Tender For Peb Warehouse And Workshop Tender For Cauvery Basin Refinery (Cbr) Project Of Cpcl, Nagapattinam-Tamil Nadu

Chennai Petroleum Corporation Limited-CPCL has published Tender For Peb Warehouse And Workshop Tender For Cauvery Basin Refinery (Cbr) Project Of Cpcl. Submission Date for this Tender is 08-01-2024. Fabrication Work Tenders in Nagapattinam Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

39923295
Corrigendum : Tender For Peb Warehouse And Workshop Tender For Cauvery Basin Refinery (Cbr) Project Of Cpcl
Open Tender
Indian
Tamil Nadu
Nagapattinam
08-01-2024

Tender Details

Tender For Peb Warehouse And Workshop Tender For Cauvery Basin Refinery ( Cbr ) Project Of Cpcl , Sp-0 Description Peb Warehouse And Workshop Works Of Cbr Project On Lumpsum Turnkey Basis With Single Point Responsibility Including But Not Limited To The Following Activities Of Works: Detailed Engineering, Preparation Of Datasheets, Specifications For Procurement, Gad & Layouts, Engineering & Fabrication Drawings, Procurement & Construction Schemes, Control Logics, Cause And Effect Diagram, Electrical System Studies, Statutory Approval From Various Statutory State & Central Government Bodies, Review / Approval Of Drawings & Documents From Owner / Eil, Supply Of Documents / Manuals , 3-D Modelling, As Built And Final Documentation And Completing All Works As Per The Bid Document Requirements. Supply Of All Equipment And Materials But Not Limited To - Procurement Services, Shop Fabrication , Third Party Inspection, Expediting, Project Management, Planning, Scheduling, Monitoring, Transportation, All Loading And Unloading; Payable In The Contractor’S Country; Insurance In Contractor’S Scope; All Type Of Freights Including Ocean Freight, Air Freight And Inland Freight; Custom Clearance, All Type Of Handling Including Port Handling, Stevedoring, Handling At Worksite Etc.; Supply Of Start-Up / Pre-Commissioning / Commissioning / Mandatory Spares; Supply Of Consumables, Chemicals / Lubricants / Refigerant And Replenishment Of Any Loss During Commissioning And Pg Testing Of Operation And Maintanence Of 6 ( Six ) Months Period After Commissioning As Per Technical Specifications For Completing The Work In All Respects As Per Provision Of Bidding Document. Construction / Erection Including But Not Limited Toloading / Unloading Of The Materials At Contractor’S Warehouse ; Transportation Of The Materials From Contractor’S Workshop / Store To Erection Site; Assembly / Sub-Assembly Of The Equipment, Erection, Installation, Testing, Inspection; Pre-Commissioning / Commissioning And Pgtr Of The Various Systems; Training To Owner Personals, Handing Over To Owner Including All Disciplines Of Work As Per Tender Requirements Such As Structural, Civil, Mechanical, Piping, Electrical, Instrumentation, Insulation, Painting; Supply Of All Accessories And Materials For Erection / Testing; Supply Of All Consumables; Providing All Construction Plants, Equipments, Special Tools; Providing Supervisory Personnel, Tradesman Skilled / Unskilled Labour; Insurance In Contractor’S Scope; Completing All Works In All Respects As Per Provisions Of Bidding Document. Completion Of All Works In All Respects As Per Provisions Of The Bidding Document And Directions Of The Engineer-In-Charge, Including Any Other Activity Of Work Required To Complete The Peb Ware House And Workshop In All Respects To Make Them Functional. , Sp 01 ( Supply Portion ) , Supply Of All Equipment And Materials But Not Limited To - Procurement Services, Shop Fabrication , Third Party Inspection, Expediting, Project Management, Planning, Scheduling, Monitoring, Transportation, All Loading And Unloading; Payable In The Contractor’S Country; Insurance In Contractor’S Scope; All Type Of Freights Including Ocean Freight, Air Freight And Inland Freight; Custom Clearance, All Type Of Handling Including Port Handling, Stevedoring, Handling At Worksite Etc.; Supply Of Start-Up / Pre-Commissioning / Commissioning / Mandatory Spares; Supply Of Consumables, Chemicals / Lubricants / Refigerant And Replenishment Of Any Loss During Commissioning And Pg Testing Of Operation And Maintanence Of 6 ( Six ) Months Period After Commissioning As Per Technical Specifications For Completing The Work In All Respects As Per Provision Of Bidding Document. , Lumpsum Price Of 1.1 Above , Sp-02 ( Services Portion ) , Detailed Engineering, Preparation Of Datasheets, Specifications For Procurement, Gad & Layouts, Engineering & Fabrication Drawings, Procurement & Construction Schemes, Control Logics, Cause And Effect Diagram, Electrical System Studies, Statutory Approval From Various Statutory State & Central Government Bodies, Review / Approval Of Drawings & Documents From Owner / Eil, Supply Of Documents / Manuals , 3-D Modelling, As Built And Final Documentation As Per Bidding Document Requirements. , Construction, Installation Etc. And Completion Of Entire Work In All Respects For Pre Engineered Ware House Package Including Transportation And Site-Handling Of Material / Equipment, Supply Of Consumables, Tools And Tackles, Field Engineering Services, Receipt, Storage, Conservation Of Fim And Contractor-Supplied Items. Fabrication, Construction, Assembly, Erection At Site For All Piping, Civil, Structural, Architectural, Mechanical, Electrical And Instrumentation Works Within Battery Limit Including Insulation, Coating, Painting, Testing, Etc. , Providing All Temporary Works / Structures And Equipment For Completion, Obtaining Statutory Approvals, Pre-Commissioning, Commissioning, Performance Guarantee Test Runs Of The Various Systems, Providing Training To Owner Personnel And Complete All The Work In All Respects To Make System Smooth, Operable Until Handing Over As Per The Bidding-Document Requirements And Instructions / Satisfaction Of The Engineer In Charge. , Lumpsum Price Of 2.1 & 2.2 Above , Sp-0 ( Total Of Sp-1 + Sp-2 )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 20-Oct-2023 BID DUE DATE EXTENSION - 01 Date 15-11-2023
2 02-Nov-2023 REPLY TO PRE BID QUERY-01 Other 15-11-2023
3 06-Nov-2023 TECHNICAL AMENDMENT NO- 01 Technical Bid 15-11-2023
4 09-Nov-2023 COMMERCIAL AMENDMENT-01 Other 15-11-2023
5 14-Nov-2023 BID DUE DATE EXTENSION - 02 Date 30-11-2023
6 15-Nov-2023 REPLY TO PRE BID QUERY-02 Other 30-11-2023
7 01-Dec-2023 BID DUE DATE EXTENSION - 03 Date 15-12-2023
8 07-Dec-2023 REPLIES TO PRE-BID QUERIES - 03 Other 15-12-2023
9 18-Dec-2023 BID DUE DATE EXTENSION - 04 Date 28-12-2023
10 29-Dec-2023 BID DUE DATE EXTENSION - 05 Date 08-01-2024
11 02-Jan-2024 REPLIES TO PRE-BID QUERIES - 04 Other 08-01-2024

Key Value

Document Fees
Refer document
EMD
INR 2635000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: PEB WAREHOUSE AND WORKSHOP TENDER FOR CAUVERY BASIN REFINERY (CBR) PROJECT of CPCL
Sl. No. Item Description
1SP-0 DESCRIPTION PEB WAREHOUSE AND WORKSHOP WORKS OF CBR PROJECT ON LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Detailed engineering, preparation of Datasheets,specifications for procurement, GAD & Layouts, engineering & fabrication drawings, Procurement & Construction schemes, Control logics, cause and effect diagram, Electrical system studies, Statutory approval from various Statutory state & central Government bodies, review / approval of drawings & documents from OWNER/ EIL, supply of documents / manuals , 3-D modelling, AS BUILT and final documentation and completing all works as per the bid document requirements. Supply of all equipment and materials but not limited to - procurement services, shop fabrication , third party inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight, air freight and inland freight; custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc.; supply of start-up / pre-commissioning / commissioning / mandatory spares; supply of consumables, chemicals / lubricants/refigerant and replenishment of any loss during commissioning and PG testing of operation and maintanence of 6 (six) months period after commissioning as per technical specifications for completing the work in all respects as per provision of Bidding Document. Construction / Erection including but not limited toloading/unloading of the materials at Contractor’s warehouse ; transportation of the materials from Contractor’s workshop / Store to erection site; assembly / sub-assembly of the equipment, erection, installation, testing, Inspection; pre-commissioning / commissioning and PGTR of the various systems; training to Owner personals, handing over to owner including all disciplines of work as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting; supply of all accessories and materials for erection / testing; supply of all consumables; providing all construction plants, equipments, special tools; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document. Completion of all works in all respects as per provisions of the Bidding Document and directions of the Engineer-in-Charge, including any other activity of work required to complete the PEB ware house and workshop in all respects to make them functional."
2SP 01 ( Supply portion )
3Supply of all equipment and materials but not limited to - procurement services, shop fabrication , third party inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight, air freight and inland freight; custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc.; supply of start-up / pre-commissioning / commissioning / mandatory spares; supply of consumables, chemicals / lubricants/refigerant and replenishment of any loss during commissioning and PG testing of operation and maintanence of 6 (six) months period after commissioning as per technical specifications for completing the work in all respects as per provision of Bidding Document.
4LUMPSUM PRICE OF 1.1 ABOVE
5SP-02 (Services Portion)
6Detailed engineering, preparation of Datasheets,specifications for procurement, GAD & Layouts, engineering & fabrication drawings, Procurement & Construction schemes, Control logics, cause and effect diagram, Electrical system studies, Statutory approval from various Statutory state & central Government bodies, review / approval of drawings & documents from OWNER/ EIL, supply of documents / manuals , 3-D modelling, AS BUILT and final documentation as per Bidding Document requirements.
7Construction, installation etc. and completion of entire work in all respects for Pre Engineered Ware House package including Transportation and site-handling of material/equipment, supply of consumables, tools and tackles, field engineering services, Receipt, storage, conservation of FIM and contractor-supplied items. Fabrication, construction, assembly, erection at site for all piping, civil, structural, architectural, mechanical, electrical and instrumentation works within battery limit including insulation, coating,painting, testing, etc. ,providing all temporary works/structures and equipment for completion, obtaining statutory approvals, Pre-commissioning, commissioning, performance guarantee test runs of the various systems, providing training to owner personnel and complete all the work in all respects to make system smooth, operable until handing over as per the Bidding-Document requirements and instructions/satisfaction of the Engineer In Charge.
8LUMPSUM PRICE OF 2.1 & 2.2 ABOVE
9SP-0 (TOTAL OF SP-1 + SP-2)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail