Madhyanchal Vidut Vitran Nigam Limited has published Tender For Increasing Capacity Of Transformers At Different Places And Construction Of Transformer Plinth And Fencing Of Transfomer Under Electricity Distribution Division-Rudauli, Ayodhya. Submission Date for this Tender is 06-10-2023. Electrification Work Tenders in Ayodhya Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Part - A ( Material) Following Material Supplied by the Contractor:- |
2 | F- Bracket |
3 | Clamp for Top, T-off Channel |
4 | Holding Clamp with Nut and Bolt |
5 | Stay Clamp |
6 | Stay Insulator |
7 | Suspension Clamp |
8 | Dead And Clamp |
9 | LT Clamp for PCC Pole |
10 | Copper L Pices For 250 KVA T/F |
11 | Copper L Pices For 400 KVA T/F |
12 | Aluminum Lug 100 KVA T/F |
13 | Aluminum Lug 250 KVA T/F |
14 | Aluminum Lug 400 KVA T/F |
15 | Holding Clamp Top &Dropper Channel |
16 | Stone Pad |
17 | I Hook |
18 | Nut & Bolt |
19 | Carriage including loading,unloading & Proper stacking of following Stockmaterials from store/departmental store to Dump site distance 0 to 70 Kms. (distance approx) |
20 | PCC Pole 8.5 Mtr. Long |
21 | XLPE Cable 1x240 sqmm |
22 | XLPE Cable 1x400 sqmm |
23 | XLPE Cable 1x630 sqmm |
24 | AB Cable 3x50 |
25 | AB Cable 3x95+1x701x16 |
26 | AB Cable 3x120+1x951x16 |
27 | ACSR Weasel Conductor |
28 | Transformer 25 KVA |
29 | Transformer 63 KVA |
30 | Transformer 250 KVA |
31 | Transformer 400 KVA |
32 | Three Phase Distribution Box |
33 | Other matching Materials |
34 | Dragging of PCC/ST Pole from dump site to pit site |
35 | Fabrication and Errection of DoublePole Support on PCC/ST Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPoNorms.(Cost of clamps borne by contractor) |
36 | Fabrication and Errection of SinglePole Support on PCC/ST Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPoNorms.(Cost of clamps borne by contractor) |
37 | Stringing, Sagging, Binding and jumpering of ACSR Conductor as per RESSPO Norms |
38 | Stringing, Sagging, Binding and jumpering of AB Cable 3x50 Conductor as per RESSPO Norms |
39 | Stringing, Sagging, Binding and jumpering of AB Cable3x95+1x701x16 Conductor as per RESSPO Norms |
40 | Stringing, Sagging, Binding and jumpering of AB Cable 3x120+1x951x16 Conductor as per RESSPO Norms |
41 | Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms |
42 | Earthing of Poles as per RESPO Norms |
43 | Constructionof Transformer Plinth including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms |
44 | Fencing of Transformer Plinth with the help of wire mesh/Barbed wire after grouting proper size of angle as per RESSPO Norms. Inclusive of all material such as Wiremesh/Barbed Wire, Angle Flats, Nut Bolts etc. |
45 | Repairing of old Transformer Plinth including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms |
46 | Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.) |
47 | Erection & Commissioning of of3 Phase/Single Phase Distribution Box with help of clamps(Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms. |
48 | Mounting of 25KVA Transformer as per RESSPO Norms. |
49 | Mounting of 63KVA Transformer as per RESSPO Norms. |
50 | Mounting of 250KVA Transformer as per RESSPO Norms. |
51 | Mounting of 400KVA Transformer as per RESSPO Norms. |
52 | Connection of L.T. XLPE Cable Different Size |
53 | Rect. Back old and used 10 KVA T/F |
54 | Rect. Back old and used 16 KVA T/F |
55 | Rect. Back old and used 100 KVA T/F |
56 | Rect. Back old and used 250 KVA T/F |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail