| 1 | Material |
| 2 | Stay Clamp For ST Pole SP- 21/10 Of Size 50x6 sqmm duly red oxide painted with suitable size with fitted Nut and Bolts and washer as per specification of UPCL |
| 3 | MS Half Clamp For LT DB For ST Pole SP- 21/10 Of Size 25x3 sqmm duly red oxide painted with suitable size with fitted Nut and Bolts. |
| 4 | 3 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm |
| 5 | 1 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm |
| 6 | Insulated piercing connector size 70-70/35-35 sqmm for line to line tapping |
| 7 | Insulated piercing connector size 70/35 sqmm to 16 sqmm for energising disribution box |
| 8 | Dead End Clamp With I Hook.(Insulated) |
| 9 | Suspension Clamp With I Hook.(Insulated) |
| 10 | LT Wire Neutral Connector PG Clamp 50/25-25sqmm single bolt as per UPCL specificationfor energising distribution box |
| 11 | LT Wire Neutral Connector PG Clamp 50-50/25-25sqmm single bolt as per UPCL specification for line to line tapping |
| 12 | Head shink type end caps suitable for LT ABC |
| 13 | Lug size 16 Sqr Mm |
| 14 | Lug size 50 Sqr Mm |
| 15 | 1x16 sq mm XLPE insulated Al. Cable for energising the distribution boxes |
| 16 | 1x50 sq mm XLPE insulated Al. Cable for energising the distribution boxes |
| 17 | LT AB Cable 3x70+1x50 Sqr mm |
| 18 | LT AB Cable 3x35+1x25 Sqr mm |
| 19 | LT AB Cable 1x35+1x25 Sqr mm |
| 20 | Holding clamp for J-hook |
| 21 | Mid span Joint |
| 22 | Various type Nut and Bolt. |
| 23 | Labour |
| 24 | Cartage of ST Pole SP-21 pole from Store Centre Kotdwar/Risikesh/Dehradun to Work Site with Stacking site in 1Km Distance Including Loading & unloading (distance 5kms-225 kms) |
| 25 | ST Pole SP-21 |
| 26 | ST Pole SP-10 |
| 27 | Head Load Cartage of ST Pole SP-21 From Road Site to work site distance approx 3.0 km By Man Power |
| 28 | ST Pole SP-21 |
| 29 | ST Pole SP-10 |
| 30 | Cartage of small Line material from Store Centre Dehradun /Kotdwar to road Side Including loading & unloading (distance 5kms-2225 kms) |
| 31 | Head Load Cartage of Road Site to work site distance approx 3.0 km By Man Power |
| 32 | LT AB Cable 3x70+1x50 Sqr Mm |
| 33 | LT AB Cable 3x35+1x25 Sqr Mm |
| 34 | LT AB Cable 1x35+1x25 Sqr Mm |
| 35 | Erection charge of ST Pole SP-21/10 pole in long span as per UPCL norms |
| 36 | ST Pole SP-21 |
| 37 | ST Pole SP-10 |
| 38 | Fixing and Grouting of stay Complete Work |
| 39 | Removing & Reconnection of Single phase/Three phase LT Consumer Service Connection |
| 40 | Painting of poles |
| 41 | ST Pole SP-21 |
| 42 | ST Pole SP-10 |
| 43 | Dismantling of Old ACSR weasel Conductor from existing LT line including Re Rolling cartage from worksite to JE Store after Head Load cartage from different site. |
| 44 | LT line 3 Phase 4 Wire |
| 45 | LT line 2 Phase 3 Wire |
| 46 | LT line 1 Phase 2 Wire. |
| 47 | Head load cartage of dismantled old ACSR Weasel Conductor from work site to road side |
| 48 | Back cartage of dismantled old ACSR Weasel Conductor from JE Store to Rishikesh store |
| 49 | Laying stringing and sagging of AB cable including fixing of piercing Connector, dead end clamp with I hook, suspension clampsinall complete work. |
| 50 | LT AB Cable 3x70+1x50Sqr Mm |
| 51 | LT AB Cable 3x35+1x25 Sqr Mm |
| 52 | LT AB Cable 1x35+1x25 Sqr Mm |
| 53 | Laying and fixing of 1x16/25 sq mm XLPE insulated Al. Cable for energising the distribution boxes |
| 54 | Installation of LT Distribution Box complete work Three Phase |
| 55 | Installation of LT Distribution Box complete work One Phase |
| 56 | Lopping chopping of tree Branches |
| 57 | Fixing of Holding clamp and stay clamp |
| 58 | Fixing of Nuts and Bolts |
| 59 | Straightening of tilted pole |
| 60 | Fixing of Aluminium Lugs |
| 61 | Fixing of Aluminium Lugs |