Supply Of 1.1Kv Aeiral Bunched Cable With Accessories And Constructing 13750 Mtr Of Lt Overhead Line With Abc Of Size 3X 70 Sqmm X 1X16 Sqmm X50 Sqmm On Existing Psc Pole By Replacing Existing Oh Line On Turkey Basis At Different Locations Under Electrica
Tender Overview
Project Description
Supply Of 1.1Kv Aeiral Bunched Cable With Accessories And Constructing 13750 Mtr Of Lt Overhead Line With Abc Of Size 3X 70 Sqmm X 1X16 Sqmm X50 Sqmm On Existing Psc Pole By Replacing Existing Oh Line On Turkey Basis At Different Locations Under Electrical Sub Division, Koratty
BOQ
| Sl. No. | Item Description |
| 1 | Aerial Bunched Cable LT 3x70 + 1x16 + 1x50 sq.mm (Insulated Messenger) |
| 2 | Anchor / Dead End Clamp for AB Cables 70 sq.mm |
| 3 | Suspension Clamp for AB Cables 70 sq.mm |
| 4 | Cable Tie UV Plast Heavy Duty 300 mm |
| 5 | End Cap for LT ABC 70 Sq mm |
| 6 | End Cap for LT ABC 50 Sq mm |
| 7 | End Cap for LT ABC 16 Sq mm |
| 8 | Insulation Piercing Connector - Main: 16 sq mm to 95 sq mm; Tap : 1.5 sq mm to 16 sq mm |
| 9 | Insulation Piercing Connector - Main: 16 sq mm to 95 sq mm; Tap : 16 sq mm to 95 sq mm |
| 10 | PIERCING CONNECTOR for ABC TO ABC (TEE CONNECTION) |
| 11 | Post mounting Distribution box for effecting LT service connection |
| 12 | Stainless Steel Strap [20 mm x 0.7 mm] |
| 13 | Stainless Steel Buckle Slot width 20.5 mm x 1.5 mm,Thickness 1.2 mm. |
| 14 | Earth Connector 95 Sqmm |
| 15 | Pre-Insulated Midspan Joints and Terminal Lugs 70 Sq.mm |
| 16 | Pre-Insulated Midspan Joints and Terminal Lugs 50 Sq.mm |
| 17 | Pre-Insulated Midspan Joints and Terminal Lugs 16 Sq.mm |
| 18 | Satellite connector – Main : 16 sq mm to 95 sq mm; Tap : 1.5 sq mm to 35 sq mm (4 way) |
| 19 | Cable 1.1 kV PVC AL 4c x25 sq mm (Un Armoured) |
| 20 | INSULATION TAPE for ABC |
| 21 | Insulation Piercing Satellite connector – Main : 16 sq mm to 95 sq mm; Tap : 4 sq mm to 50 sq mm (4 way) |
| 22 | Cable Tie UV Plastic Heavy Duty 500 mm Length |
| 23 | Insulation Piercing Connector Main 16 sq mm to 95 sq mm; Tap 4 sq.mm to 35 sq.mm |
| 24 | Insulation Piercing Connector - Main: 16 sq mm to 95 sq mm; Tap : 16 sq mm to 95 sq mm |
| 25 | IPC FOR ABC 3X95+1X70+1X16 Tap 1.5-10 sqmm |
| 26 | Stainless Steel Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm. |
| 27 | Stainless Steel Strap 10 mm x 0.7 mm-For clamping earth wire |
| 28 | Insulation Piercing Connector Main 16 sq mm to 95 sq mm; Tap 4 sq.mm to 50 sq.mm |
| 29 | Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) |
| 30 | Ferrules 5 Sq.mm(GI) |
| 31 | Earthing Coil GI 115 Turns 50 mm internal Dia dia |
| 32 | G.I.WIRE. 4MM (8 SWG) |
| 33 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 34 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 35 | Erection of suspension clamp for LT ABC of any size |
| 36 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 37 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 38 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap : 4-35 sqmm |
| 39 | Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections |
| 40 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 41 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 42 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 43 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 44 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 45 | Providing End Caps |
| 46 | Providing Cable Tie |
| 47 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender