| 1 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 as per Technical Specification Clause 303.1 Excluding rayalty. |
| 2 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 3 | Providing and applying tack coat with bitumen VG-10 using Bittumen distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 4 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. |
| 5 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat |
| 6 | S/F of Signboard as per direction of engineer in charge. |
| 7 | Excavation in foundation in ordenary soile excaveted earth to be in the form of regular pits not exceeding 11/2m,in depth and earth work in embankment to be 20cm. Layer including dresing,ramming and watering the surface of the required lavel and stopes and also including 1.5cm lift and 30m lead the earth from cutting to be used in making embankment or to be deposited as spoilbank with 30m distance . |
| 8 | P/L Cement Concrete 1:4:8 (1 Cement: 4 Coarse Sand :8 Graged Stone Ballast 40mm) including supply of all materials labour and T&P etc required for proper completion of work and curing complete also including cost of form work foundation and floors.(281) |
| 9 | Class M-150Brick work in 1:4 in Cement and Coarse sandIn Foundation and Plinth Including all Supply of all materials, labour and t&p. Si No.305(b) |
| 10 | 12 mm thick plaster 1:4 cement and coarse sand over brick work minimum thickness not be less than 1cm including supply of all material,labourT&P … etc. required for paper wall, outer wall, and parapet completion of work. |
| 11 | WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405 |
| 12 | Supply Of Rubber module reflective Zig Zag 80 mm Thick.Precist Compressed C.C. Inter Locking as lock compressive strngth shall not be less then 30MPA and wight not less then 5.50kg each block including of 50mm thich bedding sand joint filling with sand all material labour T&P etc.required for proper complation of the work over the prepared base concrete as directed by Engineering-in-charge . |
| 13 | S/F of 110mm dia P.V.C.downpipe complete with rose heads Bends and gratings and including supply on necessary M.S. clams 2.5cm x3mm (I\"1/8\") fixed to walls mm with and including supply of 15cm (6\") long. 6mm (1/4\") dia nails all materials labour and T&P etc, reuired for proper completion of work and also including repair of plaster pointing etc. in damged during fixing of the pipes. |