Tender For Increasing Capacity Of 33 11 Kv Substations Bangarmau Gramin From 1X5 1X8 Mva To 1X5 1X10 Mva Ajgain From 2X5 1X10 Mva To 1X5 2X10 Mva Miyaganj From 1X5 1X8 To 1X10 1X8 Hasanganj From 1X8 1X5 Mva To 1X8 1X10 Mva Pathakauk From 1X5 Mva To 1, unnao-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Tender For Increasing Capacity Of 33 11 Kv Substations Bangarmau Gramin From 1X5 1X8 Mva To 1X5 1X10 Mva Ajgain From 2X5 1X10 Mva To 1X5 2X10 Mva Miyaganj From 1X5 1X8 To 1X10 1X8 Hasanganj From 1X8 1X5 Mva To 1X8 1X10 Mva Pathakauk From 1X5 Mva To 1. Submission Date for this Tender is 10-10-2023. Civil Work Tenders in unnao Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

39901863
Corrigendum : Tender For Increasing Capacity Of 33 11 Kv Substations Bangarmau Gramin From 1X5 1X8 Mva To 1X5 1X10 Mva Ajgain From 2X5 1X10 Mva To 1X5 2X10 Mva Miyaganj From 1X5 1X8 To 1X10 1X8 Hasanganj From 1X8 1X5 Mva To 1X8 1X10 Mva Pathakauk From 1X5 Mva To 1
Open Tender
Indian
Uttar Pradesh
unnao
10-10-2023

Tender Details

Tender For Increasing Capacity Of Following Bangarmau Grameen1x5+1X8 Mva To 1X5+1X10 Mva, Ajgain1x10+2X5 Mva To 1X5+2X10 Mva, Miyaganj 1X8+1X5 Mva To 1X8+1X10 Mva, Hasanganj 1X8+1X5 Mva To 1X8+1X10mva, Pathakour 1X5 Mva To 1X10 Mva, Bihar 1X5 Mva To 1X10 Mva, Mawai 2X5 Mva To 1X5+1X10 Mva, Gangaghat 1X5 Mva To 1X10 Mva, Erabhetir2x5 Mva To 1X5+1X10 Mva, Pd Nagar 2X5 Mva To 1X5+1X10 Mva & Industrial Area 2X5 Mva To 1X5+1X10 Mva Distt-Unnao- 2 33 Kv Line Isolator 3 33 Kv Lightening Arrester 4 33 Kv Vcb 800 Amp., 750 Mva 5 33 Kv Ct 200 / 100 / 1 Amp. 6 33 Kv Ct 400 / 200 / 1 Amp. 7 11 Kv Vcb O / G Ctr 200 / 100 / 5 Amp, 350 Mva 8 11 Kv Vcb Bus Coupler 9 11 Kv 3X300 Sq Mm Xlpe 10 11 Kv 3X120 Sq Mm Xlpe 11 Ms Angles 75X75x6mm 12 Acsr Panther Conductor 13 Pcc Pole 8.5Mtr Long 14 St Pole 11 Mt Long-Sp-55 15 11 Kv V-Type Cross Arm 65X65x6 Mm 16 Polymeric 11 Kv Disc Insulator B&S. Type 70 Kn. 17 Disc Fittingsdog / Racoon 70 Kn. 18 Polymeric 33Kv Pin Insulator 19 Ms Channel 125X65mm3.2 Mtr. Long 20 Ms Channel 100X50 Mm 21 Ms Channel 100X50x2028 Mm ( Dropper For Fuse Set ) 22 Ms Channel 100X50x2240mm Top Channel 23 11 Kv Polymeric Disc Insulator T & C 24 11 Kv Disc Fitting T & C Type 4500 Kg. 25 11 Kv Composite Polymeric Pin Insulator 26 Ms Earthing Rod 20X2500 Mm 27 Ms Angle 65X65x6mm 2028 Mm 28 Guarding Angle 65X65x6mm ( 2500 / 1600 ) Mm 29 Complete Stay Set ( Gi Stay Rod 16X1800 Mm ) 30 Stay Wire 7 / 10 Swg ( 5 Kg. / Stay ) 31 11 Kv 3X300 Sq Mm Xlpe Cable Outdoor Jointing Kit 32 11 Kv 3X300 Sq Mm Xlpe Cable Indoor Jointing Kit 33 11 Kv 3X120 Sq Mm Xlpe Cable Outdoor Jointing Kit 34 11 Kv 3X120 Sq Mm Xlpe Cable Indoor Jointing Kit 35 Gi Wire 8 Swg For Guarding 36 Gi Wire 6 Swg For Earthing 37 Acsr Weasel Conductor 38 Single Core Pvc Cable 1X240 Sq.Mm. 39 Dismantling & Safe Shifting Of Existing Old & Non Working 05 Mva T / F From Plinth To Suitable Storage Place After Opening Jumper And Cable Connections As Per Required. 40 Extension And Repairing Of Existing Power Transformer Plinth Of 05 Mva T / F As Per Required. 41 Lightening Arrestor, P.I. & Ct Structure : Fabrication Of Lightening Arrestor, P.I. & Ct Structure 3.5 Mtr. In Height As Per Drg. Digging Of Two No Pits Of Size 1.075X0.9X0.3 Mtr. Providing Stone Pad At The Bottom Of The Pit And Grouting Of Two Legs Of The Structure In Cc ( Cement Coarse Sand And Stone Grit Of 20Mm Gauge ) Of The Ratio 1:4:8 In Block Of 1.075X0.3 Mtr. Including All Civil Material, T&P Complete In All Respect. The Work Includes Dragging, Shifting Up To 40 Mtr., Raising And Erecting The Two Legs With Runner On Proper Alignment And Level And Plumb. Both Plinths Of The Structure Shall Be Properly Finished With Smoothing Of Edges. 42 Plinth Of Vcb : Construction Of Plinth Of Size 2.0 Mtrx1.5Mtrx0.9Mtr. Suitable For Erection Of Upper Structure Of 33Kv Vcb Including Grouting Of Anchor Bolts In Proper Alignment And Level. Scope Of Work Includes Excavation Of Foundation Base And Concreting In Cc 1:3:6 ( Cement, Find Sand & Stone Grit ) 1St Class Brick Work In Cement Mortor Ratio 1:4:8. 43 Connection Of 33 / 11Kv 10 Mva T / F At Both Side Of ( Ht / Lt ) With Proper & Suitable Connectors, Lugs. This Works Also Include Jointing Of Earthing Strip With Body And Neutral By Proper Welding And Bolting. ( All Decentralised Materials Are To Be Provided By Contractor ) . 44 Earthing For Power T / Fby Way Of Boring And Lowering Of 40Mm Dia, 2.9 Mm Thick Gi Pipe B Class From Ground Upto The Water Level ( Minimum 60 Feet Deep ) As Per Standard Practice As Per Respo / Rec Drg With Making Of Earth Pit Of 300X300 Mm & 1 Feet Deep With Cover. ( All Materials To Be Provided By Contractor ) . 45 Neutral Standfabrication And Grouting ( 1:4:8 ) Of Ms Angle 75X75x6mm In L Shape & In Proper Size And Alignment To Provide Support Through Gi Earthing Strips ( 50X6 ) Mm Size For Power Transformer Neutral Including Supply & Fixing Of Flexible Copper Bonds For Neutral Earthing As Per Respo Drg. ( All Decentralised Materials To Be Provided By Contractor ) . 46 Cable Standfabrication And Erection Of Cable Support Made Of Two Pieces Of Ms Channel 100X50mm, 3.0 Mtr. Long Joined To Each Other By Means Of 5 No. Ms Flat 50X6mm Pieces Of Size 150Mm Long Each By Welding At Equal Intervals As Per Drawing And Grouting In Block Of Size 300X300x700mm ( 1:4:8 ) Complete. This Includes Providing Of Required Ms Clamp Made Of Ms Flat Holding The Cable Including Nuts & Bolts And Fixing Of Xlpe Cable. 47 Installation Of Isolators: Assembling And Installation Of Line / Bus Isolator On The Isolator Structure Adjusting Of Opening Mechanis In Proper Alignment So As To Ensure Smooth Operation Of The Same. In Case Of Line Isolator Proper Operation Of Earth Links Shall Also Be Ensured. The Work Includes Fabrication & Proper Connection With Earthmat / Earthing By G.I. Earth Strip 50X6mm Proper Fixing If Required ( All Decentralised Materials To Be Provided By Contractor ) . 48 Installation Of P.I. & Lightening Arrestors : Assembling, Installation & Mounting Of 3 No. ( 1Set ) L.A. & Post Insulator On The L.A & P.I. Structure / Complete With Making Earth Connections ( Separate ) With Gi Strip 50X6mm. The Work Includes Fabrication For Fixing If Required. ( All Decentralised Materials To Be Provided By Contractor ) . 49 Installation Of Ct: Installation Of 3 No. ( 1 Set ) Ct On The Ct Structure Along With Ct Junction Box. The Work Includes Fabrication, Proper Fixing Of C.T. With Making Earth Connections ( Earth Mat / Earthing ) With Gi Strip 50X6mm And Control Wiring Connection, Proper Commissioning & Testing. ( All Decentralised Materials To Be Provided By Contractor ) . 50 Installation Of Vcb: Installation Of 33Kv Vcb Complete Work With Making Earth Connections ( Earth Mat / Earthing ) With Gi Strip 50X6mmincluding Control Wiring, Commissioning & Testing ( All Decentralised Materials To Be Provided By Contractor ) . 51 Installation Of Switchgears In Control Room:Shifting Carefully & Installation Safely 11Kv I / C, O / G & Bus Couplar Switchgears From Outside The Switchgear Room Placing And Fixing Of Switchgear On Foundation Providing G.I. Bolt & Nuts Of Proper Size In Proper Position And Alignment. This Includes Checking, Complete Work With Mounting Of P.T. On Incoming S / G With Proper Testing, Connetion Of Earthing & Commissioning Of Switchgears. 52 Fixing And Making Bus Bar Connections In Between All Switchgears After Cleaning And Tapping With H.T. Tape, Empire Tape And Pvc Tape Properly, Providing And Fixing Of 6 Mm Thick Bakelite Separators And Plugging Of All Opening & Holes With Plastic Compound Complete Work As Per Required. 53 Earthing Of 11 Kv, 33 Kv Switchgears & Equipment: Earthing Of 11 Kv, 33 Kv Switchgears Equpiment By Lowaring And Boring Of Chemical Earthing Outside Of Switchyard And Connecting Through G.I. Strip 50X6mm With Indoor / Outdoor Equipments With Making Of Earth Pit Of 300X300 Mm & 1 Feet Deep With Cover. ( All The Material Provided By The Contractor ) 54 Painting Of All Structures And Equipments With Good Quality Isi Mark One Coat Of Red Oxide Primer & Two Coats Of Aluminium Paint. 55 Laying & Dressing Of 11Kv 3X300 Sq.Mm Xlpe Cable From 10Mva T / F To 11Kv Incoming Switchgear By Excavation Of Trench In The Ground Of Size 450Mm Wide, 900Mm Deep Providing 150Mm Fine Sand Cushion Belowthe Cable. The Cable Shall Be Duly Protected By Bricks, Sand & Stone Slab And Refilling & Ramming Of The Left Out Soil. Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. Cable Laying Work Includes Unrolling, Cutting, Making Ring And Sealing Both Ends Of The Cable. ( All Decentralised Materials To Be Provided By Contractor ) . 56 Laying & Dressing Of 11Kv 3X120 Sq.Mm Xlpe Cable From11kv O / G Switchgear By Excavation Of Trench In The Ground Of Size 450Mm Wide, 900 / 1200 Mm Deep Providing 150Mm Fine Sand Cushion Below & Abovethe Cable. The Cable Shall Be Duly Protected By Bricks, Sand & Stone Slab And Refilling & Ramming Of The Left Out Soil. Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. Cable Laying Work Includes Unrolling, Cutting, Making Ring And Sealing Both Ends Of The Cable. ( All Decentralised Materials To Be Provided By Contractor ) . 57 Hoisting Of 11Kv Cable With 100 Mm Dia 3 Mtr. Long Gi Pipe On The Feeder Cable Before Mounting The Cable On The Double Pole, Lifting, Mounting And Clamping Of 11Kv Feeder Cable Boxes On The Feeder Double Pole Structure And Making Connection Including Supply Of Cable Mounting Clamps. The Work Includes The Sealing Of Gi Pipes, Lower End Of The Pipe Is To Be Buried Into The Earth By About One Foot. ( All Decentralised Materials To Be Provided By Contractor ) . 58 Connection Of 11Kv Xlpe Cable For 11 Kv Switchgears & 33 / 11Kv T / F Of Requried Size. 59 Making Vertical / Horizontal Jumper Connections Using Panther / Dog Conductor With Existing Busbar Gantry Through Pg Clamps And Connecting All Equipments With Each Other Through Connecting Clamps. The Work Includes All The Jumpers From Busbar Tot / F ( 1No. T / F Bay & All Equipments ) ( All Fitting Clamps, Pg Connector Etc. To Be Provided By Contractor ) . 60 Supply And Laying Of Following Size Copper Control Cable Through Underground / Cable Trench / Trenching Sgr Interlinking Through Proper Connections To T / F Control Panel / Protection Board / Battery And Battery Charger / Bunch Joints, Relay 33 / 11Kv T / F Junction Box / 33Kv Vcb, Cts Etc. As Per Site Conditions: 61 4X2.5 Sq.Mm 62 6X2.5 Sq.Mm 63 Fixing Of Single Corepvc Cable, 1X240 / 400 / 630 Sq.Mm. & Fixing Between Transformer Incoming 3X300 Sq.Mm Xlpe Cable And Transformer 11 Kv / Lv Side Bushing Connector For Reducing Of Tension At Lv Side Bushing. 64 Construction Of 11 Kv Feeders : ( A ) Excavation Of Foundation Pit In Mix Soil / Normal Soil, Soft & Hard Rock And Its Back Filling And Levelling Etc. The Size Of The Pit Will Be 800X900 Mm And Having A Depth Of 1 / 6 Of The Full Length Of The Support. Erection Of Supports By Providing Stone Pad, Fixing All Clamps And Other Accessories Such As No. Plate, Danger Board, Barbed Wire ( 2Kg. ) , Painting ( One Coat Red Oxide Primer & Two Coats Of Red& Aluminium Paint At Required Height ) . As Per Relevant Respo / Res. Drawing . This Includes Any Fabrication, If Required. ( B ) Grouting Of Above Supports With Cement, Concrete ( Cc Will Be Of Cement Coarse Sand & Stone Grit ) Grouting Will Be Done With The Help Of Wooden / Steel Formers In A Block Of Size 450 Mm X 450 Mm X 1 / 6 Of The Full Length Of The Support In The Cc 1:4:8 Ratio As Per Respo / Res. Drawing Including Back Filling And Proper Ramming. ( C ) Making Plinth Of Stp 300 Mm, Dia & 300 Mm Above Ground Level In Cc Of 1:4:8 & Plastering Of The Same With 12 Mm Thick Plaster Of Cement & Sand In 1:4 Ratio. ( D ) Earthing Of Supports With Earth Electrode 2.5 Mtr. Length Including Excavation Of Pit And Driving M.S. Rod Upto Proper Depth And Connecting The Earth Electrode With The Help Of 6 / 8 Swg G.I. Wire And Earthing Lugs. Respo / Res. Drawing. 65 Double Pole Structure For Outgoing Feeder On 8.5 Mtr Pcc Pole With Complete Accessories. 66 Single Support On 11Mtr. Stp : 67 Single Support On 8.5 Mtr Pcc Pole : 68 ( A ) Grouting Of Stay Rods 1800X20 Mm Including All Works Of Excavation Grouting By, Cement Concrete In Size 0.60X0.60X0.3 Mtr. With Ratio 1:4:8 As Per Relevant Drawing Including Back Filling Of Earth And Proper Ramming. ( B ) Fixing, Making Of Loop Insulator, Tightening & Nuzzling Of Stay With The Poles And Required Tension As Per Respo / Res. Drawing. 69 Laying, Spreading, Lifting, Stinging, Jointing And Final Sagging Of Acsr Dog / Weasel Conductor In Accordance With Profiles And Sag Chart Including Binding, Jumpering And Fixing Of All Accessories In 3 Nos. Conductor In Parallel With Pg Clamp Binding Wire Etc Requested For Job. 70 Guarding Between Two Poles Like Single / Double / Tri. / Four Poles Etc. To Guardlt / 11 Kv / Telephone Lines, Road / River Crossing Etc. With G.I. Wire 6 Swg And G.I. Wire 8 Swg Including Fixing Of Guarding Channel Of Requested Sitewith Clamps And Nuts And Bolts As Per Respo / Res. Drawing 71 Supply And Installation Of 24 Volt Battery And It Charger With Connections To Existingcontrol Circuit Complete In All Respects. 72 Looping Of Branches Of Trees Along The Route Of Line And Disposal Of The Same After Obtaining Permission Of Competant Authority.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 03-Oct-2023 TIME EXTENSION Date 10-10-2023

Key Value

Document Fees
INR 3540 /-
EMD
INR 54850.0 /-
Tender Value
INR 54.85 Lakhs /-

BOQ Items

Name of Works: For Increasing capacity offollowing Bangarmau Grameen1x5+1x8 MVA to 1x5+1x10 MVA, Ajgain1x10+2x5 MVA to 1x5+2x10 MVA, Miyaganj 1x8+1x5 MVA to 1x8+1x10 MVA, Hasanganj 1x8+1x5 MVA to 1x8+1x10MVA, Pathakour 1x5 MVA to 1x10 MVA, Bihar 1x5 MVA to 1x10 MVA, Mawai 2x5 MVA to 1x5+1x10 MVA, Gangaghat 1x5 MVA to 1x10 MVA, Erabhetir2x5 MVA to 1x5+1x10 MVA, PD Nagar 2x5 MVA to 1x5+1x10 MVA & Industrial Area 2x5 MVA to 1x5+1x10 MVA Distt-Unnao.
Sl. No. Item Description
1Safe loading, Carriage and Unloading of following Store Material with Proper Stacking from any ESC of Lucknow Zone to JE"s Dump Store/Store to work Site: (Approx.30 KM)
233 KV Line Isolator
333 KV Lightening Arrester
433 KV VCB 800 Amp., 750 MVA
533 KV CT 200/100/1 Amp.
633 KV CT 400/200/1 Amp.
711 KV VCB O/G CTR 200/100/5 AMP, 350 MVA
811 KV VCB Bus Coupler
911 KV 3x300 SQ MM XLPE
1011 KV 3x120 SQ MM XLPE
11MS Angles 75x75x6mm
12ACSR Panther Conductor
13PCC Pole 8.5mtr long
14ST Pole 11 Mt Long-SP-55
1511 KV V-type cross arm 65x65x6 mm
16Polymeric 11 KV Disc Insulator B&S. Type 70 KN.
17Disc FittingsDog/ Racoon 70 KN.
18Polymeric 33KV Pin Insulator
19MS Channel 125x65mm3.2 mtr. Long
20MS Channel 100x50 mm
21MS Channel 100x50x2028 mm (Dropper for Fuse Set)
22MS Channel 100x50x2240mm Top Channel
2311 KV Polymeric Disc Insulator T & C
2411 KV Disc fitting T & C type 4500 Kg.
2511 KV Composite Polymeric Pin Insulator
26MS Earthing rod 20x2500 mm
27MS Angle 65x65x6mm 2028 mm
28Guarding Angle 65x65x6mm (2500/1600) mm
29Complete Stay Set (GI Stay rod 16x1800 mm)
30Stay Wire 7/10 SWG (5 Kg./stay)
3111 KV 3x300 SQ MM XLPE Cable Outdoor jointing Kit
3211 KV 3x300 SQ MM XLPE Cable Indoor jointing Kit
3311 KV 3x120 SQ MM XLPE Cable Outdoor jointing Kit
3411 KV 3x120 SQ MM XLPE Cable Indoor jointing Kit
35GI wire 8 SWG for guarding
36GI wire 6 SWG for earthing
37ACSR Weasel Conductor
38Single core PVC Cable 1X240 sq.mm.
39Dismantling & safe shifting of existing old & non working 05 MVA T/F from plinth to suitable storage place after opening jumper and cable connections as per required.
40Extension and Repairing of existing Power Transformer Plinth of 05 MVA T/F as per required.
41Lightening Arrestor, P.I. & CT Structure : Fabrication of Lightening Arrestor, P.I. & CT Structure 3.5 mtr. in height as per Drg. digging of two no pits of size 1.075x0.9x0.3 mtr. providing stone pad at the bottom of the pit and grouting of two legs of the Structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the structure shall be properly finished with smoothing of edges.
42Plinth of VCB : Construction of Plinth of size 2.0 mtrx1.5mtrx0.9mtr. suitable for erection of upper structure of 33KV VCB including grouting of anchor bolts in proper alignment and level. Scope of work includes excavation of foundation base and concreting in CC 1:3:6 (cement, find sand & stone grit) 1st class brick work in cement mortor ratio 1:4:8.
43Connection of 33/11KV 10 MVA T/F at both side of (HT/LT) with proper & Suitable Connectors, Lugs. This works also include jointing of earthing strip with body and neutral by proper welding and bolting. (All decentralised materials are to be provided by Contractor).
44Earthing for power T/Fby way of boring and lowering of 40mm dia, 2.9 mm thick GI Pipe B class from ground upto the water level (minimum 60 feet deep) as per standard practice as per RESPO/REC Drg with making of earth pit of 300x300 mm & 1 feet deep with Cover. (All materials to be provided by Contractor).
45Neutral Stand Fabrication and grouting (1:4:8) of MS Angle 75x75x6mm in L Shape & in proper size and alignment to provide support through GI earthing strips (50x6) mm size for power transformer neutral including supply & fixing of flexible copper bonds for neutral earthing as per RESPO Drg. (All decentralised materials to be provided by Contractor).
46Cable Stand Fabrication and erection of cable support made of two pieces of MS channel 100x50mm, 3.0 mtr. long joined to each other by means of 5 no. MS Flat 50x6mm pieces of size 150mm long each by welding at equal intervals as per drawing and grouting in block of size 300x300x700mm (1:4:8) complete. This includes providing of required MS Clamp made of MS Flat holding the cable including nuts & bolts and fixing of XLPE cable.
47Installation of Isolators: Assembling and installation of line/ bus isolator on the isolator structure adjusting of opening mechanis in proper alignment so as to ensure smooth operation of the same. In case of line isolator proper operation of earth links shall also be ensured. The work includes fabrication & proper connection with earthmat/earthing by G.I. earth strip 50x6mm proper fixing if required (All decentralised materials to be provided by Contractor).
48Installation of P.I. & Lightening Arrestors : Assembling, installation & mounting of 3 No.(1set) L.A. & Post insulator on the L.A & P.I. Structure/complete with making earth connections (separate) with GI Strip 50x6mm. The work includes fabrication for fixing if required. (All decentralised materials to be provided by Contractor).
49Installation of CT: Installation of 3 No.(1 set) CT on the CT Structure along with CT Junction Box. The work includes fabrication, proper fixing of C.T. with making earth connections(Earth Mat/earthing) with GI Strip 50x6mm and control wiring connection, proper commissioning & testing.(All decentralised materials to be provided by Contractor).
50Installation of VCB: Installation of 33KV VCB complete work with making earth connections(Earth Mat/earthing) with GI Strip 50x6mmincluding control wiring, commissioning & testing (All decentralised materials to be provided by Contractor).
51Installation of Switchgears in Control Room: Shifting carefully & installation safely 11KV I/C, O/G & Bus Couplar switchgears from outside the switchgear room placing and fixing of switchgear on foundation providing G.I. Bolt & Nuts of proper size in proper position and alignment. This includes checking, complete work with mounting of P.T. on incoming S/G with proper testing, connetion of earthing & commissioning of switchgears.
52Fixing and making Bus Bar connections in between all switchgears after cleaning and tapping with H.T. Tape, empire tape and PVC tape properly, providing and fixing of 6 mm thick Bakelite separators and plugging of all opening & holes with plastic compound complete work as per required.
53Earthing of 11 KV, 33 KV Switchgears & Equipment: Earthing of 11 KV, 33 KV Switchgears equpiment by lowaring and boring of Chemical Earthing outside of switchyard and connecting through G.I. Strip 50x6mm with indoor/outdoor equipments with making of earth pit of 300x300 mm & 1 feet deep with Cover. (All the material provided by the contractor)
54Painting of all structures and equipments with good quality ISI Mark one coat of red oxide primer & two coats of Aluminium Paint.
55Laying & dressing of 11KV 3x300 Sq.mm XLPE cable from 10MVA T/F to 11KV incoming Switchgear by excavation of trench in the ground of size 450mm wide, 900mm deep providing 150mm fine sand cushion belowthe cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. (All decentralised materials to be provided by Contractor).
56Laying & dressing of 11KV 3x120 Sq.mm XLPE cable from11KV O/G Switchgear by excavation of trench in the ground of size 450mm wide, 900/1200 mm deep providing 150mm fine sand cushion below & abovethe cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. (All decentralised materials to be provided by Contractor).
57Hoisting of 11KV Cable with 100 mm dia 3 Mtr. long GI Pipe on the feeder cable before mounting the cable on the double pole, lifting, mounting and clamping of 11KV feeder cable boxes on the feeder double pole structure and making connection including supply of cable mounting clamps. The work includes the sealing of GI Pipes, lower end of the pipe is to be buried into the earth by about one foot.(All decentralised materials to be provided by Contractor).
58Connection of 11KV XLPE Cable for 11 KV switchgears & 33/11KV T/F of requried size.
59Making vertical/horizontal jumper connections using Panther/Dog Conductor with existing busbar gantry through PG Clamps and connecting all equipments with each other through connecting clamps. The work includes all the jumpers from busbar toT/F (1no. T/F bay & all equipments) (All Fitting Clamps, PG Connector etc. to be provided by Contractor).
60Supply and laying of following size Copper Control Cable through underground/cable trench/trenching SGR interlinking through proper connections to T/F Control panel/protection board/Battery and Battery Charger/Bunch joints, Relay 33/11KV T/F junction Box/33KV VCB, CTs etc. as per site conditions:
614x2.5 Sq.mm
626x2.5 Sq.mm
63Fixing of Single CorePVC Cable, 1x240/400/630 sq.mm. & fixing between Transformer incoming 3x300 Sq.mm XLPE Cable and Transformer 11 KV/LV Side Bushing connector for reducing of tension at LV Side Bushing.
64Construction of 11 KV feeders : (a) Excavation of foundation pit in mix soil/normal soil, soft & hard rock and its back filling and levelling etc. The size of the pit will be 800x900 mm and having a depth of 1/6 of the full length of the support. Erection of supports by providing stone pad, fixing all clamps and other accessories such as No. Plate, Danger Board, Barbed Wire (2Kg.), Painting (one coat red oxide primer & two coats of red& Aluminium paint at required height). as per relevant RESPO/ RES. drawing . This includes any fabrication, if required. (b) Grouting of above supports with cement, concrete (CC will be of cement coarse sand & Stone Grit) Grouting will be done with the help of wooden/steel formers in a block of size 450 mm x 450 mm x 1/6 of the full length of the support in the CC 1:4:8 ratio as per RESPO/ RES. drawing including back filling and proper ramming. (c) Making plinth of STP 300 mm, dia & 300 mm above ground level in CC of 1:4:8 & plastering of the same with 12 mm thick plaster of cement & sand in 1:4 ratio. (d) Earthing of supports with Earth Electrode 2.5 mtr. length including excavation of pit and driving M.S. Rod upto proper depth and connecting the earth electrode with the help of 6/8 SWG G.I. Wire and earthing lugs. RESPO/ RES. drawing.
65Double Pole Structure for Outgoing Feeder on 8.5 mtr PCC Pole with complete accessories.
66Single Support on 11Mtr. STP :
67Single Support on 8.5 mtr PCC Pole :
68(a) Grouting of stay rods 1800x20 mm including all works of excavation grouting by, cement concrete in size 0.60x0.60x0.3 mtr. with ratio 1:4:8 as per relevant drawing including back filling of earth and proper ramming. (b) Fixing, making of loop insulator, tightening & nuzzling of stay with the poles and required tension as per RESPO/ RES. drawing.
69Laying, spreading, lifting, Stinging, jointing and final sagging of ACSR Dog/Weasel Conductor in accordance with profiles and sag chart including binding, jumpering and fixing of all accessories in 3 nos. conductor in parallel with PG Clamp binding wire etc requested for job.
70Guarding between two poles like single/double/Tri./Four Poles etc. to guardLT/11 KV/Telephone lines, Road/River Crossing etc. with G.I. Wire 6 SWG and G.I. Wire 8 SWG including fixing of guarding channel of requested sitewith clamps and nuts and bolts as per RESPO/ RES. drawing
71Supply and Installation of 24 Volt Battery and it charger with connections to existingcontrol circuit complete in all respects.
72Looping of branches of trees along the route of Line and disposal of the same after obtaining permission of competant Authority.
73GST will be paid extra as applicable.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail