as per copy)
43Monthly reports (Design and Construction)
44Half yearly Reports
45Various others reports as provided in the Concession Agreement such as Completion Report
46Road Survey Equipment
47Surface defects detection and roughness measurement using Network Survey Vehicle
48Pavement strength measurement using FWD
49Bridge inspection using Mobile Bridge Inspection Unit
50Road signs inspection using Retro Reflectometer
51Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.