Tender For Increasing Capacity Of 33/11 Kv Substation Pakwara (10+5 To 2X10mva), Choudharpur Industrial (10+5 To 2X10mva), Naanpur (2X5 To 10+5Mva), Kundarki (5+10 To 2X10mva), Pipalsana (3X5 To 2X5+10Mva), Thakurdwara Dehar (5+10 To 2X10mva), Surjannagar, moradabad-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Increasing Capacity Of 33/11 Kv Substation Pakwara (10+5 To 2X10mva), Choudharpur Industrial (10+5 To 2X10mva), Naanpur (2X5 To 10+5Mva), Kundarki (5+10 To 2X10mva), Pipalsana (3X5 To 2X5+10Mva), Thakurdwara Dehar (5+10 To 2X10mva), Surjannagar. Submission Date for this Tender is 12-10-2023. Civil Work Tenders in moradabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

39898938
Tender For Increasing Capacity Of 33/11 Kv Substation Pakwara (10+5 To 2X10mva), Choudharpur Industrial (10+5 To 2X10mva), Naanpur (2X5 To 10+5Mva), Kundarki (5+10 To 2X10mva), Pipalsana (3X5 To 2X5+10Mva), Thakurdwara Dehar (5+10 To 2X10mva), Surjannagar
Open Tender
Indian
Uttar Pradesh
moradabad
12-10-2023

Tender Details

Increasing Capacity Of 33 / 11 Kv Substation Pakwara ( 10+5 To 2X10mva ) , Choudharpur Industrial ( 10+5 To 2X10mva ) , Naanpur ( 2X5 To 10+5Mva ) , Kundarki ( 5+10 To 2X10mva ) , Pipalsana ( 3X5 To 2X5+10Mva ) , Thakurdwara Dehar ( 5+10 To 2X10mva ) , Surjannagar ( 5+10 To 2X10mva ) And 33 / 11Kv S / S Ramganga Vihar-Ii ( 2X5 To 10+5Mva ) , District-Moradabad.- 1 Supply of following Items :- (By Contractor)for Item No. 1.01 to 1.261.01 33 KV Bus Isolator 800 Amp/Line Isolator 2 33 KV Fuse Set 3 33 KV Lightening Arrestor 4 33KV Post Insualtor 5 Structure 33 KV CT on 125x65x6 mm Galvanised Channel(As per RESPO Norms) 6 2x2.5 mm2 Control Cable 7 4x2.5 mm2 Control Cable 8 11 KV 3×300mm2 XLPE Cable Jointing Kit (Outdoor) 9 11 KV 3×300mm2 XLPE Cable Jointing Kit (Indoor) 10 11 KV 3×185mm2 XLPE Cable Jointing Kit (Outdoor) /11 KV 3×50mm2 XLPE Cable Jointing Kit (Outdoor) 11 11 KV 3×185mm2 XLPE Cable Jointing Kit (Indoor) / 11 KV 3×50mm2 XLPE Cable Jointing Kit (Indoor) 12 Stone Pad (300×300×75mm) 13 Number Plate with Clamp & Nuts 14 Danger Board & Clamps with Bolts and nuts 15 MS Nut & Bolts 16 M.S. Earthing Rod of 20×2500mm and 6 SWG Wire 17 Stay Complete (Stay Rod 16×1800mm, Stay Wire 5 Kg, Stay Insulators, Sty Clamps, bolts & nuts with grouting) 18 Barbed Wire GI 19 11 KV TPMO with fixing clamp (3 Phase) 20 11 KV Fuse Set (drop out) with fixing clamp (3 Phase) 21 Holding Clamp for GI Pipe 22 Holding Clamp for Channel and Angle 23 G.I. Channel 100×50×6mm, 2240mm 24 G.I. Channel 100×50×6mm, 2028mm 25 G.I Pipe 150 mm Dia, 3 mtr long 26 33KV CT Junction Box 27 Safe carriage of following with loading & unloading at both ends respectively. (under jurisdiction of PVVNL)for Item No. 2.01 to 2.112.01 11 KV Incoming Switch Gear 600/300/5A 350MVA 28 11 KV Outgoing Switch Gear 200/100/5A 350MVA 29 33KV MOCB/VCB 800A750MVA 30 33kV Control Panel for Double T/F without Differential Relay 31 33KV CT 200/100/1-1A 32 ACSR Dog Conductor 33 11KV 3x300 mm2XLPE Cable / 11KV 3x185mm2 XLPE Cable / 11KV 3x50mm2 XLPE Cable 34 11 Mtr. ST Pole, SP-55 Bottom Galvanized 35 11 KV Disc Insulators T&C Type 45 KN Polymeric 36 11 KV Disc fitting 45 KN 37 11 KV Polymeric Pin Insulator 38 Renovation/ Repairing of old Transformer Plinth 39 Disconnecting HT cable connection from 33KV side &11KV side of 05MVA/8MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc. 40 Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismentling neutral earthing systemto facilitate removal of Power transformer from plinth. 41 Disconnecting Earthing strip from body of 05MVA/8MVA Power transformer. 42 Draining of transformer oil from conservator, radiators of existing 05 MVA/08MVA T/F, at respective 33/11 KV S/S into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided & arranged by contractor. 43 Removal of conservator, radiators and other accessories from existing 05 MVA/08MVA Power transformer. 44 Safe Shifting of 05 MVA/08MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O 45 Safe Shifting of 10MVA/05MVA, 33/11 KV, Power transformer from out side of switchyard to near Power transformer plinth in Switchyard. 46 Erection & Installation of 10MVA/05MVA Power transformer on Power Transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. Reconnecting 2 Nos. earthing strip to transformer body. 47 Earthing of Outdoor Equipments in Switchyard, as per site requirement/as per PVVNL guideline details as given below:- for Item No. 7.01 to 7.027.01 Providing &laying of G.I.Strip of size 50x6mm for connecting the earthmat with each equipment (Bus Isolators, 33KV C.T., 33KV V.C.B., L.As., Fuse Set, Post Insulators, T/F Body & its neutral and M.S.Frame of Cabe Supporting Structure), various steel structures. The work also includes cutting, bending, straightening, over laping and welding the earth strip with earth mat and by using high quality arc welding in already digged trenches, as per PVVNL guidline and as per site requirement. 48 Providing M.S Round 32mm dia and Making delta earthing for power T/F neutral/L.A as per RESPO Norms. 49 Making earthing of all 11KV Switchgears, P.T. and other outdoor equipments on both earth terminal inside the control room by providing G.I.Strip in size 50x6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding, as per PVVNL guidline. 50 Supply & Erection of Water level earthing by Boring and lowering by providing of G.I.Pipe size 40mm dia, into the ground upto water level or minimum 20Mtr, which ever is more, with the lower end of solid copper cone Approx 224mm long and 750gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG, from the cone upto the ground surface where it will be bolted to the G.I. Strip for Transformer neutral connection, the G.I.Strip will be connected to star point through providing Copper Bond Strip of size-35x6mm, as per PVVNL guidline. 51 Excavation of earth in size, erection of structure by making plinth C.C ratio 1:3:6, 12mm thick plasting on plinth in ratio 1:4 : 10.01 – 33KV C.T Strucure 52 Installation & mounting of materials on erected structure (The Work also includes safe removal of old items & Height incrasing of existing structures by providing M.S Channel/Angle as per site requirement if applicable) : for Item No. 11.01 to 11.0111.01 33KV C.T (200/100/1A, 400/100/1A) 53 Mounting of 33KV Fuse Set 54 Mounting of 33KV L.A 55 33KV Bus Isolator / Line Isolator 56 Hight Increasing of old structures by providing required size G.I/M.S channel/Angle as per site requirement (Mounted item safely remove, after hight increasing item safely mounted on structures) : for Item No. 12.01 to 12.0812.01 33KV Fuse set structure 57 33KV L.A Structure 58 Construction of plinth for the structure of 33 KV VCB as per details : for Item No. 13.01 to 13.05.13.01 a) Excavation of earth of size (2.4×1.5×1.0) m pits for construction of plinth. (3.6 Cum) 59 b) Brick Ballast ratio (1:4:8) (cement, sand & brick ballast ) for foundation work (2.4×1.5×0.15)m plinth. (0.54 Cum) 60 c) C.C. work in ratio 1:2:4 (cement, coarse sand &stone grit) of 20mm size for making plinth of size (2.4×1.5×1.00)m and grouting of foundation bolts 04 Nos. for 33 KV VCB. (3.6 Cum) 61 d) 12 mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level size (2.4×1.5)m. (4.77 Cum) 62 e) Assembling and installation of 33 KV VCB on the VCB out door structure on the plinth.Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required and also safe removal of old 33KV VCB if applicable. 63 Laying, Stringing & Sagging of ACSR Dog Conductor from main Bus Bar to Power T/F, through Post Insulator, Bus Isolator, C.Ts, VCB and L.As., byproviding & fixing P.G.Clamp/Connectors, suitable for Dog/Panther. 64 Erection of I/C Switchgear, Bus Coupler, O/G Switchgears & Double T/F Control panel in alignment, in Control Room, including safe shifting, from Dump Place. The work also includes safe removal of old switch gears to safe place if applicable. Making 4No. Pockets for each and providing/fixing of Reg Bolt by CC in ratio 1:2:4, with tightening also. As per PVVNL guidline. 65 Commissioning & fixing of Bus bar (Copper), between each Switchgear, Double T/F Control panel control cable, by bolt, nut & washers and HT compound and providing & tapping HT Tape, Empire Tape & PVC Tape, on each joint & Bus Coupler connect which existing Bus-bar. ( If extra fitting/adjustment or suitable copper bus-Bar for fitment required then provided by the contractor) 66 Construction of double pole structure :- Providing supply of complete materials & Erection for Double Pole Structure on STP 11M.long, with fabrication of all accessories, such as Channel/Angle, 11KV TPMO, Fuse Set, Disc Insulator & Pin insulators etc & Fixing of all accessories on Double Pole, by providing &fixing M.S.Clamp withBolt,Nut&Washers. Earthing to be provided on each supports by providing & driving M.S.Earthing Rod and connecting between Rod &Supports, by providing, G.I wire of 6 SWG as per RESPO Norms. 67 Grouting of STP 11M. long, with CC in ratio 1:4:8, complete in all respect, as per RESPO Norms. 68 Providing of Stay Set-16x1800mm. on Double Pole, including digging of pits of size-0.75x0.75x1.5M. Grouting in CC ratio 1:4:8 Cement, Sand & Stone Shingle. Binding and nozelling of Stay Wire, complete in all respect, by providing & fixing of Stay Clamp, as per RESPO Norms. 69 Preparation of 11 KV Power Cable ends: as per RESPO specification of the following : for Item No.20.01 to 20.0220.01-Making ofcable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x300q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect. 70 Making ofcable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x300Sq.mm XLPE cable.Providing, fixing and crimping of proper size good quality lugs complete in all respect. 71 Preparation of 11 KV Power Cable ends: as per RESPO specification of the following : for Item No.21.01 to 21.0221.01-Making ofcable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x185q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect. 72 Making ofcable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x185Sq.mm XLPE cable.Providing, fixing and crimping of proper size good quality lugs complete in all respect. 73 Providing all required materials & Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100×50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300×300×700mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond size 35x6mm M.S. Bolt and washer. 74 Cable Support : for Item No. 23.01 to 23.0223.01 Supply & Fabrication and erection of cable support made of two pieces of M.S. Channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Angle (50x50x6) mm pieces of size 0.75Mtr long each by welding at equal intervals and grouting in a block of size (300x1000x1000)mm in C.C. 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50x6)mm M.S. Flat for holding the cable including nuts and bolts with stone Pad of size (300x300x75mm). 75 Providing & Fixing 110mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm. 76 Copper bus bar support T-type M.S.Structure(As per site requirement) : for Item No.24.01 to 24.0224.01 Supply & Fabrication and grouting of M.S. frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be provided in L.V. side of Power transformer. The M.S. frame shall be made of M.S. channel (100x50)mm in T shape. Providing 2 Nos. support of M.S. Angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 03No. 33 KV Post insulator. The M.S. frame shall be painted with one coat of primer & two coat of aluminium paint and grouting the frame in C.C. ratio 1:3:6 in a block of size (300x300x700) mm with stone Pad of size (300x300x75mm). The work also includes the fixing of 33KV Post Insulator by Aluminium binding wire in complete with nut & Bolts. 77 Supply & Fabrication of copper bus bar of size (2400x50x6)mm in L.V. side for 05MVA and (3000x65x8)mm for 10MVA T/F as per requirementfor power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work covering copper Bus-Bar in Complete. 78 Fixing of Cable Box on 5MVA/10MVA T/F, 11KV Switchgears, by Bolt & Nuts and tapping the joints by providing HT/Empire/PVC Tape. 79 H.T. Power Cable Laying : for Item No.26.01 to 26.0226.01 Laying and dressing of 11 KV 3×300 mm2/3×185 mm2 power cable in air/Trench. 80 Laying 11 KV, 3×300mm2/3×185mm2 XLPE, Power cable from power T/F to incoming switchgear/outgoing switch gear to 11 KV double poles in the cable trench 0.45m wide, 0.90m depth. Providing 150 mm thickness local sand for cushion beneath and 150 mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying bricks vertically and bricks would also be laid horizontally on top of vertically laid bricks along the cable (minimum 18 Nos. per mtr. length are to be laid top and outer side along the cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminals, back filling of earth and testing and commissioning of power cables etc. Spare cable shall be left over and laid in the trenches in shape of 6m rings at both ends. At the end of feeder cables, where the cable is to be laid across pucca/main road,150 mm dia G.I. pipe will be weared over the cable in the cable trench for the protection of cable. G.I Pipe 150mm dia will be provided by contractor. 81 Laying of Control Cable in Packka Trench, from VCB/CTs/T/F to 33KV Control Panel and making connection for operation & protection of equipments, by using ferrules including commissioning battery charger with battery by providing copper lead with lugs etc & dressing of Control Cable and making arrangement for testing in the equipments. 82 CONSTRUCTION OF CONTROL CABLE TRENCH IN SWITCHYARD : for Item No. 28.01 to 28.05 (As per RESPO Norms)28.01 – Excavation of earth in size 0.80x0.40m., C.C.work in foundation in ratio 1:4:8 (Cement, sand & Brick Ballast) with proper ramming in size 0.80x0.15m., Ist Class Brick work in cement mortar in ratio 1:4. as per site requirement. 83 Providing &Grouting of M.S.Strip of size 25x6mm in cable trench 100mm above floor level and at equal space distance 300mm 84 Providing and Grouting of M.S.Angle Iron of size 50x50x6mm in upper edge of trench. 85 C.C.work on the Top in the ratio 1:2:4 in the grouting of Edge of the Trenches. & plastring of trench. 86 Providing Fabrication and fixing cable trench cover of providing M.S.Angle Iron size 40x40x6mm of size 0.3m wide 0.5 to 1.0 mtr length. As per site requirement. After construction of cable trench. 87 Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Alumn. Paint after rubbing with sand paper to the surface of the structure includidng labour and T&P complete in all respect.:for Item No.29.01 to 29.0529.01 – Line Isolator Structure 88 Fuse Set Structure 89 Post Insulator, L.A.Structure 90 V.C.B.Structure, C.T.Structure 91 M.S.Frame for Cable 92 Hiring of D/G Set, including carriage, loading, unloading & operating charges (with fuel) at 33/11KV Substation, :for Item No. 30.01 to 30.0230.01 – 20 KVA, 3 Phase D/G Set for testing of Power T/F & equipments installed at Sub-station. 93 5 KVA, Single Phase D/G Set for Welding/Testing of equipments installed at Sub-station. 94 Providing required No. ofSkilled Technicians for testing & Commisning to work on power T/F, HT/LT Panels, during testing as assisting technical hands of test team during commissioning & energisation. After installation of new protection equipments (33KV VCB, C.T & Double T/F, single T/F Control panel) the contractor will ensure its testing on his own expences. 95 Carriage of Received back Material from site to concerned electricity store center : for Item No. 32.01 to 32.0432.01 – Double Transformer Control panel (Old & Damage) 96 33KV VCB (Old & Damage) 97 33KV CT 200/100/1-1A (Old & Damage) 98 05/08MVA Transformer (Old & Used)

Key Value

Document Fees
INR 3540 /-
EMD
INR 83000.0 /-
Tender Value
INR 83 Lakhs /-

BOQ Items

Name of Work: Work for Increasing Capacity of 33/11 KV Substation Pakwara (10+5 to 2x10MVA), Choudharpur Industrial (10+5 to 2x10MVA), Naanpur (2x5 to 10+5MVA), Kundarki (5+10 to 2x10MVA), Pipalsana (3x5 to 2x5+10MVA), Thakurdwara Dehar (5+10 to 2x10MVA), Surjannagar (5+10 to 2x10MVA) and 33/11KV S/S Ramganga Vihar-II (2x5 to 10+5MVA), District-Moradabad.
Sl. No. Item Description
1Supply of following Items :- (By Contractor)for Item No. 1.01 to 1.26 1.01 33 KV Bus Isolator 800 Amp/Line Isolator
233 KV Fuse Set
333 KV Lightening Arrestor
433KV Post Insualtor
5Structure 33 KV CT on 125x65x6 mm Galvanised Channel(As per RESPO Norms)
62x2.5 mm2 Control Cable
74x2.5 mm2 Control Cable
811 KV 3×300mm2 XLPE Cable Jointing Kit (Outdoor)
911 KV 3×300mm2 XLPE Cable Jointing Kit (Indoor)
1011 KV 3×185mm2 XLPE Cable Jointing Kit (Outdoor) /11 KV 3×50mm2 XLPE Cable Jointing Kit (Outdoor)
1111 KV 3×185mm2 XLPE Cable Jointing Kit (Indoor) / 11 KV 3×50mm2 XLPE Cable Jointing Kit (Indoor)
12Stone Pad (300×300×75mm)
13Number Plate with Clamp & Nuts
14Danger Board & Clamps with Bolts and nuts
15MS Nut & Bolts
16M.S. Earthing Rod of 20×2500mm and 6 SWG Wire
17Stay Complete (Stay Rod 16×1800mm, Stay Wire 5 Kg, Stay Insulators, Sty Clamps, bolts & nuts with grouting)
18Barbed Wire GI
1911 KV TPMO with fixing clamp (3 Phase)
2011 KV Fuse Set (drop out) with fixing clamp (3 Phase)
21Holding Clamp for GI Pipe
22Holding Clamp for Channel and Angle
23G.I. Channel 100×50×6mm, 2240mm
24G.I. Channel 100×50×6mm, 2028mm
25G.I Pipe 150 mm Dia, 3 mtr long
2633KV CT Junction Box
27Safe carriage of following with loading & unloading at both ends respectively. (under jurisdiction of PVVNL)for Item No. 2.01 to 2.11 2.01 11 KV Incoming Switch Gear 600/300/5A 350MVA
2811 KV Outgoing Switch Gear 200/100/5A 350MVA
2933KV MOCB/VCB 800A750MVA
3033kV Control Panel for Double T/F without Differential Relay
3133KV CT 200/100/1-1A
32ACSR Dog Conductor
3311KV 3x300 mm2XLPE Cable / 11KV 3x185mm2 XLPE Cable / 11KV 3x50mm2 XLPE Cable
3411 Mtr. ST Pole, SP-55 Bottom Galvanized
3511 KV Disc Insulators T&C Type 45 KN Polymeric
3611 KV Disc fitting 45 KN
3711 KV Polymeric Pin Insulator
38Renovation/ Repairing of old Transformer Plinth
39Disconnecting HT cable connection from 33KV side &11KV side of 05MVA/8MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
40Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismentling neutral earthing systemto facilitate removal of Power transformer from plinth.
41Disconnecting Earthing strip from body of 05MVA/8MVA Power transformer.
42Draining of transformer oil from conservator, radiators of existing 05 MVA/08MVA T/F, at respective 33/11 KV S/S into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided & arranged by contractor.
43Removal of conservator, radiators and other accessories from existing 05 MVA/08MVA Power transformer.
44Safe Shifting of 05 MVA/08MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O
45Safe Shifting of 10MVA/05MVA, 33/11 KV, Power transformer from out side of switchyard to near Power transformer plinth in Switchyard.
46Erection & Installation of 10MVA/05MVA Power transformer on Power Transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect. Reconnecting 2 Nos. earthing strip to transformer body.
47Earthing of Outdoor Equipments in Switchyard, as per site requirement/as per PVVNL guideline details as given below:- for Item No. 7.01 to 7.02 7.01 Providing &laying of G.I.Strip of size 50x6mm for connecting the earthmat with each equipment (Bus Isolators, 33KV C.T., 33KV V.C.B., L.As., Fuse Set, Post Insulators, T/F Body & its neutral and M.S.Frame of Cabe Supporting Structure), various steel structures. The work also includes cutting, bending, straightening, over laping and welding the earth strip with earth mat and by using high quality arc welding in already digged trenches, as per PVVNL guidline and as per site requirement.
48Providing M.S Round 32mm dia and Making delta earthing for power T/F neutral/L.A as per RESPO Norms.
49Making earthing of all 11KV Switchgears, P.T. and other outdoor equipments on both earth terminal inside the control room by providing G.I.Strip in size 50x6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding, as per PVVNL guidline.
50Supply & Erection of Water level earthing by Boring and lowering by providing of G.I.Pipe size 40mm dia, into the ground upto water level or minimum 20Mtr, which ever is more, with the lower end of solid copper cone Approx 224mm long and 750gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG, from the cone upto the ground surface where it will be bolted to the G.I. Strip for Transformer neutral connection, the G.I.Strip will be connected to star point through providing Copper Bond Strip of size-35x6mm, as per PVVNL guidline.
51Excavation of earth in size, erection of structure by making plinth C.C ratio 1:3:6, 12mm thick plasting on plinth in ratio 1:4 : 10.01 – 33KV C.T Strucure
52Installation & mounting of materials on erected structure (The Work also includes safe removal of old items & Height incrasing of existing structures by providing M.S Channel/Angle as per site requirement if applicable) : for Item No. 11.01 to 11.01 11.01 33KV C.T (200/100/1A, 400/100/1A)
53Mounting of 33KV Fuse Set
54Mounting of 33KV L.A
5533KV Bus Isolator / Line Isolator
56Hight Increasing of old structures by providing required size G.I/M.S channel/Angle as per site requirement (Mounted item safely remove, after hight increasing item safely mounted on structures) : for Item No. 12.01 to 12.08 12.01 33KV Fuse set structure
5733KV L.A Structure
58Construction of plinth for the structure of 33 KV VCB as per details : for Item No. 13.01 to 13.05. 13.01 a) Excavation of earth of size (2.4×1.5×1.0) m pits for construction of plinth. (3.6 Cum)
59b) Brick Ballast ratio (1:4:8) (cement, sand & brick ballast ) for foundation work (2.4×1.5×0.15)m plinth. (0.54 Cum)
60c) C.C. work in ratio 1:2:4 (cement, coarse sand &stone grit) of 20mm size for making plinth of size (2.4×1.5×1.00)m and grouting of foundation bolts 04 Nos. for 33 KV VCB. (3.6 Cum)
61d) 12 mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level size (2.4×1.5)m. (4.77 Cum)
62e) Assembling and installation of 33 KV VCB on the VCB out door structure on the plinth.Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required and also safe removal of old 33KV VCB if applicable.
63Laying, Stringing & Sagging of ACSR Dog Conductor from main Bus Bar to Power T/F, through Post Insulator, Bus Isolator, C.Ts, VCB and L.As., byproviding & fixing P.G.Clamp/Connectors, suitable for Dog/Panther.
64Erection of I/C Switchgear, Bus Coupler, O/G Switchgears & Double T/F Control panel in alignment, in Control Room, including safe shifting, from Dump Place. The work also includes safe removal of old switch gears to safe place if applicable. Making 4No. Pockets for each and providing/fixing of Reg Bolt by CC in ratio 1:2:4, with tightening also. As per PVVNL guidline.
65Commissioning & fixing of Bus bar (Copper), between each Switchgear, Double T/F Control panel control cable, by bolt, nut & washers and HT compound and providing & tapping HT Tape, Empire Tape & PVC Tape, on each joint & Bus Coupler connect which existing Bus-bar. ( If extra fitting/adjustment or suitable copper bus-Bar for fitment required then provided by the contractor)
66Construction of double pole structure :- Providing supply of complete materials & Erection for Double Pole Structure on STP 11M.long, with fabrication of all accessories, such as Channel/Angle, 11KV TPMO, Fuse Set, Disc Insulator & Pin insulators etc & Fixing of all accessories on Double Pole, by providing &fixing M.S.Clamp withBolt,Nut&Washers. Earthing to be provided on each supports by providing & driving M.S.Earthing Rod and connecting between Rod &Supports, by providing, G.I wire of 6 SWG as per RESPO Norms.
67Grouting of STP 11M. long, with CC in ratio 1:4:8, complete in all respect, as per RESPO Norms.
68Providing of Stay Set-16x1800mm. on Double Pole, including digging of pits of size-0.75x0.75x1.5M. Grouting in CC ratio 1:4:8 Cement, Sand & Stone Shingle. Binding and nozelling of Stay Wire, complete in all respect, by providing & fixing of Stay Clamp, as per RESPO Norms.
69Preparation of 11 KV Power Cable ends: as per RESPO specification of the following : for Item No.20.01 to 20.0220.01-Making ofcable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x300q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
70Making ofcable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x300Sq.mm XLPE cable.Providing, fixing and crimping of proper size good quality lugs complete in all respect.
71Preparation of 11 KV Power Cable ends: as per RESPO specification of the following : for Item No.21.01 to 21.0221.01-Making ofcable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x185q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
72Making ofcable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x185Sq.mm XLPE cable.Providing, fixing and crimping of proper size good quality lugs complete in all respect.
73Providing all required materials & Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100×50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300×300×700mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond size 35x6mm M.S. Bolt and washer.
74Cable Support : for Item No. 23.01 to 23.02 23.01 Supply & Fabrication and erection of cable support made of two pieces of M.S. Channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Angle (50x50x6) mm pieces of size 0.75Mtr long each by welding at equal intervals and grouting in a block of size (300x1000x1000)mm in C.C. 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50x6)mm M.S. Flat for holding the cable including nuts and bolts with stone Pad of size (300x300x75mm).
75Providing & Fixing 110mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.
76Copper bus bar support T-type M.S.Structure(As per site requirement) : for Item No.24.01 to 24.02 24.01 Supply & Fabrication and grouting of M.S. frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be provided in L.V. side of Power transformer. The M.S. frame shall be made of M.S. channel (100x50)mm in "T" shape. Providing 2 Nos. support of M.S. Angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 03No. 33 KV Post insulator. The M.S. frame shall be painted with one coat of primer & two coat of aluminium paint and grouting the frame in C.C. ratio 1:3:6 in a block of size (300x300x700) mm with stone Pad of size (300x300x75mm). The work also includes the fixing of 33KV Post Insulator by Aluminium binding wire in complete with nut & Bolts.
77Supply & Fabrication of copper bus bar of size (2400x50x6)mm in L.V. side for 05MVA and (3000x65x8)mm for 10MVA T/F as per requirementfor power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work covering copper Bus-Bar in Complete.
78Fixing of Cable Box on 5MVA/10MVA T/F, 11KV Switchgears, by Bolt & Nuts and tapping the joints by providing HT/Empire/PVC Tape.
79H.T. Power Cable Laying : for Item No.26.01 to 26.02 26.01 Laying and dressing of 11 KV 3×300 mm2/3×185 mm2 power cable in air/Trench.
80Laying 11 KV, 3×300mm2/3×185mm2 XLPE, Power cable from power T/F to incoming switchgear/outgoing switch gear to 11 KV double poles in the cable trench 0.45m wide, 0.90m depth. Providing 150 mm thickness local sand for cushion beneath and 150 mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying bricks vertically and bricks would also be laid horizontally on top of vertically laid bricks along the cable (minimum 18 Nos. per mtr. length are to be laid top and outer side along the cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal"s, back filling of earth and testing and commissioning of power cables etc. Spare cable shall be left over and laid in the trenches in shape of 6m rings at both ends. At the end of feeder cables, where the cable is to be laid across pucca/main road,150 mm dia G.I. pipe will be weared over the cable in the cable trench for the protection of cable. G.I Pipe 150mm dia will be provided by contractor.
81Laying of Control Cable in Packka Trench, from VCB/CTs/T/F to 33KV Control Panel and making connection for operation & protection of equipments, by using ferrules including commissioning battery charger with battery by providing copper lead with lugs etc & dressing of Control Cable and making arrangement for testing in the equipments.
82CONSTRUCTION OF CONTROL CABLE TRENCH IN SWITCHYARD : for Item No. 28.01 to 28.05 (As per RESPO Norms) 28.01 – Excavation of earth in size 0.80x0.40m., C.C.work in foundation in ratio 1:4:8 (Cement, sand & Brick Ballast) with proper ramming in size 0.80x0.15m., Ist Class Brick work in cement mortar in ratio 1:4. as per site requirement.
83Providing &Grouting of M.S.Strip of size 25x6mm in cable trench 100mm above floor level and at equal space distance 300mm
84Providing and Grouting of M.S.Angle Iron of size 50x50x6mm in upper edge of trench.
85C.C.work on the Top in the ratio 1:2:4 in the grouting of Edge of the Trenches. & plastring of trench.
86Providing Fabrication and fixing cable trench cover of providing M.S.Angle Iron size 40x40x6mm of size 0.3m wide 0.5 to 1.0 mtr length. As per site requirement. After construction of cable trench.
87Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Alumn. Paint after rubbing with sand paper to the surface of the structure includidng labour and T&P complete in all respect.:for Item No.29.01 to 29.05 29.01 – Line Isolator Structure
88Fuse Set Structure
89Post Insulator, L.A.Structure
90V.C.B.Structure, C.T.Structure
91M.S.Frame for Cable
92Hiring of D/G Set, including carriage, loading, unloading & operating charges (with fuel) at 33/11KV Substation, :for Item No. 30.01 to 30.02 30.01 – 20 KVA, 3 Phase D/G Set for testing of Power T/F & equipments installed at Sub-station.
935 KVA, Single Phase D/G Set for Welding/Testing of equipments installed at Sub-station.
94Providing required No. ofSkilled Technicians for testing & Commisning to work on power T/F, HT/LT Panels, during testing as assisting technical hands of test team during commissioning & energisation. After installation of new protection equipments (33KV VCB, C.T & Double T/F, single T/F Control panel) the contractor will ensure its testing on his own expences.
95Carriage of Received back Material from site to concerned electricity store center : for Item No. 32.01 to 32.04 32.01 – Double Transformer Control panel (Old & Damage)
9633KV VCB (Old & Damage)
9733KV CT 200/100/1-1A (Old & Damage)
9805/08MVA Transformer (Old & Used)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail