Tender For Arc For Inst Maintenance Jobs 2023 24; 1 Annexure-I Piping Tubing & Allied Jobs. 1.1 I-1.1. Removal Of Piping Alongwith Fittings And Necessary Clamps & Supports 1.11 A ) Carbon Steel Size Upto 1 / 2 Mr. 70.0 1.12 B ) Carbon Steel Size 3 / 4 Mr. 20.0 1.13 C ) Carbon Steel Size 1 Mr. 10.0 1.14 D ) Stainless Steel Size Upto 1 / 2 Sch.40 & Above. Mr. 10.0 1.15 E ) Stainless Steel Size 1 Sch.40 & Above. Mr. 10.0 1.2 I-1.2. Installation, Supporting, Clamping / Welding & Hydraulic Testing Of Piping Complete With Fittings Etc. As Per Standards 1.21 A ) Carbon Steel Size Upto 1 / 2 Mr. 60.0 1.22 B ) Carbon Steel Size 3 / 4 Mr. 20.0 1.23 C ) Carbon Steel Size 1 Mr. 10.0 1.24 D ) Stainless Steel Size 1 / 2 Sch. 40 & Above. Mr. 50.0 1.3 I- 2.1. Removal Of Piping Alongwith Fittings And Necessary Clamps & Supports Including Cutting / Welding Job. 1.31 A ) G.I. Pipe Size Upto 1 / 2 Mr. 40.0 1.32 B ) G.I. Pipe Size 3 / 4 Mr. 20.0 1.33 C ) G.I. Pipe Size 1 Mr. 5.0 1.34 D ) G.I. Pipe 2 Mr. 5.0 1.35 E ) S.S. Sch.10 Size 1 / 2 Mr. 30.0 1.36 F ) S.S. Sch.10 Size 3 / 4 Mr. 10.0 1.4 I- 2.2. Installation Of Piping, Supporting, Clamping / Welding & Hydraulic Testing Of Piping Complete With Fittings Etc. As Per Standards. 1.41 A ) S.S. Sch.10 Size Upto 1 / 2 Mr. 250.0 1.42 B ) S.S. Sch.10 Size 3 / 4 Mr. 50.0 1.43 C ) S.S. Sch.10 Size 1 Mr. 20.0 1.44 D ) S.S. Sch.10 Size 2 Mr. 5.0 Schedule Of Rates For “Arc For Assistance In Instrument Maintenance Jobs For The Year 2023-24 Name Of Bidder / Firm / Company:- Sr. No. Ann. / Item No. Item Description Unit Total Qty. For Year 2024 Unit Rate ( Rs ) Total Amount ( Rs ) In Figures In Words E 1.5 I- 3.1. Removal Of Pvc Covered Single Copper Tubing Along With Fittings & Necessary Clamps And Supports. 1.51 A ) Size 6 Mm Or 1 / 4 Od Mr. 50.0 1.52 B ) Size 10 Mm Od Mr. 40.0 1.6 I-3.2. Laying, Clamping, Supporting And Testing Of Pvc Covered Single Copper Tubing Complete With Fittings And Connections, On Trays / Angles / Ducts. 1.61 A ) Size 6 Mm Or 1 / 4 Od Mr. 30.0 1.62 B ) Size 10 Mm Od Mr. 15.0 1.7 I-4.1. Removal Of S.S.Tubing And Necessary Clamps & Supports. 1.71 A ) Size 6 Mm Od Mr. 40.0 1.72 B ) Size 10 Mm Od Mr. 40.0 1.73 C ) Size 12 Mm Od Mr. 50.0 1.8 I-4.2. Laying, Clamping, Supporting & Testing Of Ss Tubings Complete With Fitting & Connections On Trays / Angles / Ducts. 1.81 A ) Size 6 Mm Od Mr. 250.0 1.82 B ) Size 10 Mm Od Mr. 150.0 1.83 C ) Size 12 Mm Od Mr. 250.0 1.9 I-5.1 Removal Of Multi-Polythene Tube Bundles Complete With Identification & Connections Etc. 1.91 A ) Size 7 Core Mr. 10.0 1.92 B ) Size 12 Core Mr. 5.0 2.1 I-6.1. Removal Of Steam Tracing Tubings Along With Fittings & Necessary Clamps, Supports And The Insulation . Mr. 100.0 2.2 I-6.2. Laying, Clamping, Supporting And Testing Of Steam Tracing Tubing Complete With Fittings, Connections And Fixing Of Steam Traps, Stainers And Valves. Mr. 100.0 3 I-7.1 Removal Of Instrument Mounting Pipe Stanchions . 3.1 A ) L Type No. 15.0 3.2 B ) T Type No. 15.0 4 I-7.2. Fabriction And Installation Of Pipe Stanchion As Per Standards, For Mounting Of Instruments Including Cutting / Welding Jobs. 4.1 A ) L Type No. 30.0 4.2 B ) T Type No. 50.0 5 I-8.1. Removal Of Mainfolds And Necessary Clamps & Supports 5.1 A ) Pressure Gauge No. 5.0 5.2 B ) D / P Transmitter No. 5.0 5.3 C ) Pressure Switch No. 5.0 5.4 D ) Draft Gauge No. 5.0 6 I-8.2. Fabriction, Erection And Testing Of Manifolds As Per Standards Including Cutting / Welding Jobs. 6.1 A ) Pressure Gauge No. 5.0 6.2 B ) D / P Transmitter No. 5.0 6.3 C ) Pressure Switch No. 5.0 6.4 D ) Draft Gauge No. 5.0 7 I-9.1. Removal Of Shielded / Unshielded, Electrical / Thermocouple Cables Including Cutting Of Clamps Etc. 7.1 A ) Size 2 X 1.5 Sq Mm Armoured Mr. 1500.0 7.2 B ) Size 3 X 1.5 Sq Mm Armoured Mr. 300.0 7.3 C ) Size 4 X 1.5 Sq Mm Armoured Mr. 50.0 7.4 D ) Size 24 X 1.5 Sq Mm Armoured Mr. 200.0 8 I-9.2. Laying, Clamping, Testing, Identification And Connection Of Sheilded / Unshielded Electrical / Thermocouple Cables On Trays / Angles / Ducts / Trenches . 8.1 A ) Size 2 X 1.5 Sq Mm Armoured Mr. 1500.0 8.2 B ) Size 3 X 1.5 Sq Mm Armoured Mr. 1000.0 8.3 C ) Size 4 X 1.5 Sq Mm Armoured Mr. 100.0 8.4 D ) Size 7 X 1.5 Sq Mm Armoured Mr. 150.0 8.5 E ) Size 12 X 1.5 Sq Mm Armoured Mr. 140.0 8.6 F ) Size 24 X 1.5 Sq Mm Armoured Mr. 1000.0 9.1 I-10.1. Removal Of Control Panel, With Instruments, Including Necessary Cutting Of Associated Structures ( Measurement Will Be As Per Panel Front - Area ) Sq.Mr. 6.0 9.2 I-10.2. Installation Of Control Panels, Without Inst., Including Erection Of Associated Structures ( Measurement Will Be As Per The Front Area Of Panel ) Including Cutting / Welding Jobs. Sq.Mr. 6.0 10 I-11.1. Removal Of Angle Iron / Perforated Trays Including Cutting Of Clamps And Supports. This Includes Lifting Of Existing Cables / Tubes, Wherever Required . 10.1 A ) Trays Size Upto 50 Mm Wide Mr. 150.0 10.2 B ) Trays Size Above 50 Mm Upto 100 Mm Wide Mr. 100.0 10.3 C ) Trays Size Above 100 Mm Upto 150 Mm Wide Mr. 100.0 10.4 D ) Trays Size Above 150 Mm Upto 200 Mm Wide Mr. 70.0 10.5 E ) Trays Size Above 200 Mm Upto 300 Mm Wide Mr. 50.0 10.6 F ) Angle Iron Size Upto 25 Mm Mr. 10.0 10.7 G ) Angle Iron Size Above 25 Mm Upto 50 Mm Mr. 20.0 11 I-11.2. Erection, Laying, Supporting Of Angle Iron / Perforated Trays Including Clamping Of Existing Cables / Tubes, Including Cutting / Welding Jobs. 11.1 A ) Trays Size Upto 50 Mm Wide Mr. 150.0 11.2 B ) Trays Size Above 50 Mm Upto 100 Mm Wide Mr. 100.0 11.3 C ) Trays Size Above 100 Mm Upto 150 Mm Wide Mr. 100.0 11.4 D ) Trays Size Above 150 Mm Upto 200 Mm Wide Mr. 50.0 11.5 E ) Trays Size Above 200 Mm Upto 300 Mm Wide Mr. 50.0 11.6 F ) Angle Iron Size Upto 25 Mm Mr. 30.0 11.7 G ) Angle Iron Size Above 25 Mm Upto 50 Mm Mr. 50.0 11.8 H ) Channels Size Upto 100 Mm Mr. 10.0 12 I-12.1. Removal Of Junction Boxes Including Cutting Of Supports / Frame, If Required. 12.1 A ) Pneumatic Junction Box No. 3.0 12.2 B ) Pneumatic Controller Box No. 2.0 12.3 C ) Thermocouple Junction Box No. 10.0 12.4 D ) Electrical Junction Box No. 10.0 13 I-12.2. Installation Of Junction Boxes After Fabraction & Erection Of Proper Frame Including Termination Of Exisiting Tubes / Cables As Per Drawing Including Cutting / Welding Jobs. 13.1 A ) Pneumatic Junction Box No. 2.0 13.2 B ) Thermocouple Junction Box No. 7.0 13.3 C ) Electrical Junction Box No. 10.0 14.1 I-13.1. Panel ( Thickness Upto 5 Mm ) Cutting, With Well Finished Edges, For Installation Of Instruments. Sq.Cm 4000.0 14.2 I-13.2. Fabrication Of Surface Finished Ms Blank Plate ( Thickness Upto 5Mm ) For Fill Up Of Panel Cut Outs. ( Measurement Will Be As Per Front Area ) . Sq.Cm. 4000.0 15 I-14 Fabrication Of Hylum / Bakelite Sheet Board Upto 10 Mm Thickness, Including Mounting Of Relay, Relay Base, Toggle Switch, Fuse Holder, Lamp Holder, Elemax Terminals ( Measurement Will Be As Per Front Area ) . 15.1 A ) Size Upto 1000 Sq.Cms. No. 20.0 16 I-15 Drilling Of Lamp Holders / Push Buttons / Toggle Switch Holes Of Dia. Upto 30 Mm On Panel Sheet Thickness Upto 8Mm. No. 7.0 17 I-16 Fabrication Of Panel Board Of M.S. Sheet, Thickness Upto 3 Mm, With Angle Iron Supports For Mounting Of Gauges / Instruments Including Cut-Out As Per Drawings ( Measurement Will Be As Per Front Area ) . 17.1 A ) Area Upto 1000 Sq.Cm. No. 10.0 18 I-17 Fabriction & Erection Of Ms / Gi / Al Sheet Upto 3Mm Thick Cover / Canopy / Shade For Instruments, Including Supports, As Per Drawings ( Measurement Will Be As Per Front Area ) . Including Cutting / Welding Jobs. 18.1 A ) Size Upto 1000 Sq.Cm. No. 20.0 18.2 B ) Size Above 1000 Sqcm. But Upto 3000 Sqcm. No. 20.0 19 I-18 Welding Of Joints Of Impulse Pipe, Pipe Fittings, Flanges, Isolation Valves To Arrest Leakage. No. 40.0 20 Annexure-Ii Field Instrumentation Related Jobs. 21 Ii-1.1 Removal Of Solenoid Valves, Including Electric & Pneumatic Connections And Removal Of Associated Structures. 21.1 A ) Explosion Proof No. 40 21.2 B ) Non - Explosion Proof No. 40 22 Ii-1.2. Installation Of Solenoid Valves Including Electric & Pneumatic Connections And Supports. 22.1 A ) Explosion Proof No. 40 22.2 B ) Non - Explosion Proof No. 40 23 Ii-2.1. Removal Of On - Line Rotameters Including Accessories And Associated Structers, If Required. 23.1 A ) Direct Type Rotameter. No. 10 23.2 B ) Transmitter Type Rotameter No. 5 24 Ii-2.2. Installation Of On - Line Rotameters With Accessories And Proper Supporting. 24.1 A ) Direct Type Rotameter No. 10 24.2 B ) Transmitter Type Rotameter No. 5 24.3 C ) Glass Tube Rotameterfor Chlorination System No. 3 25.1 Ii-3.1. Removal Of Mass / Turbine Flow-Meter / Ultrasonic Flow Meter Including Electric Connections No. 3 25.2 Ii-3.2. Installation Of Mass / Turbine Flow Meter / Ultra Sonic Flow Meter Including Electric Connections No. 3 26 Ii-4.1. Removal Of Orifice Plate, Venturi , Flow Nozzle Etc From Pipe Line. Total Of Annexure-I ( Without Gst ) 26.1 A ) For Pipe Line Size Upto 8 And Pressure Rating Upto 600# No. 4 27 Ii-4.2. Installation Of Orfice Plate, Venturi , Flow Nozzle Etc In Pipe Line. 0 27.1 A ) For Pipe Line Size Upto 8 And Pressure Rating Upto 600# No. 4 28 Ii-5.1. Removal Of Control Valves Along With Accessories From The Pipe Line / Bonnet. 28.1 A ) Size Upto 3 And Pressure Rating Upto 600#. No. 80 29 Ii-5.2. Installation And Testing Of Control Valves On Supports Alongwith Mounting Of Accessories. 29.1 A ) Size Upto 3 And Pressure Rating Upto 600#. No. 80 30.1 Ii-6.1. Removal Of Power Cylinder With Accessories Including Removal Of Air Connections And Supports Etc. No. 150 30.2 Ii-6.2. Mounting Of Power Cylinder With Accessories Including Provision Of Air Connections And Supports Etc. No. 150 31.1 Ii-7.1. Removal Of Control Valve Accessories. No. 10 31.2 Ii-7.2 Installation Of Control Valve Accessories No. 10 32.1 Ii-8.1. Removal Of Limit Switches Including Electrical Connections & Supports Etc. No. 10 32.2 Ii-8.2. Installation Of Limit Switches Including Glanding, Electrical Connections & Supports Etc. No. 10 33 Ii-9 Replacement Of Actuator Diaphragm Of Dopo / Dopc Valves Including Leak & Stroke Check Etc. 33.1 A ) Size Upto 2 No. 40 33.2 B ) Size Above 2 & Upto 4 No. 30 33.3 C ) Size Above 4 & Upto 6 No. 30 34 Ii-10 Replacement Of Bottom Diaphragms & Air Sealing O Rings Of Dopo / Dopc Valves Including Stroke & Leak Check Etc. 34.1 A ) Size Upto 2 No. 40 34.2 B ) Size Above 2 & Upto 4 No. 30 34.3 C ) Size Above 4 & Upto 6 No. 30 35 Ii-11.1. Removal Of Level Gauges Including Drain Valves Etc. 35.1 A ) Above 600 # Pressure Rating No. 12 35.2 B ) Below 600 # Pressure Rating No. 12 35.3 C ) Tubular Type No. 6 35.4 D ) Magnetic Type No. 2 36 Ii-11.2. Installation Of Level Gauges Including Drain Valves Etc. 36.1 A ) Above 600 # Pressure Rating No. 15 36.2 B ) Below 600 # Pressure Rating No. 20 36.3 C ) Tubular Type No. 5 36.4 D ) Magnetic Type No. 2 37 Ii-12.1. Removal Of Level Switch Including Cable Glands & Connections Etc. 37.1 A ) Magnetic Type No. 5 37.2 B ) Direct Mounted Float Type No. 5 38 Ii-12.2. Installation Of Level Switch Including Mountings, Glanding And Electric Connections Etc. 38.1 A ) Magnetic Type No. 5 38.2 B ) Direct Mounted Float Type No. 5 39 Ii-13.1. Removal Of Level Indicator / Transmitter / Controller Alongwith Accessories, Elect. / Pneumatic / Process Connection Etc. 39.1 A ) Float & Tape Type Including Float Guide, Wire, Pulleys, Taps & Piping Etc., If Required. No. 2 39.2 B ) D / P Transmitter Including Purge Pipe. No. 5 39.3 C ) Displacement Type Including Float Chamber. No. 20 39.4 D ) Level Transmitter Radar Type With Cage Assembly. No. 5 40 Ii-13.2. Installation Of Level Indicator / Transmitter / Controller Alongwith Accessories Elect. / Pneumatic / Process Connections Etc. 40.1 A ) Float & Tape Type Including Float Guide, Wire, Pulleys, Taps & Piping Etc., If Required. No. 2 40.2 B ) D / P Transmitter Including Purge Pipe. No. 4 40.3 C ) Displacement Type Including Float Chamber. No. 20 40.4 D ) Level Transmitter Radar Type With Cage Assembly. No. 5 41.1 Ii-14.1. Removal Of Electrical Speed Indicator From The Panel, Including Electrical Connections. No. 1 41.2 Ii-14.2. Installation Of Electrical Speed Indicator On The Panel, Including Electric Connections. No. 1 42 Ii-15.1. Removing Of Pressure / Vacuum / Differtional Pressure / Receiver Gauges With Or Without Snubbers. 42.1 A ) Without Siphon No. 150 42.2 B ) With Siphon No. 10 43 Ii-15.2. Installation Of Pressure / Vacuum / Differtional Pressure / Receiver Gauges With Or Without Snubbers As Per Schedule. 43.1 A ) Without Siphon No. 150 43.2 B ) With Siphon No. 10 44 Ii-16.1. Removal Of Diaphragm Seal Pressure / Differential Pressure Gauges. 44.1 A ) Direct Mounting Type No. 25 44.2 B ) With Ss Capillary No. 10 45 Ii-16.2. Installation Of Diaphragm Seal Pressure / Differential Pressure Gauges. 45.1 A ) Direct Mounting Type No. 25 45.2 B ) With Ss Capillary With Proper Laying & Clamping. No. 10 46 Ii-17.1. Removal Of Temperature Gauges. 46.1 A ) Rigid Stem Type No. 5 46.2 B ) With Capillary Including Removal Of Clamps No. 1 46.3 C ) With Screwed Thermowell No. 2 46.4 D ) With Flanged Thermowell No. 2 47 Ii-17.2. Installation Of Temperature Gauges. 47.1 A ) Rigid Stem Type No. 5 47.2 B ) With Capillary Including Removal Of Clamps No. 1 47.3 C ) With Screwed Thermowell No. 2 47.4 D ) With Flanged Thermowell No. 2 48 Ii-18.1. Removal Of Local Switches Alongwith Electrical Connections Etc. 48.1 A ) Pressure No. 5 48.2 B ) Temperature No. 5 49 Ii-18.2. Installation Of Local Switches Including Support & Connections. 49.1 A ) Pressure No. 5 49.2 B ) Temperature No. 5 50 Ii-19.1 Removal Of Pressure Transmitter Alongwith Electrical / Pneumatic Connections Etc. 50.1 A ) Diaphragm Seal Type With Capillary No. 10 50.2 B ) Pressure & Vacuum Transmitter No. 50 51 Ii-19.2 Installation Of Pressure Transmitter Alongwith Electrical / Pneumatic Connections Etc. 51.1 A ) Diaphragm Seal Type With Capillary No. 10 51.2 B ) Pressure & Vacuum Transmitter No. 50 52 Ii-20.1. Removal Of Flow Transmitter Alongwith Electrical / Pneumatic Connections Etc. 52.1 A ) Ultra - Sonic Type No. 2 52.2 B ) Diaphragm Seal D.P.Transmitter No. 20 52.3 C ) Differential Pressure Transmitter No. 30 53 Ii-20.2. Installation Of Flow Transmitter Alongwith Electrical / Pneumatic Connections Etc. 53.1 A ) Ultra - Sonic Type No. 2 53.2 B ) Diaphragm Seal D.P.Transmitter No. 20 53.3 C ) Differential Pressure Transmitter No. 30 54.1 Ii-21.1. Removal Of Mercury Filled Temperature Transmitter With Capilary And Other Accesseries. No. 2 54.2 Ii-21.2. Installation Of Mercury Filled Temperature Transmitter With Capilary And Other Accesseries. No. 2 55 Ii-22.1. Removal Of Electronic Instruments Including Electrical / Pneumatic Connection Etc. 55.1 A ) I / P Converters No. 15 55.2 B ) P / I Converters No. 5 56 Ii-22.2. Installation Of Electronic Instruments Including Electrical / Pneumatic Connection Etc. 56.1 A ) Flow Transducer No. 1 56.2 B ) I / P Converters No. 15 56.3 C ) P / I Converters No. 5 57.1 Ii-23.1. Removal Of Receving Indicating Controller Alongwith Electric / Pneumatic Connections Etc. No. 3 57.2 Ii-23.2. Installation Of Receving Indicating Controller Alongwith Electric / Pneumatic Connections Etc. No. 3 58 Ii-25.1. Removal Of Temperature Indicator / Recorder / Scanner Including All Connections. 58.1 A ) Single Point No. 2 58.2 B ) Multi Points No. 2 59 Ii-25.2. Installation Of Temperature Indicator / Recorder / Scanner Including All Connections. 59.1 A ) Single Point No. 2 59.2 B ) Multi Points No. 2 60.1 Ii-26.1 Removal Of Alarm Annunciators Including All Connections. No. 2 60.2 Ii-26.2 Installation Of Alarm Annunciators Including All Connections. No. 5 61.1 Ii-27.1. Removal Of Air Filter Regulator Including Necessary Supports & Connections. No. 150 61.2 Ii-27.2. Installation Of Air Filter Regulator Including Necessary Supports & Connections. No. 150 62 Ii-28.1. Removal Of Thermowell Assembly. 62.1 A ) Screwed Type No. 10 62.2 B ) Flanged Type No. 20 63 Ii-28.2. Installation Of Thermowell Assembly. 63.1 A ) Screwed Type No. 10 63.2 B ) Flanged Type No. 20 64.1 Ii-29.1 Removal Of Oilers Including Necessary Supports & Connections From Inst. Air Lines. No. 20 64.2 Ii-29.2 Installation Of Oilers Including Necessary Supports & Connections For Inst. Air Lines. No. 20 65.1 Ii-30.1 Removal Of Vortex Flowmeter / Mass Flowmeters / Magnetic Flow Meter With Integral / Remote Electronic Unit. No. 4 65.2 Ii-30.2 Installation Of Vortex Flowmeter / Mass Flowmeters / Magnetic Flow Meter With Integral / Remote Electronic Unit. No. 4 66.1 Ii-31.1 Removal Of Ph. Meter With Electronics & Elect Connections. No. 25 66.2 Ii-31.2 Installation Of Ph. Meter With Electronics & Elect. Connections. No. 25 67.1 Ii-32.1 A ) Removal Of Conductivity Meter With Cell & Connection No. 3 67.2 B ) Removal Of Conductivity Cell & Connection. No. 3 67.3 Ii-32.2 A ) Installation Of Conductivity Meter With Cell & Connection No. 3 67.4 B ) Installation Of Conductivity Cell & Connection. No. 3 68.1 Ii-33.1 Removal Oftemperature Transmitter Alongwith Electrical / Pneumatic Connections Etc. No. 20 68.2 Ii-33.2 Installation Of Temperature Transmitter Alongwith Electrical / Pneumatic Connections Etc. No. 20 69.1 Ii-34.1 Removal Of Hydrastep With Electrical Connections No. 3 69.2 Ii-34.2 Installation Of Hydrastep With Electrical Connections No. 3 70.1 Ii-35.1 Removal Of Hydrastep Electrodes No. 30 70.2 Ii-35.2 Installation Of Hydrastep Elctrodes No. 30 71.1 Ii-36.1 Removal Of Gc / Analysers No. 10 71.2 Ii-36.2 Fixing Of Gc / Analysers No. 10 73.1 Ii-37.1 Removal Of Gas Detectors No. 25 73.2 Ii-37.2 Fixing Of Gas Detectors No. 25 74.1 Ii-38.1 Removal Of Proximity Probes / Proximity Switches No. 25 74.2 Ii-38.2 Fixing Of Proximity Probes / Proximity Switches No. 25 75 Total Of Ann-Ii ( Without Gst ) Annexure-Iii Assistance In Execution Of Jobs For The Year 2023-24. Description Unit Quantity Min. Wage As Per Govt. Rate Epf 12% Esic 3.25% Bonus 8.33% Punjab Welfare Fund 0.4% ( Max. Rs. 50.00 Per Month ) Total Rate ( Excluding Service Charges & Gst ) Total Rate Per Manday Including Service Charge But Excluding Gst ( G+H ) Total Quoted Value Including Service Charge But Excluding Gst ( A*I ) I J In Figures In Words 75.1 Iii-1-A Skilled Manpower For Welding Jobs. Mandays 50.0 695.00 83.40 22.59 57.89 1.92 860.80 75.2 Iii-1-B Unskilled Manpower. Mandays 4100.0 494.00 59.28 16.06 41.15 1.92 612.41 75.3 Iii-1-C Skilled Manpower For Rigging Jobs . Mandays 40.0 695.00 83.40 22.59 57.89 1.92 860.80 75.4 Iii-1-D Skilled Manpower For Inst. Maintenance Jobs. Mandays 1600.0 695.00 83.40 22.59 57.89 1.92 860.80 75.5 Iii-1-E Semi Skilled Manpower For Inst. Maintenance Jobs. Mandays 600.0 577.00 69.24 18.75 48.06 1.92 714.97 75.6 Iii-1-F Extra Man Hours For Skilled Manpower Hours 433.0 173.75 0.00 5.65 0.00 0.00 179.40 75.7 Iii-1-G Extra Man Hours For Semi-Skilled Manpower Hours 166.0 144.25 0.00 4.69 0.00 0.00 148.94 75.8 Iii-1-H Extra Man Hours For Un Skilled Manpower Hours 1025.0 123.50 0.00 4.01 0.00 0.00 127.51