Tender For Supply & Installation Of Steam Flow Meter For Bisalpur Kisan Sahkari Chini Mills, Ltd., Bisalpur ( Pilibhit ) For The Season 2023-24 SUPPLY & INSTALLATION OF Complete Digital Steam Flow Indicator (Meter), Size 96mm x 96mm, Calibrated As Required. 150 NB (6) Sch. 80 WNRF Class 600 A105 OPA Orifice plate flange assembly consisting of pair of WNRF IBR flanges in ASTM A105, Square Edge Concentric Orifice plate in ASTM A240 Gr. 316, Butt-weld ends, Studs & Jackbolt in ASTM A193 Gr.B7, Nuts in ASTM A194 Gr. 2H, Spiral gaskets, two pairs of 1/2 NPTF flange taps with one pair plugged with required instruments cable, Pressure Transmitter, Condensate Port Connection, IBR Approved Globe Valve, Sleeveless Tube, HP M.S. Tee, HP M.S. Union, 3 Valve S.S. Manifold, M.S. Plough etc. Complete with all respect and Successful Trial & Commissioning in Boiler No. 01 & 02 ( Cap.-20 Ton ). 02 No Complete SUPPLY & INSTALLATION OF Complete Digital Steam Flow Indicator (Meter), Size 96mm x 96mm, Calibrated As Required. 200 NB (8) Sch. 80 WNRF Class 600 A105 OPA Orifice plate flange assembly consisting of pair of WNRF IBR flanges in ASTM A105, Square Edge Concentric Orifice plate in ASTM A240 Gr. 316, Butt-weld ends, Studs & Jackbolt in ASTM A193 Gr.B7, Nuts in ASTM A194 Gr. 2H, Spiral gaskets, two pairs of 1/2 NPTF flange taps with one pair plugged with required instruments cable, Pressure Transmitter, Condensate Port Connection, IBR Approved Globe Valve, Sleeveless Tube, HP M.S. Tee, HP M.S. Union, 3 Valve S.S. Manifold, M.S. Plough etc. Complete with all respect and Successful Trail & Commissioning in Boiler No. 03 ( Cap.-30 Ton ) 01 No Complete SUPPLY & INSTALLATION OF Complete Digital Steam Flow Indicator (Meter), Size 96mm x 96mm, Calibrated As Required. 150 NB (6) Sch. 80 WNRF Class 600 A105 OPA Orifice plate flange assembly consisting of pair of WNRF IBR flanges in ASTM A105, Square Edge Concentric Orifice plate in ASTM A240 Gr. 316, Butt-weld ends, Studs & Jackbolt in ASTM A193 Gr.B7, Nuts in ASTM A194 Gr. 2H, Spiral gaskets, two pairs of 1/2 NPTF flange taps with one pair plugged with required instruments cable, Pressure Transmitter, Condensate Port Connection, IBR Approved Globe Valve, Sleeveless Tube, HP M.S. Tee, HP M.S. Union, 3 Valve S.S. Manifold, M.S. Plough etc. Complete with all respect and Successful Trail & Commissioning in Power Turbine No. 01 & 02 ( Cap.-1.5 MW Belliss Make ) 02 No Complete