}

Tender For Arc For Inst Maintenance Jobs 2023 24, panipat-Haryana

National Fertilizers Limited-NFL has published Tender For Arc For Inst Maintenance Jobs 2023 24. Submission Date for this Tender is 26-10-2023. Tubings Tenders in panipat Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

39870526
Tender For Arc For Inst Maintenance Jobs 2023 24
Open Tender
Indian
Haryana
panipat
26-10-2023

Tender Details

Tender For Arc For Inst Maintenance Jobs 2023 24; 1 Annexure-I Piping Tubing & Allied Jobs. 1.1 I-1.1. Removal Of Piping Alongwith Fittings And Necessary Clamps & Supports 1.11 A ) Carbon Steel Size Upto 1 / 2 Mr. 70.0 1.12 B ) Carbon Steel Size 3 / 4 Mr. 20.0 1.13 C ) Carbon Steel Size 1 Mr. 10.0 1.14 D ) Stainless Steel Size Upto 1 / 2 Sch.40 & Above. Mr. 10.0 1.15 E ) Stainless Steel Size 1 Sch.40 & Above. Mr. 10.0 1.2 I-1.2. Installation, Supporting, Clamping / Welding & Hydraulic Testing Of Piping Complete With Fittings Etc. As Per Standards 1.21 A ) Carbon Steel Size Upto 1 / 2 Mr. 60.0 1.22 B ) Carbon Steel Size 3 / 4 Mr. 20.0 1.23 C ) Carbon Steel Size 1 Mr. 10.0 1.24 D ) Stainless Steel Size 1 / 2 Sch. 40 & Above. Mr. 50.0 1.3 I- 2.1. Removal Of Piping Alongwith Fittings And Necessary Clamps & Supports Including Cutting / Welding Job. 1.31 A ) G.I. Pipe Size Upto 1 / 2 Mr. 40.0 1.32 B ) G.I. Pipe Size 3 / 4 Mr. 20.0 1.33 C ) G.I. Pipe Size 1 Mr. 5.0 1.34 D ) G.I. Pipe 2 Mr. 5.0 1.35 E ) S.S. Sch.10 Size 1 / 2 Mr. 30.0 1.36 F ) S.S. Sch.10 Size 3 / 4 Mr. 10.0 1.4 I- 2.2. Installation Of Piping, Supporting, Clamping / Welding & Hydraulic Testing Of Piping Complete With Fittings Etc. As Per Standards. 1.41 A ) S.S. Sch.10 Size Upto 1 / 2 Mr. 250.0 1.42 B ) S.S. Sch.10 Size 3 / 4 Mr. 50.0 1.43 C ) S.S. Sch.10 Size 1 Mr. 20.0 1.44 D ) S.S. Sch.10 Size 2 Mr. 5.0 Schedule Of Rates For “Arc For Assistance In Instrument Maintenance Jobs For The Year 2023-24 Name Of Bidder / Firm / Company:- Sr. No. Ann. / Item No. Item Description Unit Total Qty. For Year 2024 Unit Rate ( Rs ) Total Amount ( Rs ) In Figures In Words E 1.5 I- 3.1. Removal Of Pvc Covered Single Copper Tubing Along With Fittings & Necessary Clamps And Supports. 1.51 A ) Size 6 Mm Or 1 / 4 Od Mr. 50.0 1.52 B ) Size 10 Mm Od Mr. 40.0 1.6 I-3.2. Laying, Clamping, Supporting And Testing Of Pvc Covered Single Copper Tubing Complete With Fittings And Connections, On Trays / Angles / Ducts. 1.61 A ) Size 6 Mm Or 1 / 4 Od Mr. 30.0 1.62 B ) Size 10 Mm Od Mr. 15.0 1.7 I-4.1. Removal Of S.S.Tubing And Necessary Clamps & Supports. 1.71 A ) Size 6 Mm Od Mr. 40.0 1.72 B ) Size 10 Mm Od Mr. 40.0 1.73 C ) Size 12 Mm Od Mr. 50.0 1.8 I-4.2. Laying, Clamping, Supporting & Testing Of Ss Tubings Complete With Fitting & Connections On Trays / Angles / Ducts. 1.81 A ) Size 6 Mm Od Mr. 250.0 1.82 B ) Size 10 Mm Od Mr. 150.0 1.83 C ) Size 12 Mm Od Mr. 250.0 1.9 I-5.1 Removal Of Multi-Polythene Tube Bundles Complete With Identification & Connections Etc. 1.91 A ) Size 7 Core Mr. 10.0 1.92 B ) Size 12 Core Mr. 5.0 2.1 I-6.1. Removal Of Steam Tracing Tubings Along With Fittings & Necessary Clamps, Supports And The Insulation . Mr. 100.0 2.2 I-6.2. Laying, Clamping, Supporting And Testing Of Steam Tracing Tubing Complete With Fittings, Connections And Fixing Of Steam Traps, Stainers And Valves. Mr. 100.0 3 I-7.1 Removal Of Instrument Mounting Pipe Stanchions . 3.1 A ) L Type No. 15.0 3.2 B ) T Type No. 15.0 4 I-7.2. Fabriction And Installation Of Pipe Stanchion As Per Standards, For Mounting Of Instruments Including Cutting / Welding Jobs. 4.1 A ) L Type No. 30.0 4.2 B ) T Type No. 50.0 5 I-8.1. Removal Of Mainfolds And Necessary Clamps & Supports 5.1 A ) Pressure Gauge No. 5.0 5.2 B ) D / P Transmitter No. 5.0 5.3 C ) Pressure Switch No. 5.0 5.4 D ) Draft Gauge No. 5.0 6 I-8.2. Fabriction, Erection And Testing Of Manifolds As Per Standards Including Cutting / Welding Jobs. 6.1 A ) Pressure Gauge No. 5.0 6.2 B ) D / P Transmitter No. 5.0 6.3 C ) Pressure Switch No. 5.0 6.4 D ) Draft Gauge No. 5.0 7 I-9.1. Removal Of Shielded / Unshielded, Electrical / Thermocouple Cables Including Cutting Of Clamps Etc. 7.1 A ) Size 2 X 1.5 Sq Mm Armoured Mr. 1500.0 7.2 B ) Size 3 X 1.5 Sq Mm Armoured Mr. 300.0 7.3 C ) Size 4 X 1.5 Sq Mm Armoured Mr. 50.0 7.4 D ) Size 24 X 1.5 Sq Mm Armoured Mr. 200.0 8 I-9.2. Laying, Clamping, Testing, Identification And Connection Of Sheilded / Unshielded Electrical / Thermocouple Cables On Trays / Angles / Ducts / Trenches . 8.1 A ) Size 2 X 1.5 Sq Mm Armoured Mr. 1500.0 8.2 B ) Size 3 X 1.5 Sq Mm Armoured Mr. 1000.0 8.3 C ) Size 4 X 1.5 Sq Mm Armoured Mr. 100.0 8.4 D ) Size 7 X 1.5 Sq Mm Armoured Mr. 150.0 8.5 E ) Size 12 X 1.5 Sq Mm Armoured Mr. 140.0 8.6 F ) Size 24 X 1.5 Sq Mm Armoured Mr. 1000.0 9.1 I-10.1. Removal Of Control Panel, With Instruments, Including Necessary Cutting Of Associated Structures ( Measurement Will Be As Per Panel Front - Area ) Sq.Mr. 6.0 9.2 I-10.2. Installation Of Control Panels, Without Inst., Including Erection Of Associated Structures ( Measurement Will Be As Per The Front Area Of Panel ) Including Cutting / Welding Jobs. Sq.Mr. 6.0 10 I-11.1. Removal Of Angle Iron / Perforated Trays Including Cutting Of Clamps And Supports. This Includes Lifting Of Existing Cables / Tubes, Wherever Required . 10.1 A ) Trays Size Upto 50 Mm Wide Mr. 150.0 10.2 B ) Trays Size Above 50 Mm Upto 100 Mm Wide Mr. 100.0 10.3 C ) Trays Size Above 100 Mm Upto 150 Mm Wide Mr. 100.0 10.4 D ) Trays Size Above 150 Mm Upto 200 Mm Wide Mr. 70.0 10.5 E ) Trays Size Above 200 Mm Upto 300 Mm Wide Mr. 50.0 10.6 F ) Angle Iron Size Upto 25 Mm Mr. 10.0 10.7 G ) Angle Iron Size Above 25 Mm Upto 50 Mm Mr. 20.0 11 I-11.2. Erection, Laying, Supporting Of Angle Iron / Perforated Trays Including Clamping Of Existing Cables / Tubes, Including Cutting / Welding Jobs. 11.1 A ) Trays Size Upto 50 Mm Wide Mr. 150.0 11.2 B ) Trays Size Above 50 Mm Upto 100 Mm Wide Mr. 100.0 11.3 C ) Trays Size Above 100 Mm Upto 150 Mm Wide Mr. 100.0 11.4 D ) Trays Size Above 150 Mm Upto 200 Mm Wide Mr. 50.0 11.5 E ) Trays Size Above 200 Mm Upto 300 Mm Wide Mr. 50.0 11.6 F ) Angle Iron Size Upto 25 Mm Mr. 30.0 11.7 G ) Angle Iron Size Above 25 Mm Upto 50 Mm Mr. 50.0 11.8 H ) Channels Size Upto 100 Mm Mr. 10.0 12 I-12.1. Removal Of Junction Boxes Including Cutting Of Supports / Frame, If Required. 12.1 A ) Pneumatic Junction Box No. 3.0 12.2 B ) Pneumatic Controller Box No. 2.0 12.3 C ) Thermocouple Junction Box No. 10.0 12.4 D ) Electrical Junction Box No. 10.0 13 I-12.2. Installation Of Junction Boxes After Fabraction & Erection Of Proper Frame Including Termination Of Exisiting Tubes / Cables As Per Drawing Including Cutting / Welding Jobs. 13.1 A ) Pneumatic Junction Box No. 2.0 13.2 B ) Thermocouple Junction Box No. 7.0 13.3 C ) Electrical Junction Box No. 10.0 14.1 I-13.1. Panel ( Thickness Upto 5 Mm ) Cutting, With Well Finished Edges, For Installation Of Instruments. Sq.Cm 4000.0 14.2 I-13.2. Fabrication Of Surface Finished Ms Blank Plate ( Thickness Upto 5Mm ) For Fill Up Of Panel Cut Outs. ( Measurement Will Be As Per Front Area ) . Sq.Cm. 4000.0 15 I-14 Fabrication Of Hylum / Bakelite Sheet Board Upto 10 Mm Thickness, Including Mounting Of Relay, Relay Base, Toggle Switch, Fuse Holder, Lamp Holder, Elemax Terminals ( Measurement Will Be As Per Front Area ) . 15.1 A ) Size Upto 1000 Sq.Cms. No. 20.0 16 I-15 Drilling Of Lamp Holders / Push Buttons / Toggle Switch Holes Of Dia. Upto 30 Mm On Panel Sheet Thickness Upto 8Mm. No. 7.0 17 I-16 Fabrication Of Panel Board Of M.S. Sheet, Thickness Upto 3 Mm, With Angle Iron Supports For Mounting Of Gauges / Instruments Including Cut-Out As Per Drawings ( Measurement Will Be As Per Front Area ) . 17.1 A ) Area Upto 1000 Sq.Cm. No. 10.0 18 I-17 Fabriction & Erection Of Ms / Gi / Al Sheet Upto 3Mm Thick Cover / Canopy / Shade For Instruments, Including Supports, As Per Drawings ( Measurement Will Be As Per Front Area ) . Including Cutting / Welding Jobs. 18.1 A ) Size Upto 1000 Sq.Cm. No. 20.0 18.2 B ) Size Above 1000 Sqcm. But Upto 3000 Sqcm. No. 20.0 19 I-18 Welding Of Joints Of Impulse Pipe, Pipe Fittings, Flanges, Isolation Valves To Arrest Leakage. No. 40.0 20 Annexure-Ii Field Instrumentation Related Jobs. 21 Ii-1.1 Removal Of Solenoid Valves, Including Electric & Pneumatic Connections And Removal Of Associated Structures. 21.1 A ) Explosion Proof No. 40 21.2 B ) Non - Explosion Proof No. 40 22 Ii-1.2. Installation Of Solenoid Valves Including Electric & Pneumatic Connections And Supports. 22.1 A ) Explosion Proof No. 40 22.2 B ) Non - Explosion Proof No. 40 23 Ii-2.1. Removal Of On - Line Rotameters Including Accessories And Associated Structers, If Required. 23.1 A ) Direct Type Rotameter. No. 10 23.2 B ) Transmitter Type Rotameter No. 5 24 Ii-2.2. Installation Of On - Line Rotameters With Accessories And Proper Supporting. 24.1 A ) Direct Type Rotameter No. 10 24.2 B ) Transmitter Type Rotameter No. 5 24.3 C ) Glass Tube Rotameterfor Chlorination System No. 3 25.1 Ii-3.1. Removal Of Mass / Turbine Flow-Meter / Ultrasonic Flow Meter Including Electric Connections No. 3 25.2 Ii-3.2. Installation Of Mass / Turbine Flow Meter / Ultra Sonic Flow Meter Including Electric Connections No. 3 26 Ii-4.1. Removal Of Orifice Plate, Venturi , Flow Nozzle Etc From Pipe Line. Total Of Annexure-I ( Without Gst ) 26.1 A ) For Pipe Line Size Upto 8 And Pressure Rating Upto 600# No. 4 27 Ii-4.2. Installation Of Orfice Plate, Venturi , Flow Nozzle Etc In Pipe Line. 0 27.1 A ) For Pipe Line Size Upto 8 And Pressure Rating Upto 600# No. 4 28 Ii-5.1. Removal Of Control Valves Along With Accessories From The Pipe Line / Bonnet. 28.1 A ) Size Upto 3 And Pressure Rating Upto 600#. No. 80 29 Ii-5.2. Installation And Testing Of Control Valves On Supports Alongwith Mounting Of Accessories. 29.1 A ) Size Upto 3 And Pressure Rating Upto 600#. No. 80 30.1 Ii-6.1. Removal Of Power Cylinder With Accessories Including Removal Of Air Connections And Supports Etc. No. 150 30.2 Ii-6.2. Mounting Of Power Cylinder With Accessories Including Provision Of Air Connections And Supports Etc. No. 150 31.1 Ii-7.1. Removal Of Control Valve Accessories. No. 10 31.2 Ii-7.2 Installation Of Control Valve Accessories No. 10 32.1 Ii-8.1. Removal Of Limit Switches Including Electrical Connections & Supports Etc. No. 10 32.2 Ii-8.2. Installation Of Limit Switches Including Glanding, Electrical Connections & Supports Etc. No. 10 33 Ii-9 Replacement Of Actuator Diaphragm Of Dopo / Dopc Valves Including Leak & Stroke Check Etc. 33.1 A ) Size Upto 2 No. 40 33.2 B ) Size Above 2 & Upto 4 No. 30 33.3 C ) Size Above 4 & Upto 6 No. 30 34 Ii-10 Replacement Of Bottom Diaphragms & Air Sealing O Rings Of Dopo / Dopc Valves Including Stroke & Leak Check Etc. 34.1 A ) Size Upto 2 No. 40 34.2 B ) Size Above 2 & Upto 4 No. 30 34.3 C ) Size Above 4 & Upto 6 No. 30 35 Ii-11.1. Removal Of Level Gauges Including Drain Valves Etc. 35.1 A ) Above 600 # Pressure Rating No. 12 35.2 B ) Below 600 # Pressure Rating No. 12 35.3 C ) Tubular Type No. 6 35.4 D ) Magnetic Type No. 2 36 Ii-11.2. Installation Of Level Gauges Including Drain Valves Etc. 36.1 A ) Above 600 # Pressure Rating No. 15 36.2 B ) Below 600 # Pressure Rating No. 20 36.3 C ) Tubular Type No. 5 36.4 D ) Magnetic Type No. 2 37 Ii-12.1. Removal Of Level Switch Including Cable Glands & Connections Etc. 37.1 A ) Magnetic Type No. 5 37.2 B ) Direct Mounted Float Type No. 5 38 Ii-12.2. Installation Of Level Switch Including Mountings, Glanding And Electric Connections Etc. 38.1 A ) Magnetic Type No. 5 38.2 B ) Direct Mounted Float Type No. 5 39 Ii-13.1. Removal Of Level Indicator / Transmitter / Controller Alongwith Accessories, Elect. / Pneumatic / Process Connection Etc. 39.1 A ) Float & Tape Type Including Float Guide, Wire, Pulleys, Taps & Piping Etc., If Required. No. 2 39.2 B ) D / P Transmitter Including Purge Pipe. No. 5 39.3 C ) Displacement Type Including Float Chamber. No. 20 39.4 D ) Level Transmitter Radar Type With Cage Assembly. No. 5 40 Ii-13.2. Installation Of Level Indicator / Transmitter / Controller Alongwith Accessories Elect. / Pneumatic / Process Connections Etc. 40.1 A ) Float & Tape Type Including Float Guide, Wire, Pulleys, Taps & Piping Etc., If Required. No. 2 40.2 B ) D / P Transmitter Including Purge Pipe. No. 4 40.3 C ) Displacement Type Including Float Chamber. No. 20 40.4 D ) Level Transmitter Radar Type With Cage Assembly. No. 5 41.1 Ii-14.1. Removal Of Electrical Speed Indicator From The Panel, Including Electrical Connections. No. 1 41.2 Ii-14.2. Installation Of Electrical Speed Indicator On The Panel, Including Electric Connections. No. 1 42 Ii-15.1. Removing Of Pressure / Vacuum / Differtional Pressure / Receiver Gauges With Or Without Snubbers. 42.1 A ) Without Siphon No. 150 42.2 B ) With Siphon No. 10 43 Ii-15.2. Installation Of Pressure / Vacuum / Differtional Pressure / Receiver Gauges With Or Without Snubbers As Per Schedule. 43.1 A ) Without Siphon No. 150 43.2 B ) With Siphon No. 10 44 Ii-16.1. Removal Of Diaphragm Seal Pressure / Differential Pressure Gauges. 44.1 A ) Direct Mounting Type No. 25 44.2 B ) With Ss Capillary No. 10 45 Ii-16.2. Installation Of Diaphragm Seal Pressure / Differential Pressure Gauges. 45.1 A ) Direct Mounting Type No. 25 45.2 B ) With Ss Capillary With Proper Laying & Clamping. No. 10 46 Ii-17.1. Removal Of Temperature Gauges. 46.1 A ) Rigid Stem Type No. 5 46.2 B ) With Capillary Including Removal Of Clamps No. 1 46.3 C ) With Screwed Thermowell No. 2 46.4 D ) With Flanged Thermowell No. 2 47 Ii-17.2. Installation Of Temperature Gauges. 47.1 A ) Rigid Stem Type No. 5 47.2 B ) With Capillary Including Removal Of Clamps No. 1 47.3 C ) With Screwed Thermowell No. 2 47.4 D ) With Flanged Thermowell No. 2 48 Ii-18.1. Removal Of Local Switches Alongwith Electrical Connections Etc. 48.1 A ) Pressure No. 5 48.2 B ) Temperature No. 5 49 Ii-18.2. Installation Of Local Switches Including Support & Connections. 49.1 A ) Pressure No. 5 49.2 B ) Temperature No. 5 50 Ii-19.1 Removal Of Pressure Transmitter Alongwith Electrical / Pneumatic Connections Etc. 50.1 A ) Diaphragm Seal Type With Capillary No. 10 50.2 B ) Pressure & Vacuum Transmitter No. 50 51 Ii-19.2 Installation Of Pressure Transmitter Alongwith Electrical / Pneumatic Connections Etc. 51.1 A ) Diaphragm Seal Type With Capillary No. 10 51.2 B ) Pressure & Vacuum Transmitter No. 50 52 Ii-20.1. Removal Of Flow Transmitter Alongwith Electrical / Pneumatic Connections Etc. 52.1 A ) Ultra - Sonic Type No. 2 52.2 B ) Diaphragm Seal D.P.Transmitter No. 20 52.3 C ) Differential Pressure Transmitter No. 30 53 Ii-20.2. Installation Of Flow Transmitter Alongwith Electrical / Pneumatic Connections Etc. 53.1 A ) Ultra - Sonic Type No. 2 53.2 B ) Diaphragm Seal D.P.Transmitter No. 20 53.3 C ) Differential Pressure Transmitter No. 30 54.1 Ii-21.1. Removal Of Mercury Filled Temperature Transmitter With Capilary And Other Accesseries. No. 2 54.2 Ii-21.2. Installation Of Mercury Filled Temperature Transmitter With Capilary And Other Accesseries. No. 2 55 Ii-22.1. Removal Of Electronic Instruments Including Electrical / Pneumatic Connection Etc. 55.1 A ) I / P Converters No. 15 55.2 B ) P / I Converters No. 5 56 Ii-22.2. Installation Of Electronic Instruments Including Electrical / Pneumatic Connection Etc. 56.1 A ) Flow Transducer No. 1 56.2 B ) I / P Converters No. 15 56.3 C ) P / I Converters No. 5 57.1 Ii-23.1. Removal Of Receving Indicating Controller Alongwith Electric / Pneumatic Connections Etc. No. 3 57.2 Ii-23.2. Installation Of Receving Indicating Controller Alongwith Electric / Pneumatic Connections Etc. No. 3 58 Ii-25.1. Removal Of Temperature Indicator / Recorder / Scanner Including All Connections. 58.1 A ) Single Point No. 2 58.2 B ) Multi Points No. 2 59 Ii-25.2. Installation Of Temperature Indicator / Recorder / Scanner Including All Connections. 59.1 A ) Single Point No. 2 59.2 B ) Multi Points No. 2 60.1 Ii-26.1 Removal Of Alarm Annunciators Including All Connections. No. 2 60.2 Ii-26.2 Installation Of Alarm Annunciators Including All Connections. No. 5 61.1 Ii-27.1. Removal Of Air Filter Regulator Including Necessary Supports & Connections. No. 150 61.2 Ii-27.2. Installation Of Air Filter Regulator Including Necessary Supports & Connections. No. 150 62 Ii-28.1. Removal Of Thermowell Assembly. 62.1 A ) Screwed Type No. 10 62.2 B ) Flanged Type No. 20 63 Ii-28.2. Installation Of Thermowell Assembly. 63.1 A ) Screwed Type No. 10 63.2 B ) Flanged Type No. 20 64.1 Ii-29.1 Removal Of Oilers Including Necessary Supports & Connections From Inst. Air Lines. No. 20 64.2 Ii-29.2 Installation Of Oilers Including Necessary Supports & Connections For Inst. Air Lines. No. 20 65.1 Ii-30.1 Removal Of Vortex Flowmeter / Mass Flowmeters / Magnetic Flow Meter With Integral / Remote Electronic Unit. No. 4 65.2 Ii-30.2 Installation Of Vortex Flowmeter / Mass Flowmeters / Magnetic Flow Meter With Integral / Remote Electronic Unit. No. 4 66.1 Ii-31.1 Removal Of Ph. Meter With Electronics & Elect Connections. No. 25 66.2 Ii-31.2 Installation Of Ph. Meter With Electronics & Elect. Connections. No. 25 67.1 Ii-32.1 A ) Removal Of Conductivity Meter With Cell & Connection No. 3 67.2 B ) Removal Of Conductivity Cell & Connection. No. 3 67.3 Ii-32.2 A ) Installation Of Conductivity Meter With Cell & Connection No. 3 67.4 B ) Installation Of Conductivity Cell & Connection. No. 3 68.1 Ii-33.1 Removal Oftemperature Transmitter Alongwith Electrical / Pneumatic Connections Etc. No. 20 68.2 Ii-33.2 Installation Of Temperature Transmitter Alongwith Electrical / Pneumatic Connections Etc. No. 20 69.1 Ii-34.1 Removal Of Hydrastep With Electrical Connections No. 3 69.2 Ii-34.2 Installation Of Hydrastep With Electrical Connections No. 3 70.1 Ii-35.1 Removal Of Hydrastep Electrodes No. 30 70.2 Ii-35.2 Installation Of Hydrastep Elctrodes No. 30 71.1 Ii-36.1 Removal Of Gc / Analysers No. 10 71.2 Ii-36.2 Fixing Of Gc / Analysers No. 10 73.1 Ii-37.1 Removal Of Gas Detectors No. 25 73.2 Ii-37.2 Fixing Of Gas Detectors No. 25 74.1 Ii-38.1 Removal Of Proximity Probes / Proximity Switches No. 25 74.2 Ii-38.2 Fixing Of Proximity Probes / Proximity Switches No. 25 75 Total Of Ann-Ii ( Without Gst ) Annexure-Iii Assistance In Execution Of Jobs For The Year 2023-24. Description Unit Quantity Min. Wage As Per Govt. Rate Epf 12% Esic 3.25% Bonus 8.33% Punjab Welfare Fund 0.4% ( Max. Rs. 50.00 Per Month ) Total Rate ( Excluding Service Charges & Gst ) Total Rate Per Manday Including Service Charge But Excluding Gst ( G+H ) Total Quoted Value Including Service Charge But Excluding Gst ( A*I ) I J In Figures In Words 75.1 Iii-1-A Skilled Manpower For Welding Jobs. Mandays 50.0 695.00 83.40 22.59 57.89 1.92 860.80 75.2 Iii-1-B Unskilled Manpower. Mandays 4100.0 494.00 59.28 16.06 41.15 1.92 612.41 75.3 Iii-1-C Skilled Manpower For Rigging Jobs . Mandays 40.0 695.00 83.40 22.59 57.89 1.92 860.80 75.4 Iii-1-D Skilled Manpower For Inst. Maintenance Jobs. Mandays 1600.0 695.00 83.40 22.59 57.89 1.92 860.80 75.5 Iii-1-E Semi Skilled Manpower For Inst. Maintenance Jobs. Mandays 600.0 577.00 69.24 18.75 48.06 1.92 714.97 75.6 Iii-1-F Extra Man Hours For Skilled Manpower Hours 433.0 173.75 0.00 5.65 0.00 0.00 179.40 75.7 Iii-1-G Extra Man Hours For Semi-Skilled Manpower Hours 166.0 144.25 0.00 4.69 0.00 0.00 148.94 75.8 Iii-1-H Extra Man Hours For Un Skilled Manpower Hours 1025.0 123.50 0.00 4.01 0.00 0.00 127.51

Key Value

Document Fees
INR 750 /-
EMD
INR 50000.0 /-
Tender Value
INR 56.18 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail