|
| 1 | Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki / JE Store to site of work. |
| 2 | PCC Pole 8.5 |
| 3 | 11kv Pin Insulator . |
| 4 | 11kv Disc Insulator . |
| 5 | Top Channel 11 kv |
| 6 | T-off Channel 11 kv |
| 7 | Sub-Station Base Angle |
| 8 | MS Earthing Rod |
| 9 | Transformer 63 KVA |
| 10 | Transformer 100KVA |
| 11 | Transformer 250 KVA |
| 12 | Transformer 400KVA |
| 13 | Transformer 25 KVA |
| 14 | ABC Cable 3x50 SQ. MM. |
| 15 | ACSR Weasal Conductor |
| 16 | Stay Set Complete |
| 17 | Other line material |
| 18 | Safe carriage inclunding unloading proper stacking from store center barabanki to dump store of work site for maximum uto 1 to 6 no . PCC/STP Poleas senction estimate (pole quantity less then full capacity of carriar vehicle bot carriage chargeses will be paid as per full capacity in a job.) |
| 19 | Dragging of pole from JE Dump Store to site |
| 20 | Concreating and pilinthing of ST& PCCPole 18x24 CM. |
| 21 | Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, thumble turn buckle andstay insulate etc. digging of pit of size of size 0.4x0.6x1.6 m for grouting 1:3:6 cement concrete, with stay of size 7/8 SWG, nuzzling & Grouting. |
| 22 | Stringing and sagging of 11 KV line with ACSR Weasal Conductor including nuzzling binding and jumpering (weasal conductor will be provided by the department) |
| 23 | Errectionof Substation type double pole with PCC Pole 8.5 Mtr. Long including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt 33/11 KV line including grouting of support and plinthing 300 mm above ground level, fitting of 33/11 KV pin & Pin insulator. 1/6 of total lenght of poles will remain under the ground and planted on stone pad of Size 300x300x75 MM. |
| 24 | Earthing of pole with MS Earthing. |
| 25 | Stringing and Sagging of LT 3x50 ABC Cable (LT ABC Cable will be provided by the department) |
| 26 | Fabricate with hole suitable size in steel items, receive from central store lightas top channel/dropper channel sub station base angle etc. |
| 27 | Installation of Mounting of Following capacityof Transformer including its connection between 11 KV and LT Line mounting of copper L-Pieces, provinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor) |
| 28 | Munting of 63 KVA Tranformer |
| 29 | Munting of 100 KVA Tranformer |
| 30 | Munting of 250 KVA Tranformer |
| 31 | Munting of 400 KVA Tranformer |
| 32 | Munting of 25 KVA Tranformer |
| 33 | Providingof various type materials. All materials shall be supplied by the contractor. |
| 34 | Nut & Bolt |
| 35 | Clamp for Top/ Dropper and T-off Channel etc. |
| 36 | Fixing of various type materials. All T& P and Labour will be provided by the contractor. |
| 37 | Nut & Bolt |
| 38 | Clamp for Top/ Dropper and T-off Channel etc. |
| 39 | Wiremessfencing of 11/0.4 KVS/S shall be made of rectangular of size as per site requirement not exceeding 3 meter fabrication 45x45x5 mm angle the frame is also have 1 no. Horizontal runner of MS flat 40x5 welded in middle to support of wire mess. Rectangular welded type wire mess of size 50x25 made of 12 S.W.G. wire mess shall be welded all along the periphery of theframe as well as on horizontal runner to give extra strength of welding to wire mess welded on the frame. Diagonal bracing of all the frame panel will be welded with MS flat of size 25x3mm to support as per RESPO specification & direction of E/I |
| 40 | Construction of T/F Plinth of size 2x2x1.5 mtr with first class brick and Massionary work in the ratio 1:4 cement and core sand with RCC top 20 mm 1:2:2cement sand & core sand stone grit with 20 Mm MS bar and MS Channel for resting of T/F. |
| 41 | Earthing of T/F Pipe type with 40 fit deep borring and providing GI Pipe 1.5\" dia (60 fit GI Pipe) and GI strip 25x5 mmx6 meter long attached with clamps, L piece, nut & bolts and GI Pipe Cap. All material shall be supplied by the contractor. |
| 42 | Dismentaling of 10/16/25/63/100/250 KVA T/F & Carriage site to store |
| 43 | Dismentaling& Shifting of 250 KVAT/F |
| 44 | Other line work |