| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:Edges of slabs and breaks in floors and walls under 20 cm wide |
| 11 | 12mm Cement plaster finished with a floating coat of neat cement of mix 1 : 3 ( 1 cement : 3 fine sand) |
| 12 | 15mm Cement plaster finished with a floating coat of neat cement of mix 1 : 4 ( 1 cement : 4 fine sand) |
| 13 | Carriage of cement by an average lead of 15 Km by MT |
| 14 | Carriage of sand by an average lead of 55 Km by MT |
| 15 | Carriage of Aggregate by an average lead of 55 Km by MT |
| 16 | Carriage of steel by an average lead of 15 Km by MT |
| 17 | Add cost of sign Board |