| 1 | Supplying and erecting 50 kVAr, 3 phase, 50 Hz., Power contactors Deratedfor microprocessor APFC controller with MPP / APP type capacitor with 525V and having minimum overcurrent capacity of 1.8 In, peak inrush currentcapacity 300 In and minimum life 150000 hours with , consisting of suitable stepsof MPP / APP type capacitor units with detuned aluminium filter 7% reactorswith circuit breaker as main incomer and MCCB for each branch protection, as perspecification no CP-ED/APFC 6-7-12 (Reduced rate 50% for existing panel) |
| 2 | Supplying and erecting 200 kVAr, 3 phase, 50 Hz., Power contactors Deratedfor microprocessor APFC controller with MPP / APP type capacitor with 525V and having minimum overcurrent capacity of 1.8 In, peak inrush currentcapacity 300 In and minimum life 150000 hours with , consisting of suitable stepsof MPP /APP type capacitor units with detuned aluminium filter 7% reactorswith circuit breaker as main incomer and MCCB for each branch protection, as perspecification no CP-ED/APFC 6-7-16 (Reduced rate 50% for existing panel) |
| 3 | Supplying and erecting 200 kVAr, 3 phase, 50 Hz., Power contactors Deratedfor microprocessor APFC controller with MPP / APP type capacitor with 525V and having minimum overcurrent capacity of 1.8 In, peak inrush currentcapacity 300 In and minimum life 150000 hours with , consisting of suitable stepsof MPP /APP type capacitor units with detuned aluminium filter 7% reactorswith circuit breaker as main incomer and MCCB for each branch protection, as perspecification no CP-ED/APFC 6-7-16 (Reduced rate 50% for existing panel) |
| 4 | A) Supplying and erecting 100 kVAr, 3 phase, 50 Hz., Power contactors Deratedfor microprocessor APFC controller with MPP / APP type capacitor with525 V and having minimum overcurrent capacity of 1.8 In, peak inrush currentcapacity 300 In and minimum life 150000 hours with , consisting of suitable stepsof MPP / APP type capacitor units with detuned aluminium filter 7% reactorswith circuit breaker as main incomer and MCCB for each branch protection, as perspecification no CP-ED/APFC 6-7-13 |
| 5 | B) Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 120 sq. mm.aluminium conductor complete erected with glands & lugs, on wall/trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL7-1-20 ) |
| 6 | C) Supplying, erecting & terminating FR XLPE insulated, galvanised steelformed wire armoured (strip) cable 1100 V, 2 core 2.5 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU.7-2-8 ) |
| 7 | D) Supplying and erecting LT current transformer with bar primary 50/5 to1000/5 ratio with 15 VA burden erected in provided CRCA box duly securedwith insulating materials connected to the meter with test certificates.6-5-2 ) |
| 8 | A) Supplying and erecting 50 kVAr, 3 phase, 50 Hz., Power contactors Deratedfor microprocessor APFC controller with MPP / APP type capacitor with 525V and having minimum overcurrent capacity of 1.8 In, peak inrush currentcapacity 300 In and minimum life 150000 hours with , consisting of suitable stepsof MPP / APP type capacitor units with detuned aluminium filter 7% reactorswith circuit breaker as main incomer and MCCB for each branch protection, as perspecification no CP-ED/APFC 6-7-12 |
| 9 | B) Supplying, erecting & terminating FR XLPE insulated, galvanised steel formedwire armoured (strip) cable 1100 V, 3½ core 95 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL.7-1-19 ) |
| 10 | C) Supplying, erecting & terminating FR XLPE insulated, galvanised steelformed wire armoured (strip) cable 1100 V, 2 core 2.5 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU.7-2-8 ) |
| 11 | D) Supplying and erecting LT current transformer with bar primary 50/5 to1000/5 ratio with 15 VA burden erected in provided CRCA box duly securedwith insulating materials connected to the meter with test certificates.6-5-2 ) |
| 12 | 1%ADD Insurance |
| 13 | 18% GST ADD |