| 1 | Erection of 11/.4KV, 63 KVA S/Stn.inVill Dangro Kheter |
| 2 | Erection of 25 KVA S/Stn. i.e. digging of pit for pole & earthing two No. poles & 3 Nos. for earthdrilling of holes in X-arms, preparation of plateform str. Members C.I., A.L. i.e. X-arms & K.B. set, errection of D/P, concreating of RCC muff errection of plateform, errection of X-arms, D.O., L.A., MCCB, Switch LT box, energy meter, errection of transformer, earthing connection to G.O. switch, Transformer L.A. etc., errection of stay set, jumper, pipe earthing 3 Nos set, L.T. cable, barbed wire and painting complete in all respect. |
| 3 | Mannual carriage of 25 KVA pole mounted distribution S/Stn. average distance (0.400 KM) ST poles, X-arms, G.O. Switch, LT cable, plate for fitting , earthing set, LT box, insulators & stay set etc. with 25 KVA Transformer |
| 4 | Loading & unloading of poles & others materials of S/Stn. |
| 5 | Erection of HT Line |
| 6 | Erection of 9 Mtr. Steel TublerPolei.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clump, barbed wire, danger plate, drilling of holes and filling of pit + ramming , painting of pole complete in all respect. |
| 7 | Erection of Stay set HT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning. |
| 8 | Fixing of jumper |
| 9 | Laying stringing and sagging of AAAC/ACSR/50mm (3Wire) of 11KV,HT Line laying of conductor,dtringing and sagging binding with insulator making jumper on dead poles etc. complete in all respect (Rate to be quoted in KM) |
| 10 | Laying stringing and sagging of GI Wire (1Wire) of 11KV,HT Line laying of conductor,dtringing and sagging binding with insulator making jumper on dead poles etc. complete in all respect (Rate to be quoted in KM) |
| 11 | Mannual carriage of 11KV HT Line Materials on steel tubular pole for an average lead of 1KM from road head to site of work i.e 200M (Rate to be quoted in KM) |
| 12 | Loading & unloading of poles & others materials of 11KV HT Line |
| 13 | PROVIDING & SUPPLY OF MATERIALS |
| 14 | 11/0.4KV,25KVA S/stn |
| 15 | Prov. G.O. SwitchComp. |
| 16 | Prov. D.O. fuse unit Comp. |
| 17 | Prov. S/Stn. pipe earthing i/c earthing plate with GI wire Charcole & salt complete in all respect |
| 18 | Prov. L.As. (3 Nos) comp.set. |
| 19 | Prov. Almunium Paint |
| 20 | Prov. S/Stn. plinth protection |
| 21 | Prov. RCC Muffs |
| 22 | 11KV HT Line |
| 23 | Prov. RCC Muffs |
| 24 | Prov. & fabrication of X-Arm (Channel iron 100X50X6mm for S/P Str. |
| 25 | Prov. & fabrication of Angle iron 50X50X6mmi/c clamp for single pole |
| 26 | Pole Top Bracket 100X50X6mm |
| 27 | Prov. Pin Insulator with GI Pin |
| 28 | Prov.. GI Wire 8 SWG |
| 29 | Prov. M/S Nutt & Bolts off sizes |
| 30 | Prov. Almunium Paint |