| 1 | Supply of The Line Material as per Relevent ISS :- |
| 2 | Nut & Bolt with Washer |
| 3 | 33 KV Cable Jointing Kit O/D |
| 4 | MS Droper Chanel |
| 5 | Stone Pad |
| 6 | Top Chanel |
| 7 | Holding Clamp for Top Chanel |
| 8 | MS T off Chanel |
| 9 | Danger Board |
| 10 | Protection Board for Power TF |
| 11 | Tripping Coil for VCB |
| 12 | 33 KV Jointing Kit Straight Thourgh |
| 13 | Base Angle |
| 14 | Erection Work :- |
| 15 | Safe carriage of line material from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 16 | Safe carriage of 11 KV XLPE Cable 3x120 sqmm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 17 | Safe carriage of 33 KV VCB from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 18 | Safe Carriage of 9/8.5 Mtr Long PCC Pole from Electricty store center Etah/nearest 33/11 KV S/S to direect Pit site in distance range 0 to 60 Kms.Including loading and unloading at both side |
| 19 | Safe Carriage of following TF from Electricty store center Etah/nearest 33/11 KV S/S to direect Pit site in distance range 0 to 60 Kms.Including loading and unloading at both side. |
| 20 | (a) 25/63 KVA TF |
| 21 | (b) 100 KVA TF |
| 22 | Erection of 9 mtr long PCC Pole as single support including fixing of HT/LT accessories etc and other work complete as per RESPO norms. |
| 23 | Erection of 8.5 mtr long PCC Pole as Double Pole/Section Pole including fixing of HT/LT accessories with TPMO etc and other work complete as per RESPO norms. |
| 24 | Dismantling and removal of existing ACSR Dog conductor conductor from the various area, stacking and placement their coils and their in the safer place including cost of lobour T&P etc. required for proper completion of work. |
| 25 | Laying sagging stringing, binding, jumpering & fixing of all accessories etc of following conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work. |
| 26 | (a) ACSR Dog Conductor |
| 27 | (b) 11 KV XLPE Cable 3x120 sqmm |
| 28 | Re-sagging of looseWeseal/Dog conductor as per direction of supervising engineer. It includes the cost of labour, T & P carrier etc required for proper completion of work. |
| 29 | Stone Pad |
| 30 | Earthing Complete |
| 31 | 33 KV Cable Jonting Kit O/D |
| 32 | 33 KV Cable Jonting Kit Straight Through |
| 33 | Danger Board with clamp |
| 34 | Power Board Power TF |
| 35 | Tripping Coil for VCB |
| 36 | 33 KV Lighting Arrestor |
| 37 | 33 KV VCB 800 Amp, 750 MVA |
| 38 | Erection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 39 | Mounting of following TF on Double Pole including making of the connection etc. complete. |
| 40 | (a) 25/63 KVA TF |
| 41 | (b) 100 KVA TF |
| 42 | Any other material/consumable required to complete the work shall be arrange by the contractor at his own cost. |
| 43 | Carriage of line material (Scrap) from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking. |
| 44 | (a) ACSR Dog Conductor |
| 45 | (b) 100 KVA TF |