Regarding Increasing Capacity ( 20 Crore ) Of Transformer Installation New Transformer Against Sanctioned Packages Time To Time In The Scheme Of System Improvement, Under The Area Of Edd-I, Mawana., mawana-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Regarding Increasing Capacity ( 20 Crore ) Of Transformer Installation New Transformer Against Sanctioned Packages Time To Time In The Scheme Of System Improvement, Under The Area Of Edd-I, Mawana.. Submission Date for this Tender is 03-10-2023. Electrification Work Tenders in mawana Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

39898804
Regarding Increasing Capacity ( 20 Crore ) Of Transformer Installation New Transformer Against Sanctioned Packages Time To Time In The Scheme Of System Improvement, Under The Area Of Edd-I, Mawana.
Open Tender
Indian
Uttar Pradesh
mawana
03-10-2023

Tender Details

Regarding Increasing Capacity ( 20 Crore ) Of Transformer Installation New Transformer Against Sanctioned Packages Time To Time In The Scheme Of System Improvement, Under The Area Of Edd-I, Mawana.- 1 Cartage of the following material from central store Meerut to J.E. store including loading & unloading at both ends (maximum distance up to 50 km.) 2 1-P.C.C. Pole 8.5 Mtr. Long. 3 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. 4 Cartage of the following material from store J.E. to site of work including loading & unloading at both ends (maximum distance up to 10 km.)1-P.C.C. Pole 8.5 Mtr. Long. 5 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GIWire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. 6 Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.)1-250 KVA TO 400 KVA 7 2-63 KVA to 100 KVA 8 Safe cartage of Transformer from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 15 km.)1-250 KVA TO 400 KVA 9 2-63 KVA to 100 KVA 10 Erection of Round Pole/P.C.C. Pole 8.5 Mtr. Long including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs. 1-PCC Pole 11 Erection of D/P on PCC/Round Poles after digging of pits of size 1.20X0.75X1.75 Mtrs including fabrication of Structure as per RESPO norms. 12 Earthing of PCC support with MS Earth rod of 2.5 Mtr. Long including excavation of pit & driving of MS rod up to proper depth & connection the earth electrode with the help of GI wire. 13 Laying lifting strengthening and sagging of conductor complete in all respects as per respo norms1-Weasel Conductor. 14 Increasing Capicity of 11/0.4 KV T/F on plinth & making connection of PVC Cable & Lead of HT/LT line. 1-250 KVA TO 400 KVA 15 2-63 KVA to 100 KVA 16 Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect.1-Holding Clamps with nut & bolt. 17 Providing & fixing of stay rod with complete in all respect. 18 Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50X6 mm complete in all respect. 19 Providing & fixing of Stay insulator in stay wire as per site requirement. 20 Cartage of ABC Cable 3x95+1x150+1x35 with junction Box & other store materials related with the work of ABC for each site/Transformer. 21 Laying Lifting of ABC Cable 3x95+1x150+1x35 complete in all respect as per instruction of J.E./SDO. 22 Cartage of LT XLPE Cable 1x120/1X400 sqmm.& other store materials related with the work of ABC for each site/Transformer. 23 Laying Lifting ofLT XLPE Cable 1x120/1X400 sqmm. complete in all respect as per instruction of J.E./SDO. 24 Fixing of TPMO at D/P./Plinth of11/0.4 KV T/F 25 Fixing of Fuse Set at D/P./Plinthof 11/0.4 KV T/F 26 Replacement/Repairing of LT PVC Cable of existing T/F.:1-63 KVA to 100 KVA 27 Water level Earthing (Neutral/Body) by providing & fixing 30 mtrs 30 mm dia GI Pipe with MS Strip 40x6 mm. lowering the same after boring of earth by 4 dia upto 30 mtr depth/water level. 28 Cartage of Dismantled and removal material from site to J.E store including loading & unloading at both ends maximum distance about upto15 Km. 29 Cartage of Dismantled and removal material from J.E store to Central Store Meerut including loading & unloading at both ends maximum distance about upto15 Km. 30 Removal of old/damaged T/F from exsisting D.P./Plinth after Opening the LT/HT side connections due to increasing capacity or due to any other reason.1-10 KVA to 25 KVA 31 2-63 KVA to 100 KVA 32 3-250 KVA to 400 KVA 33 Cartage of old/damaged T/F. from work site to JE Store including loading & unloading at both ends. 1-10 KVA to 25 KVA 34 2-63 KVA to 100 KVA 35 3-250 KVA to 400 KVA 36 Cartage of old/damaged T/F. from JE Store to Central Store Meerut including loading & unloading at both ends. 1-10 KVA to 25 KVA 37 2-63 KVA to 100 KVA 38 3-250 KVA to 400 KVA 39 Repair/Making new Plinth for 250/400 KVA T/F. for installation new T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). 40 Repair/Making new wire mess Security Fainsing for 250/400 KVA T/F. for installation new T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor).

Key Value

Document Fees
INR 3540 /-
EMD
INR 12000.0 /-
Tender Value
INR 11 Lakhs /-

BOQ Items

Name of Work:REGARDINGINCRESING CAPACITY (20 CRORE) OF T/F, INSTALLATION NEW T/F., AGAINST SANCTIONED PACKAGES TIME TO TIME IN THE SCHEME OF SYSTEM IMPROVEMENT, UNDER THE AREA OF EDD-I, MAWANA.
Sl. No. Item Description
1Cartage of the following material from central store Meerut to J.E. store including loading & unloading at both ends (maximum distance up to 50 km.)
21-P.C.C. Pole 8.5 Mtr. Long.
33-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc.
4Cartage of the following material from store J.E. to site of work including loading & unloading at both ends (maximum distance up to 10 km.) 1-P.C.C. Pole 8.5 Mtr. Long.
53-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GIWire/MS angle & MS channel/stay wire/stay rod, disc fitting etc.
6Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.) 1-250 KVA TO 400 KVA
72-63 KVA to 100 KVA
8Safe cartage of Transformer from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 15 km.) 1-250 KVA TO 400 KVA
92-63 KVA to 100 KVA
10Erection of Round Pole/P.C.C. Pole 8.5 Mtr. Long including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs. 1-PCC Pole
11Erection of D/P on PCC/Round Poles after digging of pits of size 1.20X0.75X1.75 Mtrs including fabrication of Structure as per RESPO norms.
12Earthing of PCC support with MS Earth rod of 2.5 Mtr. Long including excavation of pit & driving of MS rod up to proper depth & connection the earth electrode with the help of GI wire.
13Laying lifting strengthening and sagging of conductor complete in all respects as per respo norms 1-Weasel Conductor.
14Increasing Capicity of 11/0.4 KV T/F on plinth & making connection of PVC Cable & Lead of HT/LT line. 1-250 KVA TO 400 KVA
152-63 KVA to 100 KVA
16Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect. 1-Holding Clamps with nut & bolt.
17Providing & fixing of stay rod with complete in all respect.
18Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50X6 mm complete in all respect.
19Providing & fixing of Stay insulator in stay wire as per site requirement.
20Cartage of ABC Cable 3x95+1x150+1x35 with junction Box & other store materials related with the work of ABC for each site/Transformer.
21Laying Lifting of ABC Cable 3x95+1x150+1x35 complete in all respect as per instruction of J.E./SDO.
22Cartage of LT XLPE Cable 1x120/1X400 sqmm.& other store materials related with the work of ABC for each site/Transformer.
23Laying Lifting ofLT XLPE Cable 1x120/1X400 sqmm. complete in all respect as per instruction of J.E./SDO.
24Fixing of TPMO at D/P./Plinth of11/0.4 KV T/F
25Fixing of Fuse Set at D/P./Plinthof 11/0.4 KV T/F
26Replacement/Repairing of LT PVC Cable of existing T/F.: 1-63 KVA to 100 KVA
27Water level Earthing (Neutral/Body) by providing & fixing 30 mtrs 30 mm dia GI Pipe with MS Strip 40x6 mm. lowering the same after boring of earth by 4" dia upto 30 mtr depth/water level.
28Cartage of Dismantled and removal material from site to J.E store including loading & unloading at both ends maximum distance about upto15 Km.
29Cartage of Dismantled and removal material from J.E store to Central Store Meerut including loading & unloading at both ends maximum distance about upto15 Km.
30Removal of old/damaged T/F from exsisting D.P./Plinth after Opening the LT/HT side connections due to increasing capacity or due to any other reason. 1-10 KVA to 25 KVA
312-63 KVA to 100 KVA
323-250 KVA to 400 KVA
33Cartage of old/damaged T/F. from work site to JE Store including loading & unloading at both ends. 1-10 KVA to 25 KVA
342-63 KVA to 100 KVA
353-250 KVA to 400 KVA
36Cartage of old/damaged T/F. from JE Store to Central Store Meerut including loading & unloading at both ends. 1-10 KVA to 25 KVA
372-63 KVA to 100 KVA
383-250 KVA to 400 KVA
39Repair/Making new Plinth for 250/400 KVA T/F. for installation new T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor).
40Repair/Making new wire mess Security Fainsing for 250/400 KVA T/F. for installation new T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor).
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail